CN113914290A - Quick reinforcing apparatus of engineering geology - Google Patents

Quick reinforcing apparatus of engineering geology Download PDF

Info

Publication number
CN113914290A
CN113914290A CN202111425529.4A CN202111425529A CN113914290A CN 113914290 A CN113914290 A CN 113914290A CN 202111425529 A CN202111425529 A CN 202111425529A CN 113914290 A CN113914290 A CN 113914290A
Authority
CN
China
Prior art keywords
fixed
frame
fixedly connected
fixing
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111425529.4A
Other languages
Chinese (zh)
Inventor
李庆洋
倪航之
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ni Hangzhi
Original Assignee
Ni Hangzhi
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ni Hangzhi filed Critical Ni Hangzhi
Priority to CN202111425529.4A priority Critical patent/CN113914290A/en
Publication of CN113914290A publication Critical patent/CN113914290A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/08Improving by compacting by inserting stones or lost bodies, e.g. compaction piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

The invention provides a quick engineering geology reinforcing device, which belongs to the technical field of geology reinforcement and comprises an upper fixing frame and a lower fixing frame, wherein four corners of the lower surface of the upper fixing frame are fixedly connected with first fixing columns, the upper surface of each first fixing column is provided with a first limiting hole, one side of each first fixing column is fixedly connected with a fixed triangular supporting rod, and one side of the outer surface of each fixed triangular supporting rod is fixedly connected with a first fixing block. Can increase the self fastness of upper fixed frame and lower fixed frame through the fixed network to and the rethread fixed network, the material of upper fixed frame and lower fixed frame is high strength aluminum alloy, then the triangular supports structure that rethread triangular support pole, first fixed block, picture peg and second fixed block are constituteed can increase the firm in connection between upper fixed frame and the lower fixed frame, thereby make the device have higher self fastness, can further promote the fastness of foundation construction.

Description

Quick reinforcing apparatus of engineering geology
Technical Field
The invention belongs to the technical field of geological reinforcement, and particularly relates to a quick reinforcing device for engineering geology.
Background
With the continuous development of human technology, various high-rise buildings are present in our lives. When the high-rise buildings are built, firm engineering geology is required to be built firstly as a foundation, then high-rise building is carried out on the foundation, wherein a reinforcing device is often required to increase the firmness of the foundation when the foundation is built, namely the reinforcing device is paved on the planned engineering geology firstly, and then concrete is poured on the reinforcing device, so that the firm foundation can be poured. But general reinforcing apparatus all adopts the reinforcing bar to build at present, neither has the function of building fast like this, makes it can not carry out the rapid reinforcement operation, influences the engineering progress, and more reinforcing apparatus's self fastness is not good moreover, and the later stage can reduce the fastness of ground like this, has influenced the security of building. Aiming at the defects, the invention provides a quick reinforcing device for engineering geology.
Disclosure of Invention
The invention aims to provide a quick engineering geology reinforcing device and aims to solve the problems that the prior art does not have a quick building function and is poor in self firmness.
In order to achieve the purpose, the invention provides the following technical scheme: engineering geology quick reinforcement device, including upper fixed frame and lower fixed frame, the first fixed column of the equal fixedly connected with in four corners department of upper fixed frame lower surface, first spacing hole has been seted up to the upper surface of first fixed column, the fixed triangular support pole of one side fixedly connected with of first fixed column, first fixed block is taken to one side fixedly connected with of fixed triangular support pole surface, the lower fixed surface of first fixed block connects the picture peg, the equal fixedly connected with second fixed column in four corners department of lower fixed frame upper surface, the spacing hole of second has been seted up to the upper surface of second fixed column, one side of upper fixed frame is provided with the support column.
Furthermore, the upper fixing frame and the lower fixing frame are both made of high-strength alloy steel.
Furthermore, the equal fixedly connected with fixed network of medial surface of upper fixed frame and lower fixed frame, the material of fixed network is high strength alloy steel.
Further, the upper surface of the lower fixing frame is fixedly connected with four second fixing blocks, four the second fixing blocks are rectangular arrays, the upper surface of the second fixing block is provided with a limiting groove, and the limiting groove is matched with the first fixing block in size.
Furthermore, both sides all open around the spacing inslot wall have first fixed orifices, the inside edge of picture peg all opens and has the second fixed orifices, the size looks adaptation of first fixed orifices and second fixed orifices.
Furthermore, the top end of the support column is fixedly connected with a first inserting block, and the first inserting block is matched with the first limiting hole in size.
Furthermore, the lower end of the supporting column is fixedly connected with a second insertion block, and the second insertion block is matched with the second limiting hole in size.
Furthermore, the outer surfaces of the upper fixing frame and the lower fixing frame are both fixedly connected with at least two mounting plates.
Compared with the prior art, the invention has the beneficial effects that:
1. this quick reinforcing apparatus of engineering geology, lay subaerial with the lower fixed frame earlier, it is downthehole to peg graft corresponding first spacing with four first grafting pieces respectively again, then it is downthehole to peg graft corresponding second spacing with four second grafting pieces respectively, just so can carry out preliminary fixed of putting up with the lower fixed frame, and four picture pegs also can peg graft four spacing inslots respectively at this in-process, and also can make the axle center of first fixed orifices and second fixed orifices corresponding, it is fixed mutually with first fixed block and second fixed block to rethread external bolt at last, thereby can put up fixedly with the lower fixed frame of upper fixed frame and secondary, thereby make the device have and put up fixed function fast, both can shorten certain time limit for a project, also can increase the practicality of the device.
2. This engineering geology quick reinforcement device, can increase the self fastness of upper fixed frame and lower fixed frame through the fixed network, and the rethread fixed network, the material of upper fixed frame and lower fixed frame is the high strength aluminum alloy, then rethread triangular support pole, first fixed block, the triangular supports structure that picture peg and second fixed block are constituteed, can increase the firm in connection between upper fixed frame and the lower fixed frame, thereby make the device have higher self fastness, can further promote the fastness of ground construction, the security of maximize guarantee building.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic view of the partially disassembled structure of FIG. 1 according to the present invention;
FIG. 3 is an enlarged schematic view of the structure at A in FIG. 2 according to the present invention;
fig. 4 is a partial sectional structural view of fig. 2 according to the present invention.
In the figure: 1. an upper fixing frame; 2. a lower fixed frame; 3. a first fixed column; 4. a first limit hole; 5. a triangular support bar; 6. a first fixed block; 7. inserting plates; 8. a second fixed column; 9. a second limiting hole; 10. a support pillar; 11. fixing the net; 12. a second fixed block; 13. a limiting groove; 14. a first fixing hole; 15. a second fixing hole; 16. a first plug-in block; 17. a second insertion block; 18. and (7) mounting the plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Examples
Referring to fig. 1-4, the present invention provides the following technical solutions: quick reinforcing apparatus of engineering geology, including upper fixed frame 1 and lower fixed frame 2, the first fixed column 3 of the equal fixedly connected with in four corners department of 1 lower surface of upper fixed frame, first spacing hole 4 has been seted up to the upper surface of first fixed column 3, the fixed triangular support pole 5 of one side fixedly connected with of first fixed column 3, first fixed block 6 is taken to one side fixedly connected with of fixed triangular support pole 5 surface, the lower fixed surface of first fixed block 6 connects picture peg 7, the equal fixedly connected with second fixed column 8 in four corners department of 2 upper surfaces of lower fixed frame, the spacing hole 9 of second has been seted up to the upper surface of second fixed column 8, one side of upper fixed frame 1 is provided with support column 10.
In the specific embodiment of the invention, the lower fixing frame 2 is laid on the ground, then the four first insertion blocks 16 are respectively inserted into the corresponding first limiting holes 4, then the four second insertion blocks 17 are respectively inserted into the corresponding second limiting holes 9, so that the upper fixing frame 1 and the lower fixing frame 2 can be preliminarily constructed and fixed, in the process, the four insertion plates 7 can also be respectively inserted into the four limiting grooves 13, the axes of the first fixing holes 14 and the second fixing holes 15 can also correspond to each other, finally the first fixing blocks 6 and the second fixing blocks 12 can be fixed through external bolts, so that the upper fixing frame 1 and the lower fixing frame 2 can be secondarily constructed and fixed, the self firmness of the upper fixing frame 1 and the lower fixing frame 2 can be improved through the fixing net 11, and the triangular support rod 5 and the first fixing blocks 6, The triangular support structure composed of the insert plate 7 and the second fixing block 12 can increase the connection firmness between the upper fixing frame 1 and the lower fixing frame 2, and can further increase the connection firmness between the upper fixing frame 1 and the lower fixing frame 2 through the support columns 10.
Specifically, the upper fixing frame 1 and the lower fixing frame 2 are both made of high-strength alloy steel.
In this embodiment: the upper fixing frame 1 and the lower fixing frame 2 are made of high-strength aluminum alloy, so that the self firmness of the upper fixing frame 1 and the lower fixing frame 2 can be further improved.
Specifically, the inner side surfaces of the upper fixing frame 1 and the lower fixing frame 2 are fixedly connected with fixing nets 11, and the fixing nets 11 are made of high-strength alloy steel.
In this embodiment: the self-firmness of the upper and lower fixed frames 1 and 2 can be increased by the fixing net 11.
Specifically, the upper surface of the lower fixing frame 2 is fixedly connected with four second fixing blocks 12, the four second fixing blocks 12 are in a rectangular array, the upper surface of each second fixing block 12 is provided with a limiting groove 13, and the limiting grooves 13 are matched with the first fixing blocks 6 in size.
In this embodiment: the second fixing block 12 can be inserted into the limiting groove 13, so that the upper fixing frame 1 and the lower fixing frame 2 can be fixed conveniently in the later period.
Specifically, both sides all open around the spacing groove 13 inner wall have first fixed orifices 14, and the inside edge of picture peg 7 all opens and has second fixed orifices 15, the size looks adaptation of first fixed orifices 14 and second fixed orifices 15.
In this embodiment: the first fixing hole 14 and the second fixing hole 15 can be crossed by an external bolt by corresponding the axes of the first fixing hole 14 and the second fixing hole 15. The first fixing block 6 and the second fixing block 12 may be fixed to each other.
Specifically, the top end of the supporting column 10 is fixedly connected with a first insertion block 16, and the first insertion block 16 is matched with the first limiting hole 4 in size.
In this embodiment: the support column 10 can be fixedly inserted into the upper fixing frame 1 by inserting the first insertion block 16 into the first limit hole 4.
Specifically, the lower end of the supporting column 10 is fixedly connected with a second insertion block 17, and the second insertion block 17 is matched with the second limiting hole 9 in size.
In this embodiment: the upper fixing frame 1 and the lower fixing frame 2 can be preliminarily supported and fixed by inserting the second insertion block 17 into the second stopper hole 9.
Specifically, the outer surfaces of the upper and lower fixed frames 1 and 2 are fixedly connected with at least two mounting plates 18.
In this embodiment: the mounting plate 18 can be fixedly connected with other fixing frames.
The working principle and the using process of the invention are as follows: this quick reinforcing apparatus of engineering geology is when using, at first lay the lower fixed frame 2 subaerially, insert respectively the first grafting piece 16 on four support columns 10 tops to four first spacing holes 4 that correspond again, then move the upper fixed frame 1 directly over the lower fixed frame 2, and make the second grafting piece 17 of four support columns 10 bottoms respectively with the axle center of four spacing holes 9 of second corresponding, insert respectively four second grafting pieces 17 again in the corresponding spacing hole 9 of second, just so can carry out preliminary support and fix with upper fixed frame 1 and lower fixed frame 2. In the process, the four insertion plates 7 below the first fixing block 6 can also be respectively inserted into the four limiting grooves 13, the axes of the first fixing hole 14 and the second fixing hole 15 can also correspond to each other, and finally the first fixing hole 14 and the second fixing hole 15 are transversely crossed through an external bolt. The first fixing block 6 and the second fixing block 12 can be fixed together, so that the upper fixing frame 1 and the lower fixing frame 2 can be fixed again, and the device can be quickly built; the self-firmness of the upper fixing frame 1 and the lower fixing frame 2 can be improved through the fixing net 11, and the connection firmness between the upper fixing frame 1 and the lower fixing frame 2 can be improved through a triangular supporting structure consisting of the triangular supporting rod 5, the first fixing block 6, the inserting plate 7 and the second fixing block 12, the connection firmness between the upper fixing frame 1 and the lower fixing frame 2 can be further improved through the supporting columns 10, and finally, the self-firmness of the upper fixing frame 1 and the lower fixing frame 2 can be further improved through the fact that the upper fixing frame 1 and the lower fixing frame 2 are made of high-strength aluminum alloy; the mounting plate 18 can be fixedly connected with other fixing frames.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the invention. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. Engineering geology quick reinforcement device, including upper fixed frame (1) and lower fixed frame (2), its characterized in that: the utility model discloses a fixed frame, including upper fixed frame (1), the first fixed column of the equal fixedly connected with in four corners department of upper fixed frame (1) lower surface (3), first spacing hole (4) have been seted up to the upper surface of first fixed column (3), the fixed triangular support pole of one side fixedly connected with (5) of first fixed column (3), one side fixedly connected with of fixed triangular support pole (5) surface takes first fixed block (6), lower fixed surface fixed connection picture peg (7) of first fixed block (6), the equal fixedly connected with second fixed column (8) in four corners department of lower fixed frame (2) upper surface, spacing hole of second (9) have been seted up to the upper surface of second fixed column (8), one side of upper fixed frame (1) is provided with support column (10).
2. The engineering geology rapid reinforcement device of claim 1, characterized in that: the upper fixing frame (1) and the lower fixing frame (2) are both made of high-strength alloy steel.
3. The engineering geology rapid reinforcement device of claim 1, characterized in that: the inner side surfaces of the upper fixing frame (1) and the lower fixing frame (2) are fixedly connected with fixing nets (11), and the fixing nets (11) are made of high-strength alloy steel.
4. The engineering geology rapid reinforcement device of claim 1, characterized in that: the last fixed surface of lower fixed frame (2) is connected with four second fixed blocks (12), four second fixed block (12) are the rectangle array, spacing groove (13) have been seted up to the upper surface of second fixed block (12), the size looks adaptation of spacing groove (13) and first fixed block (6).
5. The engineering geology rapid reinforcement device of claim 4, characterized in that: both sides all open around spacing groove (13) inner wall have first fixed orifices (14), the edge of picture peg (7) inside all opens and has second fixed orifices (15), the size looks adaptation of first fixed orifices (14) and second fixed orifices (15).
6. The engineering geology rapid reinforcement device of claim 1, characterized in that: the top end of the supporting column (10) is fixedly connected with a first inserting block (16), and the first inserting block (16) is matched with the first limiting hole (4) in size.
7. The engineering geology rapid reinforcement device of claim 1, characterized in that: the lower end of the supporting column (10) is fixedly connected with a second inserting block (17), and the second inserting block (17) is matched with the second limiting hole (9) in size.
8. The engineering geology rapid reinforcement device of claim 1, characterized in that: the outer surfaces of the upper fixing frame (1) and the lower fixing frame (2) are at least fixedly connected with two mounting plates (18).
CN202111425529.4A 2021-11-26 2021-11-26 Quick reinforcing apparatus of engineering geology Pending CN113914290A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111425529.4A CN113914290A (en) 2021-11-26 2021-11-26 Quick reinforcing apparatus of engineering geology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111425529.4A CN113914290A (en) 2021-11-26 2021-11-26 Quick reinforcing apparatus of engineering geology

Publications (1)

Publication Number Publication Date
CN113914290A true CN113914290A (en) 2022-01-11

Family

ID=79248070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111425529.4A Pending CN113914290A (en) 2021-11-26 2021-11-26 Quick reinforcing apparatus of engineering geology

Country Status (1)

Country Link
CN (1) CN113914290A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4915827B1 (en) * 2011-07-01 2012-04-11 グラウンドシステム株式会社 Ground strengthening system and ground strengthening method
CN206844611U (en) * 2017-06-23 2018-01-05 济宁职业技术学院 A kind of building engineering construction support meanss
CN110453670A (en) * 2019-08-30 2019-11-15 扬州长城铁路器材有限公司 A kind of trackside signalling arrangement hardened ground and its installation method being mutually inserted
CN111894638A (en) * 2020-08-07 2020-11-06 无锡广兴东茂科技有限公司 Opening supporting steel structure for coal mine mining

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4915827B1 (en) * 2011-07-01 2012-04-11 グラウンドシステム株式会社 Ground strengthening system and ground strengthening method
CN206844611U (en) * 2017-06-23 2018-01-05 济宁职业技术学院 A kind of building engineering construction support meanss
CN110453670A (en) * 2019-08-30 2019-11-15 扬州长城铁路器材有限公司 A kind of trackside signalling arrangement hardened ground and its installation method being mutually inserted
CN111894638A (en) * 2020-08-07 2020-11-06 无锡广兴东茂科技有限公司 Opening supporting steel structure for coal mine mining

Similar Documents

Publication Publication Date Title
CN108708481B (en) Construction method for constructional column without formwork support
CN206571007U (en) A kind of lattice pillar compound shear wall of the concealed batten plate of band
CN113914290A (en) Quick reinforcing apparatus of engineering geology
CN207121993U (en) The hinged joint that a kind of reinforced concrete frame structure bracing members are reinforced
CN212656462U (en) Building beam body reinforcing steel structure
CN111677325B (en) A building reinforcing apparatus for city planning
CN212001632U (en) Assembled square steel pipe column-H shaped steel roof beam connected node
CN210561586U (en) Landscape plank road
CN207314524U (en) A kind of high performance concrete chain type combining structure
CN216340091U (en) Novel large-span anti-seismic steel structure
CN211735986U (en) Prefabricated floor connecting device of building assembly
CN219732987U (en) Enclose fender convenient to concatenation
CN220365014U (en) Geotechnical engineering slope reinforcing apparatus
CN216690511U (en) Public space rest device of prefabricated module
CN211228857U (en) Reinforced structure is used in civil structure connection
CN220673076U (en) Mounting frame structure for box-type substation
CN216196013U (en) Structure of general node of shaped steel concrete post beam column
CN214006642U (en) Supporting beam for assembled steel structure building
CN216973706U (en) Civil engineering bearing structure for building construction
CN212956966U (en) Ready-package steel construction based on building energy saving technology
CN212743591U (en) Building engineering protection network
CN213539521U (en) Mounting structure of curtain canopy
CN214170074U (en) Factory building steel construction beam column
CN212656416U (en) Anti-seismic energy-saving building structure
CN216920363U (en) Easy dismouting formula excavation supporting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20220111