CN114049086A - Engineering project management system based on big data - Google Patents
Engineering project management system based on big data Download PDFInfo
- Publication number
- CN114049086A CN114049086A CN202111350547.0A CN202111350547A CN114049086A CN 114049086 A CN114049086 A CN 114049086A CN 202111350547 A CN202111350547 A CN 202111350547A CN 114049086 A CN114049086 A CN 114049086A
- Authority
- CN
- China
- Prior art keywords
- project
- module
- personnel
- information
- management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012544 monitoring process Methods 0.000 claims abstract description 32
- 238000000034 method Methods 0.000 claims abstract description 11
- 238000010276 construction Methods 0.000 claims description 9
- 238000013475 authorization Methods 0.000 claims description 7
- 238000004891 communication Methods 0.000 claims description 4
- 238000012545 processing Methods 0.000 claims description 4
- 230000002354 daily effect Effects 0.000 claims description 3
- 230000003203 everyday effect Effects 0.000 claims description 3
- 230000010354 integration Effects 0.000 claims description 2
- 238000013480 data collection Methods 0.000 claims 1
- 238000010586 diagram Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008094 contradictory effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/109—Time management, e.g. calendars, reminders, meetings or time accounting
- G06Q10/1091—Recording time for administrative or management purposes
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Data Mining & Analysis (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a project management system based on big data, which comprises a permission management module and a control module, wherein the control module comprises a project progress early warning module and an information module, the project progress early warning module is used for analyzing the project progress to generate early warning information, the project progress early warning module comprises a project progress expectation module and a project data acquisition module, the information module is used for monitoring and managing a project site, the on-duty distribution of personnel and the working state of the personnel in real time, and the information module comprises a screen monitoring module, a personnel management module and an information sharing module. The project management system can timely master the condition of the whole project through the authority management module, realizes the control of the basic project implementation process and the information acquisition and sharing, thereby realizing the stable operation of a big data platform, facilitating the master of the problems existing in the project progress through the personnel management module, improving the project progress and the project management level, and realizing the dynamic management of the project.
Description
Technical Field
The invention relates to a project management system, in particular to a project management system based on big data.
Background
The project management system is system software which is applied by a project manager to specially manage projects, and effectively manages all work related to the projects by applying viewpoints, methods and theories of the system under the constraint of limited resources. The existing engineering admiration has the problems of large volume, short construction period, multiple process interlude, large personnel flow and the like, has multiple variation factors in engineering project management, is complicated and complicated in management process, and relates to the coordination work of a plurality of departments in the construction process.
Disclosure of Invention
The invention aims to provide an engineering project management system based on big data, which can timely master the progress and change conditions of the whole project through an authority management module, realize the control of a basic project implementation process and information acquisition and sharing, thereby realizing the stable operation of a big data platform, carry out the schedule management on the expected schedule and the actual schedule of the project through a project schedule expectation module, can early warn and remind a direct responsible person, conveniently master the problems existing in the project schedule through a personnel management module and process the problems in time, can allocate personnel in time, improve the project schedule and the project management level, and realize the dynamic management of the project.
The purpose of the invention can be realized by the following technical scheme:
the project management system comprises a permission management module and a control module, wherein the control module comprises a project progress early warning module and an information module, and the project progress early warning module is used for analyzing the project progress to generate early warning information.
The project progress early warning module comprises a project progress expectation module and a project data acquisition module, the information module is used for carrying out real-time monitoring and management on a project site, personnel on-duty distribution and personnel working states, and the information module comprises a screen monitoring module, a personnel management module and an information sharing module.
Furthermore, the authority management module is used for authorizing and dynamically adjusting the management architecture, the posts and the personnel of the project management system based on the big data, and the control module is used for realizing the control of the basic project implementation process and the information acquisition and sharing.
Furthermore, the authority management module comprises a project information input module and an authorization module, wherein the project information input module is used for inputting employee information and position keywords, and the authorization module is used for performing authorized login according to the employee authority level limiting unit.
Further, the project progress expectation module comprises a project expectation completion database, a project material claiming module and a project material use management module, wherein the project expectation completion database is used for decomposing the estimation data of the expectation completion conditions of all branch projects in the project.
The project material application module is used for controlling a responsible person for material approval in time, and the project material use management module is used for carrying out progress management on the expected progress and the actual progress of project engineering according to the use condition of materials.
Further, the project data acquisition module is used for classifying data in the database by using historical data comparison, performing integrated arrangement, calculating according to the material usage amount, the actual usage amount and the residual materials acquired by personnel every day, and generating data corresponding to projects.
Furthermore, the video monitoring module comprises a key area monitoring unit, a real-time video conference unit, a fixed-point shooting unit and a safety performance monitoring unit.
The key area monitoring unit is used for respectively monitoring areas, the fixed-point shooting unit is used for recording construction conditions of an engineering site, and the safety performance monitoring unit is used for tracking and monitoring non-project personnel and vehicles around construction.
Furthermore, the personnel management module comprises a personnel attendance unit, a personnel work recording unit, a personnel problem feedback unit, a personnel information supervision unit and a personnel comprehensive learning unit.
The staff attendance unit is used for recording the daily attendance conditions of staff and managers, the staff information monitoring unit is used for counting the staff attendance conditions, tracking the work and sorting the problems fed back by the problem feedback unit for integration and analysis, and the staff problem feedback unit is used for mastering the problems existing in the engineering progress and timely processing the problems.
Furthermore, the information sharing module is a communication bridge of the engineering project management system, and is used for authorizing personnel who input information into the management module to log in and then transmitting documents, exchanging and intercommunicating, humanistic care, learning and drawing, and hiding and leaving messages in the suggestion box.
The invention has the beneficial effects that:
1. the project management system can timely master the progress and change conditions of the whole project through the authority management module, and realizes the control of the basic project implementation process and the information acquisition and sharing, thereby realizing the stable operation of a large data platform;
2. the project management system performs schedule management on the expected schedule and the actual schedule of the project through the project schedule expected module and can early warn and remind a direct responsible person;
3. the project management system of the invention is convenient for mastering the problems existing in the project progress and processing the problems in time through the personnel management module, can allocate personnel in time, improves the project progress and the project management level, and realizes the dynamic management of the project.
Drawings
The invention will be further described with reference to the accompanying drawings.
FIG. 1 is a block diagram of a project management system of the present invention;
FIG. 2 is a diagram of a personnel management module of the present invention;
FIG. 3 is a diagram of project progress expectation module of the present invention;
fig. 4 is a view of a video monitor module of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The project progress early warning module is used for analyzing project progress to generate early warning information, the project progress early warning module comprises a project progress expectation module and a project data acquisition module, the information module is used for monitoring and managing a project site, personnel on-duty distribution and personnel working states in real time, and the information module comprises a screen monitoring module, a personnel management module and an information sharing module.
The authority management module can authorize and dynamically adjust the management architecture, posts and personnel of the project management system based on big data, so that stable operation of a big data platform is realized, the control module is used for realizing control and information acquisition and sharing of a basic project implementation process, and the progress and change conditions of the whole project can be mastered in time.
The authority management module comprises a project information input module and an authorization module, the project information input module is used for conveniently and quickly finding a corresponding login end by storing and inputting employee information and inputting position keywords, and the authorization module is used for authorizing login according to the employee authority level limiting unit.
The project progress anticipation module comprises a project anticipation completion database, a project material claiming module and a project material use management module, as shown in fig. 3, the project anticipation completion database is used for decomposing the anticipation completion data of anticipation completion conditions of all branch projects in a project, node references are set according to days, weeks, months and quarters, the project material claiming module is used for controlling responsible persons for material approval in time and analyzing the influence of a collection box on the project progress according to claim data of materials, and the project material use management module can be used for carrying out progress management on the anticipation progress and the actual progress of the project according to the use conditions of the materials and can give an early warning and remind of direct responsible persons.
The project data acquisition module acquires project data from the historical database, performs integrated arrangement according to data classification in the database, eliminates contradictory data, performs integrated processing, inputs data corresponding to different requirements, and calculates material usage, actual usage and residual materials acquired by personnel every day, so as to generate data corresponding to projects, facilitate related personnel and departments to look up, and effectively reduce management and learning costs of management and staff.
The screen monitoring module comprises a key area monitoring unit, a real-time screen conference unit, a fixed-point shooting unit and a safety performance monitoring unit, as shown in fig. 4, the key area monitoring unit is used for respectively monitoring areas, the screen conference can be viewed in a certain area through the real-time screen conference unit, the problem in management is timely rectified, the screen conference can be viewed in all areas simultaneously, the fixed-point shooting unit is used for recording the construction condition of an engineering field, the management layer is convenient to patrol and manage, the safety performance monitoring unit is used for non-local project personnel around construction, and tracking and monitoring of vehicles.
The personnel management module comprises a personnel attendance unit, a personnel work recording unit, a personnel problem feedback unit, a personnel information monitoring unit and a personnel comprehensive learning unit, the personnel attendance unit is used for recording the daily attendance conditions of the personnel and the managers, as shown in fig. 2, the attendance checking condition is made into a form and sent to the staff information supervision unit, the staff work recording unit is used for recording the construction result of each day and the expected work arrangement effect of the next day, the staff information supervision unit is convenient for the comprehensive evaluation and analysis of staff, the staff information supervision unit is used for counting the attendance checking condition of the staff, performing work tracking and integrating the problem fed back by the problem feedback sheet, and the bulletins are made and sent to the information sharing module, so that the problems existing in the project progress can be conveniently mastered and processed in time, personnel can be allocated in time, and the project progress and project management level are improved.
The information sharing module is a communication bridge of the engineering project management system, and personnel who input information through the authorization management module can log in and then transmit documents, exchange and intercommunicate, carry out humanistic care, learn and submit, leave messages in a secret suggestion box, so that the latest dynamics can be really and effectively mastered, the communication between management and personnel is improved, and the dynamic management of projects is realized.
In the description herein, references to the description of "one embodiment," "an example," "a specific example" or the like are intended to mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the invention as claimed.
Claims (8)
1. A project management system based on big data comprises a permission management module and a control module, and is characterized in that the control module comprises a project progress early warning module and an information module, and the project progress early warning module is used for analyzing the project progress to generate early warning information;
the project progress early warning module comprises a project progress expectation module and a project data acquisition module, the information module is used for carrying out real-time monitoring and management on a project site, personnel on-duty distribution and personnel working states, and the information module comprises a screen monitoring module, a personnel management module and an information sharing module.
2. The big data-based engineering project management system according to claim 1, wherein the authority management module is used for authorizing and dynamically adjusting management architecture, posts and personnel of the project management system based on big data, and the control module is used for realizing control and information acquisition and sharing of a basic project implementation process.
3. The big data-based engineering project management system according to claim 2, wherein the authority management module comprises a project information input module and an authorization module, the project information input module is used for inputting employee information and position keywords, and the authorization module is used for performing authorized login according to the employee authority level limiting unit.
4. The big data-based engineering project management system according to claim 3, wherein the project progress expectation module comprises a project expectation completion database, a project material claiming module and a project material usage management module, wherein the project expectation completion database is used for decomposing forecast data of expectation completion conditions of all branch projects in a project;
the project material application module is used for controlling a responsible person for material approval in time, and the project material use management module is used for carrying out progress management on the expected progress and the actual progress of project engineering according to the use condition of materials.
5. The engineering project management system based on big data as claimed in claim 4, wherein the project data collection module is used for classifying data in the database by using historical data comparison, performing integrated arrangement, and calculating according to the material usage amount, actual usage amount and residual material acquired by personnel every day to generate data corresponding to a project.
6. The big data-based engineering project management system according to claim 5, wherein the video monitoring module comprises a key area monitoring unit, a real-time video conference unit, a fixed point shooting unit and a safety performance monitoring unit;
the key area monitoring unit is used for respectively monitoring areas, the fixed-point shooting unit is used for recording construction conditions of an engineering site, and the safety performance monitoring unit is used for tracking and monitoring non-project personnel and vehicles around construction.
7. The big data-based engineering project management system according to claim 6, wherein the personnel management module comprises a personnel attendance unit, a personnel work recording unit, a personnel problem feedback unit, a personnel information supervision unit and a personnel comprehensive learning unit;
the staff attendance unit is used for recording the daily attendance conditions of staff and managers, the staff information monitoring unit is used for counting the staff attendance conditions, tracking the work and sorting the problems fed back by the problem feedback unit for integration and analysis, and the staff problem feedback unit is used for mastering the problems existing in the engineering progress and timely processing the problems.
8. The big data-based engineering project management system according to claim 7, wherein the information sharing module is a communication bridge of the engineering project management system, and the information sharing module is used for authorizing personnel who input information into the management module to log in and then transmitting documents, communicating and intercommunicating, humanistic care, learning and raising, and leaving messages in a secret opinion box.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111350547.0A CN114049086A (en) | 2021-11-15 | 2021-11-15 | Engineering project management system based on big data |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111350547.0A CN114049086A (en) | 2021-11-15 | 2021-11-15 | Engineering project management system based on big data |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114049086A true CN114049086A (en) | 2022-02-15 |
Family
ID=80209289
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111350547.0A Pending CN114049086A (en) | 2021-11-15 | 2021-11-15 | Engineering project management system based on big data |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114049086A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114782030A (en) * | 2022-06-24 | 2022-07-22 | 硕广达微电子(深圳)有限公司 | Intelligent management system and method based on big data project |
CN116090634A (en) * | 2023-01-09 | 2023-05-09 | 江苏悦达绿色建筑科技有限公司 | Engineering fine-packaging and repairing intelligent management platform and method based on Internet of things |
CN117132240A (en) * | 2023-10-24 | 2023-11-28 | 中川建投集团有限公司 | Engineering project management system based on big data |
-
2021
- 2021-11-15 CN CN202111350547.0A patent/CN114049086A/en active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114782030A (en) * | 2022-06-24 | 2022-07-22 | 硕广达微电子(深圳)有限公司 | Intelligent management system and method based on big data project |
CN116090634A (en) * | 2023-01-09 | 2023-05-09 | 江苏悦达绿色建筑科技有限公司 | Engineering fine-packaging and repairing intelligent management platform and method based on Internet of things |
CN116090634B (en) * | 2023-01-09 | 2024-02-23 | 江苏悦达绿色建筑科技有限公司 | Engineering fine-packaging and repairing intelligent management platform and method based on Internet of things |
CN117132240A (en) * | 2023-10-24 | 2023-11-28 | 中川建投集团有限公司 | Engineering project management system based on big data |
CN117132240B (en) * | 2023-10-24 | 2023-12-22 | 中川建投集团有限公司 | Engineering project management system based on big data |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN114049086A (en) | Engineering project management system based on big data | |
Qing et al. | Quality risk management model for railway construction projects | |
Lu et al. | An inexact two-stage fuzzy-stochastic programming model for water resources management | |
CN105118005B (en) | Communities ' Integrated management system | |
CN102521685A (en) | Electronic monitoring system | |
CN103903088B (en) | A kind of high speed railway construction engineering drawing lessons control system and method | |
Zhao et al. | Development and innovation of enterprise knowledge management strategies using big data neural networks technology | |
CN109377180A (en) | A kind of electric system industry expansion procedure information managing and control system | |
CN114819478A (en) | Power grid collaborative planning management platform based on BIM | |
CN101261696B (en) | Whole solution for information construction of railway office station | |
CN111260334A (en) | Engineering project management system based on system dynamics | |
Li et al. | A Performance Analysis Model for the Training and Education of Information Security Talents | |
Zifei et al. | Application of optical network transmission based on 5G network in knowledge management of digital factories | |
Froese | Help wanted: project information officer | |
El Ghorfi et al. | A modeling approach for IT governance basics application on IT projects and IT goals | |
El Khatib et al. | Collaborative Business Intelligence A Case Study of the Dubai Smart City Strategy | |
CN1293437C (en) | Software use monitoring system and method | |
Nubatonis et al. | Implementation of building construction permit in So'e city, South Timor Tengah regency (TTS) | |
Martinez et al. | Production planners’ scope of action in the context of digital twin construction | |
Hussein et al. | Influence of Devolution Monitoring and Evaluation on Service Delivery in Garissa County Government | |
Jin et al. | Evaluation and analysis of strategic human resource management based on multi-mode fuzzy logic control algorithm | |
Nirschl et al. | A quantitative competence model for e-recruiting and team building in safety critical domains | |
Hu | Research on the Reform of University Financial Supervision System Driven by Big Data | |
CN201030867Y (en) | Railway engineering station segment comprehensive information management system | |
Kutlu | Industry 4.0 and the Internet of Things (IoT) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |