CN113833195A - Metal ripple veneer design structure - Google Patents

Metal ripple veneer design structure Download PDF

Info

Publication number
CN113833195A
CN113833195A CN202111143915.4A CN202111143915A CN113833195A CN 113833195 A CN113833195 A CN 113833195A CN 202111143915 A CN202111143915 A CN 202111143915A CN 113833195 A CN113833195 A CN 113833195A
Authority
CN
China
Prior art keywords
piece
hanging
metal
notch
veneer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111143915.4A
Other languages
Chinese (zh)
Inventor
葛峰
龚晓艳
何跃洪
欧阳文斌
董晓谦
王沙
陈健
陈文文
张为健
陆徐徐
黄荣芳
李健
张森
徐虎
欧建森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Gold Mantis Construction Decoration Co Ltd
Original Assignee
Suzhou Gold Mantis Construction Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Gold Mantis Construction Decoration Co Ltd filed Critical Suzhou Gold Mantis Construction Decoration Co Ltd
Priority to CN202111143915.4A priority Critical patent/CN113833195A/en
Publication of CN113833195A publication Critical patent/CN113833195A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction

Abstract

The invention relates to a metal water ripple veneer design structure, which is used for connecting a water ripple veneer and a building steel structure and comprises: the hanging component is hung and connected with the building steel structure; the main keel is connected with the hanging component; the first hanging piece is hung on the main keel, and a first notch is formed in the first hanging piece; the first end of the auxiliary keel is inserted into the first notch, and the second end of the auxiliary keel is connected with the water ripple veneer through a connecting piece; a disengagement prevention assembly disposed at a second end of the cross runner to limit rotation of the connector. According to the metal water ripple veneer design structure, the separation preventing assembly is arranged between the auxiliary keel and the connecting piece to limit the rotation of the connecting piece, so that discrete bodies of the whole structure are avoided, the stability of the whole structure during connection is kept, and the safety of the metal water ripple veneer design structure is improved.

Description

Metal ripple veneer design structure
Technical Field
The invention relates to the technical field of decoration, in particular to a metal water ripple veneer design structure.
Background
The modern building utilizes the excellent corrosion resistance of stainless steel to replace metal materials such as copper, iron and the like, so that the stainless steel becomes a material which is preferentially used when decorating the modern building.
And the connection mode of the base layer of the ripple veneer and the stainless steel structure can not adopt the conventional connection mode of directly fixing the base layer plate and the lifting rib fixing piece, so that a hoisting structure for connecting an upper component and a lower component by using a friction-resistant material to replace the traditional lifting piece is produced.
However, the stability of the hoisting structure comes from friction, and when the load borne by the hoisting structure is greater than the friction, the hoisting structure is easy to separate, so that the problems of poor stability and low safety of the hoisting structure are caused.
Disclosure of Invention
Therefore, the technical problem to be solved by the invention is to overcome the problem that a hoisting structure formed by friction force is easy to separate from a discrete body in the prior art, and provide a metal water ripple decorative surface design structure with good stability and high safety.
In order to solve the technical problem, the invention provides a metal water ripple veneer design structure, which is used for connecting a water ripple veneer and a building steel structure, and comprises the following components:
the hanging component is hung and connected with the building steel structure;
the main keel is connected with the hanging component;
the first hanging piece is hung on the main keel, and a first notch is formed in the first hanging piece;
the first end of the auxiliary keel is inserted into the first notch, and the second end of the auxiliary keel is connected with the water ripple veneer through a connecting piece;
a disengagement prevention assembly disposed at a second end of the cross runner to limit rotation of the connector.
As a further improvement of the present invention, the detachment prevention assembly includes:
the positioning piece is connected with the auxiliary keel and provided with a first threaded hole;
the screw rod penetrates through the first threaded hole and is in threaded fit with the positioning piece;
the height adjusting piece is provided with a second threaded hole and is arranged at the bottom end of the screw rod and in threaded fit with the screw rod;
the first anti-separation unit and the second anti-separation unit are arranged on two sides of the screw respectively, the first anti-separation unit and the second anti-separation unit are connected with the heightening part, and the first anti-separation unit and the second anti-separation unit are abutted to the connecting piece to limit the rotation of the connecting piece.
As a further improvement of the present invention, the first separation-preventing unit includes a first separation-preventing member and a first limiting member, the first separation-preventing member is connected to the height-adjusting member, the first separation-preventing member includes a rigid portion and a flexible portion which are arranged from top to bottom, the flexible portion is connected to the first limiting member, and the first limiting member abuts against the connecting member.
As a further improvement of the present invention, the second separation-preventing unit includes a second separation-preventing member and a second limiting member, the height-adjusting member is connected to the second limiting member through the second separation-preventing member, the second limiting member abuts against the connecting member, and when the connecting member has a tendency to rotate, the second separation-preventing member axially contracts and limits the connecting member to rotate through the second limiting member.
As a further improvement of the invention, a second notch is further arranged at the bottom in the first notch, a clamping block is further arranged at the first end of the auxiliary keel, and when the first end of the auxiliary keel is inserted into the first notch, the clamping block is matched with the second notch to limit the first end of the auxiliary keel to be separated from the first notch.
As a further improvement of the present invention, the cartridge is made of a magnet.
As a further improvement of the invention, the first hanging piece is further provided with a leveling bolt, and the leveling bolt passes through the first hanging piece and abuts against the main keel.
As a further improvement of the present invention, the hanging assembly comprises:
the hook is hung on the building steel structure;
the second hangs the piece, the bottom of couple with the second hangs a screw-thread fit, be equipped with two nuts on the couple, two nuts set up respectively the second hangs the both sides of piece with spacing the second hangs the piece, the second hang the piece with the main joist is connected.
As a further improvement of the present invention, the hanging assembly further includes two spacers, the spacers correspond to the nuts one to one, and the spacers are disposed between the nuts and the second hanging members.
As a further improvement of the invention, the connecting piece is connected with the water ripple veneer through metal glue.
Compared with the prior art, the technical scheme of the invention has the following advantages:
according to the metal water ripple veneer design structure, the separation preventing assembly is arranged between the auxiliary keel and the connecting piece to limit the rotation of the connecting piece, so that discrete bodies of the whole structure are avoided, the stability of the whole structure during connection is kept, and the safety of the metal water ripple veneer design structure is improved.
Drawings
In order that the present disclosure may be more readily and clearly understood, reference is now made to the following detailed description of the embodiments of the present disclosure taken in conjunction with the accompanying drawings, in which
FIG. 1 is a schematic structural view of a metal water wave veneer design structure according to a preferred embodiment of the present invention;
FIG. 2 shows a preferred embodiment of the present invention
The specification reference numbers indicate: 1. a main keel; 2. a first hanger; 3. a first notch; 4. a false keel; 5. a positioning member; 6. a screw; 7. a height adjusting piece; 8. a first drop prevention member; 9. a first limit piece; 10. a second drop prevention member; 11. a second limiting member; 12. a clamping block; 13. leveling bolts; 14. hooking; 15. a second hanger; 16. a nut; 17. a connecting member.
Detailed Description
The present invention is further described below in conjunction with the following figures and specific examples so that those skilled in the art may better understand the present invention and practice it, but the examples are not intended to limit the present invention.
It will be understood that when an element is referred to as being "disposed on," "secured to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "secured" to, or "fixedly coupled" to another element, it can be removably secured or non-removably secured to the other element. When an element is referred to as being "connected," "pivotally connected," to another element, it can be directly connected to the other element or intervening elements may also be present. The use of the terms "vertical," "horizontal," "left," "right," "up," "down," and the like are for illustrative purposes only and do not denote a single embodiment.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
The terms "first," "second," "third," and the like in the description herein do not denote any particular quantity or order, but rather are used to distinguish one element from another.
In some embodiments, referring to fig. 1, a metal corrugated veneer design of the present invention for connecting a corrugated veneer and a construction steel structure comprises:
the hanging component is connected with the building steel structure in a hanging manner;
the main keel 1 is connected with the hanging component;
the first hanging piece 2 is hung on the main keel 1, and a first notch 3 is arranged on the first hanging piece 2;
the first end of the auxiliary keel 4 is inserted in the first notch 3, and the second end of the auxiliary keel 4 is connected with the corrugated veneer through a connecting piece 17;
and a separation preventing assembly provided at the second end of the cross runner 4 to restrict the rotation of the connector 17.
The first hanging piece 2 is hung on the main keel 1, the main keel 1 is hung and connected with a building steel structure through a hanging component, the auxiliary keel 4 is inserted in the first notch 3 and is connected with the water ripple facing through the connecting piece 17, so that the connection of the water ripple facing and the building steel structure is completed, when the water ripple facing bears a high load and the connecting piece 17 has a tendency of being separated from the auxiliary keel 4, the separation-preventing component limits the rotation of the connecting piece 17, the rotation of the connecting piece 17 is avoided, so that the connecting piece 17 is kept to be matched with the auxiliary keel 4, and the stability of the whole structure is improved;
preferably, set up the through-hole with other building steel structure looks adaptations on the first piece 2 that hangs for peg graft with other building steel structures, thereby further improve the efficiency of construction.
In some embodiments, referring to fig. 1, a detachment prevention assembly includes:
the positioning piece 5 is connected with the auxiliary keel 4, and a first threaded hole is formed in the positioning piece 5;
the screw 6 penetrates through the first threaded hole and is in threaded fit with the positioning piece 5;
the height-adjusting piece 7 is provided with a second threaded hole, and the height-adjusting piece 7 is arranged at the bottom end of the screw rod 6 and is in threaded fit with the screw rod 6;
set up respectively at the first anti-disengaging unit and the second anti-disengaging unit of screw rod 6 both sides, first anti-disengaging unit and second are prevented disengaging unit and are connected with heightening piece 7, and first anti-disengaging unit and second are prevented disengaging unit and connecting piece 17 butt to restriction connecting piece 17 rotates.
Fix screw rod 6 in the top of connecting piece 17 through setting element 5, heighten the piece 7 through rotating, make it rise along screw rod 6, can adjust the height that first anti-separation unit and second prevent breaking away from the unit, when connecting piece 17 and false keel 4 need assemble, upwards adjust heighten piece 7, make first anti-separation unit and second prevent breaking away from the second end that the false keel 4 was kept away from to the unit, be convenient for the assembly of connecting piece 17 and the second end of false keel 4, after connecting piece 17 and false keel 4 assemble and finish, heighten the piece 7 is adjusted downwards, make first anti-separation unit and second prevent breaking away from the second end that the unit is close to false keel 4, first anti-separation unit and second prevent breaking away from the unit and play the effect of restriction pivoted to connecting piece 17 this moment.
In some embodiments, referring to fig. 1, the first separation-preventing unit includes a first separation-preventing member 8 and a first limiting member 9, the first separation-preventing member 8 is connected to the height-adjusting member 7, the first separation-preventing member 8 includes a rigid portion and a flexible portion from top to bottom, the flexible portion is connected to the first limiting member 9, and the first limiting member 9 abuts against the connecting member 17. When the connecting piece 17 has the tendency of rotating, the flexible portion contracts, stores elastic potential energy, and first locating part 9 and connecting piece 17 butt, until the flexible portion contracts to the limit, rigid portion plays the effect of restriction pivoted to connecting piece 17 through first locating part 9, prevents that connecting piece 17 from breaking away from, and flexible portion release elastic potential energy afterwards for connecting piece 17 resumes to the normal position.
In some embodiments, referring to fig. 1, the second detachment prevention unit includes a second detachment prevention member 10 and a second limiting member 11, the height adjustment member 7 is connected to the second limiting member 11 through the second detachment prevention member 10, the second limiting member 11 abuts against the connecting member 17, and when the connecting member 17 has a rotation tendency, the second detachment prevention member 10 axially contracts and limits the connecting member 17 from rotating through the second limiting member 11. When the connecting piece 17 has a rotation trend, the second limiting piece 11 is abutted against the connecting piece 17 to generate upward displacement, at the moment, the second anti-falling piece 10 bears axial pressure, when the second anti-falling piece shrinks to a certain degree, the rotation trend of the connecting piece 17 disappears, and the second anti-falling piece 10 restores to deform;
it should be noted that the second anti-slip element 10 is preferably a compression spring, and a certain gap is formed between the coils of the compression spring, so that the compression spring contracts and deforms when being subjected to an external load, and stores deformation potential energy.
In some embodiments, referring to fig. 1, a second notch is further disposed at the bottom of the first notch 3, and a fixture block 12 is further disposed at the first end of the cross runner 4, and when the first end of the cross runner 4 is inserted into the first notch 3, the fixture block 12 is matched with the second notch to limit the first end of the cross runner 4 to be separated from the first notch 3. Through the cooperation of fixture block 12 and first breach 3, can play limiting displacement to the first end of false keel 4 when the first end of false keel 4 is pegged graft in first breach 3, avoid the first end of false keel 4 to break away from first breach 3, further improve overall structure's stability.
In some embodiments, referring to fig. 1, the cartridge 12 is made of a magnet. Through the attraction of magnet and first hanging 2, can avoid false keel 4 to lead to fixture block 12 and the second breach to lose the complex condition because of rotating, stability when further improving fixture block 12 and the second breach complex.
In some embodiments, referring to fig. 1, the first hanging member 2 is further provided with a leveling bolt 13, and the leveling bolt 13 passes through the first hanging member 2 and abuts against the main keel 1. The flatness of the first hanging piece 2 relative to the main keel 1 is adjusted through the leveling bolt 13, so that the flatness of the water ripple facing can be adjusted.
In some embodiments, referring to FIG. 1, a hanger assembly comprises:
the hook 14 is hung on the building steel structure;
the second hangs a 15, and the bottom and the second of couple 14 hang a 15 screw-thread fit, are equipped with two nuts 16 on the couple 14, and two nuts 16 set up respectively and hang a 15 with spacing second in the both sides that the second hung a 15, and the second hangs a 15 and is connected with main joist 1.
The second hanger 15 is locked on the hook 14 through two nuts 16 and is hung on a building steel structure through the hook 14, so that the installation process is further simplified, and the installation efficiency is improved.
In some embodiments, referring to fig. 1, the hanger assembly further comprises two washers, wherein the washers correspond to the nuts 16 one by one, and the washers are arranged between the nuts 16 and the second hanger 15. The washer increases the contact area between the nut 16 and the second hanger 15, and further increases the stability of the second hanger 15 when locked.
In some embodiments, referring to FIG. 1, the connector 17 is attached to the corrugated finish by a metal glue. The connecting efficiency of the connecting piece 17 and the water ripple facing is higher through the metal adhesive, and the integral installation efficiency is convenient to improve.
It should be understood that the above examples are only for clarity of illustration and are not intended to limit the embodiments. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. And obvious variations or modifications of the invention may be made without departing from the spirit or scope of the invention.

Claims (10)

1. The utility model provides a metal ripple veneer design structure for connect ripple veneer and building steel construction, its characterized in that includes:
the hanging component is hung and connected with the building steel structure;
the main keel is connected with the hanging component;
the first hanging piece is hung on the main keel, and a first notch is formed in the first hanging piece;
the first end of the auxiliary keel is inserted into the first notch, and the second end of the auxiliary keel is connected with the water ripple veneer through a connecting piece;
a disengagement prevention assembly disposed at a second end of the cross runner to limit rotation of the connector.
2. The metal corrugated veneer design structure according to claim 1, wherein the separation prevention assembly comprises:
the positioning piece is connected with the auxiliary keel and provided with a first threaded hole;
the screw rod penetrates through the first threaded hole and is in threaded fit with the positioning piece;
the height adjusting piece is provided with a second threaded hole and is arranged at the bottom end of the screw rod and in threaded fit with the screw rod;
the first anti-separation unit and the second anti-separation unit are arranged on two sides of the screw respectively, the first anti-separation unit and the second anti-separation unit are connected with the heightening part, and the first anti-separation unit and the second anti-separation unit are abutted to the connecting piece to limit the rotation of the connecting piece.
3. The metal water ripple finishing design structure of claim 2, wherein the first separation preventing unit comprises a first separation preventing member and a first limiting member, the first separation preventing member is connected to the height adjusting member, the first separation preventing member comprises a rigid portion and a flexible portion arranged from top to bottom, the flexible portion is connected to the first limiting member, and the first limiting member abuts against the connecting member.
4. The metal corrugated veneer design structure according to claim 2, wherein the second separation preventing unit comprises a second separation preventing member and a second limiting member, the height adjusting member is connected with the second limiting member through the second separation preventing member, the second limiting member abuts against the connecting member, and when the connecting member has a rotation tendency, the second separation preventing member axially contracts and limits the connecting member from rotating through the second limiting member.
5. The metal ripple finish design structure of claim 1, wherein a second notch is further formed at a bottom of the first notch, a fixture block is further disposed at the first end of the cross runner, and when the first end of the cross runner is inserted into the first notch, the fixture block is matched with the second notch to limit the first end of the cross runner from being separated from the first notch.
6. The corrugated metal finishing design of claim 1, wherein the clips are made of magnets.
7. The corrugated metal veneer design structure of claim 1, wherein the first hanging element is further provided with a leveling bolt, and the leveling bolt passes through the first hanging element and abuts against the main keel.
8. The corrugated metal veneer design according to claim 1, wherein the hanging assembly comprises:
the hook is hung on the building steel structure;
the second hangs the piece, the bottom of couple with the second hangs a screw-thread fit, be equipped with two nuts on the couple, two nuts set up respectively the second hangs the both sides of piece with spacing the second hangs the piece, the second hang the piece with the main joist is connected.
9. The corrugated metal veneer design according to claim 8, wherein the hanging assembly further comprises two washers, the washers corresponding to the nuts one to one, the washers being disposed between the nuts and the second hanging members.
10. The metal corrugated veneer design according to claim 1, wherein the connecting piece is connected to the corrugated veneer by metal glue.
CN202111143915.4A 2021-09-28 2021-09-28 Metal ripple veneer design structure Pending CN113833195A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111143915.4A CN113833195A (en) 2021-09-28 2021-09-28 Metal ripple veneer design structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111143915.4A CN113833195A (en) 2021-09-28 2021-09-28 Metal ripple veneer design structure

Publications (1)

Publication Number Publication Date
CN113833195A true CN113833195A (en) 2021-12-24

Family

ID=78967062

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111143915.4A Pending CN113833195A (en) 2021-09-28 2021-09-28 Metal ripple veneer design structure

Country Status (1)

Country Link
CN (1) CN113833195A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1076170A (en) * 1992-02-25 1993-09-15 三菱电机株式会社 Cargo hook gear
JP2004019234A (en) * 2002-06-17 2004-01-22 Daiwa House Ind Co Ltd Height position adjustment structure for ceiling frame
CN206035261U (en) * 2016-08-26 2017-03-22 浙江亚厦幕墙有限公司 Connection structure of window is opened to couple formula curtain
CN207332084U (en) * 2017-10-20 2018-05-08 深圳市翔大装饰工程有限公司 A kind of furred ceiling structure
CN209413627U (en) * 2018-12-12 2019-09-20 山西八建集团有限公司 Curtain wall opening leaf anti-drop device
CN110904743A (en) * 2019-12-10 2020-03-24 中铁山桥集团有限公司 Mechanical anti-loosening structure of turnout fastener
CN111219009A (en) * 2020-03-10 2020-06-02 苏州金螳螂建筑装饰股份有限公司 Mounting structure and mounting method for arc-shaped aluminum profile modeling
CN210768170U (en) * 2019-08-26 2020-06-16 武邑贝多智能科技有限公司 Hook type lock latch device
CN211883665U (en) * 2020-01-19 2020-11-10 西安佳赢企业管理咨询有限公司 Mop head of flat mop and flat mop
CN113356448A (en) * 2021-07-13 2021-09-07 浙江亚厦装饰股份有限公司 Installation device and installation method of curved surface metal ceiling

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1076170A (en) * 1992-02-25 1993-09-15 三菱电机株式会社 Cargo hook gear
JP2004019234A (en) * 2002-06-17 2004-01-22 Daiwa House Ind Co Ltd Height position adjustment structure for ceiling frame
CN206035261U (en) * 2016-08-26 2017-03-22 浙江亚厦幕墙有限公司 Connection structure of window is opened to couple formula curtain
CN207332084U (en) * 2017-10-20 2018-05-08 深圳市翔大装饰工程有限公司 A kind of furred ceiling structure
CN209413627U (en) * 2018-12-12 2019-09-20 山西八建集团有限公司 Curtain wall opening leaf anti-drop device
CN210768170U (en) * 2019-08-26 2020-06-16 武邑贝多智能科技有限公司 Hook type lock latch device
CN110904743A (en) * 2019-12-10 2020-03-24 中铁山桥集团有限公司 Mechanical anti-loosening structure of turnout fastener
CN211883665U (en) * 2020-01-19 2020-11-10 西安佳赢企业管理咨询有限公司 Mop head of flat mop and flat mop
CN111219009A (en) * 2020-03-10 2020-06-02 苏州金螳螂建筑装饰股份有限公司 Mounting structure and mounting method for arc-shaped aluminum profile modeling
CN113356448A (en) * 2021-07-13 2021-09-07 浙江亚厦装饰股份有限公司 Installation device and installation method of curved surface metal ceiling

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
上海市建筑工程局: "《建筑业职工业余中学教材物理学》", 30 April 1959, 上海科学技术出版社 *

Similar Documents

Publication Publication Date Title
CN103291043B (en) The installation suspension assembly of finishing material
CN113833195A (en) Metal ripple veneer design structure
CN106838467A (en) A kind of suspension rod and fastener for being applied to antidetonation suspension and support
CN203856157U (en) Stone dry hanging installation system
CN102425254B (en) Keel connecting device based on suspended curtain wall
CN111827560A (en) Assembled seamless paint veneer furred ceiling
CN216921177U (en) Network floor adjusts foot mounting structure
CN206555564U (en) A kind of suspension rod and fastener applied to antidetonation suspension and support
CN215167466U (en) Self-cleaning aluminium veneer structure
CN207260404U (en) Furred ceiling bulk and furred ceiling
CN210797877U (en) Beam column connecting node structure of steel structure factory building
CN207714580U (en) A kind of installation system of no crossbeam stone curtain wall
CN106368417A (en) Skirting line convenient to install and construction method thereof
CN112554429A (en) Fast-assembly type assembly ceiling structure and installation method
CN209881714U (en) Assembly frame mounting structure
CN215631007U (en) Assembled fixing device of top surface buckle
CN212295503U (en) Buckle mounting, decoration material structure and decoration material fixed component
CN219260518U (en) Automatic leveling clothes-horse mounting structure
CN110821098A (en) Buckle mounting, decoration material and decoration material fixed component
CN202787617U (en) Sleeve type lift sub
CN212106463U (en) Toughened glass convenient to install fast
CN216407450U (en) Screw mounting structure and have its panel, water module, air source heat pump
CN215604679U (en) Detachable screen
CN220365242U (en) Connecting structure of flat buckle type buckle piece floor
CN203906474U (en) Mortise joint structure and combined hardware pendant applying same

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20211224

RJ01 Rejection of invention patent application after publication