CN113889920A - Building machine electrical pipeline construction equipment - Google Patents

Building machine electrical pipeline construction equipment Download PDF

Info

Publication number
CN113889920A
CN113889920A CN202111307541.5A CN202111307541A CN113889920A CN 113889920 A CN113889920 A CN 113889920A CN 202111307541 A CN202111307541 A CN 202111307541A CN 113889920 A CN113889920 A CN 113889920A
Authority
CN
China
Prior art keywords
support
fixed
spring
wall
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202111307541.5A
Other languages
Chinese (zh)
Other versions
CN113889920B (en
Inventor
李伟芳
梁国东
郝永波
严东哲
张硕欣
剧翔宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Overseas Traffic Construction Co ltd
Original Assignee
China Overseas Traffic Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Overseas Traffic Construction Co ltd filed Critical China Overseas Traffic Construction Co ltd
Priority to CN202111307541.5A priority Critical patent/CN113889920B/en
Publication of CN113889920A publication Critical patent/CN113889920A/en
Application granted granted Critical
Publication of CN113889920B publication Critical patent/CN113889920B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/30Installations of cables or lines on walls, floors or ceilings
    • H02G3/32Installations of cables or lines on walls, floors or ceilings using mounting clamps
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/30Installations of cables or lines on walls, floors or ceilings
    • H02G3/34Installations of cables or lines on walls, floors or ceilings using separate protective tubing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Supports For Pipes And Cables (AREA)
  • Clamps And Clips (AREA)

Abstract

The invention discloses a construction device for an electric pipeline of a building, and relates to the technical field of building construction. The novel fixing device comprises a bracket, the inside of support is provided with fixed subassembly, the inside of support is provided with spacing subassembly and driven subassembly, the inboard of support is provided with auxiliary assembly, fixed subassembly includes splint, the left side of splint is articulated with the one end of horizontal pole, the other end of horizontal pole runs through the inboard of support and is fixed with the inner wall of support, the inner wall of support is fixed with the top of dead lever. Through the auxiliary assembly who sets up, when setting up the installation to the electric wire tube, fix the support on the roof through the bolt earlier, promote the electric wire tube from the support top, the baffle can provide a stable support of electric wire tube this moment, nevertheless can not influence the removal of electric wire tube, and the staff can be connected this section electric wire tube with the electric wire tube that has installed and finish, and convenient operation does not need the workman to support the electric wire tube temporarily.

Description

Building machine electrical pipeline construction equipment
Technical Field
The invention relates to the technical field of building construction, in particular to a building electric pipeline construction device.
Background
The wire conduit is also called as a wire conduit, the wire conduit is a novel conduit material which is popularized and used in the power engineering, along with the rapid development of the power cable buried laying engineering, the wire conduit puts higher requirements on the wire conduit, the wire conduit produced like Kangtai plastic can meet the requirements of the engineering at present, the material is light, the investment is saved, the color and luster are beautiful, the insulativity is good, the impact resistance is strong, the insect and mouse prevention and the corrosion resistance are realized, and the wire conduit is a better choice for the threading carrier of electric, communication and data transmission lines.
When current building machine electrical conduit was under construction, need use the support to fix the electric wire tube, but the electric wire tube needs splice with other electric wire tubes, then need the workman to prop the electric wire tube temporarily this moment, will connect between two sets of electric wire tubes and finish the back, the rethread support is fixed the electric wire tube, but the support need be walked around the electric wire tube this moment and install on the roof, the operation is inconvenient and extremely low to the installation effectiveness of electric wire tube when using, the staff not only intensity of labour is big and possess certain danger.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a construction device for an electromechanical pipeline of a building, which solves the problems in the background technology.
(II) technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme: the utility model provides a building machine electrical conduit construction equipment, includes the support, the inside of support is provided with fixed subassembly, the inside of support is provided with spacing subassembly and driven subassembly, the inboard of support is provided with auxiliary assembly, fixed subassembly includes splint, the left side of splint is articulated with the one end of horizontal pole, the other end of horizontal pole runs through the inboard of support and is fixed with the inner wall of support, the inner wall of support is fixed with the top of dead lever, the dead lever run through the top of loop bar and with loop bar sliding connection, the top of loop bar is fixed with spring A's one end, spring A's the other end is fixed on the inner wall of support, the loop bar run through the inboard of support and with support sliding connection, the bottom of loop bar is fixed with the top of clamp plate.
Preferably, fixed subassembly is still including fixed frame, the left side at the support is fixed on the right side of fixed frame, the right side of fixed frame and support be run through by the ejector pin and with ejector pin sliding connection, the left side of ejector pin is fixed with spring B's one end, spring B's the other end is fixed on the inner wall of fixed frame, the top of ejector pin is fixed with the fixed block.
Preferably, the auxiliary assembly includes the baffle, the left side of baffle is articulated with the inboard of support, the top of baffle is fixed with torsional spring A's one end, torsional spring A's the other end is fixed in the inboard of support, the bottom slidable mounting of support has the stopper.
Preferably, the limiting assembly comprises a spring C, one end of the spring C is fixed on the inner wall of the support, the other end of the spring C is fixed at the top of the transverse plate, the transverse plate is slidably mounted on the inner wall of the support, and the bottom of the transverse plate is fixed with the top of the clamping rod.
Preferably, splint, horizontal pole, fixed frame, ejector pin, spring B, fixed block all are provided with two sets of and two sets of splint, horizontal pole, fixed frame, ejector pin, spring B, fixed block and all use the central line of support to set up as symmetry axis symmetry, the draw-in groove has been seted up at the top of ejector pin.
Preferably, the driven assembly comprises an L-shaped driven plate, the L-shaped driven plate is slidably mounted on the inner wall of the support, the left side of the L-shaped driven plate is fixed to one end of a spring D, and the other end of the spring D is fixed to the inner wall of the support.
Preferably, driven subassembly is still including two way telescopic link, two way telescopic link's one end is articulated with the top of L type driven plate, two way telescopic link's intermediate position is articulated with the inner wall of support, two way telescopic link's the other end is articulated with the bottom of connecting rod, the right side of connecting rod is fixed with the left side of slide bar, the bottom slidable mounting of slide bar is on the inner wall of support, the right side of slide bar is articulated with the left side of gag lever post, the top of gag lever post is fixed with torsional spring B's one end, torsional spring B's the other end is fixed on the slide bar, the right side of slide bar is fixed with the dog.
Preferably, the support is "U" style of calligraphy, the left and right sides of loop bar all is provided with the rectangular block, both ends are fixed with the mounting panel about the support.
Preferably, the limiting assembly, the driven assembly and the auxiliary assembly are provided with two groups of limiting assemblies, two groups of driven assemblies and two groups of auxiliary assemblies which are symmetrically arranged by taking the central line of the support as a symmetry axis.
(III) advantageous effects
The invention provides a construction device for an electric pipeline of a building. The method has the following beneficial effects:
(1) this building machine electrical pipeline construction equipment through the auxiliary assembly who sets up, when erectting the installation to the electric wire tube, fixes the support on the roof through the bolt earlier, promotes the electric wire tube from the support top, and the baffle can provide a stable support of electric wire tube this moment, nevertheless can not influence the removal of electric wire tube, and the staff can be connected this section electric wire tube with the electric wire tube that has installed, and convenient operation does not need the workman to support the electric wire tube temporarily.
(2) This building machine electric pipeline construction equipment through the fixed subassembly that sets up, spacing subassembly and driven subassembly, finishes the back when the electric wire tube concatenation, upwards promotes the electric wire tube, and clamp plate cooperation splint can be fixed the electric wire tube, does not need the conventional installation support behind the earlier concatenation electric wire tube, has improved the installation effectiveness of electric wire tube, and effectual staff's that has reduced intensity of labour has just reduced danger.
Drawings
FIG. 1 is a schematic cross-sectional front view of the present invention;
FIG. 2 is an enlarged view of A in FIG. 1;
FIG. 3 is an enlarged view of B of FIG. 1 according to the present invention;
FIG. 4 is an enlarged view of the structure C in FIG. 3 according to the present invention.
In the figure: 1. a support; 2. a fixing assembly; 21. a splint; 22. a cross bar; 23. fixing the rod; 24. a loop bar; 25. a spring A; 26. pressing a plate; 27. a fixing frame; 28. a top rod; 29. a spring B; 210. a fixed block; 3. a limiting component; 31. a spring C; 32. a transverse plate; 33. a clamping rod; 4. a driven assembly; 41. an L-shaped driven plate; 42. a spring D; 43. a bidirectional telescopic rod; 44. a connecting rod; 45. a slide bar; 46. a limiting rod; 47. a torsion spring B; 48. a stopper; 5. an auxiliary component; 51. a baffle plate; 52. a torsion spring A; 53. a limiting block; 6. and (7) mounting the plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a construction device for building electromechanical pipelines comprises a support 1, a fixing component 2 is arranged inside the support 1, a limiting component 3 and a driven component 4 are arranged inside the support 1, an auxiliary component 5 is arranged inside the support 1, the fixing component 2 comprises a clamping plate 21, the left side of the clamping plate 21 is hinged with one end of a cross rod 22, the other end of the cross rod 22 penetrates through the inside of the support 1 to be fixed with the inner wall of the support 1, the inner wall of the support 1 is fixed with the top of a fixing rod 23, the fixing rod 23 penetrates through the top of a sleeve rod 24 and is in sliding connection with the sleeve rod 24, the top of the sleeve rod 24 is fixed with one end of a spring A25, the other end of the spring A25 is fixed on the inner wall of the support 1, the sleeve rod 24 penetrates through the inside of the support 1 and is in sliding connection with the support 1, the bottom of the sleeve rod 24 is fixed with the top of a pressing plate 26, the right side of a fixing frame 27 is fixed on the left side of the support 1, the right side of the fixing frame 27 and the support 1 are penetrated by a mandril 28 and are in sliding connection with the mandril 28, the left side of ejector pin 28 is fixed with the one end of spring B29, the other end of spring B29 is fixed on the inner wall of fixed frame 27, the top of ejector pin 28 is fixed with fixed block 210, support 1 is "U" style of calligraphy, the left and right sides of loop bar 24 all is provided with the rectangular block, realize spacing or relieve spacingly to loop bar 24 through cooperation gag lever post 46, both ends are fixed with mounting panel 6 about support 1, can fix fixed plate 6 on the roof through the bolt, thereby accomplish the fixed to support 1. Splint 21, horizontal pole 22, fixed frame 27, ejector pin 28, spring B29, fixed block 210 all are provided with two sets of and two sets of splint 21, horizontal pole 22, fixed frame 27, ejector pin 28, spring B29, fixed block 210 and all use the central line of support 1 as symmetry axis symmetry setting, and the draw-in groove has been seted up at the top of ejector pin 28, realizes spacing or relieves spacing to ejector pin 28 through cooperation kelly 33.
In this embodiment, auxiliary assembly 5 includes baffle 51, the left side of baffle 51 is articulated with the inboard of support 1, the top of baffle 51 is fixed with torsional spring A52's one end, the other end of torsional spring A52 is fixed in the inboard of support 1, the bottom slidable mounting of support 1 has stopper 53, under stopper 53's effect, baffle 51 can only use and support 1 articulated position upwards rotate as the centre of a circle, and then the realization can push the inboard of support 1 with the electric wire tube, and baffle 51 can support the electric wire tube simultaneously, frictional force between stopper 53 and the support 1 is great, only can remove when receiving the power of certain degree.
In this embodiment, the limiting assembly 3 includes a spring C31, one end of the spring C31 is fixed on the inner wall of the bracket 1, the other end of the spring C31 is fixed on the top of the transverse plate 32, the transverse plate 32 is slidably mounted on the inner wall of the bracket 1, the bottom of the transverse plate 32 is fixed with the top of the clamping rod 33, the clamping rod 33 and the fixing block 210 are not in the same plane, and the normal left-right movement of the fixing block 210 is not affected. When the loop bar 24 is pushed to move upwards, the loop bar 24 drives the rectangular block to move upwards together, the rectangular block can push the transverse plate 32 to move upwards together against the bottom of the transverse plate 32, the transverse plate 32 drives the clamping rod 33 to move upwards and withdraw from the clamping groove at the top of the ejector rod 28, and the purpose of releasing the limit of the ejector rod 28 is achieved.
In this embodiment, the driven assembly 4 includes an L-shaped driven plate 41, the L-shaped driven plate 41 is slidably mounted on the inner wall of the bracket 1, the left side of the L-shaped driven plate 41 is fixed to one end of a spring D42, the other end of a spring D42 is fixed to the inner wall of the bracket 1, one end of a two-way telescopic rod 43 is hinged to the top of the L-shaped driven plate 41, the middle position of the two-way telescopic rod 43 is hinged to the inner wall of the bracket 1, the other end of the two-way telescopic rod 43 is hinged to the bottom of a connecting rod 44, the right side of the connecting rod 44 is fixed to the left side of a sliding rod 45, the bottom of the sliding rod 45 is slidably mounted on the inner wall of the bracket 1, the right side of the sliding rod 45 is hinged to the left side of a limiting rod 46, the top of the limiting rod 46 is fixed to one end of a torsion spring B47, the other end of a torsion spring B47 is fixed to the sliding rod 45, a stop 48 is fixed to the right side of the sliding rod 45, under the action of the stop 48, the stop rod 46 can only rotate upward at the position hinged to the sliding rod 45, when the stop rod 46 is caught in the rectangular blocks on both sides of the loop bar 24, the loop bar 24 can move only upward but not downward.
In this embodiment, the limiting component 3, the driven component 4 and the auxiliary component 5 are provided with two sets of limiting components 3, two sets of driven components 4 and two sets of auxiliary components 5 which are symmetrically arranged by taking the central line of the bracket 1 as a symmetry axis.
During the during operation (or during the use), pass through mounting panel 6 and fix it on the roof through the bolt with support 1 earlier, aim at the electric wire pipe support 1 bottom and upwards promote, the electric wire pipe supports baffle 51 for baffle 51 upwards rotates with the position articulated with support 1, and when the electric wire pipe moved to the top of baffle 51, baffle 51 rotated down with the position articulated with support 1 under the effect of torsional spring A52 and resets, realizes playing the effect that supports to the electric wire pipe.
The wire tube is connected with another group of installed wire tubes, after the connection is finished, the wire tubes are pushed upwards, the wire tubes abut against the bottom of the pressing plate 26 to push the pressing plate 26 to move upwards, the pressing plate 26 drives the loop bar 24 to move upwards, the loop bar 24 drives the rectangular block to move upwards, the rectangular block abuts against the transverse plate 32 to move upwards together, the transverse plate 32 drives the clamping rod 33 to move upwards to withdraw from the clamping groove in the top of the ejector rod 28, and the limitation on the ejector rod 28 is relieved.
Under the action of the spring B29, the ejector rod 28 moves rightwards to abut against the bottom of the left side of the clamping plate 21, so that the clamping plate 21 rotates anticlockwise by taking the position hinged with the cross rod 22 as a center, and the clamping plate 21 holds the electric wire pipe.
The push rod 28 drives the fixing block 210 to move rightwards together, after the fixing block 210 moves for a certain distance, the fixing block 210 abuts against the left side of the L-shaped driven plate 41 to push the L-shaped driven plate 41 to move rightwards together, the L-shaped driven plate 41 pulls the sliding rod 45 to move leftwards through the bidirectional telescopic rod 43, the sliding rod 45 drives the limiting rod 46 to move leftwards, the limiting rod 46 withdraws from the rectangular block on the loop bar 24 to release the limiting on the loop bar 24, the loop bar 24 drives the pressing plate 26 to move downwards under the action of the spring A25, and the pressing plate 26 is matched with the clamping plate 21 to fix the electric wire tube.
When the electric wire tube needs to be overhauled and replaced, only the limiting block 53 needs to be pushed leftwards, so that the limiting block 53 relieves the limitation on the baffle 51, the ejector rod 28 is pushed to move leftwards to reset, and after the ejector rod 28 moves leftwards for a certain distance, the clamping rod 33 is inserted into the clamping groove at the top of the ejector rod 28, and the ejector rod 28 is limited.
At this time, the clamp plate 21 is no longer abutted by the ejector rod 28, and the iron pipe is released from being fixed, and the pressing plate 26 is pushed upward to be reset.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (9)

1. The utility model provides a building machinery electric pipeline construction equipment, includes support (1), its characterized in that: the inside of support (1) is provided with fixed subassembly (2), the inside of support (1) is provided with spacing subassembly (3) and driven subassembly (4), the inboard of support (1) is provided with auxiliary assembly (5), fixed subassembly (2) include splint (21), the left side of splint (21) is articulated with the one end of horizontal pole (22), the other end of horizontal pole (22) runs through the inboard of support (1) and is fixed with the inner wall of support (1), the inner wall of support (1) is fixed with the top of dead lever (23), dead lever (23) run through the top of loop bar (24) and with loop bar (24) sliding connection, the top of loop bar (24) is fixed with the one end of spring A (25), the other end of spring A (25) is fixed on the inner wall of support (1), loop bar (24) run through the inboard of support (1) and with support (1) sliding connection, the bottom of the loop bar (24) is fixed with the top of the pressure plate (26).
2. The construction device for the electric pipeline of the building as claimed in claim 1, wherein: fixed subassembly (2) are still including fixed frame (27), the left side at support (1) is fixed on the right side of fixed frame (27), the right side of fixed frame (27) and support (1) are run through by ejector pin (28) and with ejector pin (28) sliding connection, the left side of ejector pin (28) is fixed with the one end of spring B (29), the other end of spring B (29) is fixed on the inner wall of fixed frame (27), the top of ejector pin (28) is fixed with fixed block (210).
3. The construction device for the electric pipeline of the building as claimed in claim 1, wherein: the auxiliary assembly (5) comprises a baffle (51), the left side of the baffle (51) is hinged to the inner side of the support (1), the top of the baffle (51) is fixed to one end of a torsion spring A (52), the other end of the torsion spring A (52) is fixed to the inner side of the support (1), and a limiting block (53) is slidably mounted at the bottom of the support (1).
4. The construction device for the electric pipeline of the building as claimed in claim 1, wherein: spacing subassembly (3) include spring C (31), the one end of spring C (31) is fixed on the inner wall of support (1), the top at diaphragm (32) is fixed to the other end of spring C (31), diaphragm (32) slidable mounting is on the inner wall of support (1), the bottom of diaphragm (32) is fixed with the top of kelly (33).
5. The construction device for the electric pipeline of the building as claimed in claim 2, wherein: splint (21), horizontal pole (22), fixed frame (27), ejector pin (28), spring B (29), fixed block (210) all are provided with two sets of and two sets of splint (21), horizontal pole (22), fixed frame (27), ejector pin (28), spring B (29), fixed block (210) and all use the central line of support (1) to set up as symmetry axis symmetry, the draw-in groove has been seted up at the top of ejector pin (28).
6. The construction device for the electric pipeline of the building as claimed in claim 1, wherein: driven subassembly (4) include L type driven plate (41), L type driven plate (41) slidable mounting is on the inner wall of support (1), the left side of L type driven plate (41) is fixed with the one end of spring D (42), the other end of spring D (42) is fixed on the inner wall of support (1).
7. The construction device for the electric pipeline of the building as claimed in claim 6, wherein: driven subassembly (4) are still including two way telescopic link (43), the one end of two way telescopic link (43) is articulated with the top of L type driven plate (41), the intermediate position of two way telescopic link (43) is articulated with the inner wall of support (1), the other end of two way telescopic link (43) is articulated with the bottom of connecting rod (44), the right side of connecting rod (44) is fixed with the left side of slide bar (45), the bottom slidable mounting of slide bar (45) is on the inner wall of support (1), the right side of slide bar (45) is articulated with the left side of gag lever post (46), the top of gag lever post (46) is fixed with the one end of torsional spring B (47), the other end of torsional spring B (47) is fixed on slide bar (45), the right side of slide bar (45) is fixed with dog (48).
8. The construction device for the electric pipeline of the building as claimed in claim 1, wherein: the support (1) is "U" word form, the left and right sides of loop bar (24) all is provided with the rectangular block, both ends are fixed with mounting panel (6) about support (1).
9. The construction device for the electric pipeline of the building as claimed in claim 1, wherein: the limiting assembly (3), the driven assembly (4) and the auxiliary assembly (5) are provided with two groups of limiting assemblies (3), two groups of driven assemblies (4) and two groups of auxiliary assemblies (5) which are symmetrically arranged by taking the center line of the support (1) as a symmetry axis.
CN202111307541.5A 2021-11-05 2021-11-05 Construction device for electromechanical pipeline of building Active CN113889920B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111307541.5A CN113889920B (en) 2021-11-05 2021-11-05 Construction device for electromechanical pipeline of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111307541.5A CN113889920B (en) 2021-11-05 2021-11-05 Construction device for electromechanical pipeline of building

Publications (2)

Publication Number Publication Date
CN113889920A true CN113889920A (en) 2022-01-04
CN113889920B CN113889920B (en) 2023-06-09

Family

ID=79016660

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111307541.5A Active CN113889920B (en) 2021-11-05 2021-11-05 Construction device for electromechanical pipeline of building

Country Status (1)

Country Link
CN (1) CN113889920B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN210536192U (en) * 2019-11-15 2020-05-15 深圳市睿唯科技有限公司 Clamping device of four portable concentrator of USB
CN211059496U (en) * 2019-12-03 2020-07-21 葛勇 Assembly type building structure with electromechanical pipeline support
CN213185368U (en) * 2020-10-26 2021-05-11 王建波 Pipeline fixing device on construction frame
CN112830345A (en) * 2021-01-10 2021-05-25 深圳万宏业科技有限公司 Auxiliary assembly that construction of environment-friendly wiring engineering was used
CN214140945U (en) * 2020-12-01 2021-09-07 华正兴 Cable pay-off is used in building electrical construction
CN214308775U (en) * 2021-04-22 2021-09-28 河南工业职业技术学院 Building mapping device for construction

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN210536192U (en) * 2019-11-15 2020-05-15 深圳市睿唯科技有限公司 Clamping device of four portable concentrator of USB
CN211059496U (en) * 2019-12-03 2020-07-21 葛勇 Assembly type building structure with electromechanical pipeline support
CN213185368U (en) * 2020-10-26 2021-05-11 王建波 Pipeline fixing device on construction frame
CN214140945U (en) * 2020-12-01 2021-09-07 华正兴 Cable pay-off is used in building electrical construction
CN112830345A (en) * 2021-01-10 2021-05-25 深圳万宏业科技有限公司 Auxiliary assembly that construction of environment-friendly wiring engineering was used
CN214308775U (en) * 2021-04-22 2021-09-28 河南工业职业技术学院 Building mapping device for construction

Also Published As

Publication number Publication date
CN113889920B (en) 2023-06-09

Similar Documents

Publication Publication Date Title
CN111290092A (en) Beam line finishing device for optical fiber branching unit
CN113889920A (en) Building machine electrical pipeline construction equipment
CN110029808A (en) A kind of gondola-hanging mechanism and its construction method on steel construction cant beam
CN201202298Y (en) Apparatus for erecting or laying down thin long rod
CN209797167U (en) Portable telescopic electric wire positioner
CN217583411U (en) Auxiliary device for installation and construction of outdoor pipeline
CN215568471U (en) Multi-purpose support of interim water and electricity pipeline of assembled that building site used
CN212509821U (en) Lateral support air pipe anti-seismic hanging bracket
CN213240625U (en) Combined cable tube for optical cable arrangement
CN210938952U (en) Fixing device is used in production of power cable protection pipe
CN210005766U (en) guiding device for pulling inspection well optical cable
CN109494624B (en) Traversing device for erecting bunched conductors
CN214534827U (en) A gallows convenient to installation
CN220016349U (en) Protection device for municipal pipeline
CN220527631U (en) Splicing mechanism of bus duct
CN219587012U (en) Curtain wall connecting piece
CN112909879A (en) Cable support for tunnel cable trench
CN205791198U (en) Aluminium armor tape wind
CN216842905U (en) Cable drag chain convenient to assembly
CN214833287U (en) Drainage is with electric melting connection polymer inspection shaft
CN216787453U (en) Assembled steel construction building wall and post connection structure
CN213143324U (en) Assembled municipal administration plumbing inspection shaft
CN215808747U (en) Water knockout drum installation fixed plate for heating
CN211455501U (en) Oil-immersed transformer ground lead device
CN218940639U (en) MPP cable protection tube capable of preventing cable from being wound

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant