CN113914591A - Modularization intelligent movement scaffold frame - Google Patents

Modularization intelligent movement scaffold frame Download PDF

Info

Publication number
CN113914591A
CN113914591A CN202111251171.8A CN202111251171A CN113914591A CN 113914591 A CN113914591 A CN 113914591A CN 202111251171 A CN202111251171 A CN 202111251171A CN 113914591 A CN113914591 A CN 113914591A
Authority
CN
China
Prior art keywords
rod
intelligent
steel pipe
support
connecting steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111251171.8A
Other languages
Chinese (zh)
Inventor
赵卫
和超
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yijianwang Technology Co ltd
Original Assignee
Yijianwang Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yijianwang Technology Co ltd filed Critical Yijianwang Technology Co ltd
Priority to CN202111251171.8A priority Critical patent/CN113914591A/en
Publication of CN113914591A publication Critical patent/CN113914591A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • E04G1/22Scaffolds having a platform on an extensible substructure, e.g. of telescopic type or with lazy-tongs mechanism
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/02Scaffold feet, e.g. with arrangements for adjustment
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/06Consoles; Brackets
    • E04G5/061Consoles; Brackets specially adapted for attachment to scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks
    • E04G2001/244Scaffolds movable on wheels or tracks mechanically operated

Abstract

A modular smart mobile scaffold comprising: remove lift, intelligent support frame, detachable support, remove the lift top and be equipped with connection platform, connect and support one or more intelligent support frame of stacking, detachable support inserts the first connecting steel pipe that removes the lift both sides. The invention has convenient assembly and disassembly, greatly reduces the manual workload, and is equipped with the intelligent connecting platform to realize intelligent construction one by one.

Description

Modularization intelligent movement scaffold frame
Technical Field
The utility model relates to a scaffold frame field especially relates to a modularization intelligent movement scaffold frame.
Background
Scaffold frame that uses among the building trade at present, especially inner support frame are mostly steel-pipe type, gate-type and ordinary bowl knot formula etc. and this type of scaffold frame low cost, and the standardization level is high, but the while installation is dismantled and is taken time, causes loss and security not high easily.
For the fabricated building, the construction method of cast-in-place concrete building is still mostly adopted, and compared with the cast-in-place concrete building, the use amount of scaffolds and templates is not effectively reduced. Along with the change of the intelligent construction mode, a scaffold which is completely different from the existing erection mode is needed, and the whole construction efficiency is really improved by matching with an information system with one code.
Disclosure of Invention
In order to solve at least one of the above technical problems, the present disclosure provides a modular smart mobile scaffold.
The technical scheme adopted by the invention is as follows:
a modular smart mobile scaffold comprising: remove lift, intelligent support frame, detachable support, remove the lift top and be equipped with connection platform, connect and support one or more intelligent support frame of stacking, detachable support inserts the first connecting steel pipe that removes the lift both sides.
The movable elevator comprises a connecting platform, a fixed base, universal wheels, a motor, a lifting mechanism and a first hydraulic rod, wherein the four universal wheels are fixedly installed at the bottom end of the fixed base, the motor is fixedly installed in the middle of the bottom end of the fixed base to provide driving power, the lifting mechanism is installed on the upper portion of the fixed base, and the connecting platform is installed on the upper portion of the lifting mechanism.
Preferably, the motor can provide power for the universal wheel.
Optionally, the universal wheel has braking capability.
Furthermore, the fixed base is formed by welding two first connecting steel pipes and two second connecting steel pipes on the side edges, and the second connecting steel pipes are provided with first lock holes; the motor shell is arranged on the second connecting steel pipe, a first connecting rod at the bottom of the lifting mechanism is fixedly arranged on the second connecting steel pipe, and two sides of the second connecting rod are embedded in the first locking hole; one end of the first hydraulic rod is fixed on the second connecting rod, the other end of the first hydraulic rod is fixed on the third connecting rod, and the third connecting rod is pushed to ascend and the height of the connecting platform is lifted through the extension of the first hydraulic rod.
Optionally, one end of the first hydraulic rod is fixed to the first connecting rod, and the other end of the first hydraulic rod is fixed to the third connecting rod.
The intelligent support frame comprises a support main body, an intelligent connecting table, an adsorption device and a flashing buzzer;
further, the support main part comprises first vertical support pole, first horizontal support pole, first bracing strut, and intelligence joint chair fixed mounting is on first horizontal support pole.
Further, the signal receiver of intelligence connection platform receives component installation instruction, starts scintillation buzzer, to tower crane transmission position signal to open adsorption equipment, the tower crane transports the component to the assigned position after, adsorption equipment buries the piece with the absorption in the component and is connected.
Optionally, the adsorption device is a magnetic device.
Preferably, the adsorption device is an electric power control device.
Optionally, the flashing buzzer has the capabilities of multi-color light flashing and voice buzzing.
The detachable support comprises a third connecting steel pipe, a second hydraulic rod and a chassis, the third connecting steel pipe is inserted into the first connecting steel pipe, one end of the second hydraulic rod is fixedly connected with one end of the third connecting steel pipe to be connected with the chassis, and the chassis falls on the ground.
Optionally, the third connecting steel pipe is connected with the first connecting steel pipe in a locking manner.
Further, the component is placed after the intelligence connection platform, through the action of gravity, the second hydraulic stem of detachable support shortens, and when the component falls to lower part support top, gravity reduces, and the second hydraulic stem plays the effect of whereabouts buffering and self-adjusting height.
Compared with the prior art, the invention has the following beneficial effects: 1. the installation and disassembly modes are modularized, so that the device is convenient and quick; 2. the reinforcing devices with specific structures are arranged around the movable base, so that the stability of the scaffold is improved, the scaffold is convenient to transfer, and the scaffold is convenient and practical; 3. the intelligent connecting platform is combined with a one-code informatization system, and intelligent construction is realized through intelligent upgrading of related equipment of the component; 4. through the adsorption device and the height self-adjusting bracket, the component mounting operation is simple, and the number of mounting personnel is reduced from 4 to 1.
Drawings
The accompanying drawings, which are included to provide a further understanding of the disclosure and are incorporated in and constitute a part of this specification, illustrate exemplary embodiments of the disclosure and together with the description serve to explain the principles of the disclosure.
Fig. 1 is a schematic view of a modular smart mobile scaffold of the present invention;
fig. 2 is a schematic diagram of a modular smart mobile scaffold of the present invention;
FIG. 3 is a schematic view of the mobile lift of the present invention;
FIG. 4 is a schematic view of the smart support stand of the present invention;
FIG. 5 is a schematic view of an overhanging arm of the intelligent support frame of the present invention;
FIG. 6 is a schematic view of a removable cartridge of the present invention;
the labels in the figure are: 1 is the mobile lift, 2 is intelligent support frame, 3 is detachable support, 4 is connection platform, 5 is unable adjustment base, 6 is the universal wheel, 7 is the motor, 8 is elevating system, 9 is first hydraulic stem, 10 is first connecting steel pipe, 11 is the second connecting steel pipe, 12 is first lockhole, 13 is the head rod, 14 is the second connecting rod, 15 is the third connecting rod, 16 is the support subject, 17 is the intelligent platform of connecting, 18 is adsorption equipment, 19 is scintillation bee calling organ, 20 is first vertical support rod, 21 is first horizontal support rod, 22 is first bracing piece, 23 is the third connecting steel pipe, 24 is the second hydraulic stem, 25 is the chassis, 26 is the arm of encorbelmenting.
Detailed Description
The present disclosure will be described in further detail with reference to the drawings and embodiments. It is to be understood that the specific embodiments described herein are for purposes of illustration only and are not to be construed as limitations of the present disclosure. It should be further noted that, for the convenience of description, only the portions relevant to the present disclosure are shown in the drawings.
It should be noted that the embodiments and features of the embodiments in the present disclosure may be combined with each other without conflict. The present disclosure will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.
One embodiment disclosed herein, as shown in fig. 1, is a modular smart mobile scaffold comprising: remove lift 1, intelligent support frame 2, detachable support 3, remove 1 top of lift and be equipped with connection platform 4, connect and support an intelligent support frame 2, detachable support 3 inserts the first connecting steel pipe 9 that removes 1 both sides of lift.
In one embodiment disclosed herein, as shown in fig. 2, the mobile elevator 1 is provided with a connecting platform 4 at the top thereof for connecting and supporting a stacked smart support frame 2, and the smart support frame in the middle layer only comprises a supporting body 16.
In one embodiment disclosed herein, as shown in fig. 3, the mobile lift 1 includes a connection platform 4, a fixed base 5, universal wheels 6, a motor 7, a lifting mechanism 8, and a first hydraulic rod 9, wherein four universal wheels 6 are fixedly installed at the bottom end of the fixed base 5, the motor 7 is fixedly installed at the middle part of the bottom end to provide driving power, the lifting mechanism 8 is installed at the upper part, and the connection platform 4 is installed at the upper part of the lifting mechanism 8.
The fixed base 5 is formed by welding two first connecting steel pipes 10 and two second connecting steel pipes 11 on the side edges, and the second connecting steel pipes 11 are provided with first lock holes 12; the shell of the motor 7 is arranged on a second connecting steel pipe 11, a first connecting rod 13 at the bottom of the lifting mechanism 8 is fixedly arranged on the second connecting steel pipe 11, and two sides of a second connecting rod 14 are embedded in a first lock hole 12; one end of the first hydraulic rod 9 is fixed on the second connecting rod 14, the other end of the first hydraulic rod is fixed on the third connecting rod 15, and the third connecting rod 15 is pushed to ascend and the height of the connecting platform 4 is lifted by extending the first hydraulic rod 9.
In one embodiment disclosed herein, as shown in fig. 4, the smart support stand 2 includes a support body 16, a smart connection platform 17, an adsorption device 18, and a flashing buzzer 19;
the support main body 16 is composed of a first vertical support rod 20, a first horizontal support rod 21 and a first inclined support rod 22, and the intelligent connecting platform 17 is fixedly installed on the first horizontal support rod 21.
The signal receiver of intelligence connection platform 17 receives the component installation instruction, starts scintillation buzzer 19, to tower crane transmission position signal to open adsorption equipment 18, the tower crane transports the component to the assigned position after, adsorption equipment 18 is connected with the absorption piece that buries in the component.
In one embodiment disclosed herein, as shown in fig. 5, the smart support stand 2 is connected with a cantilever arm 26 at the periphery, and the cantilever arm 26 can increase the effective supporting area.
In one embodiment disclosed herein, as shown in fig. 6, the detachable bracket 3 includes a third connecting steel pipe 23, a second hydraulic rod 24, and a chassis 25, the third connecting steel pipe 23 is inserted into the first connecting steel pipe 10, one end of the second hydraulic rod 24 is fixedly connected to one end of the third connecting steel pipe 23 and connected to the chassis 25, and the chassis is located on the ground.
After the component is placed at the intelligent connecting platform 17, the second hydraulic rod 24 of the detachable bracket 3 is shortened under the action of gravity, and when the component falls to the lower supporting top, the gravity is reduced, and the second hydraulic rod 24 plays the roles of falling buffer and self-adjusting height.
In the description herein, reference to the description of the terms "one embodiment/mode," "some embodiments/modes," "example," "specific example," or "some examples," etc., means that a particular feature, structure, material, or characteristic described in connection with the embodiment/mode or example is included in at least one embodiment/mode or example of the application. In this specification, the schematic representations of the terms used above are not necessarily intended to be the same embodiment/mode or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments/modes or examples. Furthermore, the various embodiments/aspects or examples and features of the various embodiments/aspects or examples described in this specification can be combined and combined by one skilled in the art without conflicting therewith.
It will be understood by those skilled in the art that the foregoing embodiments are merely for clarity of illustration of the disclosure and are not intended to limit the scope of the disclosure. Other variations or modifications may occur to those skilled in the art, based on the foregoing disclosure, and are still within the scope of the present disclosure.

Claims (8)

1. A modular intelligent mobile scaffold, comprising: remove lift (1), intelligent support frame (2), detachable support (3), remove lift (1) top and be equipped with connecting platform (4), connect and support intelligent support frame (2) that one or more are stacked, detachable support (3) insert first connection steel pipe (9) that remove lift (1) both sides.
2. The modularized intelligent mobile scaffold according to claim 1, wherein the mobile lifter (1) comprises a connecting platform (4), a fixed base (5), universal wheels (6), a motor (7), a lifting mechanism (8) and a first hydraulic rod (9), the four universal wheels (6) are fixedly installed at the bottom end of the fixed base (5), the motor (7) is fixedly installed at the middle of the bottom end of the fixed base to provide driving power, the lifting mechanism (8) is installed at the upper part of the fixed base, and the connecting platform (4) is installed at the upper part of the lifting mechanism (8).
3. The modular intelligent mobile scaffold according to claim 1-2, wherein the fixed base (5) is formed by welding two first connecting steel pipes (10) and two second connecting steel pipes (11) at the side edges, and the second connecting steel pipes (11) are provided with first locking holes (12); the shell of the motor (7) is arranged on the second connecting steel pipe (11), a first connecting rod (13) at the bottom of the lifting mechanism (8) is fixedly arranged on the second connecting steel pipe (11), and two sides of a second connecting rod (14) are embedded in the first lock hole (12); one end of the first hydraulic rod (9) is fixed on the second connecting rod (14), the other end of the first hydraulic rod is fixed on the third connecting rod (15), and the third connecting rod (15) is pushed to ascend and the height of the connecting platform (4) is lifted by extending the first hydraulic rod (9).
4. A modular intelligent mobile scaffold according to claim 1, characterized in that said intelligent support frame (2) comprises a support body (16), an intelligent connection table (17), an adsorption device (18), a flashing buzzer (19).
5. A modular intelligent mobile scaffold according to claims 1 and 4, characterized in that said supporting body (16) is composed of a first vertical supporting rod (20), a first horizontal supporting rod (21) and a first inclined supporting rod (22), and the intelligent connection platform (17) is fixedly installed on the first horizontal supporting rod (21).
6. A modular intelligent mobile scaffold according to claim 1, 4 and 5, wherein a signal receiver of the intelligent connection platform (17) receives a member installation instruction, a flashing buzzer (19) is started, a position signal is transmitted to a tower crane, the adsorption device (18) is started, and after the tower crane conveys the member to a specified position, the adsorption device (18) is connected with an adsorption embedded part in the member.
7. The modular intelligent mobile scaffold according to claim 1, wherein the detachable support (3) comprises a third connecting steel pipe (23), a second hydraulic rod (24) and a base plate (25), the third connecting steel pipe (23) is inserted into the first connecting steel pipe (10), one end of the second hydraulic rod (24) is fixedly connected with one end of the third connecting steel pipe (23) and one end of the second hydraulic rod is connected with the base plate (25), and the base plate is placed on the ground.
8. A modular smart mobile scaffold according to claims 1 and 7, characterized in that the second hydraulic rod (24) of said detachable support (3) is shortened by the effect of gravity after the placement of the element behind the smart docking station (17), the gravity is reduced as the element falls down to the lower support roof, the second hydraulic rod (24) acting as a fall buffer and self-adjusting height.
CN202111251171.8A 2021-10-27 2021-10-27 Modularization intelligent movement scaffold frame Pending CN113914591A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111251171.8A CN113914591A (en) 2021-10-27 2021-10-27 Modularization intelligent movement scaffold frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111251171.8A CN113914591A (en) 2021-10-27 2021-10-27 Modularization intelligent movement scaffold frame

Publications (1)

Publication Number Publication Date
CN113914591A true CN113914591A (en) 2022-01-11

Family

ID=79242966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111251171.8A Pending CN113914591A (en) 2021-10-27 2021-10-27 Modularization intelligent movement scaffold frame

Country Status (1)

Country Link
CN (1) CN113914591A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108166739A (en) * 2018-02-26 2018-06-15 姜慧 A kind of extensible safety lifting construction working platform
CN109296188A (en) * 2018-11-30 2019-02-01 佛山科学技术学院 A kind of intelligence lifting type scaffold trolley
CN209211612U (en) * 2018-10-26 2019-08-06 广州圣安环保科技有限公司 A kind of building element, robot and building element installation system
CN110700604A (en) * 2019-10-23 2020-01-17 中建海峡建设发展有限公司 Assembly type laminated slab mounting trolley and using method thereof
CN110952788A (en) * 2019-12-13 2020-04-03 三一筑工科技有限公司 Beam-slab auxiliary installation robot for assembly type hoisting
CN111719870A (en) * 2020-07-06 2020-09-29 中建四局安装工程有限公司 One-step forming installation method for electromechanical pipeline of super high-rise standard layer
CN212926945U (en) * 2020-06-18 2021-04-09 范亚丽 Building site is with scaffold frame of just dismantling
US20210254351A1 (en) * 2020-02-14 2021-08-19 Electrawatch, Inc. Quick Deploy Scaffolding

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108166739A (en) * 2018-02-26 2018-06-15 姜慧 A kind of extensible safety lifting construction working platform
CN209211612U (en) * 2018-10-26 2019-08-06 广州圣安环保科技有限公司 A kind of building element, robot and building element installation system
CN109296188A (en) * 2018-11-30 2019-02-01 佛山科学技术学院 A kind of intelligence lifting type scaffold trolley
CN110700604A (en) * 2019-10-23 2020-01-17 中建海峡建设发展有限公司 Assembly type laminated slab mounting trolley and using method thereof
CN110952788A (en) * 2019-12-13 2020-04-03 三一筑工科技有限公司 Beam-slab auxiliary installation robot for assembly type hoisting
US20210254351A1 (en) * 2020-02-14 2021-08-19 Electrawatch, Inc. Quick Deploy Scaffolding
CN212926945U (en) * 2020-06-18 2021-04-09 范亚丽 Building site is with scaffold frame of just dismantling
CN111719870A (en) * 2020-07-06 2020-09-29 中建四局安装工程有限公司 One-step forming installation method for electromechanical pipeline of super high-rise standard layer

Similar Documents

Publication Publication Date Title
CN106320182A (en) Suspension bridge bank slope beam section long sling swing-shifting mounting device and method
CN206052568U (en) The long hoist cable of suspension bridge bank slope beam section swings shifting erecting device
JP3732414B2 (en) Method and apparatus for constructing tower structure
CN102431906A (en) Self-adaptive crane external climbing support structure
CN113914591A (en) Modularization intelligent movement scaffold frame
CN200971610Y (en) Guide lifting platform device for chimney
CN107043072B (en) Falling-beam-free integrated inner climbing tower crane supporting device and implementation method
CN211775667U (en) Power transmission line crossing tower assembly high-altitude construction platform
CN101660660B (en) Novel installing method of gas cabinet
CN206319628U (en) One kind building assembled wallboard fitting machine
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
JP3905103B2 (en) Tower-like building erection method and erection device
CN201817201U (en) Trolley slippage construction device
CN211849438U (en) Device for pile connection and perpendicularity adjustment
CN110886242A (en) Method for installing composite cable saddle in anchor hole of suspension bridge tunnel in mountainous area
CN210457299U (en) Lifting device for building engineering
CN107558607B (en) Tower crane system arranged on existing concrete structure and construction method thereof
CN202038808U (en) Adjustable hoisting flange plate frame
JP3518354B2 (en) Iron core erecting method and working device thereof
CN111196566A (en) Construction structure and construction method of super high-rise inner climbing tower crane
CN201660377U (en) Special gantry crane for overlength and large-tonnage parts
CN110980549A (en) Tower crane inner climbing machine and mounting method thereof
CN209887817U (en) Auxiliary tool for high-speed rail box beam tube drawing
CN111893892B (en) Bracket mounting method for box girder construction
CN213896778U (en) Road bridge construction support bracket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220111