CN113988507A - Power transmission and transformation operation equipment early warning method and device - Google Patents

Power transmission and transformation operation equipment early warning method and device Download PDF

Info

Publication number
CN113988507A
CN113988507A CN202111086110.0A CN202111086110A CN113988507A CN 113988507 A CN113988507 A CN 113988507A CN 202111086110 A CN202111086110 A CN 202111086110A CN 113988507 A CN113988507 A CN 113988507A
Authority
CN
China
Prior art keywords
power transmission
transformation operation
analyzing
alarm information
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111086110.0A
Other languages
Chinese (zh)
Inventor
尹云
袁少雷
杨刚
吕湛
邢烨
庄明建
宣文雯
邓蔚
邵佳丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Shengzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
Shaoxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Shengzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, Shengzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical Shaoxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority to CN202111086110.0A priority Critical patent/CN113988507A/en
Publication of CN113988507A publication Critical patent/CN113988507A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides an early warning method and device for power transmission and transformation operation equipment. The method comprises the following steps: acquiring historical data and real-time data of a plurality of power transmission and transformation operation devices; analyzing the historical data and the real-time data, and determining a risk value of each power transmission and transformation operation device in a plurality of power transmission and transformation operation devices; generating risk information when the risk value exceeds a threshold; and sending the risk information to the target personnel according to the first template. The early warning method and device for the power transmission and transformation operation equipment can be used for starting from hidden danger defect management of the power grid operation equipment, greatly improving the breadth, depth and accuracy of power grid monitoring work and strengthening monitoring safety control capability.

Description

Power transmission and transformation operation equipment early warning method and device
Technical Field
The disclosure relates to the field of computer information processing, in particular to an early warning method and device for power transmission and transformation operation equipment.
Background
In coping and dealing with power grid operation faults and transformer equipment defects, a traditional centralized monitoring operation management and control system stays at a passive layer, and the root of the system lies in all-around lag of equipment operation hidden trouble troubleshooting work, including insufficient cognitive level, lag of early warning technology and lack of an assessment system.
Firstly, the hidden trouble is insufficient in cognitive level. The traditional monitoring system mainly focuses on fault handling and defect elimination, and is still in a passive working mode of monitoring working conditions, finding alarms and handling abnormity. The regulation and control mechanism and a line of monitoring personnel often lack sufficient knowledge of the importance of the hidden danger of equipment operation, underestimate the potential risk and threat of the hidden danger of the equipment, and the monitoring array line is relatively behind, so that active prevention is difficult to realize.
Secondly, the hidden danger early warning technology falls behind. At present, a power supply regulation and control mechanism is not provided with a scientific analysis method for positioning hidden dangers, and a practical platform for a hidden danger analysis system, the hidden dangers are excavated mainly by means of manual analysis and experience summary, the discovery of the hidden dangers depends too much on personal quality and service level of a monitor, and a systematic and standardized hidden danger early warning system is difficult to realize.
And thirdly, the defect of a hidden danger assessment system. Before the new monitoring, operation, management and control system is popularized and applied, the degree of attention of the regulation and control mechanism to hidden danger early warning is insufficient, the assessment and evaluation strength of the hidden danger from top to bottom is small, an assessment index system aiming at hidden danger early warning capacity is lacked, and therefore development of hidden danger early warning work and promotion and guidance of hidden danger analysis capacity of each level of regulation and control mechanism are limited.
Therefore, a new method and device for early warning of power transmission and transformation operation equipment are needed.
Disclosure of Invention
In view of this, the present disclosure provides an early warning method and an early warning device for power transmission and transformation operation equipment, which can greatly improve the breadth, depth and accuracy of power grid monitoring work and enhance the monitoring safety control capability from the management of hidden danger and defects of power grid operation equipment.
Additional features and advantages of the disclosure will be set forth in the detailed description which follows, or in part will be obvious from the description, or may be learned by practice of the disclosure.
According to one aspect of the disclosure, a power transmission and transformation operation equipment early warning method is provided, and the method includes: acquiring historical data and real-time data of a plurality of power transmission and transformation operation devices; analyzing the historical data and the real-time data, and determining a risk value of each power transmission and transformation operation device in a plurality of power transmission and transformation operation devices; generating risk information when the risk value exceeds a threshold; and sending the risk information to the target personnel according to the first template.
In an exemplary embodiment of the present disclosure, further comprising: acquiring alarm information of the power transmission and transformation operation equipment; analyzing the alarm information through multiple dimensions to determine a label of the power transmission and transformation operation equipment; and determining hidden danger target equipment according to the label.
In an exemplary embodiment of the present disclosure, further comprising: sending the alarm information to a target person according to a second template; and the target personnel processes the real-time alarm information according to the operation procedure corresponding to the alarm information.
In an exemplary embodiment of the present disclosure, further comprising: storing the alarm information; and analyzing the alarm information at regular time.
In an example embodiment of the present disclosure, obtaining historical data and real-time data of a plurality of electric transmission and transformation operating devices comprises at least one of: acquiring historical monitoring information of a plurality of power transmission and transformation operation devices; acquiring defect record information of a plurality of power transmission and transformation operation devices; acquiring system ledger information of a plurality of power transmission and transformation operation devices; acquiring meteorological environment information of a plurality of power transmission and transformation operation devices; and acquiring real-time monitoring information of the plurality of power transmission and transformation operation devices.
In an exemplary embodiment of the present disclosure, analyzing the historical data and the real-time data includes: analyzing the historical data and real-time data from a time dimension; and/or analyzing the historical data and the real-time data from the spatial dimension; and/or analyzing the historical data and the real-time data from a type dimension; and/or analyzing the historical data and the real-time data from the device dimension.
In an exemplary embodiment of the disclosure, analyzing the alarm information through multiple dimensions, and determining the label of the electric transmission and transformation operating equipment includes at least one of: analyzing the alarm information through a correlation analysis method to determine a label of the power transmission and transformation operation equipment; and/or analyzing the alarm information by a time sequence analysis method to determine the label of the power transmission and transformation operation equipment; and/or analyzing the alarm information by a frequency analysis method to determine the label of the power transmission and transformation operation equipment; and/or analyzing the alarm information through a text analysis method to determine the label of the power transmission and transformation operation equipment.
In an exemplary embodiment of the present disclosure, analyzing the alarm information through multiple dimensions, and determining the label of the power transmission and transformation operating device includes: determining a quality attribute label according to the alarm information; determining a relation attribute label according to the alarm information; and determining the state attribute label according to the alarm information.
According to an aspect of this disclosure, provide a power transmission and transformation operation equipment early warning device, the device includes: the data module is used for acquiring historical data and real-time data of a plurality of power transmission and transformation operation devices; the analysis module is used for analyzing the historical data and the real-time data and determining the risk value of each power transmission and transformation operation device in the plurality of power transmission and transformation operation devices; the judging module is used for generating risk information when the risk value exceeds a threshold value; and the sending module is used for sending the risk information to the target personnel according to the first template.
In an exemplary embodiment of the present disclosure, further comprising: the alarm module is used for acquiring alarm information of the power transmission and transformation operation equipment; the label module is used for analyzing the alarm information through multiple dimensions and determining a label of the power transmission and transformation operation equipment; and the equipment module is used for determining the hidden danger target equipment according to the label.
According to an aspect of the present disclosure, an electronic device is provided, the electronic device including: one or more processors; storage means for storing one or more programs; when executed by one or more processors, cause the one or more processors to implement a method as above.
According to the early warning method and device for the power transmission and transformation operation equipment, the hidden danger defect management of the power grid operation equipment can be started, the breadth, the depth and the accuracy of power grid monitoring work are greatly improved, and the monitoring safety control capability is strengthened.
Drawings
The above and other objects, features and advantages of the present disclosure will become more apparent by describing in detail exemplary embodiments thereof with reference to the attached drawings. The drawings described below are merely some embodiments of the present disclosure, and other drawings may be derived from those drawings by those of ordinary skill in the art without inventive effort.
Fig. 1 is a system block diagram illustrating an early warning method and apparatus for power transmission and transformation operating equipment according to an exemplary embodiment.
Fig. 2 is a flow chart illustrating a method for power transmission and transformation operation equipment early warning according to an example embodiment.
Fig. 3 is a flow chart illustrating a method of power transmission and transformation operation equipment forewarning according to another exemplary embodiment.
Fig. 4 is a schematic diagram illustrating a method of power transmission and transformation operation equipment forewarning according to another exemplary embodiment.
Fig. 5 is a block diagram illustrating an early warning apparatus for power transmission and transformation operating equipment according to an exemplary embodiment.
Fig. 6 is a block diagram illustrating an early warning apparatus for power transmission and transformation operating equipment according to another exemplary embodiment.
FIG. 7 is a block diagram illustrating an electronic device in accordance with an example embodiment.
FIG. 8 is a schematic diagram illustrating a computer-readable storage medium according to an example embodiment.
Detailed Description
Example embodiments will now be described more fully with reference to the accompanying drawings. Example embodiments may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein; rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the concept of example embodiments to those skilled in the art. The same reference numerals denote the same or similar parts in the drawings, and thus, a repetitive description thereof will be omitted.
Furthermore, the described features, structures, or characteristics may be combined in any suitable manner in one or more embodiments. In the following description, numerous specific details are provided to give a thorough understanding of embodiments of the disclosure. One skilled in the relevant art will recognize, however, that the subject matter of the present disclosure can be practiced without one or more of the specific details, or with other methods, components, devices, steps, and so forth. In other instances, well-known methods, devices, implementations, or operations have not been shown or described in detail to avoid obscuring aspects of the disclosure.
The block diagrams shown in the figures are functional entities only and do not necessarily correspond to physically separate entities. I.e. these functional entities may be implemented in the form of software, or in one or more hardware modules or integrated circuits, or in different networks and/or processor means and/or microcontroller means.
The flow charts shown in the drawings are merely illustrative and do not necessarily include all of the contents and operations/steps, nor do they necessarily have to be performed in the order described. For example, some operations/steps may be decomposed, and some operations/steps may be combined or partially combined, so that the actual execution sequence may be changed according to the actual situation.
It will be understood that, although the terms first, second, third, etc. may be used herein to describe various components, these components should not be limited by these terms. These terms are used to distinguish one element from another. Thus, a first component discussed below may be termed a second component without departing from the teachings of the disclosed concept. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
It is to be understood by those skilled in the art that the drawings are merely schematic representations of exemplary embodiments, and that the blocks or processes shown in the drawings are not necessarily required to practice the present disclosure and are, therefore, not intended to limit the scope of the present disclosure.
Fig. 1 is a system block diagram illustrating an early warning method and apparatus for power transmission and transformation operating equipment according to an exemplary embodiment.
As shown in fig. 1, the system architecture may include terminal devices 101, 102, 103, a network 104 and a server 105. The network 104 serves as a medium for providing communication links between the terminal devices 101, 102, 103 and the server 105. Network 104 may include various connection types, such as wired, wireless communication links, or fiber optic cables, to name a few.
The user may use the terminal devices 101, 102, 103 to interact with the server 105 via the network 104 to receive or send messages or the like. The terminal devices 101, 102, 103 may have various communication client applications installed thereon, such as a shopping application, a web browser application, a search application, an instant messaging tool, a mailbox client, social platform software, and the like.
The terminal devices 101, 102, 103 may be various electronic devices having a display screen and supporting web browsing, including but not limited to smart phones, tablet computers, laptop portable computers, desktop computers, and the like.
The server 105 may be a server providing various services, for example, a server performing background management on information of the power transmission and transformation running devices collected by the user using the terminal devices 101, 102, and 103. The server 105 may analyze and perform other processing on the received alarm information of the power transmission and transformation operating device, and feed back a processing result to the terminal device.
The server 105 may, for example, obtain historical data and real-time data of a plurality of power transmission and transformation operating devices; the server 105 may, for example, analyze the historical data and the real-time data to determine a risk value for each of the plurality of electric transmission and transformation operating devices; server 105 may generate risk information, for example, when the risk value exceeds a threshold; the server 105 may, for example, send the risk information to the target person in accordance with the first template.
The server 105 may, for example, obtain alarm information for the electric transmission and transformation operating equipment; the server 105 may analyze the alarm information, for example, through multiple dimensions, to determine a tag of the power transmission and transformation operating equipment; the server 105 may determine the hidden danger target device, for example, from the tag.
The server 105 may, for example, send the alert information to the target person in accordance with the second template; the server 105 may, for example, process the real-time warning information according to the operation procedure corresponding to the warning information.
The server 105 may, for example, store the alert information; the server 105 may analyze the alert information, for example, periodically.
The server 105 may be a physical server, or may be composed of a plurality of servers, for example, it should be noted that the power transmission and transformation operation equipment early warning method provided by the embodiment of the present disclosure may be executed by the server 105, and accordingly, the power transmission and transformation operation equipment early warning device may be disposed in the server 105.
Fig. 2 is a flow chart illustrating a method for power transmission and transformation operation equipment early warning according to an example embodiment. The power transmission and transformation operation equipment early warning method at least comprises the steps S202 to S208.
As shown in fig. 2, in S202, historical data and real-time data of a plurality of electric transmission and transformation operating devices are acquired.
In one embodiment, obtaining historical data and real-time data for a plurality of electric transmission and transformation operating devices may include, for example: acquiring historical monitoring information of a plurality of power transmission and transformation operation devices; acquiring defect record information of a plurality of power transmission and transformation operation devices; acquiring system ledger information of a plurality of power transmission and transformation operation devices; acquiring meteorological environment information of a plurality of power transmission and transformation operation devices; and acquiring real-time monitoring information of the plurality of power transmission and transformation operation devices.
According to the analysis research and practice of the centralized monitoring information of the saturated power grid, aiming at the problems of low utilization rate, lack of effective correlation butt joint and the like of the current regulation and control data, a regulation and control cloud database is built by utilizing the monitoring information and typical defect records of a transformer substation and combining system ledgers such as PMS, OMS and the like and information such as meteorological environment, online monitoring and the like, and massive deep sleep data are fully awakened and regulated. The method is characterized by combining important defects and operation tracking conditions of the equipment, analyzing the operation potential safety hazard of the equipment, deeply excavating monitoring information, and carrying out special analysis on monitoring events, including accident special analysis, abnormal (defect) special analysis, remote operation special analysis and other related special analysis.
In S204, the historical data and the real-time data are analyzed, and a risk value of each of the plurality of electric transmission and transformation operating devices is determined.
In one embodiment, analyzing the historical data and the real-time data comprises: analyzing the historical data and real-time data from a time dimension; and/or analyzing the historical data and the real-time data from the spatial dimension; and/or analyzing the historical data and the real-time data from a type dimension; and/or analyzing the historical data and the real-time data from the device dimension.
By analyzing the uploaded information, combining data resources such as equipment ledgers, defect historical records, environmental meteorology and online monitoring information and the like, and utilizing a reasonable organization management method and a scientific technical analysis method, the equipment operation state is deeply excavated by taking the equipment hidden danger as a target in advance of the occurrence of faults and defects of the power transformation equipment, so that the positioning prejudgment of the equipment hidden danger is realized, the control capability of centralized monitoring on the health condition of key equipment of a transformer substation is improved, and the monitoring operation safety and stability are effectively supported.
For accurate analysis of the device status, an analysis log table can be built as follows:
TABLE 1 analysis and record table for hidden trouble of equipment defect
Figure BDA0003265811480000061
Figure BDA0003265811480000071
In S206, when the risk value exceeds a threshold, risk information is generated.
In S208, the risk information is sent to the target person according to the first template. The method comprises the steps of classifying and confirming daily alarm information according to action reasons, rechecking the handling timeliness and correctness of a current value monitor, associating items such as equipment defects, risk identification and problem feedback, combing, summarizing, monitoring operation and power grid operation conditions, and accordingly achieving early warning of potential hazards of the power transformation equipment.
According to the early warning method for the power transmission and transformation operation equipment, accident tripping and defect events are compared and information monitoring alarming is carried out by utilizing different technologies based on different dimensions in the process of information review and excavation, correlation analysis, time sequence analysis, frequency analysis and text analysis of information and hidden dangers are carried out, alarm information is generated, quality attributes, relation attributes and state attribute labels are added, potential hidden dangers are located, the alarm information is listed in an equipment hidden danger library through analysis and processing, and early warning and locating of the hidden dangers are achieved.
It should be clearly understood that this disclosure describes how to make and use particular examples, but the principles of this disclosure are not limited to any details of these examples. Rather, these principles can be applied to many other embodiments based on the teachings of the present disclosure.
Fig. 3 is a flow chart illustrating a method of power transmission and transformation operation equipment forewarning according to another exemplary embodiment. The power transmission and transformation operation equipment early warning method in fig. 3 is further described in the method in fig. 2, and includes steps S302 to S306.
In S302, alarm information of the power transmission and transformation operation device is acquired. Further comprising: sending the alarm information to a target person according to a second template; and the target personnel processes the real-time alarm information according to the operation procedure corresponding to the alarm information.
In S304, the alarm information is analyzed in multiple dimensions, and a label of the power transmission and transformation operating device is determined.
In one embodiment, analyzing the alarm information through multiple dimensions, and determining the label of the power transmission and transformation operation device includes: analyzing the alarm information through a correlation analysis method to determine a label of the power transmission and transformation operation equipment; and/or analyzing the alarm information by a time sequence analysis method to determine the label of the power transmission and transformation operation equipment; and/or analyzing the alarm information by a frequency analysis method to determine the label of the power transmission and transformation operation equipment; and/or analyzing the alarm information through a text analysis method to determine the label of the power transmission and transformation operation equipment.
In one embodiment, analyzing the alarm information through multiple dimensions, and determining the label of the power transmission and transformation operation device includes: determining a quality attribute label according to the alarm information; determining a relation attribute label according to the alarm information; and determining the state attribute label according to the alarm information.
In S306, the hidden danger target device is determined according to the tag.
According to the early warning method for the power transmission and transformation operation equipment, the monitoring working efficiency and the monitoring effect are greatly improved by using the data penetration type hidden danger management system for the power transmission and transformation operation equipment, a large amount of labor cost is saved, the service life of the equipment is prolonged, the maintenance cost is reduced, and the indirect economic benefit is realized by 2 million yuan each year.
The data-penetration-type power transmission and transformation operation equipment hidden danger management system effectively improves the operation control level of power grid equipment, strengthens and ensures the safety and stability of a power grid, particularly the operation safety of the power grid in heavy rainfall, typhoon and summer time, avoids large-area power failure events and improves the reliability of power supply service.
Fig. 4 is a flow chart illustrating a method of power transmission and transformation operation equipment forewarning according to another exemplary embodiment. The power transmission and transformation operation equipment early warning method in fig. 4 is further described in the method in fig. 2, and includes steps S402 to S426.
In S402, the alarm information matches the grid time, and an event tag is added.
In S404, the association is analyzed.
In S406, the timing is analyzed.
In S408, the frequency is analyzed.
In S410, the text is analyzed.
In S412, a tag is added to the alarm information.
In S414, the hidden danger device is determined.
In S416, whether a special analysis is performed.
At S418, a special analysis agent is included.
In S420, the closed loop is tracked.
In S422, rectification is required.
In S424, an rectification notification is initiated.
In S426, the equipment hidden danger library is added.
The method has the advantages that the hidden danger discovery and control are enhanced in daily work, the technical support of advanced applications such as intelligent patrol function and the like in comprehensive intelligent alarm is perfected by means of information analysis and enhancement of scheduling technology support system function technology application, long-term tracking and deep excavation are carried out on abnormal information through deep analysis and patrol of monitoring information, the equipment hidden danger is discovered in time, monitoring operation work is converted from passive receiving to active precaution, a normal state mechanism of monitoring information comprehensive treatment, monitoring risk identification and hidden danger investigation is established, potential problems and equipment hidden dangers which are difficult to discover in normal monitoring work of a monitor are effectively made up, and the safe operation level of a power grid is further improved.
Through periodic hidden danger early warning and positioning work, a regulation and control mechanism organizes systematic monitoring information recheck, deeply excavates the monitoring information value, perfects a monitoring operation safety control mechanism, classifies and confirms daily warning information according to action reasons, rechecks the handling timeliness and correctness of a current value monitor, associates equipment defects, risk identification, problem feedback and other items, and combs, gathers, monitors and operates and a power grid, so that early warning of hidden dangers of power transformation equipment is realized.
For example, in the process of checking the monitoring information, a person in a power grid in a certain place discovers that potential hazards of voltage transformation in the 110kV era can exist through frequency analysis of the monitoring information, the probability of the potential hazards of a secondary circuit is judged to be the maximum, and the insulation of a voltage transformation secondary terminal in a station is reduced due to high humidity in the plum rain season after the potential hazards are inspected and fed back on site by an overhaul unit, so that the defect of the voltage transformation secondary circuit is developed if measures are not taken in time.
And carrying out deep sorting analysis on the eliminated defects, and inquiring and matching according to information such as equipment type, equipment manufacturer, equipment model, defect parts, delivery date and the like. If any sub-item has more than 3 same problems, establishing special analysis work for the related defects, further excavating the hidden danger of the equipment and perfecting the early warning of the hidden danger. According to the method, the effect is obvious through deep analysis and continuous tracking of abnormal information, for example, potential safety hazards caused by poor insulation of a direct-current system of a plurality of 220 kV transformer substations are found and processed, and the hidden defects of low power supply quality and the like caused by three-phase imbalance of 10kV bus voltages of the plurality of transformer substations are eliminated, so that major accidents are avoided.
Those skilled in the art will appreciate that all or part of the steps implementing the above embodiments are implemented as computer programs executed by a CPU. When executed by the CPU, performs the functions defined by the above-described methods provided by the present disclosure. The program may be stored in a computer readable storage medium, which may be a read-only memory, a magnetic or optical disk, or the like.
Furthermore, it should be noted that the above-mentioned figures are only schematic illustrations of the processes involved in the methods according to exemplary embodiments of the present disclosure, and are not intended to be limiting. It will be readily understood that the processes shown in the above figures are not intended to indicate or limit the chronological order of the processes. In addition, it is also readily understood that these processes may be performed synchronously or asynchronously, e.g., in multiple modules.
The following are embodiments of the disclosed apparatus that may be used to perform embodiments of the disclosed methods. For details not disclosed in the embodiments of the apparatus of the present disclosure, refer to the embodiments of the method of the present disclosure.
Fig. 5 is a block diagram illustrating an early warning apparatus for power transmission and transformation operating equipment according to an exemplary embodiment. The power transmission and transformation operation equipment early warning device includes: a data module 502, an analysis module 504, a determination module 506, and a sending module 508.
The data module 502 is configured to obtain historical data and real-time data of a plurality of power transmission and transformation operating devices; can be for example: acquiring historical monitoring information of a plurality of power transmission and transformation operation devices; acquiring defect record information of a plurality of power transmission and transformation operation devices; acquiring system ledger information of a plurality of power transmission and transformation operation devices; acquiring meteorological environment information of a plurality of power transmission and transformation operation devices; and acquiring real-time monitoring information of the plurality of power transmission and transformation operation devices.
The analysis module 504 is configured to analyze the historical data and the real-time data, and determine a risk value of each of the plurality of power transmission and transformation operating devices; analyzing the historical data and real-time data from a time dimension; and/or analyzing the historical data and the real-time data from the spatial dimension; and/or analyzing the historical data and the real-time data from a type dimension; and/or analyzing the historical data and the real-time data from the device dimension.
The judging module 506 is configured to generate risk information when the risk value exceeds a threshold; and
the sending module 508 is configured to send the risk information to the target person according to the first template. The method comprises the steps of classifying and confirming daily alarm information according to action reasons, rechecking the handling timeliness and correctness of a current value monitor, associating items such as equipment defects, risk identification and problem feedback, combing, summarizing, monitoring operation and power grid operation conditions, and accordingly achieving early warning of potential hazards of the power transformation equipment.
According to the early warning device for the power transmission and transformation operation equipment, accident tripping and defect events are compared and monitored information is alarmed based on different dimensions and by using different technologies in the process of information review and excavation, correlation analysis, time sequence analysis, frequency analysis and text analysis of information and hidden dangers are carried out, alarm information is generated, quality attributes, relation attributes and state attribute labels are added, potential hidden dangers are located, the hidden dangers are listed in an equipment hidden danger library through analysis and processing, and early warning location of the hidden dangers is achieved.
Fig. 6 is a block diagram illustrating an early warning apparatus for power transmission and transformation operating equipment according to another exemplary embodiment. The early warning device of the power transmission and transformation operation equipment further comprises: an alarm module 602, a tag module 604, and an equipment module 606.
The alarm module 602 is configured to obtain alarm information of the power transmission and transformation operating device; further comprising: sending the alarm information to a target person according to a second template; and the target personnel processes the real-time alarm information according to the operation procedure corresponding to the alarm information.
The label module 604 is configured to analyze the alarm information in multiple dimensions to determine a label of the power transmission and transformation operating device; the method comprises the following steps: analyzing the alarm information through a correlation analysis method to determine a label of the power transmission and transformation operation equipment; and/or analyzing the alarm information by a time sequence analysis method to determine the label of the power transmission and transformation operation equipment; and/or analyzing the alarm information by a frequency analysis method to determine the label of the power transmission and transformation operation equipment; and/or analyzing the alarm information through a text analysis method to determine the label of the power transmission and transformation operation equipment.
The device module 606 is configured to determine a hidden danger target device according to the tag.
The utility model provides a power transmission and transformation operation equipment early warning device, the power transmission and transformation operation equipment hidden danger management system of application data infiltration type promotes control work efficiency and effect by a wide margin, saves a large amount of human costs, extension equipment life reduces the cost of overhaul, realizes that indirect economic benefits totals 2 hundred million yuan annually.
FIG. 7 is a block diagram illustrating an electronic device in accordance with an example embodiment.
An electronic device 200 according to this embodiment of the present disclosure is described below with reference to fig. 7. The electronic device 200 shown in fig. 7 is only an example, and should not bring any limitation to the functions and the scope of use of the embodiments of the present disclosure.
As shown in fig. 7, the electronic device 200 is embodied in the form of a general purpose computing device. The components of the electronic device 200 may include, but are not limited to: at least one processing unit 210, at least one memory unit 220, a bus 230 connecting different system components (including the memory unit 220 and the processing unit 210), a display unit 240, and the like.
Wherein the storage unit stores program code executable by the processing unit 210 to cause the processing unit 210 to perform the steps according to various exemplary embodiments of the present disclosure described in the above-mentioned electronic prescription flow processing method section of the present specification. For example, the processing unit 210 may perform the steps as shown in fig. 2, 3, 4.
The memory unit 220 may include readable media in the form of volatile memory units, such as a random access memory unit (RAM)2201 and/or a cache memory unit 2202, and may further include a read only memory unit (ROM) 2203.
The storage unit 220 may also include a program/utility 2204 having a set (at least one) of program modules 2205, such program modules 2205 including, but not limited to: an operating system, one or more application programs, other program modules, and program data, each of which, or some combination thereof, may comprise an implementation of a network environment.
Bus 230 may be one or more of several types of bus structures, including a memory unit bus or memory unit controller, a peripheral bus, an accelerated graphics port, a processing unit, or a local bus using any of a variety of bus architectures.
The electronic device 200 may also communicate with one or more external devices 300 (e.g., keyboard, pointing device, bluetooth device, etc.), with one or more devices that enable a user to interact with the electronic device 200, and/or with any devices (e.g., router, modem, etc.) that enable the electronic device 200 to communicate with one or more other computing devices. Such communication may occur via an input/output (I/O) interface 250. Also, the electronic device 200 may communicate with one or more networks (e.g., a Local Area Network (LAN), a Wide Area Network (WAN), and/or a public network such as the Internet) via the network adapter 260. The network adapter 260 may communicate with other modules of the electronic device 200 via the bus 230. It should be appreciated that although not shown in the figures, other hardware and/or software modules may be used in conjunction with the electronic device 200, including but not limited to: microcode, device drivers, redundant processing units, external disk drive arrays, RAID systems, tape drives, and data backup storage systems, among others.
Through the above description of the embodiments, those skilled in the art will readily understand that the exemplary embodiments described herein may be implemented by software, or by software in combination with necessary hardware. Therefore, the technical solution according to the embodiments of the present disclosure may be embodied in the form of a software product, which may be stored in a non-volatile storage medium (which may be a CD-ROM, a usb disk, a removable hard disk, etc.) or on a network, and includes several instructions to enable a computing device (which may be a personal computer, a server, or a network device, etc.) to execute the above method according to the embodiments of the present disclosure.
Fig. 8 schematically illustrates a computer-readable storage medium in an exemplary embodiment of the disclosure.
Referring to fig. 8, a program product 400 for implementing the above method according to an embodiment of the present disclosure is described, which may employ a portable compact disc read only memory (CD-ROM) and include program code, and may be run on a terminal device, such as a personal computer. However, the program product of the present disclosure is not limited thereto, and in this document, a readable storage medium may be any tangible medium that can contain, or store a program for use by or in connection with an instruction execution system, apparatus, or device.
The program product may employ any combination of one or more readable media. The readable medium may be a readable signal medium or a readable storage medium. A readable storage medium may be, for example, but not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or any combination of the foregoing. More specific examples (a non-exhaustive list) of the readable storage medium include: an electrical connection having one or more wires, a portable disk, a hard disk, a Random Access Memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disc read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
The computer readable storage medium may include a propagated data signal with readable program code embodied therein, for example, in baseband or as part of a carrier wave. Such a propagated data signal may take many forms, including, but not limited to, electro-magnetic, optical, or any suitable combination thereof. A readable storage medium may also be any readable medium that is not a readable storage medium and that can communicate, propagate, or transport a program for use by or in connection with an instruction execution system, apparatus, or device. Program code embodied on a readable storage medium may be transmitted using any appropriate medium, including but not limited to wireless, wireline, optical fiber cable, RF, etc., or any suitable combination of the foregoing.
Program code for carrying out operations for the present disclosure may be written in any combination of one or more programming languages, including an object oriented programming language such as Java, C + + or the like and conventional procedural programming languages, such as the "C" programming language or similar programming languages. The program code may execute entirely on the user's computing device, partly on the user's device, as a stand-alone software package, partly on the user's computing device and partly on a remote computing device, or entirely on the remote computing device or server. In the case of a remote computing device, the remote computing device may be connected to the user computing device through any kind of network, including a Local Area Network (LAN) or a Wide Area Network (WAN), or may be connected to an external computing device (e.g., through the internet using an internet service provider).
The computer readable medium carries one or more programs which, when executed by a device, cause the computer readable medium to perform the functions of: acquiring historical data and real-time data of a plurality of power transmission and transformation operation devices; analyzing the historical data and the real-time data, and determining a risk value of each power transmission and transformation operation device in a plurality of power transmission and transformation operation devices; generating risk information when the risk value exceeds a threshold; and sending the risk information to the target personnel according to the first template.
Those skilled in the art will appreciate that the modules described above may be distributed in the apparatus according to the description of the embodiments, or may be modified accordingly in one or more apparatuses unique from the embodiments. The modules of the above embodiments may be combined into one module, or further split into multiple sub-modules.
Through the above description of the embodiments, those skilled in the art will readily understand that the exemplary embodiments described herein may be implemented by software, or by software in combination with necessary hardware. Therefore, the technical solution according to the embodiments of the present disclosure may be embodied in the form of a software product, which may be stored in a non-volatile storage medium (which may be a CD-ROM, a usb disk, a removable hard disk, etc.) or on a network, and includes several instructions to enable a computing device (which may be a personal computer, a server, a mobile terminal, or a network device, etc.) to execute the method according to the embodiments of the present disclosure.
Exemplary embodiments of the present disclosure are specifically illustrated and described above. It is to be understood that the present disclosure is not limited to the precise arrangements, instrumentalities, or instrumentalities described herein; on the contrary, the disclosure is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the appended claims.

Claims (10)

1. The early warning method for the power transmission and transformation operation equipment is characterized by comprising the following steps:
acquiring historical data and real-time data of a plurality of power transmission and transformation operation devices;
analyzing the historical data and the real-time data, and determining a risk value of each power transmission and transformation operation device in a plurality of power transmission and transformation operation devices;
generating risk information when the risk value exceeds a threshold; and
and sending the risk information to the target personnel according to the first template.
2. The method of claim 1, further comprising:
acquiring alarm information of power transmission and transformation operation equipment, analyzing the alarm information through multiple dimensions, and determining a label of the power transmission and transformation operation equipment; and determining hidden danger target equipment according to the label.
3. The method of claim 2, further comprising:
and sending the alarm information to a target person according to a second template, and processing the real-time alarm information by the target person according to an operation procedure corresponding to the alarm information.
4. The method of claim 2, further comprising: and storing the alarm information and analyzing the alarm information at regular time.
5. The method of claim 1, wherein obtaining historical data and real-time data for a plurality of electric transmission and transformation operating equipment comprises at least one of:
acquiring historical monitoring information of a plurality of power transmission and transformation operation devices;
acquiring defect record information of a plurality of power transmission and transformation operation devices;
acquiring system ledger information of a plurality of power transmission and transformation operation devices;
acquiring meteorological environment information of a plurality of power transmission and transformation operation devices; and
and acquiring real-time monitoring information of a plurality of power transmission and transformation operation devices.
6. The method of claim 1, wherein analyzing the historical data and the real-time data comprises:
analyzing the historical data and real-time data from a time dimension; and/or
Analyzing the historical data and the real-time data from a spatial dimension; and/or
Analyzing the historical data and the real-time data from a type dimension; and/or
The historical data and real-time data are analyzed from the device dimension.
7. The method of claim 2, wherein analyzing the alarm information through multiple dimensions, determining the label of the electric transmission and transformation operating device includes at least one of:
analyzing the alarm information through a correlation analysis method to determine a label of the power transmission and transformation operation equipment; and/or
Analyzing the alarm information through a time sequence analysis method to determine a label of the power transmission and transformation operation equipment; and/or
Analyzing the alarm information by a frequency analysis method to determine the label of the power transmission and transformation operation equipment; and/or
And analyzing the alarm information by a text analysis method to determine the label of the power transmission and transformation operation equipment.
8. The method of claim 2, wherein analyzing the alarm information through multiple dimensions, determining the label of the electric transmission and transformation operating device comprises:
determining a quality attribute label according to the alarm information;
determining a relation attribute label according to the alarm information;
and determining the state attribute label according to the alarm information.
9. The utility model provides a power transmission and transformation operation equipment early warning device which characterized in that includes:
the data module is used for acquiring historical data and real-time data of a plurality of power transmission and transformation operation devices;
the analysis module is used for analyzing the historical data and the real-time data and determining the risk value of each power transmission and transformation operation device in the plurality of power transmission and transformation operation devices;
the judging module is used for generating risk information when the risk value exceeds a threshold value; and
and the sending module is used for sending the risk information to the target personnel according to the first template.
10. The apparatus of claim 9, further comprising:
the alarm module is used for acquiring alarm information of the power transmission and transformation operation equipment;
the label module is used for analyzing the alarm information through multiple dimensions and determining a label of the power transmission and transformation operation equipment; and
and the equipment module is used for determining the hidden danger target equipment according to the label.
CN202111086110.0A 2021-09-16 2021-09-16 Power transmission and transformation operation equipment early warning method and device Pending CN113988507A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111086110.0A CN113988507A (en) 2021-09-16 2021-09-16 Power transmission and transformation operation equipment early warning method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111086110.0A CN113988507A (en) 2021-09-16 2021-09-16 Power transmission and transformation operation equipment early warning method and device

Publications (1)

Publication Number Publication Date
CN113988507A true CN113988507A (en) 2022-01-28

Family

ID=79735927

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111086110.0A Pending CN113988507A (en) 2021-09-16 2021-09-16 Power transmission and transformation operation equipment early warning method and device

Country Status (1)

Country Link
CN (1) CN113988507A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117077998A (en) * 2023-02-02 2023-11-17 北京思创信息系统有限公司 Hidden danger investigation method, hidden danger investigation system, hidden danger investigation terminal and storage medium

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101859409A (en) * 2010-05-25 2010-10-13 广西电网公司电力科学研究院 Power transmission and transformation equipment state overhauling system based on risk evaluation
CN105913126A (en) * 2016-03-25 2016-08-31 北京用尚科技股份有限公司 Transformer station intelligent alarm model method for big data and cloud environment
CN106655522A (en) * 2017-02-28 2017-05-10 中国南方电网有限责任公司 Master station system suitable for operation and maintenance management of secondary equipment of power grid
CN108830745A (en) * 2018-06-29 2018-11-16 国网上海市电力公司 Power grid cascading fault diagnosis, early warning, assessment system based on monitoring information
CN110808864A (en) * 2019-11-12 2020-02-18 国家电网有限公司 Communication early warning method, device and system
CN111798029A (en) * 2020-05-29 2020-10-20 广州供电局有限公司黄埔供电局 Join in marriage net production safety risk early warning system
CN112152314A (en) * 2020-08-13 2020-12-29 国网浙江省电力有限公司 Centralized monitoring transformer substation risk identification early warning system and working method thereof
CN112348660A (en) * 2020-10-21 2021-02-09 上海淇玥信息技术有限公司 Method and device for generating risk warning information and electronic equipment
CN113850463A (en) * 2021-08-02 2021-12-28 国网浙江省电力有限公司杭州供电公司 Processing method and device for misoperation prevention of transformer substation

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101859409A (en) * 2010-05-25 2010-10-13 广西电网公司电力科学研究院 Power transmission and transformation equipment state overhauling system based on risk evaluation
CN105913126A (en) * 2016-03-25 2016-08-31 北京用尚科技股份有限公司 Transformer station intelligent alarm model method for big data and cloud environment
CN106655522A (en) * 2017-02-28 2017-05-10 中国南方电网有限责任公司 Master station system suitable for operation and maintenance management of secondary equipment of power grid
CN108830745A (en) * 2018-06-29 2018-11-16 国网上海市电力公司 Power grid cascading fault diagnosis, early warning, assessment system based on monitoring information
CN110808864A (en) * 2019-11-12 2020-02-18 国家电网有限公司 Communication early warning method, device and system
CN111798029A (en) * 2020-05-29 2020-10-20 广州供电局有限公司黄埔供电局 Join in marriage net production safety risk early warning system
CN112152314A (en) * 2020-08-13 2020-12-29 国网浙江省电力有限公司 Centralized monitoring transformer substation risk identification early warning system and working method thereof
CN112348660A (en) * 2020-10-21 2021-02-09 上海淇玥信息技术有限公司 Method and device for generating risk warning information and electronic equipment
CN113850463A (en) * 2021-08-02 2021-12-28 国网浙江省电力有限公司杭州供电公司 Processing method and device for misoperation prevention of transformer substation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117077998A (en) * 2023-02-02 2023-11-17 北京思创信息系统有限公司 Hidden danger investigation method, hidden danger investigation system, hidden danger investigation terminal and storage medium

Similar Documents

Publication Publication Date Title
CN109062993A (en) A kind of offline electric network fault Response project generation method and its device
CN111415107B (en) Power distribution network area image generation method, device, computer equipment and storage medium
CN114639183A (en) Intelligent inspection method, system, computer equipment and medium based on element
CN105958652A (en) Unattended operation transformer substation pre-warning system and method based on big data analysis
CN115994187A (en) Hidden danger link type full-period safety management method and system based on distributed collaboration
CN113988507A (en) Power transmission and transformation operation equipment early warning method and device
CN113850463A (en) Processing method and device for misoperation prevention of transformer substation
Wu et al. An Auxiliary Decision‐Making System for Electric Power Intelligent Customer Service Based on Hadoop
CN103854230A (en) Electric power security risk management and control system and method
CN111027827B (en) Method and device for analyzing operation risk of bottom-protecting communication network and computer equipment
CN112712348A (en) Log correlation analysis method and diagnosis device for converter station
CN111626597A (en) Equipment alarm method, device, equipment and medium
CN110677271A (en) Big data alarm method, device, equipment and storage medium based on ELK
CN114069843A (en) Alarm method for misoperation of transformer substation
CN115658981A (en) Equipment data acquisition method and system, terminal equipment and storage medium
CN116205624A (en) Equipment operation management method based on digital twin and related products
CN115840656A (en) Automatic operation and maintenance method and system for application program based on fault self-healing
CN115408236A (en) Log data auditing system, method, equipment and medium
CN114154879A (en) Power grid operation risk assessment method and device, electronic equipment and readable storage medium
CN108616383A (en) A kind of network and the security process of information manage system
CN103714433A (en) Hidden danger troubleshooting internet-of-things trusted terminal and hidden danger troubleshooting method
CN114239874A (en) Power grid data processing system and method based on urban energy map
CN114443437A (en) Alarm root cause output method, apparatus, device, medium, and program product
CN113342619A (en) Log monitoring method and system, electronic device and readable medium
CN112765425A (en) Hydropower station data processing method and electronic equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination