CN215568471U - Multi-purpose support of interim water and electricity pipeline of assembled that building site used - Google Patents

Multi-purpose support of interim water and electricity pipeline of assembled that building site used Download PDF

Info

Publication number
CN215568471U
CN215568471U CN202122210909.8U CN202122210909U CN215568471U CN 215568471 U CN215568471 U CN 215568471U CN 202122210909 U CN202122210909 U CN 202122210909U CN 215568471 U CN215568471 U CN 215568471U
Authority
CN
China
Prior art keywords
support
multipurpose
chassis
support frame
assembled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122210909.8U
Other languages
Chinese (zh)
Inventor
张萌
张建怀
杨如盆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinomach Luyuan Engineering Design And Research Co ltd
Original Assignee
Xiamen Luyuan Architectural Design Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Luyuan Architectural Design Institute Co ltd filed Critical Xiamen Luyuan Architectural Design Institute Co ltd
Priority to CN202122210909.8U priority Critical patent/CN215568471U/en
Application granted granted Critical
Publication of CN215568471U publication Critical patent/CN215568471U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an assembled temporary water and electricity pipeline multipurpose support for a building site, which belongs to the technical field of building construction and is used for solving the problem that the support of the existing support which is exposed to water and electricity is unstable. The assembly type temporary water and electricity pipeline multipurpose support for the construction site enables the support frames to form a whole, is firm in structure and stable in support, can rotate relative to the underframe and is fixed through the positioning structure, so that the installation angle is adjusted, and the use is convenient.

Description

Multi-purpose support of interim water and electricity pipeline of assembled that building site used
Technical Field
The utility model relates to the technical field of building construction, in particular to an assembled temporary water and electricity pipeline multipurpose support for a building site.
Background
On the construction site, the access of the temporary water and the temporary electricity is an indispensable process. Chinese patent CN207500627U discloses a temporary cable and fire hose fixing bracket for a construction site, which comprises a middle bracket and an end bracket, wherein a first upper horizontal rod of the middle bracket is vertically fixed at the upper end of a first vertical supporting rod, a first lower horizontal rod is vertically fixed at the bottom end of the first vertical supporting rod, the first upper horizontal rod and the first lower horizontal rod are positioned at the same side of the first vertical supporting rod, a porcelain bottle is installed on the upper surface of the first upper horizontal rod, and two ends of a hoop are fixed on the upper surface of the first lower horizontal rod; the two ends of a second upper horizontal rod of the end support are fixedly connected with the top ends of the two second vertical supporting rods in a vertical mode, the two ends of a second lower horizontal rod of the end support are fixedly connected with the bottom ends of the two second vertical supporting rods in a vertical mode, a porcelain bottle is installed on the upper surface of the second upper horizontal rod, and the two ends of a hoop are fixed on the upper surface of the second lower horizontal rod. It can be seen that current support that faces electricity near water includes tip support and the intermediate strut that independent setting each other, owing to lack the connection between tip support and the intermediate strut, the stability of support is relatively poor, leads to the job site support relatively scattered easily simultaneously, inconvenient use, needs the whole rotation when current support rotates the installation angle simultaneously, and it is not convenient enough to use.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides an assembled temporary multipurpose support for a water and electricity pipeline in a building site, which at least solves the problems of dispersed arrangement, poor stability and inconvenient use of the existing support for the current water and electricity.
(II) technical scheme
In order to solve the technical problems, the utility model provides the following technical scheme:
the utility model provides a multi-purpose support of interim water and electricity pipeline of assembled that building site used, including two at least support frames, be equipped with the clamp of fixed water pipe on the support frame and be used for laying the vase of cable, still include the chassis, support frame rotatable coupling is on the chassis, be equipped with the location structure of fixed stay frame between chassis and the support frame, connect through extending structure between the adjacent chassis, extending structure is including the sleeve pipe that is fixed in the chassis, the equidistant a plurality of connecting hole that sets up of sleeve pipe axial, the telescopic cup joints and passes the connecting hole through the bolt between the sleeve pipe of adjacent chassis and fixes.
Further, strip-shaped bulges or grooves are axially arranged in the pipe wall of the sleeve, and the bulges and the grooves are movably matched and connected.
So set up, arch and recess can effectively disperse sleeve pipe stress, improve sheathed tube structural strength, have the guide effect to the cooperation between the sleeve pipe simultaneously.
Further, the connecting holes are formed in the protrusions and the grooves.
So set up, connecting hole connecting bolt, the location is connected to the intercannula to the cooperation of arch and recess simultaneously, improves joint strength.
The support frame is rotatably connected to the underframe through the rotating shaft, the positioning structure comprises a connecting rod fixed at the bottom of the support frame, a clamping block hinged to the connecting rod and clamping grooves arranged on the underframe, the clamping grooves are arranged below the rotating path of the clamping block at equal intervals, and the clamping block is clamped in the clamping grooves to limit the rotation of the connecting rod and the support frame.
So set up, after the relative chassis angle of adjustment of support frame, the fixture block card forms the circumference location to the support frame in arranging the draw-in groove of below in, prevents that the support frame from continuing to rotate convenient to use is swift.
And the clamping block is connected with the clamping groove through a pin piece.
So set up, the fixture block carries out assistance-localization real-time through round pin spare and draw-in groove, avoids the fixture block to break away from in the draw-in groove, improves the stability of fixture block.
The wire cable arranging device is characterized in that the porcelain insulator is provided with an ejector pin which is arranged towards the cable in a telescopic mode and is arranged in the arranging hole, a spring is arranged between the ejector pin and the porcelain insulator, and the ejector pin extends into the arranging hole through the elastic force of the spring and compresses the cable.
So set up, the cable passes and draws out the thimble before laying the hole, can reset through the thimble after passing and carry out quick fixed, installation convenient to use to the cable.
Further, the sleeve is fixed on the underframe through a bolt.
So set up, the chassis is dismantled relatively to the sleeve pipe, makes things convenient for this support transport and transportation.
(III) advantageous effects
Compared with the prior art, the assembled temporary multipurpose support for the water and electricity pipelines in the construction site has the following beneficial effects:
(1) when the assembly type temporary water and electricity pipeline multipurpose support for the building site works, all the underframe are connected through the sleeve, and the sleeve is fixed by penetrating through the connecting hole through the bolt after the installation distance is adjusted, so that all the support frames form a whole, the structure is firmer, and the support is more stable;
(2) this multipurpose support frame of interim water and electricity pipeline of assembled that building site used can rotate and fix through location structure relative to the chassis to adjustment installation angle, convenient to use.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a side view of the present invention;
FIG. 3 is a front view of the present invention;
FIG. 4 is a schematic view of a bushing connection according to the present invention;
fig. 5 is a schematic view of the porcelain insulator of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Please refer to fig. 1, fig. 2, fig. 3 and fig. 4, wherein fig. 1 is a schematic structural diagram of the present invention; FIG. 2 is a side view of the present invention; FIG. 3 is a front view of the present invention; fig. 4 is a schematic view of the connection of the bushing of the present invention.
The utility model provides an assembled temporary multipurpose support for water and electricity pipelines in a building site, which is the same as the existing support and comprises at least two support frames 1, wherein the support frames 1 are provided with clamps 2 for fixing water pipes and porcelain bottles 3 for laying cables, the difference is that the support frame further comprises a bottom frame 4, the support frames 1 are rotatably connected onto the bottom frame 4, a positioning structure for fixing the support frames 1 is arranged between the bottom frame 4 and the support frames 1, the support frames 1 can rotate relative to the bottom frame 4 to adjust the laying angle, adjacent bottom frames 4 are connected through a telescopic structure, the telescopic structure comprises sleeves 6 fixed on the bottom frame 4, the sleeves 6 are axially provided with a plurality of connecting holes 60 at equal intervals, the sleeves 6 of the adjacent bottom frames 4 are telescopically sleeved and fixed through the connecting holes 60 through bolts, so that the support frames 1 are connected into a whole.
In a preferred embodiment of the connection of the sleeve 6, a strip-shaped protrusion 61 or groove 62 is axially arranged in the wall of the sleeve 6, the protrusion 61 and the groove 62 are movably matched and connected, the protrusion 61 and the groove 62 can effectively disperse the stress of the sleeve 6, improve the structural strength of the sleeve 6, and have a guiding effect on the matching between the sleeves 6; the connecting holes 60 are formed in the protrusions 61 and the grooves 62, the connecting holes 60 are connected with bolts, and meanwhile the protrusions 61 and the grooves 62 are matched to connect and position the sleeves 6, so that the connecting strength is improved.
The location structure can be current bolt fastening structure, in a preferred embodiment of location structure, support frame 1 is through pivot rotatable coupling in chassis 4, location structure is including being fixed in connecting rod 11 of 1 bottom of support frame, articulate in the fixture block 12 of connecting rod 11, set up draw-in groove 40 on chassis 4, draw-in groove 40 equidistant setting is in the rotation route below of fixture block 12, fixture block 12 card is arranged in draw-in groove 40 in order to restrict connecting rod 11 and support frame 1 and rotate, behind the 4 angle of adjustment of support frame 1 relative chassis, the fixture block 12 card is arranged in the draw-in groove 40 of below and is formed the circumference location to support frame 1, prevent that support frame 1 from continuing to rotate, high durability and convenient use. The fixture block 12 is connected with the clamping groove 40 through the pin piece 13 after being connected, the fixture block 12 is positioned with the clamping groove 40 in an auxiliary mode through the pin piece 13, the fixture block 12 is prevented from being separated from the clamping groove 40, and stability of the fixture block 12 is improved.
Referring to fig. 5, fig. 5 is a schematic view of the porcelain insulator of the present invention, a thimble 31 is provided on the porcelain insulator 3 and is telescopically disposed toward a cable laying hole, a spring 32 is provided between the thimble 31 and the porcelain insulator 3, the thimble 31 is extended into the cable laying hole by the elastic force of the spring 32 and compresses the cable, the thimble 31 is pulled out before the cable passes through the cable laying hole, and the cable can be quickly fixed by resetting the thimble 31 after passing through the cable laying hole, so that the porcelain insulator is convenient to install and use.
The sleeve 6 is fixed on the bottom frame 4 through bolts, and the sleeve 6 can be detached relative to the bottom frame 4, so that the support is convenient to carry and transport.
When the assembly type temporary water and electricity pipeline multipurpose support for the construction site works, all the underframe 4 are connected through the sleeve 6, and the sleeve 6 is fixed by penetrating through the connecting hole 60 through the bolt after the installation distance is adjusted, so that all the support frames 1 form a whole, the structure is firmer, and the support is more stable; meanwhile, the support frame 1 can rotate relative to the bottom frame 4 and is fixed through a positioning structure so as to adjust the installation angle, and the use is convenient.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a multi-purpose support of interim water and electricity pipeline of assembled that building site used, including two at least support frames, be equipped with the clamp of fixed water pipe on the support frame and be used for laying the vase of cable, a serial communication port, still include the chassis, support frame rotatable coupling is on the chassis, be equipped with the location structure of fixed stay frame between chassis and the support frame, connect through extending structure between the adjacent chassis, extending structure is including the sleeve pipe that is fixed in the chassis, the equidistant a plurality of connecting hole that sets up of sleeve pipe axial, the telescopic cup joints and passes the connecting hole through the bolt between the sleeve pipe of adjacent chassis and fixes.
2. The multipurpose support for the assembled temporary water and electricity pipelines at the construction site as claimed in claim 1, wherein strip-shaped protrusions or grooves are axially arranged in the pipe wall of the sleeve, and the protrusions and the grooves are movably connected in a matching manner.
3. The multipurpose bracket for assembled temporary hydroelectric lines for use at a construction site of claim 2, wherein the coupling holes are provided on the protrusions and the grooves.
4. The multipurpose support for the assembled temporary water and electricity pipelines in the construction site as claimed in claim 1, wherein the support frame is rotatably connected to the underframe through a rotating shaft, the positioning structure comprises a connecting rod fixed to the bottom of the support frame, a clamping block hinged to the connecting rod, and clamping grooves arranged on the underframe, the clamping grooves are arranged below the rotating path of the clamping block at equal intervals, and the clamping block is clamped in the clamping grooves to limit the rotation of the connecting rod and the support frame.
5. The multipurpose rack for prefabricated temporary water and power lines for construction sites as claimed in claim 4, wherein the fixture blocks and the clamping grooves are connected by the pin members.
6. The multipurpose support for the assembled temporary water and electricity pipelines for the construction site as claimed in claim 1, wherein an ejector pin which is arranged in a telescopic manner and faces a laying hole of the cable is arranged on the porcelain insulator, a spring is arranged between the ejector pin and the porcelain insulator, and the ejector pin is enabled to extend into the laying hole by the elastic force of the spring and to press the cable.
7. The multipurpose stand for assembled temporary hydroelectric lines for a construction site of claim 1, wherein the sleeve is fixed to the base frame by bolts.
CN202122210909.8U 2021-09-13 2021-09-13 Multi-purpose support of interim water and electricity pipeline of assembled that building site used Active CN215568471U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122210909.8U CN215568471U (en) 2021-09-13 2021-09-13 Multi-purpose support of interim water and electricity pipeline of assembled that building site used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122210909.8U CN215568471U (en) 2021-09-13 2021-09-13 Multi-purpose support of interim water and electricity pipeline of assembled that building site used

Publications (1)

Publication Number Publication Date
CN215568471U true CN215568471U (en) 2022-01-18

Family

ID=79850113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122210909.8U Active CN215568471U (en) 2021-09-13 2021-09-13 Multi-purpose support of interim water and electricity pipeline of assembled that building site used

Country Status (1)

Country Link
CN (1) CN215568471U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117080959A (en) * 2023-10-17 2023-11-17 国清环境发展有限公司 Temporary cable installation and fixation structure and fixation method for constructional engineering

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117080959A (en) * 2023-10-17 2023-11-17 国清环境发展有限公司 Temporary cable installation and fixation structure and fixation method for constructional engineering
CN117080959B (en) * 2023-10-17 2024-01-30 国清环境发展有限公司 Temporary cable installation and fixation structure and fixation method for constructional engineering

Similar Documents

Publication Publication Date Title
CN215568471U (en) Multi-purpose support of interim water and electricity pipeline of assembled that building site used
CN209943687U (en) Fixing device for indoor pipelines
CN208094147U (en) A kind of foldable cable bearer
CN205453044U (en) Way insulation support is striden to cable
CN213200425U (en) PVC pipeline strorage device for irrigation and water conservancy project
CN206922401U (en) A kind of adjustable cable holder
CN215934431U (en) Buried cable sleeve supporting mechanism
CN110635281B (en) One drags many types electric power connecting device
CN212340250U (en) Laser level meter suitable for field surveying and mapping
CN213271571U (en) Assembled antidetonation gallows
CN213741593U (en) Quick joint for light steel keel Christmas tree support frame
CN211670558U (en) Cable supporting device for bypass operation vehicle
CN113067288A (en) Multifunctional cable supporting tool for power construction
CN103247981A (en) Cable head supporting method and special portable multifunctional cable head bracket
CN212011978U (en) Temporary cable erecting device
CN216201154U (en) Steady pipe mechanism of long distance pipeline construction
CN214626187U (en) Novel cable bridge expansion joint
CN212751748U (en) Portable cable supporting and fixing device
CN220621322U (en) Angle steel cross arm
CN214274795U (en) Pipeline connecting mechanism
CN214833287U (en) Drainage is with electric melting connection polymer inspection shaft
CN219677993U (en) Dual-functional anti-dragging cable support
KR102492927B1 (en) Distribution line arrangement mechanism to prevent short circuit of underground distribution lines
CN212811195U (en) A support frame for cable installation
CN217545518U (en) Cable trench high-voltage cable fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 361000 room 7C, No. 10, Hubin North Road, Siming District, Xiamen City, Fujian Province

Patentee after: Sinomach Luyuan engineering design and Research Co.,Ltd.

Address before: 361000 room 7C, No. 10, Hubin North Road, Siming District, Xiamen City, Fujian Province

Patentee before: Xiamen Luyuan Architectural Design Institute Co.,Ltd.

CP01 Change in the name or title of a patent holder