CN113946789A - Method for calculating waste incineration amount of four-furnace three-machine waste incineration power plant in real time - Google Patents

Method for calculating waste incineration amount of four-furnace three-machine waste incineration power plant in real time Download PDF

Info

Publication number
CN113946789A
CN113946789A CN202111365107.2A CN202111365107A CN113946789A CN 113946789 A CN113946789 A CN 113946789A CN 202111365107 A CN202111365107 A CN 202111365107A CN 113946789 A CN113946789 A CN 113946789A
Authority
CN
China
Prior art keywords
time
real
calculation
data
incinerator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202111365107.2A
Other languages
Chinese (zh)
Other versions
CN113946789B (en
Inventor
王大鹏
杜保华
杨永军
吴智群
褚贵宏
何新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Thermal Power Research Institute Co Ltd
Xian TPRI Power Station Information Technology Co Ltd
Original Assignee
Xian Thermal Power Research Institute Co Ltd
Xian TPRI Power Station Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Thermal Power Research Institute Co Ltd, Xian TPRI Power Station Information Technology Co Ltd filed Critical Xian Thermal Power Research Institute Co Ltd
Priority to CN202111365107.2A priority Critical patent/CN113946789B/en
Publication of CN113946789A publication Critical patent/CN113946789A/en
Application granted granted Critical
Publication of CN113946789B publication Critical patent/CN113946789B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/10Complex mathematical operations
    • G06F17/15Correlation function computation including computation of convolution operations
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G5/00Incineration of waste; Incinerator constructions; Details, accessories or control therefor
    • F23G5/50Control or safety arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G7/00Incinerators or other apparatus for consuming industrial waste, e.g. chemicals

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Mathematical Optimization (AREA)
  • Data Mining & Analysis (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mechanical Engineering (AREA)
  • Pure & Applied Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Mathematical Physics (AREA)
  • Computing Systems (AREA)
  • Databases & Information Systems (AREA)
  • Software Systems (AREA)
  • Algebra (AREA)
  • Environmental & Geological Engineering (AREA)
  • Incineration Of Waste (AREA)

Abstract

The invention discloses a method for calculating the garbage incineration amount of a four-furnace three-machine garbage incineration power plant in real time, which starts the current round of real-time calculation by taking the current time t as a reference, collects design data and historical data, determines operation condition parameters, real-time calculation parameters and verification calculation parameters, acquires the data from a real-time database, sequentially judges whether an incinerator, a waste heat boiler and a steam turbine generator are in steady-state operation or not, then comprehensively judges whether the four-furnace three-machine is in steady-state operation or not, performs data filtering treatment on the real-time data of the calculation parameters, calculates the real-time garbage incineration amount of a whole plant by using effective data after filtering treatment, performs data verification on the real-time garbage incineration amount of the whole plant by using the verification calculation parameters, calculates the real-time garbage incineration amount of each incinerator under the steady-state operation condition by using the real-time garbage incineration amount of the whole plant which is qualified through verification, finally writes the calculation result into the real-time database and finishes the current round of calculation, and entering the next round of real-time calculation.

Description

Method for calculating waste incineration amount of four-furnace three-machine waste incineration power plant in real time
Technical Field
The invention belongs to the technical field of the power industry, and particularly relates to a method for calculating the waste incineration amount of a four-furnace three-machine waste incineration power plant in real time.
Background
The main fuel of the four-furnace three-machine large-scale waste incineration power plant is domestic waste, the garbage in the bin is lifted to the feeding hopper through the garbage grab bucket, and the garbage is continuously fed into the grate inlet through the feeding groove and finally enters the incinerator for combustion. The incineration waste is measured and weighed by a waste grab bucket weighing and metering device before entering the furnace, the existing measurement and weighing is the accumulative waste incineration amount, but an online calculation method of the real-time waste incineration amount is not reported.
The real-time waste incineration amount can assist in calculating other energy consumption indexes, and can help energy-saving professional technicians of enterprises to know the actual operation condition of the incinerator to perform transverse comparison, so that the real-time calculation of the waste incineration amount of the four-furnace three-machine large-scale waste incineration power plant is very important. The four-furnace three-machine garbage incinerator adopts a unique arrangement mode of 'four mechanical grate furnace type garbage incinerators + four waste heat boilers + three steam turbine generator units', garbage burns in the four incinerators and transfers heat to main steam of the four waste heat boilers and then collects the main steam to a main steam pipe to supply the three steam turbine generator units to generate electricity, and therefore the real-time garbage incineration amount is calculated by analyzing the historical relationship between the generated energy of the three steam turbine generator units and the garbage incineration amount of the four incinerators, and the real-time garbage incineration amount is relatively accurate.
Disclosure of Invention
In order to overcome the technical problems, the invention provides a method for calculating the garbage incineration amount of a four-furnace three-machine garbage incineration power plant in real time, which is convenient for technicians to know the real-time garbage incineration treatment conditions of three incinerators in real time.
In order to achieve the purpose, the invention adopts the technical scheme that:
a method for calculating the garbage incineration amount of a four-furnace three-machine garbage incineration power plant in real time comprises the following steps;
1) start the current round of real-time calculation
Defining the current time t as reference time, and starting the current round of real-time calculation;
2) collecting design data and historical data
Collecting design data and historical data aiming at a four-furnace three-machine waste incineration power plant;
3) determining operating condition parameters, real-time calculation parameters and verification calculation parameters
Dividing the real-time parameters into three types, namely operating condition parameters, real-time calculation parameters and checking calculation parameters, wherein the operating condition parameters are used for judging whether the incinerator, the waste heat boiler and the steam turbine generator are in steady operation or not, the real-time calculation parameters are used for calculating the real-time waste incineration amount, the checking calculation parameters are used for checking the calculated real-time waste incineration amount, and the real-time data of all the real-time parameters are obtained from a real-time database;
4) judging whether the incinerator is in steady operation
Obtaining the operating condition parameters of the incinerator in the step 2) from a real-time database at tHistoryHistorical data over time (where tHistoryDefined as time period t-6min to t-1s) and defines three incinerator boundary conditions:
incinerator boundary conditions one: incinerator operating state SFMAll of the historical data of (1);
incinerator boundary conditions two: primary air flow F of grateFMThe historical data of (2) is all larger than 5000Nm3/h, and the data fluctuation range does not exceed +/-50% of the arithmetic mean value of the historical data;
incinerator boundary conditions three: incinerator furnace temperature TIMThe historical data is all more than 750 ℃, and the data fluctuation range does not exceed +/-20% of the arithmetic mean value of the historical data;
when the three boundary conditions of the No. M incinerator are simultaneously met, the incinerator is determined to be in steady-state operation, if at least one incinerator is in steady-state operation, the whole incinerator is determined to be in steady-state operation, and the next step of calculation can be continued; otherwise, the whole incinerator is considered to be in unstable state operation, the calculation at the current time t is skipped, and the next round of calculation is carried out;
5) judging whether the exhaust-heat boiler operates in a steady state or not
Obtaining the operating condition parameters of the waste heat boiler in the step 2) from a real-time database at tHistoryHistorical data over time (where tHistoryDefined as a time period from t-6min to t-1s), and defining three boundary conditions of the waste heat boiler:
boundary conditions of the waste heat boiler are as follows: intermediate layer temperature T of first vertical flue of waste heat boilerBMThe historical data is all more than 700 ℃, and the data fluctuation range does not exceed +/-50% of the arithmetic mean value of the historical data;
and (2) boundary conditions of the waste heat boiler are as follows: opening VO of main steam electric gate valve of waste heat boilerB MThe historical data is all larger than 5%, and the data fluctuation range does not exceed +/-20% of the arithmetic mean value of the historical data;
boundary conditions of the waste heat boiler are as follows: economizer inlet feed water pressure PBMThe historical data of (2) is all larger than 3.0MPa, and the data fluctuation range does not exceed +/-50% of the arithmetic mean value of the historical data;
when the three boundary conditions of the waste heat boiler No. M are simultaneously met and the corresponding incinerator is in steady-state operation according to the step 4), the waste heat boiler No. M is considered to be in steady-state operation, if at least one waste heat boiler and the corresponding incinerator are in steady-state operation, the whole waste heat boiler is considered to be in steady-state operation, and the next step of calculation can be continued; otherwise, the whole waste heat boiler is considered to be in unstable state operation, the calculation at the current time t is skipped, and the next round of calculation is carried out;
6) judging whether the turbonator operates in a steady state or not
Obtaining the operating condition parameters of the turbonator in the step 2) from a real-time database at tHistoryHistorical data over time (where,tHistorydefined as the time period from t-6min to t-1s), and defining the boundary conditions of three turbonators:
boundary conditions of the turbonator are as follows: steam turbine operating state STNAll of the historical data of (1);
and boundary conditions of the steam turbine generator are as follows: front temperature T of main valveTNThe historical data is all more than 350 ℃, and the data fluctuation range does not exceed +/-20% of the arithmetic mean value of the historical data;
and boundary conditions of the turbonator are as follows: main valve front pressure PTNThe historical data of (2) is all larger than 3.0MPa, and the data fluctuation range does not exceed +/-50% of the arithmetic mean value of the historical data;
when the three boundary conditions of the No. N steam turbine generator are simultaneously met, the No. N steam turbine generator is considered to be in steady-state operation, if at least one steam turbine generator is in steady-state operation, the whole steam turbine generator is considered to be in steady-state operation, and then the next step of calculation can be continued; otherwise, the turbonator is considered to be in unsteady state operation, the calculation at the current time t is skipped, and the next round of calculation is carried out;
7) comprehensively judging whether four furnaces and three machines are in steady-state operation
If the incinerator, the waste heat boiler and the steam turbine generator are judged to be in steady-state operation according to the steps 4), 5) and 6), the four furnaces and the three turbines are considered to be in steady-state operation, and then the calculation of the next step can be continued; otherwise, the four furnaces and the three machines are considered to be in unsteady state operation, the calculation at the current time t is skipped, and the next round of calculation is carried out;
8) real-time computed parametric data filtering
If the four furnaces and the three machines are judged to be in steady-state operation according to the step 7), acquiring real-time data X (t) of the real-time calculation parameters in the step 2) at the current t moment from a real-time database, and cleaning the data according to a method of the formula (1):
Figure BDA0003360380650000051
in the formula (1), XiFor real-time calculation of parameters at tHistoryArbitrary data in time period, m is parameter at tHistoryStatistical amount of data over a period of time;
if the real-time data X (t) meets the formula (1), the real-time data X (t) is regarded as reliable data, and the next calculation is continued; otherwise, the data is considered as unreliable data, the data does not participate in the real-time calculation of the current round, and the next round of calculation is started;
9) calculating real-time garbage incineration amount of whole plant
If the four furnaces and the three machines are in steady-state operation according to the step 7), and the real-time calculation parameter of the active power of the generator at the current t moment is determined to be reliable data according to the step 8), calculating the whole-plant real-time waste incineration quantity LJ at the current t moment according to the formula (2)Plant(t):
Figure BDA0003360380650000052
Figure BDA0003360380650000061
In the formula (2), M designates an incinerator or a waste heat boiler and takes values of 1, 2, 3 and 4, and N designates a turbonator and takes values of 1, 2 and 3;
10) checking real-time garbage incineration amount of whole plant
According to the step 7), judging that the four furnaces and the three machines are in steady-state operation, acquiring three historical data with the numerical values of the checking calculation parameter accumulated incineration amount of the 4 incinerators determined in the step 2) before the current time t from a real-time database, and calculating real-time garbage incineration amount checking data LJ of the whole plant according to the formula (3)Check1(t):
Figure BDA0003360380650000062
In the formula (3), t-3、t-2、t-1Respectively representing historical moments corresponding to three historical data with non-repeated numerical values before the current t moment;
then, calculating real-time garbage incineration amount check data LJ of the whole plant according to the formula (4)Check2(t):
Figure BDA0003360380650000063
Then, carrying out data verification on the real-time garbage incineration amount of the whole plant according to the formula (5):
Figure BDA0003360380650000064
calculating the real-time garbage incineration amount of the whole plant and simultaneously satisfying (5.1) and (5.2) in the formula (5), if the verification is qualified, continuing the real-time calculation of the whole plant; if the calculated real-time garbage incineration amount of the whole plant does not meet the formula (5), checking the garbage to be unqualified, not outputting a result, terminating the calculation of the current round, and entering the next round of calculation;
11) calculating the real-time garbage burning amount of each incinerator
According to the step 4) and the step 5), if the boundary condition of the No. M incinerator and the boundary condition of the No. M waste heat boiler are simultaneously met, judging that the No. M incinerator and the waste heat boiler are in steady-state operation;
determining the main steam flow SF of the waste heat boiler at the M th waste heat boiler at the current t moment according to the step 2)BMWhen the data is reliable, the real-time waste incineration amount LJ of the No. M incinerator is calculated according to the formula (6)FM(t):
Figure BDA0003360380650000071
Finally, calculating to obtain the real-time waste incineration amount of each steady-state operation incinerator;
12) writing the data into the real-time database and finishing the real-time calculation of the current round
Finally, writing the verified real-time garbage burning amount of the whole plant and the real-time garbage burning amount of each steady-state operation incinerator calculated in the step 11) into a real-time database, finishing the real-time calculation of the round, and entering the next round of calculation (at the moment of t +1 s);
the collected design data and historical data collected in step 2) are shown in the following table:
Figure BDA0003360380650000072
Figure BDA0003360380650000081
the four-furnace three-machine operation condition parameters, the real-time calculation parameters and the verification calculation parameters determined in the step 3) are respectively as follows;
the operating condition parameters, symbols, units and attributions of the four-furnace three-machine are shown in the following table;
Figure BDA0003360380650000082
the real-time calculation parameters, symbols, units and attributions of the four furnaces and the three machines are shown in the following table;
Figure BDA0003360380650000083
Figure BDA0003360380650000091
the checking calculation parameters, symbols, units and attributions of the four furnaces and the three machines are shown in the following table;
parameter name Parameter symbol Unit of parameter Parameter attribution
Operating state of incinerator SFM 0/1 Incinerator
Accumulating the garbage disposal amount LJFM t Incinerator
The invention has the beneficial effects that:
the invention provides an online method for real-time calculation of the waste incineration amount of the four-furnace three-machine household waste incineration power plant, can accurately calculate the real-time waste incineration amount of each incinerator, and has guiding significance for online comparison and analysis of energy consumption indexes.
Drawings
FIG. 1 is a schematic diagram of the real-time computing process of the present invention.
FIG. 2 is a schematic diagram of a real-time waste incineration curve according to the present invention.
Detailed Description
The present invention will be described in further detail with reference to examples.
1) Start the current round of real-time calculation
Defining the current time t as the reference time, and starting the current round of real-time calculation.
2) Collecting design data and historical data
For a four-furnace three-machine waste incineration power plant, design data and historical data are collected and summarized as shown in the following table:
Figure BDA0003360380650000101
wherein, for the four furnaces and three machines of this scheme, M marks the incinerator or the exhaust-heat boiler, the value is 1, 2, 3, 4, N marks the turbo generator, the value is 1, 2, 3, the scheme is the same as below.
3) Determining operating condition parameters, real-time calculation parameters and verification calculation parameters
The real-time parameters are divided into three types, namely operation condition parameters, real-time calculation parameters and verification calculation parameters, wherein the operation condition parameters are used for judging whether the incinerator, the waste heat boiler and the steam turbine generator are in steady operation or not, the real-time calculation parameters are used for calculating the real-time waste incineration amount, and the verification calculation parameters are used for verifying the calculated real-time waste incineration amount. Real-time data of all real-time parameters are obtained from a real-time database.
The operating condition parameters, symbols, units and attributions of the four-furnace three-machine are shown in the following table.
Figure BDA0003360380650000102
Figure BDA0003360380650000111
The real-time calculation parameters, symbols, units and attributions of the four furnaces and the three machines are shown in the following table.
Parameter name Parameter symbol Unit of parameter Parameter attribution
Operating state of incinerator SFM 0/1 Incinerator
Main steam flow of waste heat boiler SFBM t/h Waste heat boiler
Active power EGN Megawatt Steam turbine generator
The parameters, symbols, units and attributions of the calibration calculation of the four furnaces and the three machines are shown in the following table.
Parameter name Parameter symbol Unit of parameter Parameter attribution
Operating state of incinerator SFM 0/1 Incinerator
Accumulating the garbage disposal amount LJFM t Incinerator
4) Judging whether the incinerator is in steady operation
Obtaining the operating condition parameters of the incinerator in the step 2) from a real-time database at tHistoryHistorical data over time (where tHistoryDefined as time period t-6min to t-1s) and defines three incinerator boundary conditions:
incinerator boundary conditions one: incinerator operating state SFMAll of the historical data of (1);
incinerator boundary conditions two: primary air flow F of grateFMThe historical data of (2) is all larger than 5000Nm3/h, and the data fluctuation range does not exceed +/-50% of the arithmetic mean value of the historical data;
incinerator boundary conditions three: incinerator furnace temperature IFMAll of the historical data of (1) is greater than 750 ℃, and the data fluctuation range does not exceed +/-20% of the arithmetic mean of the historical data.
When the above three boundary conditions of the incinerator No. M are satisfied simultaneously, the incinerator is considered to be in steady-state operation. If at least one incinerator is in steady-state operation, the whole incinerator is considered to be in steady-state operation, and the next step of calculation can be continued; otherwise, the whole incinerator is considered to be in unsteady state operation, the calculation at the current time t is skipped, and the next round of calculation is carried out.
5) Judging whether the exhaust-heat boiler operates in a steady state or not
Obtaining the operating condition parameters of the waste heat boiler in the step 2) from a real-time database at tHistoryHistorical data over time (where tHistoryDefined as a time period from t-6min to t-1s), and defining three boundary conditions of the waste heat boiler:
boundary of waste heat boilerThe first condition is as follows: intermediate layer temperature T of first vertical flue of waste heat boilerBMThe historical data is all more than 700 ℃, and the data fluctuation range does not exceed +/-50% of the arithmetic mean value of the historical data;
and (2) boundary conditions of the waste heat boiler are as follows: opening VO of main steam electric gate valve of waste heat boilerB MThe historical data is all larger than 5%, and the data fluctuation range does not exceed +/-20% of the arithmetic mean value of the historical data;
boundary conditions of the waste heat boiler are as follows: economizer inlet feed water pressure PBMThe historical data of (2) are all larger than 3.0MPa, and the data fluctuation range does not exceed +/-50% of the arithmetic mean value of the historical data.
And (4) when the three boundary conditions of the No. M waste heat boiler are simultaneously met and the corresponding incinerator is in steady-state operation according to the step 4), determining that the No. M waste heat boiler is in steady-state operation. If at least one waste heat boiler and the corresponding incinerator are in steady-state operation, the whole waste heat boiler is considered to be in steady-state operation, and then the next step of calculation can be continued; otherwise, the whole waste heat boiler is considered to be in unstable state operation, the calculation at the current time t is skipped, and the next round of calculation is carried out.
6) Judging whether the turbonator operates in a steady state or not
Obtaining the operating condition parameters of the turbonator in the step 2) from a real-time database at tHistoryHistorical data over time (where tHistoryDefined as the time period from t-6min to t-1s), and defining the boundary conditions of three turbonators:
boundary conditions of the turbonator are as follows: steam turbine operating state STNAll of the historical data of (1);
and boundary conditions of the steam turbine generator are as follows: front temperature T of main valveTNThe historical data is all more than 350 ℃, and the data fluctuation range does not exceed +/-20% of the arithmetic mean value of the historical data;
and boundary conditions of the turbonator are as follows: main valve front pressure PTNThe historical data of (2) are all larger than 3.0MPa, and the data fluctuation range does not exceed +/-50% of the arithmetic mean value of the historical data.
And when the three boundary conditions of the No. N steam turbine generator are simultaneously met, the No. N steam turbine generator is considered to be in steady-state operation. If at least one turbonator is in steady-state operation, the whole turbonator is considered to be in steady-state operation, and the calculation of the next step can be continued; otherwise, the turbonator is considered to be in unsteady state operation, the calculation at the current time t is skipped, and the next round of calculation is carried out.
7) Comprehensively judging whether four furnaces and three machines are in steady-state operation
If the incinerator, the waste heat boiler and the steam turbine generator are judged to be in steady-state operation according to the steps 4), 5) and 6), the four furnaces and the three turbines are considered to be in steady-state operation, and then the calculation of the next step can be continued; otherwise, the four furnaces and the three machines are considered to be in unsteady state operation, the calculation at the current time t is skipped, and the next round of calculation is carried out.
8) Real-time computed parametric data filtering
If the four furnaces and the three machines are judged to be in steady-state operation according to the step 7), acquiring real-time data X (t) of the real-time calculation parameters in the step 2) at the current t moment from a real-time database, and cleaning the data according to a method of the formula (1):
Figure BDA0003360380650000141
in the formula (1), XiFor real-time calculation of parameters at tHistoryArbitrary data in time period, m is parameter at tHistoryStatistical amount of data over a period of time.
If the real-time data X (t) meets the formula (1), the real-time data X (t) is regarded as reliable data, and the next calculation is continued; otherwise, the data is considered as unreliable data, the data does not participate in the real-time calculation of the current round, and the next round of calculation is started.
9) Calculating real-time garbage incineration amount of whole plant
If the four furnaces and the three machines are in steady-state operation according to the step 7), and when the real-time calculation parameter active power of at least one turbonator at the current time t is determined to be reliable data according to the step 8), calculating the whole-plant real-time waste incineration quantity LJ at the current time t according to the formula (2)Plant(t):
Figure BDA0003360380650000142
Figure BDA0003360380650000151
In the formula (2), M identifies the incinerator or the waste heat boiler and takes values of 1, 2, 3 and 4, and N identifies the turbonator and takes values of 1, 2 and 3. Wherein, the first day of the month is calculated by the formula (2.1), and the rest is calculated by the formula (2.2).
10) Checking real-time garbage incineration amount of whole plant
According to the step 7), judging that the four furnaces and the three machines are in steady-state operation, acquiring three historical data with the numerical values of the checking calculation parameter accumulated incineration amount of the 4 incinerators determined in the step 2) before the current time t from a real-time database, and calculating real-time garbage incineration amount checking data LJ of the whole plant according to the formula (3)Check1(t):
Figure BDA0003360380650000152
In the formula (3), t-3、t-2、t-1The history time points corresponding to three pieces of history data whose numerical values are not repeated before the current time point t are respectively shown.
Then, calculating real-time garbage incineration amount check data LJ of the whole plant according to the formula (4)Check2(t):
Figure BDA0003360380650000153
Then, carrying out data verification on the real-time garbage incineration amount of the whole plant according to the formula (5):
Figure BDA0003360380650000154
calculating the real-time garbage incineration amount of the whole plant and simultaneously satisfying (5.1) and (5.2) in the formula (5), if the verification is qualified, continuing the real-time calculation of the whole plant; if the real-time garbage incineration amount of the whole plant does not satisfy the formula (5), checking is unqualified, a result is not output, the calculation of the current round is terminated, and the next round of calculation is carried out.
11) Calculating the real-time garbage burning amount of each incinerator
According to the step 4) and the step 5), the boundary condition of the No. M incinerator and the boundary condition of the No. M waste heat boiler are simultaneously met, and the No. M incinerator and the No. M waste heat boiler are judged to be in steady-state operation.
Determining the main steam flow SF of the waste heat boiler at the M th waste heat boiler at the current t moment according to the step 8)BMWhen the data is reliable, the real-time waste incineration amount LJ of the No. M incinerator is calculated according to the formula (6)FM(t):
Figure BDA0003360380650000161
And finally, calculating in real time to obtain the waste incineration amount of each steady-state operation incinerator.
12) Writing the data into the real-time database and finishing the real-time calculation of the current round
And finally, writing the verified real-time garbage incineration amount of the whole plant and the real-time garbage incineration amount of each steady-state operation incinerator calculated in the step 11) into a real-time database, finishing the real-time calculation of the round, and entering the next round of calculation (at the moment of t +1 s).

Claims (3)

1. A method for calculating the waste incineration amount of a four-furnace three-machine waste incineration power plant in real time is characterized by comprising the following steps;
1) start the current round of real-time calculation
Defining the current time t as reference time, and starting the current round of real-time calculation;
2) collecting design data and historical data
Collecting design data and historical data aiming at a four-furnace three-machine waste incineration power plant;
3) determining operating condition parameters, real-time calculation parameters and verification calculation parameters
Dividing the real-time parameters into three types, namely operating condition parameters, real-time calculation parameters and checking calculation parameters, wherein the operating condition parameters are used for judging whether the incinerator, the waste heat boiler and the steam turbine generator are in steady operation or not, the real-time calculation parameters are used for calculating the real-time waste incineration amount, the checking calculation parameters are used for checking the calculated real-time waste incineration amount, and the real-time data of all the real-time parameters are obtained from a real-time database;
4) judging whether the incinerator is in steady operation
Obtaining the operating condition parameters of the incinerator in the step 2) from a real-time database at tHistoryHistorical data over time (where tHistoryDefined as time period t-6min to t-1s) and defines three incinerator boundary conditions:
incinerator boundary conditions one: incinerator operating state SFMAll of the historical data of (1);
incinerator boundary conditions two: primary air flow F of grateFMThe historical data of (2) is all larger than 5000Nm3/h, and the data fluctuation range does not exceed +/-50% of the arithmetic mean value of the historical data;
incinerator boundary conditions three: incinerator furnace temperature IFMThe historical data is all more than 750 ℃, and the data fluctuation range does not exceed +/-20% of the arithmetic mean value of the historical data;
when the three boundary conditions of the No. M incinerator are simultaneously met, the incinerator is determined to be in steady-state operation, if at least one incinerator is in steady-state operation, the whole incinerator is determined to be in steady-state operation, and the next step of calculation can be continued; otherwise, the whole incinerator is considered to be in unstable state operation, the calculation at the current time t is skipped, and the next round of calculation is carried out;
5) judging whether the exhaust-heat boiler operates in a steady state or not
Obtaining the operating condition parameters of the waste heat boiler in the step 2) from a real-time database at tHistoryHistorical data over time (where tHistoryDefined as a time period from t-6min to t-1s), and defining three boundary conditions of the waste heat boiler:
boundary conditions of the waste heat boiler are as follows: intermediate layer temperature T of first vertical flue of waste heat boilerBMThe historical data is all more than 700 ℃, and the data fluctuation range does not exceed +/-50% of the arithmetic mean value of the historical data;
and (2) boundary conditions of the waste heat boiler are as follows: opening VO of main steam electric gate valve of waste heat boilerBMThe historical data is all larger than 5%, and the data fluctuation range does not exceed +/-20% of the arithmetic mean value of the historical data;
boundary conditions of the waste heat boiler are as follows: economizer inlet feed water pressure PBMThe historical data of (2) is all larger than 3.0MPa, and the data fluctuation range does not exceed +/-50% of the arithmetic mean value of the historical data;
when the three boundary conditions of the waste heat boiler No. M are simultaneously met and the corresponding incinerator is in steady-state operation according to the step 4), the waste heat boiler No. M is considered to be in steady-state operation, if at least one waste heat boiler and the corresponding incinerator are in steady-state operation, the whole waste heat boiler is considered to be in steady-state operation, and the next step of calculation can be continued; otherwise, the whole waste heat boiler is considered to be in unstable state operation, the calculation at the current time t is skipped, and the next round of calculation is carried out;
6) judging whether the turbonator operates in a steady state or not
Obtaining the operating condition parameters of the turbonator in the step 2) from a real-time database at tHistoryHistorical data over time (where tHistoryDefined as the time period from t-6min to t-1s), and defining the boundary conditions of three turbonators:
boundary conditions of the turbonator are as follows: steam turbine operating state STNAll of the historical data of (1);
and boundary conditions of the steam turbine generator are as follows: front temperature T of main valveTNThe historical data is all more than 350 ℃, and the data fluctuation range does not exceed +/-20% of the arithmetic mean value of the historical data;
and boundary conditions of the turbonator are as follows: main valve front pressure PTNThe historical data of (2) is all larger than 3.0MPa, and the data fluctuation range does not exceed +/-50% of the arithmetic mean value of the historical data;
when the three boundary conditions of the No. N steam turbine generator are simultaneously met, the No. N steam turbine generator is considered to be in steady-state operation, if at least one steam turbine generator is in steady-state operation, the whole steam turbine generator is considered to be in steady-state operation, and then the next step of calculation can be continued; otherwise, the turbonator is considered to be in unsteady state operation, the calculation at the current time t is skipped, and the next round of calculation is carried out;
7) comprehensively judging whether four furnaces and three machines are in steady-state operation
If the incinerator, the waste heat boiler and the steam turbine generator are judged to be in steady-state operation according to the steps 4), 5) and 6), the four furnaces and the three turbines are considered to be in steady-state operation, and then the calculation of the next step can be continued; otherwise, the four furnaces and the three machines are considered to be in unsteady state operation, the calculation at the current time t is skipped, and the next round of calculation is carried out;
8) real-time computed parametric data filtering
If the four furnaces and the three machines are judged to be in steady-state operation according to the step 7), acquiring real-time data X (t) of the real-time calculation parameters in the step 2) at the current t moment from a real-time database, and cleaning the data according to a method of the formula (1):
Figure FDA0003360380640000041
in the formula (1), XiFor real-time calculation of parameters at tHistoryArbitrary data in time period, m is parameter at tHistoryStatistical amount of data over a period of time;
if the real-time data X (t) meets the formula (1), the real-time data X (t) is regarded as reliable data, and the next calculation is continued; otherwise, the data is considered as unreliable data, the data does not participate in the real-time calculation of the current round, and the next round of calculation is started;
9) calculating real-time garbage incineration amount of whole plant
If the four furnaces and the three machines are in steady-state operation according to the step 7), and when the real-time calculation parameter active power of at least one turbonator at the current time t is determined to be reliable data according to the step 8), calculating the whole-plant real-time waste incineration quantity LJ at the current time t according to the formula (2)Plant(t):
Figure FDA0003360380640000042
In the formula (2), M designates an incinerator or a waste heat boiler and takes values of 1, 2, 3 and 4, and N designates a turbonator and takes values of 1, 2 and 3; wherein, the first day of the first month is calculated by the formula (2.1), and the rest time is calculated by the formula (2.2);
10) checking real-time garbage incineration amount of whole plant
According to the step 7), judging that the four furnaces and the three machines are in steady-state operation, acquiring three historical data with the numerical values of the checking calculation parameter accumulated incineration amount of the 4 incinerators determined in the step 2) before the current time t from a real-time database, and calculating real-time garbage incineration amount checking data LJ of the whole plant according to the formula (3)Check1(t):
Figure FDA0003360380640000051
In the formula (3), t-3、t-2、t-1Respectively representing historical moments corresponding to three historical data with non-repeated numerical values before the current t moment;
then, calculating real-time garbage incineration amount check data LJ of the whole plant according to the formula (4)Check2(t):
Figure FDA0003360380640000052
Then, carrying out data verification on the real-time garbage incineration amount of the whole plant according to the formula (5):
Figure FDA0003360380640000053
calculating the real-time garbage incineration amount of the whole plant and simultaneously satisfying (5.1) and (5.2) in the formula (5), if the verification is qualified, continuing the real-time calculation of the whole plant; if the calculated real-time garbage incineration amount of the whole plant does not meet the formula (5), checking the garbage to be unqualified, not outputting a result, terminating the calculation of the current round, and entering the next round of calculation;
11) calculating the real-time garbage burning amount of each incinerator
According to the step 4) and the step 5), if the boundary condition of the No. M incinerator and the boundary condition of the No. M waste heat boiler are simultaneously met, judging that the No. M incinerator and the waste heat boiler are in steady-state operation;
determining the main steam flow SF of the waste heat boiler at the M th waste heat boiler at the current t moment according to the step 2)BMWhen the data is reliable, the real-time waste incineration amount LJ of the No. M incinerator is calculated according to the formula (6)FM(t):
Figure FDA0003360380640000061
Finally, calculating in real time to obtain the waste incineration amount of each incinerator in steady state operation;
12) writing the data into the real-time database and finishing the real-time calculation of the current round
And finally, writing the verified real-time garbage incineration amount of the whole plant and the real-time garbage incineration amount of each steady-state operation incinerator calculated in the step 11) into a real-time database, finishing the real-time calculation of the round, and entering the next round of calculation (at the moment of t +1 s).
2. The method for calculating the waste incineration capacity of the four-furnace three-machine waste incineration power plant according to the claim 1, wherein the collected design data and the historical data collected in the step 2) are shown in the following table:
Figure FDA0003360380640000062
Figure FDA0003360380640000071
3. the method for calculating the waste incineration amount of the four-furnace three-machine waste incineration power plant according to the claim 1, wherein the four-furnace three-machine operation condition parameters, the real-time calculation parameters and the check calculation parameters determined in the step 3) are respectively as follows;
the operating condition parameters, symbols, units and attributions of the four-furnace three-machine are shown in the following table;
Figure FDA0003360380640000072
the real-time calculation parameters, symbols, units and attributions of the four furnaces and the three machines are shown in the following table;
Figure FDA0003360380640000073
Figure FDA0003360380640000081
the checking calculation parameters, symbols, units and attributions of the four furnaces and the three machines are shown in the following table;
parameter name Parameter symbol Unit of parameter Parameter attribution Operating state of incinerator SFM 0/1 Incinerator Accumulating the garbage disposal amount LJFM t Incinerator
CN202111365107.2A 2021-11-17 2021-11-17 Method for calculating garbage incineration amount of four-furnace three-machine garbage incineration power plant in real time Active CN113946789B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111365107.2A CN113946789B (en) 2021-11-17 2021-11-17 Method for calculating garbage incineration amount of four-furnace three-machine garbage incineration power plant in real time

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111365107.2A CN113946789B (en) 2021-11-17 2021-11-17 Method for calculating garbage incineration amount of four-furnace three-machine garbage incineration power plant in real time

Publications (2)

Publication Number Publication Date
CN113946789A true CN113946789A (en) 2022-01-18
CN113946789B CN113946789B (en) 2024-03-12

Family

ID=79338139

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111365107.2A Active CN113946789B (en) 2021-11-17 2021-11-17 Method for calculating garbage incineration amount of four-furnace three-machine garbage incineration power plant in real time

Country Status (1)

Country Link
CN (1) CN113946789B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114790920A (en) * 2022-05-25 2022-07-26 西安热工研究院有限公司 Method for calculating overpressure state of high-temperature reheat steam pipeline in real time

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002106821A (en) * 2000-09-29 2002-04-10 Kawasaki Heavy Ind Ltd Method and device for controlling combustion in refuse incineration plant
CN111322621A (en) * 2020-03-06 2020-06-23 赫普能源环境科技股份有限公司 Thermal power plant coupled waste incineration power generation system and method
CN112016781A (en) * 2020-04-27 2020-12-01 绿色动力环保集团股份有限公司 Method and system for online evaluation of small production and operation indexes of waste incineration power plant
CN112818509A (en) * 2020-12-31 2021-05-18 深圳市深能环保东部有限公司 Method for rapidly calculating waste incineration heat value on line

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002106821A (en) * 2000-09-29 2002-04-10 Kawasaki Heavy Ind Ltd Method and device for controlling combustion in refuse incineration plant
CN111322621A (en) * 2020-03-06 2020-06-23 赫普能源环境科技股份有限公司 Thermal power plant coupled waste incineration power generation system and method
CN112016781A (en) * 2020-04-27 2020-12-01 绿色动力环保集团股份有限公司 Method and system for online evaluation of small production and operation indexes of waste incineration power plant
CN112818509A (en) * 2020-12-31 2021-05-18 深圳市深能环保东部有限公司 Method for rapidly calculating waste incineration heat value on line

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
姚胜;孟桂祥;王祝成;施延洲;: "垃圾焚烧发电厂性能试验方法研究", 电站系统工程, no. 06, 15 November 2015 (2015-11-15) *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114790920A (en) * 2022-05-25 2022-07-26 西安热工研究院有限公司 Method for calculating overpressure state of high-temperature reheat steam pipeline in real time
CN114790920B (en) * 2022-05-25 2023-09-19 西安热工研究院有限公司 Method for calculating overpressure state of high-temperature reheat steam pipeline in real time

Also Published As

Publication number Publication date
CN113946789B (en) 2024-03-12

Similar Documents

Publication Publication Date Title
CN102444885B (en) Method for avoiding overheat tube burst in tubular boiler of power station boiler
CN112131517B (en) Method for measuring and calculating lower calorific value of garbage in garbage incineration power plant
CN110096817B (en) On-line estimation system and method for receiving base heat value of low-heat-value coal power generation in-furnace fuel
CN113095591B (en) Consumption difference analysis method for self-optimization of operation parameters of thermal power generating unit
CN104268433B (en) Method for monitoring unit power generation coal consumption deviation caused by variation of gas boiler operating parameters
CN110991756A (en) MSWI furnace temperature prediction method based on TS fuzzy neural network
CN111931346A (en) Real-time calculation method and application of low calorific value of coal as fired in coal-fired boiler
CN112016781A (en) Method and system for online evaluation of small production and operation indexes of waste incineration power plant
CN104090560A (en) Device monitoring power supply integrated environment evaluation indexes
CN113946789B (en) Method for calculating garbage incineration amount of four-furnace three-machine garbage incineration power plant in real time
CN108197723B (en) Optimized energy-saving scheduling method for coal consumption and pollutant discharge of coal-electricity unit power supply
CN107274069A (en) Based on it is optional it is multifactor under the conditions of the part throttle characteristics of fired power generating unit determine method
CN110298502A (en) Based on the boiler optimum oxygen calculation method that efficiency is optimal
CN110864855A (en) Device and method for measuring air leakage rate of air preheater of power station boiler under medium and low loads
CN108021027B (en) Output power prediction system and method for supercritical circulating fluidized bed unit
CN113283052A (en) Soft measurement method for carbon content in fly ash and combustion optimization method and system for coal-fired boiler
CN111723331A (en) Equity distribution calculation method for combined cycle two-in-one unit steam turbine load
CN116720446A (en) Method for monitoring thickness of slag layer of water-cooled wall of boiler in real time
CN110888403A (en) Intelligent soot blowing closed-loop control system based on minimum loss boiler convection heating surface
CN113901381B (en) Real-time calculation method for garbage incineration amount of two-furnace one-machine household garbage incineration power plant
CN115656461A (en) Coal electric unit real-time carbon emission monitoring method based on coal quality soft measurement
CN113901382B (en) Method for calculating real-time garbage incineration amount of three-furnace two-machine household garbage incineration power generation project
CN115371055A (en) Automatic control method and system for waste incineration
CN108730943B (en) Flue gas dynamic temperature evaluation method
CN106202974A (en) A kind of thermal power unit boiler combustion control recruitment evaluation computational methods

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant