CN101261696B - Whole solution for information construction of railway office station - Google Patents

Whole solution for information construction of railway office station Download PDF

Info

Publication number
CN101261696B
CN101261696B CN2007100803791A CN200710080379A CN101261696B CN 101261696 B CN101261696 B CN 101261696B CN 2007100803791 A CN2007100803791 A CN 2007100803791A CN 200710080379 A CN200710080379 A CN 200710080379A CN 101261696 B CN101261696 B CN 101261696B
Authority
CN
China
Prior art keywords
subsystem
management
engineering
locomotive
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2007100803791A
Other languages
Chinese (zh)
Other versions
CN101261696A (en
Inventor
蒋兆远
李刚
齐金平
邱建东
范越
宋宇博
李方
张伟
杜亚江
王锐锋
郭佑民
孙启国
马殷元
高博
李小平
李建国
杜运峰
阎军
柴获
王金鉴
雷斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou Jiaotong University
Original Assignee
Lanzhou Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou Jiaotong University filed Critical Lanzhou Jiaotong University
Priority to CN2007100803791A priority Critical patent/CN101261696B/en
Publication of CN101261696A publication Critical patent/CN101261696A/en
Application granted granted Critical
Publication of CN101261696B publication Critical patent/CN101261696B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a railway locomotive station informatization construction total solution, aiming at effectively solving the problems of present domestic locomotive station that locomotive resource management is irregular and non-uniform, which results in a plurality of defects of locomotive station informatization construction. The invention includes the framework of basic communication network, locomotive equipment and the informatization of the equipment, the establishment of a locomotive work management subsystem, the establishment of an electronic office-affair and electronic business subsystem and the establishment of a decision analysis and comprehensive application subsystem; wherein, the basic communication network is the network basis of the plan, the locomotive equipment and the informatization of the equipment are the hardware equipment basis of the plan, and data generated by the locomotive equipment, the locomotive work management subsystem, the electronic office-affair and electronic business subsystem are all transmitted to a locomotive central data warehouse. The plan has the beneficial effects that the construction condition of a present locomotive information subsystem can be regulated and integrated; the existing resource can be utilized to make use of information technique to transform a traditional production management mode so as to enhance the economic benefit of the locomotive station.

Description

The solution for information construction of railway office station holistic approach
Technical field
The present invention relates to areas of information technology, relate in particular to the integration information construction of railway system's engineering station section.
Background technology
At present, the informatization of domestic engineering station section mostly possesses preliminary LAN system, and uses the part system of different vendor's exploitation, the lack of standardization and disunity of engineering resource management, so that there is following problem in the informatization of engineering station section:
1, lack general plan, the integrated application level is low.Lack general plan, unified management and effective coordination, the phenomenon that each specialty is done things in his own way has appearred in work, cause resource to be difficult to share, and the exploitation of some projects location is around improving engineering ability, level, this center of efficient, usability and inputoutput DeGrain, the overall application level is low.
2, lack technical guarantee, basis for IT application weakness.Intellectuality, the automaticity of the various tooling devices of locomotive and ground are low, and many source point information of production run can not realize that digitizing inserts; Some computer network facilities of having thrown people utilization have used for many years, fall behind technically, and equipment performance and processing power be wretched insufficiency and lack associated maintenance service such as technical support, is difficult to ensure operation steady in a long-term; The subsystem software platform construction seriously lags behind, and can not satisfy the present information managerial demand.
3, the construction of network interconnection passage lags behind.Network channel basis is poor, and apparent particularly outstanding of this problem after the new productivity distribution adjustment made by the Ministry of Railways; Segmentation, back-turning section are not networked with this section; Subsystem platform, network structure lack unified, application program is separate, incompatible, so that network can not interconnect, data resource can not be shared, a large amount of computer software and hardware resources can not get effective utilization, have a strong impact on the information-based application of result of engineering subsystem, more restricted the informationalized development of engineering.
4, the management evaluation pattern is simple, single.Management level are low, and the management evaluation pattern is simple, single, people control, can not be in time, the statistics of accurate, science, analyze the problem hidden danger that exists in each post, personnel, the link, reach the objectifying of job position details, fine-grained management.
5, information disunity, utilization factor is low.Each business has produced a large amount of system informations, but data is not put in order and excavated, and causes bulk information idle, does not have unified planning and design, does not produce the valuable information that can instruct production, and data user rate is low.
For addressing the above problem, must formulate an integrated planning scheme towards the segment information construction of whole engineering station.
Summary of the invention
The object of the present invention is to provide towards the integrated planning and the solution of the segment information construction of whole engineering station, realize unified standardized administration to comprising hardware device in interior engineering resource, and unified planning design engineering central data warehouse, realized data sharing to greatest extent.
The technical scheme that realizes above-mentioned purpose is:
The solution for information construction of railway office station holistic approach, comprise basic communication network framework, engineering equipment and information-based, set up the engineering business management subsystem, set up E-Government and ecommerce subsystem, set up decision analysis and integrated application subsystem, wherein, the basis communication network is the network foundation of scheme, engineering equipment and informationization thereof are the hardware device bases of scheme, setting up decision analysis and integrated application subsystem is to make up the engineering central data warehouse, the data storage that the engineering equipment produces is in the engineering central data warehouse, the engineering business management subsystem, E-Government all links to each other with the integrated application subsystem with decision analysis with the ecommerce subsystem, the engineering business management subsystem, the data storage that E-Government and ecommerce subsystem produce is in the engineering central data warehouse, and make up shared platform on this basis, realize sharing of whole engineering station section resource.
In the solution for information construction of railway office station holistic approach, basic communication network framework comprises engineering station this section of section network architecture, segmented network framework, the back-turning section network architecture, the branch workshop network architecture and communication network each other thereof and the communication network of station section with road bureau, the Ministry of Railways; Engineering equipment and informationization thereof comprise following two aspect: A and set up the engineering station section Resource Manager Subsystem that comprises engineering equipment and safety equipment, the resume archives of apparatus for establishing are included in unified computer information management such as the factory building of whole engineering station section, equipment, pipeline, network; The equipment that B uses engineering station section carries out digital improvement, sets up the information-based subsystem of process monitoring; On preceding two parts basis, set up the engineering business management subsystem and be and set up the engineering operation system information management system that comprises operation management module, overhaul management module, safety management module, handling of goods and materials module, fuel management module, technical management module, device management module, statistical module, evaluation module, fiscal module, human resource management module, the party and the masses' administration module, employee education administration module, and integrated planning defines the data-interface between each business module and the data-interface of each business module and shared platform; Setting up E-Government and ecommerce subsystem comprises and sets up internal E-Government ADMINISTRATION SUBSYSTEM and external managing eBusiness subsystem, E-Government comprises the circulation of office automation and mail, official document, and ecommerce refers to service and transaction between engineering station section and service provider, the supplier; Setting up decision analysis and integrated application subsystem is to make up the engineering central data warehouse, to derive from the data storage of each department, and comprise the data mining and the integrated application of statistical study, production business report and indicator-specific statistics, expert's subsystem and the decision support etc. of each service sub-system.
The function of the subsystem that each several part is set up in the railway locomotive informatization holistic approach is as follows:
1. the data transmission network basis that basic communication network is a scheme is the carrier of information transmission.It comprises the network architecture, segmented network framework, the back-turning section network architecture, the branch workshop network architecture and the communication network each other thereof and the communication network of station section with road bureau, the Ministry of Railways of engineering station this section of section.
2. engineering equipment and informationization thereof are that engineering equipment and safety equipment are carried out the informationization processing, and the information of collection and treatment generation.
The information-based subsystem of process monitoring comprises field apparatus, Workshop monitoring device, data collector, monitor data server, field apparatus links to each other with data collector, data collector links to each other with the Workshop monitoring device, and the Workshop monitoring device links to each other with the monitor data server; This subsystem can detect and data processing accurately to the work of each equipment, and a detection data is in time sent supervisory control comuter, send into the engineering central data warehouse, avoided the interference of human factor to greatest extent, guarantee the authenticity and the reliability of data, guaranteed the repair quality of locomotive component.
Monitoring analysis software is housed, the engineering equipment in the monitoring workshop on the Workshop monitoring device.Monitoring analysis software comprises that data monitoring module, monitor data analysis module, device analysis curve display module, monitor data print module, data send on-line module, and the data monitoring module links to each other with the monitor data analysis module; The monitor data analysis module links to each other with device analysis curve display module; The monitor data analysis module links to each other with the monitor data print module respectively with device analysis curve display module; The monitor data analysis module sends on-line module with data and links to each other.
The function declaration of monitoring analysis software:
Monitoring analysis software is mainly realized patrolling and examining of device and reading of data, device data is sent to server, with other service sub-system data integration, the realization data resource is shared, and equipment transmission information analyzed, graphic form with curve is shown to the user, also can generate the test form according to standard format, and the user is printing reports as required.
The data monitoring module: realization is patrolled and examined workshop separate unit or multiple devices, as equipment data transmission is arranged, and then module is by the data of the communication interface modules reading device of device.
Monitor data analysis module: facility information is analyzed the rationality of the data of judgment device.Whether the length that the data that send as vacuum drying stove testing table can be analyzed process time long enough, whether dry or the like according to technological requirement, so direct fetch equipment bottom data, avoided the interference of human factor to greatest extent, guarantee the authenticity of data, can guarantee the repair quality of locomotive component effectively.
Device analysis curve display module: according to analysis, generate the equipment test curve, and show with graphic form to monitor data, simple and clear, directly perceived, vivid, so that the guides user standard operation.
The monitor data print module: can generate the test form according to standard format according to monitor data, the user can be according to actual printing reports or trial curve figure.
Data send on-line module: facility information is sent to server, merges mutually with other business datums (as locomotive inspection and repair ADMINISTRATION SUBSYSTEM data), realize sharing of data resource.
The data exchange process of the equipment digitalized subsystem of engineering is as follows:
Data collector collecting device signal, and with certain format storage and Workshop monitoring device, and press communication protocol by communication interface fetch equipment signal, finish the exchanges data between data collector and Workshop monitoring device; The Workshop monitoring device is analyzed, shows, is printed device signal, and device signal and analytical structure are sent to the monitor data server, finishing department supervising device and the exchange of monitor data data in server.
3. in the engineering business management subsystem, safety management module links to each other with overhaul management module, operation management module respectively; Overhaul management module links to each other with handling of goods and materials module, fuel management module respectively; The operation management module links to each other with the fuel management module; The maintenance module links to each other with device management module, technical management mould respectively; Operation management module, overhaul management module, safety management module link to each other with statistical module, evaluation module respectively; Overhaul management module, operation management module, handling of goods and materials module, fuel management module link to each other with financial management module, human resource management module respectively; The human resources module links to each other with the party and the masses administration modules, financial management module, management of staff and workers module respectively.
Engineering service sub-system function declaration:
Operation management module: comprise actions such as locomotive operation management and running, the management of service on buses or trains apartment, locomotive operation monitor management, realize electronization, the network management of operation process such as locomotive, personnel, strengthen the machine control degree of locomotive depot's application safety management, improve the automaticity of producing commander, enhancing is to the security control ability of locomotive operation management, obtain the locomotive operation security information in time, accurately, all sidedly, accurately hold the emphasis of application safety work, make correct decision-making.
Overhaul management module: comprise actions such as locomotive inspection and repair quality management, motive power control management, the big accessory management of locomotive, locomotive inspection and repair supplies consumption, maintenance man-hour management and workshop transaction management, locomotive inspection and repair process, repair quality, maintenance scheduling, the big accessory of locomotive, repair materials, the affair of tool car every other day ordinary affair etc. are managed.Link closely in " 220 standard " requirement of " four change sign maintenance by three " of subsystem, hold " locomotive " and " people " two Fundamentals in the locomotive inspection and repair, locomotive inspection and repair is carried out complete monitoring, work quality, job schedule to the upkeep operation person are monitored on request, the relevant maintenance information of record, and, be convenient to quota management and wage accounting according to the automatic time data that generates of the size of task amount.
Safety management module: comprise actions such as safe procuratorial work management, safe regular meeting, security system, security information issue and safe appraisal management, function synthesizeds such as safety inspection management, safe regular meeting and safety information management, safety rule system, security history record, the online inquiry of security information are got up, utilize that the computerized information subsystem is tight, data-handling capacity is strong, be convenient to data analysis advantage relatively, the system of strengthening safety supervision.
Handling of goods and materials module: comprise actions such as material information management, material library management, material accounting management, material consumption analysis, material comprehensive inquiry, set up material database, realize many-side management to material by Bill of Material (BOM).Wherein, material accounting, material energy consumption analysis and relevant information analysis and query are the main tasks of this module, and it realizes locomotive inspection and repair cost budgeting and control by the management to all many-sides such as material essential information, use, consumption.
Fuel management module: comprise actions such as fuel oil planning management, fuel oil stock control, fuel oil quota management, oil storage safety management, fuel oil dispensing business management, oil consumption analysis, in time change the wicked energy consumption situation of grasping locomotive with oil by ground fuel oil transmitting-receiving monitoring device, standard locomotive oil consumption management, and,, cost accounting provides data for providing by all kinds of dynamic statistics forms of the automatic generation of technical data; On the basis of analyzing fuel consumption data, reach and distribute rationally and use, improve fuel utilization ratio, high-quality and efficient assurance railway security operation also cuts operating costs.
Technical management module: comprise the locomotive inspection and repair planning management, the management of locomotive technology data criterion, the comprehensive ledger management of locomotive, the management of locomotive metrical information, the locomotive quality analysis management, locomotive energy consumption is analyzed, the locomotive process management, actions such as the realistic technical management of locomotive technological transformation, relate to the locomotive resume, locomotive fittings, the locomotive essential information, the locomotive inspection and repair plan, form, the maintenance account, technical data analysis, the management of various aspects such as measuring control, be characterized in that action is numerous and diverse, data volume is big, technical strong, these technical information can be gathered by the technical information ADMINISTRATION SUBSYSTEM, conclude, be convenient to technician's statistical study, the advantage that the transmission of the performance network information is accurately quick and information resources are shared, these routine works can be carried out on the net, thereby the technician is freed from the transactional work of numerous and complicated, be engaged in creative work, increase work efficiency.
Device management module: comprise actions such as equipment maintenance plan management, equipment and technology information management, overhaul of the equipments management, device security information management, the information of equipment information management subsystem is mainly derived from each cargo handling operation in the equipment use, administrative authority, facility information in the actual motion operation and relevant statistical report form.This subsystem is by to above-mentioned information processing, realizes the management of technical information, overhaul of the equipments, use, maintenance etc. to locomotive depot's corresponding device.
Statistical module: comprise actions such as operation monitoring data acquisition, fuel consume data processing, the data acquisition of driver's declaration form, standard format list generate, classification gathers, reflect locomotive operation, maintenance, energy resource consumption situation by data acquisition, storage, processing, calculate, gather etc., for locomotive transportation production provides decision support, be the basic basis of Locomotive Cost Accounting and control.
Evaluation module: comprise actions such as utilization appraisal management, maintenance appraisal management, safe appraisal management, locomotive quality appraisal management, cadre's performance appraisal, by system controlled by computer replace manual control, the course of work all linked with one another, condition each other, omnidistance control, realize the supervisory routine standardization, the management process monitoringization, completeization of management data, management information layering subsystemization, management method is scientific, ladder of management is evolved earlier, the management effect optimization, the network information management of the man-machine joint control of realization engineering management.
Fiscal module: comprise accounting, accounting budget, fixed capital management, pricing and actions such as control, economic activity analysis and decision support, by original document, voucher are reached in account with, realization to the processing of financial accounting basic data and statistics with gather, financial management and cost accounting, and by analyzing financial data and the statistics in the regular period, the section leader provides the economic decision-making support for the engineering station.
Human resource management module: comprise actions such as occurrences in human life information management, personnel administration, have powerful safe database, realize organization management, personal information management, emolument welfare, Employee Relationship Management, training and development, manpower management, performance management, statistical study and query function, the hommization operation realizes human resource management efficiently.
The party and the masses' administration module: belong to process transaction class ADMINISTRATION SUBSYSTEM, this subsystem comprises the party affairs office administration, party member's file administration, organize personnel management, the propaganda work management, the management of Party conduct clean government, the trade union work management, the procuratorial management, work of communist youth league management, actions such as arms work management, can realize tracking to the whole process of circulation of official document, and the envisioning of detail record official document, the written instructions suggestion, handle process, handle the result, information such as current state, be convenient in time, fast, inquiry exactly, the action of various aspects simultaneously all can be carried out on the net, has realized online working and with no paper office.
Employee education administration module: comprise actions such as the management of worker's technology files, the management of worker's network examination hall, employee skills are identified and managed, the management of worker's network classroom, the management of education books and reference materials, worker's technical training tourney, technical information, educational training data are effectively managed, utilize the employee education network shared resource, the worker is carried out post education, technology service training, technical ability competency-based training, work exchange and business evaluating management, carry out the Web-based instruction, improve workforce's total quality.
4. the function declaration of E-Government and ecommerce subsystem is as follows:
E-Government makes enterprises personnel conveniently shared Sub system, collaborative work efficiently; Change manual working way complicated in the past, poor efficiency, realize rapid, omnibearing information acquisition, information processing, the foundation that provides science for the management and the decision-making of enterprise.
Ecommerce is enterprise and the extraneous commercial channel of getting in touch.The Intranet network of enterprise can link with Internet.On the one hand, relevant accessory information, market conditions can be searched by enterprise on Internet, get in touch with existing or potential client, affiliate; On the other hand, other enterprises can visit your the externally company information of issue by Internet, as enterprise's introduction, the scope of business, product/service, demand information etc., thereby play and extraneous effect of linking up cooperation.
5. set up the engineering central data warehouse in decision analysis and the integrated application subsystem, will derive from each service management department and organically be connected, realized the target of operational indicator " credible, feasible, available ".By the data of business being carried out the arrangement of subsystem ground, sort out, relatively, analyze, according to certain principle and strategy, from certain side, otherness between the every data target of certain hierarchical research, similarity, contact and influence, the correlation rule of setting up their possible regularities of distribution and may existing between them, can tentatively disclose the inner link of the every service management work of railway transport of passengers, sum up the inner link of the every service management work of some railways transport of passengers, and predict by data mining, the decision maker analyzes the every index and the moving law of railway operation business, so that can carry out the adjustment of science timely and effectively to enterprise operation, decision-making and management.
The present invention has following beneficial effect:
Realized the data interaction between engineering station this section of section and segmentation, the branch workshop; Avoided railway production distribution adjustment information interaction afterwards not smooth, business datum can not be put problems such as sharing utilization in order; Standard, the comprehensive construction situation of engineering information subsystem are at present utilized existing resource, with information technology upgrade traditional mode of production management mode, improve engineering station section economic benefit.
Embodiment
The described solution for information construction of railway office station holistic approach of the embodiment of the invention, comprise basic communication network framework, engineering equipment and informationization thereof, set up the engineering business management subsystem, set up E-Government and ecommerce subsystem, set up decision analysis and integrated application subsystem, wherein, basic communication network framework comprises engineering station this section of section network architecture, segmented network framework, the back-turning section network architecture, the branch workshop network architecture and communication network each other thereof and the communication network of station section with road bureau, the Ministry of Railways; Engineering equipment and informationization thereof comprise following two aspect: A and set up the engineering station section Resource Manager Subsystem that comprises engineering equipment and safety equipment, the resume archives of apparatus for establishing are included in unified computer information management such as the factory building of whole engineering station section, equipment, pipeline, network; The equipment that B uses engineering station section carries out digital improvement, sets up the information-based subsystem of process monitoring; On preceding two parts basis, set up the engineering business management subsystem and be and set up the engineering service sub-system information management subsystem that comprises operation management module, overhaul management module, safety management module, handling of goods and materials module, fuel management module, technical management module, device management module, statistical module, evaluation module, fiscal module, human resource management module, the party and the masses' administration module, employee education administration module, and integrated planning defines the data-interface between each business module and the data-interface of each business module and shared platform; Setting up E-Government and ecommerce subsystem comprises and sets up internal E-Government ADMINISTRATION SUBSYSTEM and external managing eBusiness subsystem, E-Government comprises the circulation of office automation and mail, official document, and ecommerce refers to service and transaction between engineering station section and service provider, the supplier; Setting up decision analysis and integrated application subsystem is to make up the engineering central data warehouse, to derive from the data storage of each department, and comprise the data mining and the integrated application of statistical study, production business report and indicator-specific statistics, expert's subsystem and the decision support etc. of each service sub-system.
In the solution for information construction of railway office station holistic approach, the basis communication network is the network foundation of scheme, engineering equipment and informationization thereof are the hardware device bases of scheme, the data storage that the engineering equipment produces is in the engineering central data warehouse, engineering business management subsystem, E-Government all link to each other with the integrated application subsystem with decision analysis with the ecommerce subsystem, the data storage that above-mentioned subsystem produces is in the engineering central data warehouse, and make up shared platform on this basis, realize sharing of whole engineering station section resource.

Claims (1)

1. solution for information construction of railway office station holistic approach, it is characterized in that: comprise basic communication network framework, engineering equipment and information-based, set up the engineering business management subsystem, set up E-Government and ecommerce subsystem, set up decision analysis and integrated application subsystem, set up decision analysis and integrated application subsystem and comprise structure engineering central data warehouse, the engineering business management subsystem, E-Government all links to each other the engineering business management subsystem with decision analysis with the ecommerce subsystem with the integrated application subsystem, the data storage that E-Government and ecommerce subsystem produce is in the engineering central data warehouse; Basis communication network framework comprises engineering station this section of section network architecture, segmented network framework, the back-turning section network architecture, the branch workshop network architecture and communication network each other thereof and the communication network of station section with road bureau, the Ministry of Railways; Engineering equipment and informationization thereof comprise following two aspect: A and set up the engineering station section Resource Manager Subsystem that comprises engineering equipment and safety equipment, the resume archives of apparatus for establishing, the equipment that B uses engineering station section carries out digital improvement, sets up the information-based subsystem of process monitoring; Setting up the engineering business management subsystem is to set up the engineering Service Information Management System that comprises operation management module, overhaul management module, safety management module, handling of goods and materials module, fuel management module, technical management module, device management module, statistical module, evaluation module, fiscal module, human resource management module, the party and the masses' administration module, employee education administration module; Setting up E-Government and ecommerce subsystem comprises and sets up internal E-Government ADMINISTRATION SUBSYSTEM and external managing eBusiness subsystem.
CN2007100803791A 2007-03-08 2007-03-08 Whole solution for information construction of railway office station Expired - Fee Related CN101261696B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007100803791A CN101261696B (en) 2007-03-08 2007-03-08 Whole solution for information construction of railway office station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007100803791A CN101261696B (en) 2007-03-08 2007-03-08 Whole solution for information construction of railway office station

Publications (2)

Publication Number Publication Date
CN101261696A CN101261696A (en) 2008-09-10
CN101261696B true CN101261696B (en) 2011-01-05

Family

ID=39962144

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007100803791A Expired - Fee Related CN101261696B (en) 2007-03-08 2007-03-08 Whole solution for information construction of railway office station

Country Status (1)

Country Link
CN (1) CN101261696B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101908163A (en) * 2009-06-05 2010-12-08 深圳市脑库计算机系统有限公司 Expert-supported application system platform used for government affair and business affair decision and establishment method thereof
CN102819775A (en) * 2011-06-09 2012-12-12 上海市第七建筑有限公司 Project labor resource allocation management system and architecture thereof
CN103996150A (en) * 2014-06-05 2014-08-20 重庆誉鸣科技有限公司 Hydrologic station network management information system
CN105321040A (en) * 2015-09-25 2016-02-10 江苏省泰州引江河管理处 Large pumping station management information system
CN110135598A (en) * 2019-05-16 2019-08-16 兰州交通大学 A kind of high-speed railway electricity business maintenance auxiliary system of knowledge based service

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1337335A (en) * 2001-09-11 2002-02-27 株洲广创电子技术有限公司 Railway running control system
CN1555998A (en) * 2004-01-05 2004-12-22 北京全路通信信号研究设计院 Marshalling station comprehensive integrated automation system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1337335A (en) * 2001-09-11 2002-02-27 株洲广创电子技术有限公司 Railway running control system
CN1555998A (en) * 2004-01-05 2004-12-22 北京全路通信信号研究设计院 Marshalling station comprehensive integrated automation system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
易彧.铁路机务部门信息化建设研究.《北京交通大学硕士学位论文》.2005,全文. *

Also Published As

Publication number Publication date
CN101261696A (en) 2008-09-10

Similar Documents

Publication Publication Date Title
CN101261696B (en) Whole solution for information construction of railway office station
CN109784788A (en) A kind of intelligent comprehensive patrol checking server, terminal and system
KR100584903B1 (en) System for real time controlling driving data of power plant
CN106600142A (en) Information management technology system based on modern manufacturing industry productivity balance
CN201030867Y (en) Railway engineering station segment comprehensive information management system
Xu Business design of human resource management based on SAP-HR system and human resources management software
Vera et al. Competency development of quality control in automotive companies to improve service quality
Gui et al. Human resource management of energy companies based on big data analysis
Wang The Optimization of Overall Budget Management and Internal Control in Colleges and Universities
Wurster et al. On the selection and application of a convenient energy management software for industrial purposes
Pengxi The construction study of college informationization teaching service system under the background of big data
RU213170U1 (en) DEVICE FOR PLANNING AND CONTROL OF MAINTENANCE AND REPAIR OF METRO ESCALATOR FACILITIES
Zou Research on the project intelligent financial expenditure control of r&d department of high-tech enterprises under the guidance of performance
Zhang Research on the Impact of Big Data on Enterprise Management Decisions
Chen et al. A Brief Analysis of the Transition from Financial Accounting to Management Accounting Under the New Situation
yang Research on Innovation of Financial Management Model Based on Cloud Computing
Hu et al. Design and Implementation of Project Schedule Management Data Collection and Analysis System
Ma et al. Research on Management Improvement of Visual Marketing Intelligence System in Automobile 4S Shop
Gao et al. Research on Labor Costs Analysis Model for Condition-Based Maintenance of Railway Freight Cars Based on the Integration of Business and Finance
TINGHE STUDY ON COST CONTROL IN THE CONSTRUCTION INDUSTRY BASED ON VALUE CHAIN THEORY---TAKE CHANG'AN CONSTRUCTION COMPANY AS AN EXAMPLE
Yongmei Design and implementation of marketing management system for real estate enterprises based on internet
Du et al. Research and implementation of management information system for Engineering Training Center in university
Ni Research on Information-based Internal Audit in the Era of Big Data--Taking Kangli Elevator as an Example
Wang Changes in Enterprise Human Resource Management in the Context of Big Data
Cai Research on Current Situation and Countermeasures of Educational Administration Informatization in Colleges and Universities

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110105