Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111437403.9A
Other languages
Chinese (zh)
Inventor
陈尚荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanchang Xieda Technology Development Co ltd
Original Assignee
Nanchang Xieda Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanchang Xieda Technology Development Co ltd filed Critical Nanchang Xieda Technology Development Co ltd
Priority to CN202111437403.9A priority Critical patent/CN113850534A/en
Publication of CN113850534A publication Critical patent/CN113850534A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Abstract

The invention provides a plan management method, a system, a readable storage medium and computer equipment, wherein the method comprises the following steps: acquiring a sample inspection request uploaded by a client, wherein the sample inspection request at least comprises sample information and inspection item information; establishing a checking schedule according to the sample information and the checking project information, wherein the checking schedule comprises schedule progress information and checking project types; judging whether test data corresponding to the test item type is received or not every first preset time; and if so, updating the plan progress information according to the inspection data corresponding to the inspection project type. The plan management method provided by the invention can track and update the project completion condition in real time according to the test data related to sample test, thereby perfecting the project feedback mechanism and promoting the improvement of the working efficiency of the staff.

Description

Plan management method, system, readable storage medium and computer device
Technical Field
The present invention relates to the field of information processing technologies, and in particular, to a plan management method, a plan management system, a readable storage medium, and a computer device.
Background
In the sample testing process, items such as water sample detection and the like are more and more along with the types of the items to be tested, and simultaneously, a plurality of experimental links are involved, and the work cooperation of a plurality of departments is needed.
In the prior art, the sample inspection affairs are usually pre-evaluated to make a work plan, and the plan is distributed to all departments to determine specific targets and specific steps, so that the actions of people can be coordinated, the initiative of work is enhanced, the blindness is reduced, and the work is orderly carried out.
However, there is no good supervision progress and conscientious process after plan allocation, and it cannot be ensured that specific task items of all employees at each department are in place in time.
Disclosure of Invention
Based on this, the present invention is directed to a plan management method, system, readable storage medium and computer device, so as to solve at least one of the above problems.
The plan management method provided by the invention is applied to a sample inspection management system, and comprises the following steps:
acquiring a sample inspection request uploaded by a client, wherein the sample inspection request at least comprises sample information and inspection item information;
establishing a checking schedule according to the sample information and the checking project information, wherein the checking schedule comprises schedule progress information and checking project types;
judging whether test data corresponding to the test item type is received or not every first preset time;
and if so, updating the plan progress information according to the inspection data corresponding to the inspection project type.
In conclusion, according to the plan management method, the online real-time progress tracking is performed by establishing the inspection schedule, so that a good supervision effect is achieved, and the working efficiency of the staff is improved. Specifically, after a sample inspection request uploaded by a user at a client is received, an inspection schedule is established according to sample information in the sample inspection request and project information to be inspected, wherein the schedule needs to include schedule progress information and all project types of the sample inspection, and whether inspection data corresponding to the sample inspection is received or not is monitored in real time at intervals of first preset time. The plan progress information in the inspection schedule is updated according to the received inspection data so as to be convenient for viewing at any time, and a health project feedback mechanism is facilitated.
Further, the step of creating a test schedule based on the sample information and the test item information, the test schedule including schedule information and test item types includes:
calling a checking item list corresponding to the sample information from a preset database according to the sample information, wherein the checking item list comprises all checking items of the sample;
and comparing the inspection item information with the inspection item list corresponding to the sample information so as to determine a single or multiple inspection items corresponding to the sample inspection according to the comparison result.
Further, the step of comparing the inspection item information with the inspection item list corresponding to the sample information to determine the single or multiple inspection items corresponding to the sample inspection according to the comparison result further includes:
generating a tester scheduling request according to a single or multiple test items corresponding to the sample test, and sending the tester scheduling request to an employee management platform;
and acquiring tester information issued by the employee management platform according to the tester scheduling request, and establishing a plan schedule according to the tester information and the single or multiple test projects corresponding to the sample test.
Further, the verification project further includes a plurality of sub-projects, the verification data is a detection result corresponding to the sub-project, and if the verification data corresponding to the verification project type is received, the step of updating the schedule progress information according to the verification data corresponding to the verification project type further includes:
when test data uploaded by a tester are received, acquiring a sub-project name corresponding to the test data according to the test data;
and modifying the schedule progress information in the schedule progress table according to the sub-project name corresponding to the inspection data, and updating the progress value corresponding to the sample inspection according to the modification result.
Further, the step of establishing a test schedule according to the sample information and the test item information, wherein the test schedule comprises schedule information and test item types, and the step of:
acquiring planning information which is uploaded by a tester according to the inspection schedule and corresponds to all inspection projects, wherein the planning information comprises estimated completion time corresponding to all the inspection projects one by one;
and establishing a task quality evaluation table according to the planning information so as to grade the project of the tester.
Further, the method further comprises:
updating the completion time under the sub-project corresponding to the inspection data according to the inspection data to obtain the final completion time;
and comparing the final completion time with the planning information, and updating the task quality evaluation table according to the comparison result and a preset grading rule.
Further, the method further comprises:
if a task canceling request sent by the client is received, the task canceling request comprises all inspection project information of the task canceling at this time;
and auditing all the inspection project information of the task to be cancelled at this time, and updating the inspection schedule according to the auditing result.
The plan management system provided by the embodiment of the invention is applied to a sample inspection management system, and the method comprises the following steps:
the task acquisition module is used for acquiring a sample inspection request uploaded by a client, wherein the sample inspection request at least comprises sample information and inspection project information;
the schedule establishing module is used for establishing a checking schedule according to the sample information and the checking project information, and the checking schedule comprises schedule progress information and checking project types;
the task monitoring module is used for judging whether the inspection data corresponding to the type of the inspection item is received or not at intervals of first preset time;
and the progress updating module is used for updating the plan progress information according to the inspection data corresponding to the inspection project type if the progress updating module is used for updating the plan progress information according to the inspection data corresponding to the inspection project type.
Another aspect of the present invention also provides a readable storage medium storing one or more programs which, when executed, implement the schedule management method as described above.
Another aspect of the present invention also provides a computer device comprising a memory and a processor, wherein:
the memory is used for storing computer programs;
the processor is configured to implement the above-described schedule management method when executing the computer program stored in the memory.
Additional aspects and advantages of the invention will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the invention.
Drawings
FIG. 1 is a flowchart of a plan management method according to a first embodiment of the present invention;
FIG. 2 is a flowchart of a plan management method according to a second embodiment of the present invention;
fig. 3 is a schematic structural diagram of a plan management system according to a third embodiment of the present invention.
The following detailed description will further illustrate the invention in conjunction with the above-described figures.
Detailed Description
To facilitate an understanding of the invention, the invention will now be described more fully with reference to the accompanying drawings. Several embodiments of the invention are presented in the drawings. This invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
Referring to fig. 1, a flowchart of a plan management method applied to a sample inspection management system according to a first embodiment of the present invention is shown, the method including steps S01 to S04, wherein:
step S01: acquiring a sample inspection request uploaded by a client, wherein the sample inspection request at least comprises sample information and inspection item information;
it can be understood that, in this step, the sample inspection request is generally uploaded by the inspection entrustor through a client, the client may be a mobile phone of an individual user or a work system of a client unit, and the sample inspection management system is an internal management system of the entrusted party.
Step S02: establishing a checking schedule according to the sample information and the checking project information, wherein the checking schedule comprises schedule progress information and checking project types;
it should be noted that, in this embodiment, the sample actually refers to an article to be detected, the principal sends a sample inspection request to the sample inspection management system, further determines information such as the name of the article to be detected and the number of samples according to the sample information in the request, and knows all items to be detected of the article to be detected according to the inspection item information.
By way of example and not limitation, in this embodiment, the name of the article to be detected of the sample to be detected is a water sample, the number of the sample is 100, the related water sample detection items are detection experiments of various microorganism contents in water, and relevant experiment matters of the sample detection request of the customer are determined according to the information, so that corresponding planning can be performed.
Step S03: judging whether test data corresponding to the test item type is received or not every first preset time;
it should be noted that the inspection data is uploaded to the sample inspection management system by the tester executing the inspection item, and the inspection data may be uploaded in one or more copies, and according to the inspection items corresponding to the inspection data one to one, it is determined that the items acquiring the inspection data have been completed.
Specifically, the first preset time is set to periodically and real-timely feed back the completion condition of the project, and the first preset time is related to the actual working environment and is not specifically limited in this embodiment.
Step S04: and if so, updating the plan progress information according to the inspection data corresponding to the inspection project type.
It can be understood that, in this embodiment, the scheduled progress information is an overall completion progress value of the sample inspection at this time, an initial value of the progress of the sample inspection at this time is 0, and a final value is one hundred percent, and the progress proportion division is performed according to all types of the detection items involved, when a plurality of inspection data uploaded by a tester are received, and then the corresponding inspection items are obtained according to the inspection data, the test sample inspection management system grays the inspection items completed in the inspection schedule to prompt that the items are completed, and synchronously updates the overall completion progress value in the inspection schedule.
In conclusion, according to the plan management method, the online real-time progress tracking is performed by establishing the inspection schedule, so that a good supervision effect is achieved, and the working efficiency of the staff is improved. Specifically, after a sample inspection request uploaded by a user at a client is received, an inspection schedule is established according to sample information in the sample inspection request and project information to be inspected, wherein the schedule needs to include schedule progress information and all project types of the sample inspection, and whether inspection data corresponding to the sample inspection is received or not is monitored in real time at intervals of first preset time. The plan progress information in the inspection schedule is updated according to the received inspection data so as to be convenient for viewing at any time, and a health project feedback mechanism is facilitated.
Referring to fig. 2, a flowchart of a plan management method according to a second embodiment of the present invention is shown, the method includes steps S11 to S20, wherein:
step S11: acquiring a sample inspection request uploaded by a client, wherein the sample inspection request at least comprises sample information and inspection item information;
step S12: calling a checking item list corresponding to the sample information from a preset database according to the sample information, wherein the checking item list comprises all checking items of the sample;
it can be understood that, in the process of actually creating the inspection schedule, the sample inspection management system may pre-create a database, where the database includes multiple types of sample information that can be inspected, and all executable inspection items corresponding to each sample, and when the sample inspection management system receives the sample information, the sample name of the sample inspection is locked according to the sample information, and then all executable inspection items under the object to be inspected are quickly retrieved according to the sample name, so as to summarize into an inspection item list.
By way of example and not limitation, in this embodiment, if the object to be detected is a water sample, all the test items related to the water sample are extracted, for example, content detection of various trace elements, content detection of inorganic substances, content detection of organic substances, and the like.
Step S13: comparing the inspection item information with an inspection item list corresponding to the sample information to determine a single or multiple inspection items corresponding to the sample inspection according to a comparison result;
it should be noted that, after the sample inspection management system generates a temporary list of inspection items, the list of inspection items is compared with all items of inspection uploaded by the customer, so as to mark all inspection items required for the sample inspection, thereby determining the inspection matters of the sample inspection.
Step S14: generating a tester scheduling request according to a single or multiple test items corresponding to the sample test, and sending the tester scheduling request to an employee management platform;
it can be understood that, in order to improve the work efficiency of the staff, when analyzing all the inspection items required to be completed by the inspection task, the sample inspection management system generates a dispatch request, where the dispatch request includes all the inspection item type information, and sends the dispatch request to the staff management platform, so as to realize the dispatching of the staff task and make clear the division of the work of each staff under each department.
Step S15: acquiring tester information issued by the employee management platform according to the tester scheduling request, and establishing a planning schedule according to the tester information and a single or multiple test projects corresponding to the sample test;
it should be noted that, after the employee management platform obtains the retrieval request, all the inspection item type information starts to be analyzed, and the testers corresponding to each inspection item type start to be retrieved according to the inspection item type information.
For example, since detection items such as trace element detection, organic substance detection, inorganic substance detection and the like may correspond to different instruments and different experimental departments, before the completion of the calling, an employee role list including employee information and information of a performable item corresponding to the employee is sent to the employee management platform, so that the employee management platform can be ensured to arrange the employee in a competent detection affair according to the obtained type information of the detection item.
Step S16: acquiring planning information which is uploaded by a tester according to the inspection schedule and corresponds to all inspection projects, wherein the planning information comprises estimated completion time corresponding to all the inspection projects one by one;
it should be noted that after the staff management platform completes the relevant scheduling, the staff management platform sends the tester information corresponding to each type of the inspection project to the sample inspection management system, so that the sample inspection management system establishes an inspection schedule, at this time, the tester submits a corresponding piece of planning information for the dispatched inspection affairs through the sample inspection management system, the planning information is mainly the estimated completion time of the next inspection project or projects of the inspection affairs of the tester, and it can be understood that each inspection project has a corresponding estimated completion time.
Step S17: establishing a task quality evaluation table according to the planning information so as to score the project of the tester;
it can be understood that after the tester completes the related planning of the detection affairs sent to the tester, the sample inspection management system can establish a task quality evaluation table according to the estimated completion time, so as to score according to the completion progress, thereby playing a good supervision role.
Further, the inspection data further includes a sub-project completion date, so that the sample inspection management system updates the completion time of the sub-project corresponding to the inspection data according to the inspection data to obtain a final completion time, compares the final completion time with the planning information, and updates the task quality evaluation table according to the comparison result and a preset scoring rule, for example, if it is analyzed that the sub-project is more estimated to be completed by ten days than the estimated completion time according to the comparison result, then, the sub-project is scored according to a scoring interval corresponding to the number of delay days, so as to complete the update of the task quality evaluation table.
Step S18: judging whether test data corresponding to the test item type is received or not every first preset time;
step S19: when test data uploaded by a tester are received, acquiring a sub-project name corresponding to the test data according to the test data;
it should be noted that the inspection item further includes a plurality of sub-items, the inspection data is a detection result corresponding to the sub-item, that is, each sub-item corresponds to one piece of inspection data, the sample inspection management system can confirm that the sub-item is completed by obtaining the detection result corresponding to each sub-item, and obtain a sub-item name related to the inspection data uploaded this time.
Step S20: and modifying the schedule progress information in the schedule progress table according to the sub-project name corresponding to the inspection data, and updating the progress value corresponding to the sample inspection according to the modification result.
It can be understood that the sample inspection management system analyzes the inspection data to confirm the names of the sub-projects that have been completed, on one hand, the sample inspection system grays all the completed sub-projects to distinguish all the sub-projects to be completed, counts the number of all the sub-projects, and modifies the schedule progress information in the schedule according to the number of completed sub-projects, thereby updating the schedule completion condition of the sample inspection.
It should be noted that, if the sample inspection management system receives a task cancellation request sent by the client, the task cancellation request includes all inspection item information of the task to be cancelled at this time; and auditing all the inspection project information of the task to be cancelled at this time, and updating the inspection schedule according to the auditing result.
In summary, according to the plan management method, the inspection schedule is established to perform online real-time progress tracking, so that a good supervision effect is achieved, and the work efficiency of the staff is improved. Specifically, after a sample inspection request uploaded by a user at a client is received, an inspection schedule is established according to sample information in the sample inspection request and project information to be inspected, wherein the schedule needs to include schedule progress information and all project types of the sample inspection, and whether inspection data corresponding to the sample inspection is received or not is monitored in real time at intervals of first preset time. The plan progress information in the inspection schedule is updated according to the received inspection data so as to be convenient for viewing at any time, and a health project feedback mechanism is facilitated. In addition, each inspection project is accurately called, each inspection affair in the whole plan is guaranteed to be implemented to each employee, and an employee progress scoring mechanism is established, so that the work efficiency of the employees is improved.
Referring to fig. 3, a schematic structural diagram of a plan management system according to a third embodiment of the present invention is shown, the system including:
the task obtaining module 11 is configured to obtain a sample inspection request uploaded by a client, where the sample inspection request at least includes sample information and inspection item information;
a schedule creating module 12 for creating a test schedule according to the sample information and the test item information, wherein the test schedule includes schedule information and test item types;
further, the schedule creating module 12 further includes:
the item calling unit is used for calling a checking item list corresponding to the sample information from a preset database according to the sample information, and the checking item list comprises all checking items of the sample;
the item comparison unit is used for comparing the inspection item information with an inspection item list corresponding to the sample information so as to determine a single or multiple inspection items corresponding to the sample inspection according to a comparison result;
the system comprises a calling request unit, a staff management platform and a data processing unit, wherein the calling request unit is used for generating a tester scheduling request according to a single or multiple inspection projects corresponding to the sample inspection at this time and sending the tester scheduling request to the staff management platform;
and the task planning unit is used for acquiring the tester information issued by the employee management platform according to the tester scheduling request and establishing a planning schedule according to the tester information and the single or multiple test projects corresponding to the sample test.
The task monitoring module 13 is configured to determine whether inspection data corresponding to the type of the inspection item is received every first preset time;
and a progress updating module 14, configured to update the planned progress information according to the inspection data corresponding to the inspection item type if the planned progress information is the current schedule.
Further, the progress updating module further includes:
the data analysis unit is used for acquiring a sub-project name corresponding to the inspection data according to the inspection data when the inspection data uploaded by a tester is received;
and the modifying unit is used for modifying the schedule progress information in the schedule progress table according to the sub-project names corresponding to the inspection data, and updating the progress value corresponding to the sample inspection according to the modification result.
Further, in some optional embodiments of the present invention, the method further comprises:
the date analysis module is used for updating the completion time under the sub-project corresponding to the inspection data according to the inspection data to obtain the final completion time;
and the supervision module is used for comparing the final completion time with the planning information and updating the task quality evaluation table according to the comparison result and a preset grading rule.
Further, in some optional embodiments of the present invention, the method further comprises:
the task canceling module is used for receiving a task canceling request sent by the client, wherein the task canceling request comprises all inspection project information of the task canceling at this time;
and the auditing module is used for auditing all the inspection project information of the task to be cancelled, and updating the inspection schedule according to the auditing result.
In summary, according to the plan management system and the plan management method, the online real-time progress tracking is performed by establishing the inspection schedule, so that a good supervision effect is achieved, and the work efficiency of the staff is improved. Specifically, after a sample inspection request uploaded by a user at a client is received, an inspection schedule is established according to sample information in the sample inspection request and project information to be inspected, wherein the schedule needs to include schedule progress information and all project types of the sample inspection, and whether inspection data corresponding to the sample inspection is received or not is monitored in real time at intervals of first preset time. The plan progress information in the inspection schedule is updated according to the received inspection data so as to be convenient for viewing at any time, and a health project feedback mechanism is facilitated. In addition, each inspection project is accurately called, each inspection affair in the whole plan is guaranteed to be implemented to each employee, and an employee progress scoring mechanism is established, so that the work efficiency of the employees is improved.
In another aspect, the present invention also provides a computer-readable storage medium having one or more programs stored thereon, which when executed by a processor implement the above-described schedule management method.
In another aspect, the present invention further provides a computer device, which includes a memory and a processor, wherein the memory is used for storing a computer program, and the processor is used for executing the computer program stored in the memory, so as to implement the above-mentioned plan management method.
Those of skill in the art will understand that the logic and/or steps represented in the flowcharts or otherwise described herein, e.g., an ordered listing of executable instructions that can be viewed as implementing logical functions, can be embodied in any computer-readable medium for use by or in connection with an instruction execution system, apparatus, or device, such as a computer-based system, processor-containing system, or other system that can fetch the instructions from the instruction execution system, apparatus, or device and execute the instructions. For the purposes of this description, a "computer-readable medium" can be any means that can contain, store, communicate, propagate, or transport the program for use by or in connection with the instruction execution system, apparatus, or device.
More specific examples (a non-exhaustive list) of the computer-readable medium would include the following: an electrical connection (electronic device) having one or more wires, a portable computer diskette (magnetic device), a Random Access Memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disc read-only memory (CDROM). Additionally, the computer-readable medium could even be paper or another suitable medium upon which the program is printed, as the program can be electronically captured, via for instance optical scanning of the paper or other medium, then compiled, interpreted or otherwise processed in a suitable manner if necessary, and then stored in a computer memory.
It should be understood that portions of the present invention may be implemented in hardware, software, firmware, or a combination thereof. In the above embodiments, the various steps or methods may be implemented in software or firmware stored in memory and executed by a suitable instruction execution system. For example, if implemented in hardware, as in another embodiment, any one or combination of the following techniques, which are known in the art, may be used: a discrete logic circuit having a logic gate circuit for implementing a logic function on a data signal, an application specific integrated circuit having an appropriate combinational logic gate circuit, a Programmable Gate Array (PGA), a Field Programmable Gate Array (FPGA), or the like.
In the description herein, references to the description of the term "one embodiment," "some embodiments," "an example," "a specific example," or "some examples," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The above-mentioned embodiments only express several embodiments of the present invention, and the description thereof is more specific and detailed, but not construed as limiting the scope of the present invention. It should be noted that, for a person skilled in the art, several variations and modifications can be made without departing from the inventive concept, which falls within the scope of the present invention. Therefore, the protection scope of the present patent shall be subject to the appended claims.

Claims (10)

1. A method of plan management for use in a specimen testing management system, the method comprising:
acquiring a sample inspection request uploaded by a client, wherein the sample inspection request at least comprises sample information and inspection item information;
establishing a checking schedule according to the sample information and the checking project information, wherein the checking schedule comprises schedule progress information and checking project types;
judging whether test data corresponding to the test item type is received or not every first preset time;
and if the inspection data corresponding to the inspection project type is received, updating the plan progress information according to the inspection data corresponding to the inspection project type.
2. The method of claim 1, wherein the step of building an inspection schedule based on the sample information and the inspection item information, the inspection schedule including schedule information and inspection item types comprises:
calling a checking item list corresponding to the sample information from a preset database according to the sample information, wherein the checking item list comprises all checking items of the sample;
and comparing the inspection item information with the inspection item list corresponding to the sample information so as to determine a single or multiple inspection items corresponding to the sample inspection according to the comparison result.
3. The method according to claim 2, wherein the step of comparing the inspection item information with the inspection item list corresponding to the sample information to determine the single or multiple inspection items corresponding to the sample inspection according to the comparison result further comprises:
generating a tester scheduling request according to a single or multiple test items corresponding to the sample test, and sending the tester scheduling request to an employee management platform;
and acquiring tester information issued by the employee management platform according to the tester scheduling request, and establishing a plan schedule according to the tester information and the single or multiple test projects corresponding to the sample test.
4. The plan management method according to claim 3, wherein the verification project further includes a plurality of sub-projects, the verification data is a detection result corresponding to the sub-projects, and the step of updating the plan progress information based on the verification data corresponding to the verification project type, if the verification data corresponding to the verification project type is received, further includes:
when test data uploaded by a tester are received, acquiring a sub-project name corresponding to the test data according to the test data;
and modifying the schedule progress information in the schedule progress table according to the sub-project name corresponding to the inspection data, and updating the progress value corresponding to the sample inspection according to the modification result.
5. The method of claim 4, wherein the step of creating a test schedule based on the sample information and the test item information, the test schedule including schedule information and test item types further comprises, after the step of:
acquiring planning information which is uploaded by a tester according to the inspection schedule and corresponds to all inspection projects, wherein the planning information comprises estimated completion time corresponding to all the inspection projects one by one;
and establishing a task quality evaluation table according to the planning information so as to grade the project of the tester.
6. The plan management method according to claim 5, the method further comprising:
updating the completion time under the sub-project corresponding to the inspection data according to the inspection data to obtain the final completion time;
and comparing the final completion time with the planning information, and updating the task quality evaluation table according to the comparison result and a preset grading rule.
7. The plan management method according to claim 5, the method further comprising:
if a task canceling request sent by the client is received, the task canceling request comprises all inspection project information of the task canceling at this time;
and auditing all the inspection project information of the task to be cancelled at this time, and updating the inspection schedule according to the auditing result.
8. A plan management system for use in a specimen testing management system, the method comprising:
the task acquisition module is used for acquiring a sample inspection request uploaded by a client, wherein the sample inspection request at least comprises sample information and inspection project information;
the schedule establishing module is used for establishing a checking schedule according to the sample information and the checking project information, and the checking schedule comprises schedule progress information and checking project types;
the task monitoring module is used for judging whether the inspection data corresponding to the type of the inspection item is received or not at intervals of first preset time;
and the progress updating module is used for updating the plan progress information according to the inspection data corresponding to the inspection project type if the inspection data corresponding to the inspection project type is received.
9. A readable storage medium, characterized in that the readable storage medium stores one or more programs which, when executed by a processor, implement the plan management method according to any one of claims 1 to 7.
10. A computer device, characterized in that the computer device comprises a memory and a processor, wherein:
the memory is used for storing computer programs;
the processor is configured to implement the schedule management method according to any one of claims 1 to 7 when executing the computer program stored in the memory.
CN202111437403.9A 2021-11-30 2021-11-30 Plan management method, system, readable storage medium and computer device Pending CN113850534A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111437403.9A CN113850534A (en) 2021-11-30 2021-11-30 Plan management method, system, readable storage medium and computer device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111437403.9A CN113850534A (en) 2021-11-30 2021-11-30 Plan management method, system, readable storage medium and computer device

Publications (1)

Publication Number Publication Date
CN113850534A true CN113850534A (en) 2021-12-28

Family

ID=78982284

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111437403.9A Pending CN113850534A (en) 2021-11-30 2021-11-30 Plan management method, system, readable storage medium and computer device

Country Status (1)

Country Link
CN (1) CN113850534A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115187125A (en) * 2022-07-27 2022-10-14 海南绿境高科环保有限公司 Laboratory data management method, device, equipment and medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101650800A (en) * 2009-09-23 2010-02-17 用友软件股份有限公司 Method and device for updating task content in project task plan system
CN106096905A (en) * 2016-05-31 2016-11-09 北京诚公通信工程监理股份有限公司 A kind of project management method and system
CN106469350A (en) * 2016-08-31 2017-03-01 内蒙古蒙牛乳业(集团)股份有限公司 The generation method of inspection task, system server
CN112116318A (en) * 2020-09-04 2020-12-22 北京安锐卓越信息技术股份有限公司 Method, device and storage medium for tracking project progress
CN112184071A (en) * 2020-10-28 2021-01-05 深圳市科荣软件股份有限公司 Water quality detection information management method, equipment, system and storage medium

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101650800A (en) * 2009-09-23 2010-02-17 用友软件股份有限公司 Method and device for updating task content in project task plan system
CN106096905A (en) * 2016-05-31 2016-11-09 北京诚公通信工程监理股份有限公司 A kind of project management method and system
CN106469350A (en) * 2016-08-31 2017-03-01 内蒙古蒙牛乳业(集团)股份有限公司 The generation method of inspection task, system server
CN112116318A (en) * 2020-09-04 2020-12-22 北京安锐卓越信息技术股份有限公司 Method, device and storage medium for tracking project progress
CN112184071A (en) * 2020-10-28 2021-01-05 深圳市科荣软件股份有限公司 Water quality detection information management method, equipment, system and storage medium

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115187125A (en) * 2022-07-27 2022-10-14 海南绿境高科环保有限公司 Laboratory data management method, device, equipment and medium

Similar Documents

Publication Publication Date Title
Vandenberg et al. A proposed framework for the systematic review and integrated assessment (SYRINA) of endocrine disrupting chemicals
US20070233414A1 (en) Method and system to develop a process improvement methodology
CN116151626B (en) Risk management and control capability evaluating method, system, electronic equipment and storage medium
CN111461517A (en) Intelligent information system for planning laboratory workflow
CN113850534A (en) Plan management method, system, readable storage medium and computer device
Carstensen et al. Let's talk about bugs!
CN115187125A (en) Laboratory data management method, device, equipment and medium
CN115619091A (en) Medicine industry material inspection release control method and device and storage medium
Frakes An empirical framework for software reuse research
CN110443444B (en) Wharf facility detection and evaluation system based on digital platform and implementation method thereof
CN111883240A (en) Methodology evaluation system for medical examination
CN111144677B (en) Efficiency evaluation method and efficiency evaluation system
Halling et al. Investigating the influence of software inspection process parameters on inspection meeting performance
CN112881605A (en) Environmental air quality monitoring method and system
CN116205496B (en) Compliance risk management and control method, system, electronic equipment and storage medium
CN116449032B (en) Method and system for laboratory processing of product samples on a production line
Barosani et al. A review on 8D problem solving process
Madhuri et al. Introduction of scope creep life cycle for effective scope creep management in software industries
CN219266987U (en) Test planning system
CN113191613A (en) Multidimensional talent evaluation system
CN116466683B (en) Method and device for controlling test tasks
Shkarina et al. Analysis and Systematization of Non-conformities Regarding Accredited Testing Laboratories Operations
Oliveira Plans of control, measurement and monitoring with risk assessment application to rehabilitation works
CN117592950B (en) Inspection detection management platform and data processing method thereof
World Health Organization Quality control for in vitro diagnostic medical devices for WHO prequalification

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20211228

RJ01 Rejection of invention patent application after publication