CN113833202A - Concrete superposed beam structure and construction method thereof - Google Patents

Concrete superposed beam structure and construction method thereof Download PDF

Info

Publication number
CN113833202A
CN113833202A CN202111112332.5A CN202111112332A CN113833202A CN 113833202 A CN113833202 A CN 113833202A CN 202111112332 A CN202111112332 A CN 202111112332A CN 113833202 A CN113833202 A CN 113833202A
Authority
CN
China
Prior art keywords
beam body
groove
splicing
vertical groove
composite beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202111112332.5A
Other languages
Chinese (zh)
Other versions
CN113833202B (en
Inventor
严晓虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO TONGSAN CONSTRUCTION GROUP CO LTD
Original Assignee
NINGBO TONGSAN CONSTRUCTION GROUP CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO TONGSAN CONSTRUCTION GROUP CO LTD filed Critical NINGBO TONGSAN CONSTRUCTION GROUP CO LTD
Priority to CN202111112332.5A priority Critical patent/CN113833202B/en
Publication of CN113833202A publication Critical patent/CN113833202A/en
Application granted granted Critical
Publication of CN113833202B publication Critical patent/CN113833202B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/20Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/02Reinforcing elements of metal, e.g. with non-structural coatings of low bending resistance
    • E04C5/03Reinforcing elements of metal, e.g. with non-structural coatings of low bending resistance with indentations, projections, ribs, or the like, for augmenting the adherence to the concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
    • E04C5/0604Prismatic or cylindrical reinforcement cages composed of longitudinal bars and open or closed stirrup rods
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to a concrete composite beam structure and construction method thereof, belong to composite beam structure field, concrete composite beam structure includes the composite beam body, connecting piece and splice, the connecting piece is connected at the both ends of composite beam body length direction and is used for making the composite beam body connect at length direction, the splice is connected at the lateral wall of composite beam body and is used for making composite beam body lateral wall connect, the connecting piece includes the sleeve, insert a section of thick bamboo and mounting, the length direction of inserting a section of thick bamboo is parallel with the length direction of composite beam body and fixed connection is on the tip reinforcing bar of composite beam body, the sleeve overlaps the reinforcing bar outer wall of establishing at composite beam body other end tip, the mounting is connected between the sleeve and inserts a section of thick bamboo and is used for fixing the sleeve and inserts a section of thick bamboo. This application has the effect that makes the convenient concatenation of composite beam body.

Description

Concrete superposed beam structure and construction method thereof
Technical Field
The application relates to the field of composite beam structures, in particular to a concrete composite beam structure and a construction method thereof.
Background
The prefabricated structure is widely used in super high-rise building structures, a beam is one of very important building components, and the existing prefabricated composite beam mainly adopts a prefabricated reinforced concrete composite beam, and reinforcing steel bars are exposed out of two ends of the composite beam in the length direction, so that the reinforcing steel bars are mutually inserted to complete connection in later periods.
Aiming at the related technologies, the inventor thinks that the splicing mode between the superposed beams depends on the mode of inserting the reinforcing steel bars, and concrete needs to be poured in the later period, which is more complicated.
Disclosure of Invention
In order to facilitate the splicing process of the composite beam, the application provides a concrete composite beam structure and a construction method thereof.
In a first aspect, the application provides a concrete composite beam structure, which adopts the following technical scheme:
the utility model provides a concrete superposed beam structure, including the superposed beam body, connecting piece and splice, the connecting piece is connected at the both ends of superposed beam body length direction and is used for making the superposed beam body connect at length direction, the splice is connected at the lateral wall of superposed beam body and is used for making and connects between the superposed beam body lateral wall, the connecting piece includes the sleeve, insert a section of thick bamboo and mounting, the length direction who inserts a section of thick bamboo is parallel with the length direction of superposed beam body and fixed connection is on the tip reinforcing bar of superposed beam body, the reinforcing bar outer wall at superposed beam body other end tip is established to the sleeve cover, the mounting is connected between the sleeve and is used for with the sleeve with insert a section of thick bamboo fixedly.
Through adopting above-mentioned technical scheme, in the work progress, the concatenation between the accessible splicer realization superposed beam body lateral wall, when the length direction concatenation superposed beam body of superposed beam body is followed to needs, insert the sleeve and insert a section of thick bamboo in, and it is fixed with an section of thick bamboo of inserting through the mounting with the sleeve, accomplish the superposed beam body and splice at length direction, the concatenation between the superposed beam body is very convenient, the purpose of diversified concatenation between the superposed beam body has also been reached, the suitability of superposed beam body has been improved.
Optionally, the fixing part includes an elastic part and a connecting column, a moving groove is formed in the outer side wall of the sleeve, one end of the connecting column is located in the sleeve, the other end of the connecting column is located outside the moving groove, the elastic part is located in the moving groove and used for driving the connecting column to move in or out of the moving groove, and a limiting groove used for accommodating the connecting column is formed in the inner wall of the inserting barrel.
Through adopting above-mentioned technical scheme, when the length direction concatenation superposed beam body of superposed beam body need be followed in the work progress, press the spliced pole, make the sleeve insert and insert a section of thick bamboo, the tip of spliced pole slides in inserting a section of thick bamboo, at this moment, the elastic component is compressed, when the spliced pole removed to the spacing groove, the spliced pole resets under the spring action of elastic component, gets into the spacing groove, makes the sleeve with insert a section of thick bamboo stable connection, the sleeve is simple with the fixed mode who inserts a section of thick bamboo.
Optionally, the splicing piece includes splicing seat, splicing column, a splicing section of thick bamboo and locking piece, and the splicing seat can be dismantled through the locking piece with the lateral wall of coincide roof beam body and be connected, and splicing column and splicing seat keep away from coincide roof beam body one side fixed connection, and the preformed groove has been seted up to another lateral wall of coincide roof beam body, a splicing section of thick bamboo insert establish in the preformed groove and with coincide roof beam body fixed connection.
Through adopting above-mentioned technical scheme, when needs are folded the superposed beam body at width or direction of height, will splice the seat and be connected with superposed beam body lateral wall, then insert the concatenation post in the concatenation section of thick bamboo after pre-buried to it is fixed through joint spare, whole process is simple convenient.
Optionally, the storage tank has been seted up with the lateral wall of concatenation seat junction to the superposed beam body, first vertical groove, horizontal groove and second vertical groove have been seted up to the inner wall of storage tank, first vertical groove is close to the lateral wall opening of concatenation seat, first vertical groove and the parallel and extending direction opposite in second vertical groove, the horizontal groove is located between first vertical groove and the second vertical groove, the one end of horizontal groove and the one end intercommunication of concatenation seat are kept away from to first vertical groove, the second vertical groove communicates with the horizontal groove other end, the locking piece is the slider, the outer wall fixed connection of slider and concatenation seat, the slider slides along first vertical groove, horizontal groove and the vertical groove of second.
Through adopting above-mentioned technical scheme, slide the slider in first vertical groove, then rotate the slider, make the slider slide along the horizontal groove, later slide along the vertical groove of second again, because the action of gravity of coincide roof beam body, the coincide roof beam body is difficult for removing easily in the storage tank, consequently the firm in connection between concatenation seat and the coincide roof beam body, and the mode of connection is convenient.
Optionally, a magnetic part is arranged between the splicing seat and the superposed beam body, the magnetic part comprises a first magnet and a second magnet, the first magnet and the second magnet are attracted magnetically, the first magnet is fixedly connected to the bottom wall of the second vertical groove, and the second magnet is fixedly connected to the bottom wall of the sliding block.
Through adopting above-mentioned technical scheme, when the slider slided along the vertical groove of second, first magnet and second magnet magnetic attraction can make and be difficult for separating more between concatenation seat and the superposed beams body, consequently help convenient connection concatenation seat.
Optionally, a third vertical groove is formed in the inner wall of the accommodating groove, the third vertical groove and the second vertical groove are collinear, and the second vertical groove is communicated with the third vertical groove.
Through adopting above-mentioned technical scheme, in the work progress, can move the composite beam body inevitable, at this moment, the slider can slide in the vertical inslot of third, and difficult entering horizontal slot, and then helps making and is difficult for breaking away from between concatenation seat and the composite beam body, has improved the connection stability between concatenation seat and the composite beam body.
Optionally, a splicing groove is formed in the side wall of the splicing barrel, the splicing groove is close to one side opening of the splicing seat, the outer wall of the splicing column is fixedly connected with a limiting strip, the outer portion of the splicing barrel is rotatably connected with a limiting plate used for plugging the splicing groove, and a limiting part used for fixing the limiting plate is connected onto the limiting plate.
Through adopting above-mentioned technical scheme, slide spacing strip in the splice groove, then rotate the limiting plate to it is fixed with the limiting plate through the locating part, at this moment, spacing strip can not shift out from the splice groove, and the installation between a splice section of thick bamboo and the superposed beam body is dismantled the mode and is simple convenient.
Optionally, the side wall of the splicing column is provided with a clamping groove, and the side wall close to the axis of the splicing cylinder is located in the clamping groove after the limiting plate is closed.
Through adopting above-mentioned technical scheme, after rotating the limiting plate, the lateral wall of limiting plate gets into the draw-in groove, and the draw-in groove plays limiting displacement to the limiting plate, makes a concatenation section of thick bamboo and concatenation post difficult detachable, has improved a concatenation section of thick bamboo and concatenation post's stability of being connected.
On the other hand, the construction method of the concrete composite beam structure provided by the application adopts the following technical scheme:
a construction method of a concrete superposed beam structure comprises the following steps:
(1) the prefabricated beam comprises a prefabricated connecting piece (2), splicing pieces (3) and a superposed beam body (1);
(2) the transportation connecting piece (2), the splicing pieces (3) and the superposed beam body (1);
(3) splicing the superposed beam body (1) according to construction requirements, and splicing the superposed beam body (1) in the length direction through the connecting piece (2); the side walls of the superposed beam body (1) are spliced through the splicing pieces (3).
Through adopting above-mentioned technical scheme, through prefabricated connecting piece, splice and composite beam body, help making firm in connection between the composite beam body, then splice the composite beam body according to the construction demand, can splice each position of composite beam body, improved the suitability of composite beam body.
To sum up, the application comprises the following beneficial technical effects:
1. the connecting piece and the splicing piece are arranged on the superposed beam body, so that the superposed beam body can be spliced in the length direction and the width direction or the height direction, the splicing mode is simple and convenient, the effect of multi-direction splicing among the superposed beam bodies is achieved, and the applicability of the superposed beam body is improved;
2. by detachably connecting the splicing seat with the superposed beam body, when the splicing seat 31 is not needed, the superposed beam body can be separated from the splicing seat, so that the superposed beam body is attractive, the self weight of the superposed beam body is reduced, and convenience is brought to the subsequent construction process of operators;
3. the third vertical groove is formed in the inner wall of the accommodating groove, and the third vertical groove is collinear with the second vertical groove, so that the sliding block can slide in the third vertical groove and cannot easily enter the horizontal groove, the splicing seat and the superposed beam body cannot be easily separated, and the connection stability between the splicing seat and the superposed beam body is improved;
4. the side wall close to the axis of the splicing cylinder is positioned in the clamping groove after the limiting plate is closed, so that the splicing cylinder and the splicing column are not easy to separate, and the connection stability of the splicing cylinder and the splicing column is improved.
Drawings
Fig. 1 is a schematic perspective view of a concrete composite beam structure according to an embodiment of the present disclosure after splicing;
FIG. 2 is a schematic perspective view of a protruded fastener in a concrete composite beam structure according to an embodiment of the present disclosure;
FIG. 3 is a schematic perspective view of a protruding splice in a concrete composite beam structure according to an embodiment of the present disclosure;
FIG. 4 is a partial exploded view of a highlighted splice in a concrete composite beam structure according to an embodiment of the present application;
fig. 5 is an enlarged view of a portion a of fig. 1.
Reference numerals: 1. a laminated beam body; 2. a connecting member; 21. a sleeve; 22. inserting a cylinder; 23. a fixing member; 231. a moving groove; 232. an elastic member; 233. connecting columns; 234. a limiting groove; 3. splicing pieces; 31. a splicing seat; 32. splicing the columns; 33. a splicing barrel; 34. a locking member; 35. a containing groove; 4. a first vertical slot; 5. a horizontal groove; 6. a second vertical slot; 7. a third vertical slot; 8. a magnetic member; 81. a first magnet; 82. a second magnet; 9. a clamping piece; 91. splicing grooves; 92. a limiting plate; 93. a limiting member; 94. a limiting strip; 10. a clamping groove.
Detailed Description
The present application is described in further detail below with reference to figures 1-5.
The embodiment of the application discloses a concrete superposed beam structure and a construction method thereof.
In a first aspect, the application discloses a concrete composite beam structure, refer to fig. 1 and 2, the concrete composite beam structure includes composite beam body 1, connecting piece 2 and splice 3, connecting piece 2 is connected at the both ends of 1 length direction of composite beam body and is used for making composite beam body 1 connect along its length direction, splice 3 is connected at the lateral wall of composite beam body 1 and is used for making and connects between the lateral wall of composite beam body 1. Predetermine connecting piece 2 and splice 3 and connect on superposed beam body 1, in the work progress, when needs concatenation superposed beam body 1, accessible connecting piece 2 makes superposed beam body 1 splice on length direction, still can realize the concatenation between the superposed beam body 1 lateral wall through splice 3, and is very convenient, has also made things convenient for the concatenation in a plurality of positions between the superposed beam body 1 simultaneously, has improved superposed beam body 1's suitability.
As shown in fig. 2, the composite beam body 1 is a rectangular parallelepiped formed by casting reinforcing steel bars and concrete, and the reinforcing steel bars at one end of the composite beam body 1 are exposed from the composite beam body 1. The connecting piece 2 comprises a sleeve 21, an inserting cylinder 22 and a fixing piece 23, the length direction of the inserting cylinder 22 is parallel to the length direction of the superposed beam body 1 and is welded on the side wall of the steel bar at the end part of the superposed beam body 1, concrete is poured between the steel bar and the sleeve 21, and the sleeve 21 is sleeved on the outer wall of the steel bar exposed at the end part of the other end of the superposed beam body 1 and is welded with the steel bar at the position.
Referring to fig. 1 and 2, the fixing member 23 may be provided with a plurality of fixing members fixed on the sidewall of the sleeve 21, in this embodiment, the fixing members 23 are provided with two fixing members and are symmetrical about the axial direction of the insertion tube 22, the outer sidewall of the sleeve 21 is provided with a moving groove 231, the fixing member 23 includes an elastic member 232 and a connecting column 233, one end of the connecting column 233 is located in the sleeve 21, the other end of the connecting column 233 is located outside the moving groove 231, and one end of the connecting column 233 exposed out of the moving groove 231 may be a cube or a convex hemisphere. The elastic member 232 is a spring, the spring is located in the moving groove 231, one end of the spring is bonded with the inner wall of the moving groove 231, the other end of the spring is welded with the side wall of the connecting column 233 located in the moving groove 231, and the inner peripheral wall of the inserting tube 22 is provided with a limiting groove 234 for accommodating the connecting column 233. When the composite beam body 1 needs to be spliced along the length direction of the composite beam body 1 in the construction process, the connecting column 233 is pressed, the sleeve 21 is inserted into the inserting cylinder 22, the end part of the connecting column 233 slides in the inserting cylinder 22, at the moment, the elastic part 232 is compressed, and when the connecting column 233 moves to the limiting groove 234, the connecting column 233 resets under the elastic action of the elastic part 232 and enters the limiting groove 234, so that an operator can quickly and conveniently fix the composite beam body 1 along the length direction of the composite beam body 1.
As shown in fig. 3, the splice 3 can be set as a plurality of and fixed on different sidewalls of the superposed beam body 1 to realize that any two sidewalls of the two superposed beam bodies 1 can be connected to each other, in this embodiment, the splice 3 is set as one, and fig. 4 and 5 are combined to show, the splice 3 includes a splice seat 31, a splice column 32, a splice cylinder 33 and a locking piece 34, a containing groove 35 has been seted up on the sidewall of the superposed beam body 1, the splice seat 31 is located in the containing groove 35 and is detachably connected with the superposed beam body 1 through the locking piece 34. Splicing column 32 and splicing seat 31 keep away from the lateral wall an organic whole of composite beam body 1 and are connected, and the preformed groove has been seted up to another lateral wall of composite beam body 1, splicing cylinder 33 insert establish in the preformed groove and with composite beam body 1 fixed connection, be equipped with joint spare 9 between splicing cylinder 33 and the splicing column 32, splicing cylinder 33 and splicing column 32 can dismantle through joint spare 9 and be connected. In the work progress, when needs splice at width or direction of height to coincide roof beam body 1, connect concatenation seat 31 in storage tank 35 through locking piece 34, then insert a concatenation section of thick bamboo 33 with concatenation post 32 in to it is fixed through joint 9, whole process is simple convenient.
As shown in fig. 4, in order to make the installation and disassembly process between the superposed beam body 1 and the splicing seat 31 simple and convenient, the inner wall of the accommodating groove 35 is provided with a first vertical groove 4, a horizontal groove 5 and a second vertical groove 6, the first vertical groove 4 is close to the side wall opening of the splicing seat 31, the first vertical groove 4 is parallel to the second vertical groove 6, the second vertical groove 6 is located below the first vertical groove 4 and the extension direction of the first vertical groove and the second vertical groove are opposite, the horizontal groove 5 is located between the first vertical groove 4 and the second vertical groove 6, one end of the horizontal groove 5 is communicated with one end of the first vertical groove 4 far away from the splicing seat 31, and the other end of the horizontal groove 5 is communicated with one end of the second vertical groove 6 close to the splicing seat 31. The inner wall of the accommodating groove 35 is provided with a third vertical groove 7, and the third vertical groove 7 is collinear and communicated with the second vertical groove 6. The locking piece 34 is a slider, the slider is integrally connected with the outer wall of the splice holder 31, and the slider slides along the first vertical groove 4, the horizontal groove 5 and the second vertical groove 6.
As shown in fig. 4, a magnetic member 8 is disposed between the splicing seat 31 and the composite beam body 1, the magnetic member 8 includes a first magnet 81 and a second magnet 82, the first magnet 81 and the second magnet 82 are magnetically attracted, the first magnet 81 is adhered to the bottom wall of the second vertical slot 6, and the second magnet 82 is welded to the bottom wall of the sliding block.
When the superposed beam body 1 needs to be spliced along the width direction or the height direction of the superposed beam body 1, firstly, the sliding block slides into the first vertical groove 4, then, the sliding block is rotated, the sliding block slides along the horizontal groove 5, when the sliding block does not move in the horizontal groove 5, the superposed beam body 1 vertically moves, the sliding block slides along the second vertical groove 6, at the moment, the first magnet 81 and the second magnet 82 are magnetically attracted, the connection between the splicing seat 31 and the superposed beam body 1 is realized, the splicing seat is simple and convenient, the disassembly is convenient, the splicing seat 31 is firmly connected with the superposed beam body 1, and when the superposed beam body 1 does not need to be spliced, after the splicing seat 31 is disassembled, the superposed beam body 1 is attractive and convenient for subsequent construction.
As shown in fig. 4, in order to further reduce the possibility that the splicing seat 31 and the composite beam body 1 are separated from each other, the inner wall of the accommodating groove 35 is provided with a third vertical groove 7, the third vertical groove 7 is collinear with the second vertical groove 6, and the bottom ends of the second vertical groove 6 and the third vertical groove 7 are communicated. At this time, even if the composite beam body 1 is pulled upward, the slider is not easily inserted into the horizontal groove 5 due to the insertion into the third vertical groove 7, which contributes to the improvement of the connection stability between the splice holder 31 and the composite beam body 1.
As shown in fig. 4 and 5, the splicing groove 91 is formed in the side wall of the splicing barrel 33, the splicing groove 91 is close to the side wall opening of the splicing seat 31, the splicing groove 91 is formed in two axial lines parallel to the splicing barrel 33, the length direction of the splicing column 32 is parallel to the length direction of the splicing barrel 33, the outer wall of the splicing column 32 is integrally connected with the limiting strip 94, and the limiting strip 94 is located in the splicing groove 91 and is slidably connected with the splicing barrel 33. The clamping piece 9 comprises a limiting plate 92 and a limiting piece 93, the limiting plate 92 is arc-shaped, one end of the limiting plate 92 in the length direction is rotatably connected with the outer wall of the splicing barrel 33 through a rotating shaft, and the other end of the limiting plate 92 is fixed on the top wall of the splicing barrel 33 through the limiting piece 93. The limiting member 93 is a fastening bolt, which is in threaded connection with the limiting plate 92 and can pass through the limiting plate 92 and then abut against the splicing barrel 33. The side wall of the splicing column 32 is provided with an annular clamping groove 10 along the circumferential direction, the clamping groove 10 is positioned on one side of the limiting strip 94 close to the splicing seat 31, and the inner side wall of the limiting plate 92 close to the axis of the splicing groove 91 is positioned in the splicing groove 91 after being closed.
Combine fig. 4 and fig. 5 to show, slide into splice groove 91 spacing strip 94, then rotate limiting plate 92, make limiting plate 92's lateral wall and the roof laminating of a concatenation section of thick bamboo 33, and will tightly decide the bolt tightening, can make the convenient concatenation of operating personnel coincide beam body 1, at this moment, in limiting plate 92's lateral wall embedding draw-in groove 10, draw-in groove 10 plays limiting displacement to limiting plate 92, help making a concatenation section of thick bamboo 33 and the difficult separation of concatenation post 32, the stability of being connected of a concatenation section of thick bamboo 33 and concatenation post 32 has been improved, the installation dismantlement mode between the concatenation beam body 1 is simple convenient.
The implementation principle of a concrete composite beam structure of the embodiment of the application is as follows: in the pouring process of the concrete superposed beam body 1, the connecting piece 2 and the splicing piece 3 are preset, and at the moment, the connecting piece 2 is connected to the superposed beam body 1. In the construction process, when the superposed beam body 1 needs to be spliced along the length direction of the superposed beam body 1, after the sleeve 21 is inserted into the insertion cylinder 22, the fixing piece 23 can make the sleeve 21 and the insertion cylinder 22 difficult to separate, so that the superposed beam body 1 is firmly spliced along the length direction; when the superposed beam body 1 needs to be spliced along the width or height direction of the superposed beam body 1, the splicing seat 31 is connected with the superposed beam body 1 through the locking piece 34, then the splicing column 32 is inserted into the splicing cylinder 33, and then the splicing column 32 is not easy to separate from the superposed beam body 1 through the clamping piece 9, so that the splicing between the side walls of the superposed beam body 1 is realized; the whole process is convenient, and the splicing can be performed in different directions of the superposed beam body 1 according to actual requirements in the construction process, so that the applicability of the superposed beam body 1 is improved.
In a second aspect, an embodiment of the present application discloses a construction method of a concrete composite beam structure, including the following steps:
(1) prefabricated connecting piece 2, splice 3 and composite beam body 1. Binding reinforcing steel bars at two ends of a reinforcing cage in the length direction, enabling the reinforcing steel bars bound at the two ends to be staggered, welding a prefabricated insertion cylinder 22 on the side wall of the reinforcing steel bar at one end, enabling an opening of the insertion cylinder 22 to face outwards, sleeving a sleeve 21 on the reinforcing steel bar at the other end, presetting a splicing cylinder 33 on the side wall of the reinforcing steel cage, pouring concrete between the reinforcing steel cage and the splicing cylinder 33 and between the reinforcing steel bar and the insertion cylinder 22, enabling one end, away from the sleeve 21, of the insertion cylinder 22 to be flush with a concrete interface, exposing the concrete interface from the sleeve 21, and processing the preset superposed beam body 1 through the steps; a preformed groove is formed on the side wall of the superposed beam body 1; and preset the splicing seat 31 in a concrete pouring mode, and the preset modes of other structures are not described herein again.
(2) Transport connector 2, splice 3 and composite beam body 1. And transporting the splicing pieces 3 and the superposed beam body 1 to a construction site as required. The construction method of the whole superposed beam structure is beneficial to quickly and conveniently realizing multi-directional splicing of the superposed beam body 1 and improving the applicability of the superposed beam body 1.
(3) Splicing the superposed beam body 1 according to construction requirements, and splicing the superposed beam body 1 in the length direction through the connecting piece 2; splicing the side walls of the superposed beam body 1 by the splicing pieces 3. After the sleeve 21 is inserted into the insertion tube 22, the connecting column 233 enters the limiting groove 234 under the elastic force of the elastic member 232, so that the sleeve 21 and the insertion tube 22 are not easy to separate, and the superposed beam body 1 is firmly spliced in the length direction; after the splicing seat 31 and the superposed beam body 1 are connected through the locking piece 34, the splicing column 32 is inserted into the splicing barrel 33, the limiting plate 92 is rotated, the inner side wall of the limiting plate 92 is positioned in the clamping groove 10, and the splicing of the superposed beam body 1 in the width direction or the height direction is completed.
The construction method of the whole superposed beam structure is beneficial to quickly and conveniently realizing multidirectional splicing of the superposed beam body 1, and further beneficial to improving the applicability of the superposed beam body 1.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (9)

1. A concrete composite beam structure is characterized in that: including superposed beam body (1), connecting piece (2) and splice (3), connecting piece (2) are connected at superposed beam body (1) length direction's both ends and are used for making superposed beam body (1) connect at length direction, splice (3) are connected at the lateral wall of superposed beam body (1) and are used for making and connect between superposed beam body (1) lateral wall, connecting piece (2) are including sleeve (21), insert a section of thick bamboo (22) and mounting (23), the length direction of inserting a section of thick bamboo (22) is parallel and fixed connection on the tip reinforcing bar of superposed beam body (1) with the length direction of superposed beam body (1), sleeve (21) cover is established at the reinforcing bar outer wall of superposed beam body (1) other end tip, mounting (23) are connected between sleeve (21) and insert a section of thick bamboo (22) and are used for fixing sleeve (21) and insert a section of thick bamboo (22).
2. The concrete composite beam structure according to claim 1, wherein: the fixing piece (23) comprises an elastic piece (232) and a connecting column (233), a moving groove (231) is formed in the outer side wall of the sleeve (21), one end of the connecting column (233) is located in the sleeve (21), the other end of the connecting column is located outside the moving groove (231), the elastic piece (232) is located in the moving groove (231) and used for driving the connecting column (233) to move into or out of the moving groove (231), and a limiting groove (234) used for containing the connecting column (233) is formed in the inner wall of the inserting barrel (22).
3. The concrete composite beam structure according to claim 1, wherein: splice (3) are including concatenation seat (31), concatenation post (32), a concatenation section of thick bamboo (33) and locking piece (34), and concatenation seat (31) can be dismantled through locking piece (34) with the lateral wall of coincide roof beam body (1) and be connected, and concatenation post (32) are kept away from coincide roof beam body (1) one side fixed connection with concatenation seat (31), and the preformed groove has been seted up to another lateral wall of coincide roof beam body (1), a concatenation section of thick bamboo (33) insert establish in the preformed groove and with coincide roof beam body (1) fixed connection.
4. A concrete composite beam structure according to claim 3, wherein: the side wall of the joint of the superposed beam body (1) and the splicing seat (31) is provided with a containing groove (35), the inner wall of the containing groove (35) is provided with a first vertical groove (4), a horizontal groove (5) and a second vertical groove (6), the first vertical groove (4) is close to the side wall opening of the splicing seat (31), the first vertical groove (4) and the second vertical groove (6) are parallel and extend in opposite directions, the horizontal groove (5) is positioned between the first vertical groove (4) and the second vertical groove (6), one end of the horizontal groove (5) is communicated with one end of the first vertical groove (4) far away from the splicing seat (31), the second vertical groove (6) is communicated with the other end of the horizontal groove (5), the locking piece (34) is a sliding block, the sliding block is fixedly connected with the outer wall of the splicing seat (31), and the sliding block is along the first vertical groove (4), the horizontal groove (5) and the second vertical groove (6) slide.
5. The concrete composite beam structure according to claim 4, wherein: be equipped with magnetic part (8) between concatenation seat (31) and the composite beam body (1), magnetic part (8) include first magnet (81) and second magnet (82), first magnet (81) and second magnet (82) magnetism actuation, first magnet (81) fixed connection is in the diapire of second vertical groove (6), second magnet (82) fixed connection is in the diapire of slider.
6. The concrete composite beam structure according to claim 5, wherein: and a third vertical groove (7) is formed in the inner wall of the accommodating groove (35), the third vertical groove (7) and the second vertical groove (6) are collinear, and the second vertical groove (6) is communicated with the third vertical groove (7).
7. A concrete composite beam structure according to claim 3, wherein: a splicing groove (91) is formed in the side wall of the splicing barrel (33), the splicing groove (91) is close to one side opening of the splicing seat (31), the outer wall of the splicing column (32) is fixedly connected with a limiting strip (94), the outside of the splicing barrel (33) is rotatably connected with a limiting plate (92) used for plugging the splicing groove (91), and the limiting plate (92) is connected with a limiting part (93) used for fixing the limiting plate (92).
8. The concrete composite beam structure according to claim 7, wherein: the side wall of the splicing column (32) is provided with a clamping groove (10), and the side wall, close to the axis of the splicing barrel (33), of the closed limiting plate (92) is located in the clamping groove (10).
9. A construction method of a concrete composite beam structure according to any one of claims 1 to 8, wherein: the method comprises the following steps:
(1) the prefabricated beam comprises a prefabricated connecting piece (2), splicing pieces (3) and a superposed beam body (1);
(2) the transportation connecting piece (2), the splicing pieces (3) and the superposed beam body (1);
(3) splicing the superposed beam body (1) according to construction requirements, and splicing the superposed beam body (1) in the length direction through the connecting piece (2); the side walls of the superposed beam body (1) are spliced through the splicing pieces (3).
CN202111112332.5A 2021-09-18 2021-09-18 Concrete superposed beam structure and construction method thereof Active CN113833202B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111112332.5A CN113833202B (en) 2021-09-18 2021-09-18 Concrete superposed beam structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111112332.5A CN113833202B (en) 2021-09-18 2021-09-18 Concrete superposed beam structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN113833202A true CN113833202A (en) 2021-12-24
CN113833202B CN113833202B (en) 2022-11-11

Family

ID=78969302

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111112332.5A Active CN113833202B (en) 2021-09-18 2021-09-18 Concrete superposed beam structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN113833202B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015063795A (en) * 2013-09-24 2015-04-09 合同会社ウッドワークス Method of manufacturing built-up beam
CN106384976A (en) * 2016-10-31 2017-02-08 国网山东省电力公司济南市长清区供电公司 Auxiliary broken line connecting device applicable to overhead lines
CN207063180U (en) * 2017-07-18 2018-03-02 西安全鼎建筑科技有限公司 A kind of installation steel bar connecting joints of overall assembled balcony component
CN108104271A (en) * 2016-11-24 2018-06-01 重庆市中科大业建筑科技有限公司 Clod wash multi-cavity steel tube concrete Special-Shaped Column and the rigid connection node of U-shaped combination beam
CN111501996A (en) * 2020-04-28 2020-08-07 无锡锡晟建设有限公司 Connecting joint structure of corbel-free concrete beam and steel column
CN111608266A (en) * 2020-05-22 2020-09-01 宁波交通工程建设集团有限公司 Steel tenon key for improving shear strength of prefabricated beam segment assembly and assembly method
CN212836272U (en) * 2020-04-27 2021-03-30 同济大学建筑设计研究院(集团)有限公司 Shearing resistant device for precast concrete beam

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015063795A (en) * 2013-09-24 2015-04-09 合同会社ウッドワークス Method of manufacturing built-up beam
CN106384976A (en) * 2016-10-31 2017-02-08 国网山东省电力公司济南市长清区供电公司 Auxiliary broken line connecting device applicable to overhead lines
CN108104271A (en) * 2016-11-24 2018-06-01 重庆市中科大业建筑科技有限公司 Clod wash multi-cavity steel tube concrete Special-Shaped Column and the rigid connection node of U-shaped combination beam
CN207063180U (en) * 2017-07-18 2018-03-02 西安全鼎建筑科技有限公司 A kind of installation steel bar connecting joints of overall assembled balcony component
CN212836272U (en) * 2020-04-27 2021-03-30 同济大学建筑设计研究院(集团)有限公司 Shearing resistant device for precast concrete beam
CN111501996A (en) * 2020-04-28 2020-08-07 无锡锡晟建设有限公司 Connecting joint structure of corbel-free concrete beam and steel column
CN111608266A (en) * 2020-05-22 2020-09-01 宁波交通工程建设集团有限公司 Steel tenon key for improving shear strength of prefabricated beam segment assembly and assembly method

Also Published As

Publication number Publication date
CN113833202B (en) 2022-11-11

Similar Documents

Publication Publication Date Title
US7314334B1 (en) Dowel bar assembly with snap fit side frames
KR101938846B1 (en) PC(Precast concrete) connecting structure and a constructing method thereof
CN211037541U (en) Assembled wallboard
KR101067001B1 (en) Slave constructing method of steel box girder bridge using steel reinforcement
KR101766806B1 (en) the rigid connection structure between precast concrete column and precast concrete beam using the temporary bracket installing precast concrete column, the modular system using the same
CN113833202B (en) Concrete superposed beam structure and construction method thereof
AU2007201886A1 (en) Interlocking spacer arrangement
JP2004190364A (en) Precast src column joint part structure
KR101487964B1 (en) The System Supporter
KR20160140120A (en) Deak plate spacer
KR101196031B1 (en) Self-Assembly Pillar Structures and Self-Assembly Exterior Material Structures
CN113699983A (en) Building tubular pile does not have shearing and draws butt joint fastener and connecting piece fast by force
CN113026962B (en) Assembly type building structure and construction method
CN215368125U (en) Prefabricated assembled floor
JP3122098U (en) Formwork foundation slab block for concrete block fence
KR102461341B1 (en) Supporting post connecting device
JP2008179944A (en) Construction method of steel beam of beam end rc construction to column
CN217536667U (en) Special split type ground tackle of prestressed bridge
CN220815092U (en) Temporary stage convenient to fast assembly
KR101223025B1 (en) Construction method which fixed end are embeded for Unbonded single strand in early constructed core wall
CN217814926U (en) Framework oil seal convenient to disassemble
KR101794073B1 (en) Reinforced concrete column structure
CN211517946U (en) Construction wallboard reinforcing bar location frock
JP2003079024A (en) Fixing device for reinforcing bar installation box
JP3133918U (en) Reinforcing bar assembly stand and reinforcing bar support device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant