CN113743765A - Decoration project construction process management method and system based on Internet of things technology - Google Patents

Decoration project construction process management method and system based on Internet of things technology Download PDF

Info

Publication number
CN113743765A
CN113743765A CN202110991884.1A CN202110991884A CN113743765A CN 113743765 A CN113743765 A CN 113743765A CN 202110991884 A CN202110991884 A CN 202110991884A CN 113743765 A CN113743765 A CN 113743765A
Authority
CN
China
Prior art keywords
construction
requirement
constructors
scheme
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110991884.1A
Other languages
Chinese (zh)
Inventor
任洋民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Yantang Decoration Co ltd
Original Assignee
Shenzhen Yantang Decoration Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Yantang Decoration Co ltd filed Critical Shenzhen Yantang Decoration Co ltd
Priority to CN202110991884.1A priority Critical patent/CN113743765A/en
Publication of CN113743765A publication Critical patent/CN113743765A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K17/00Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
    • G06K17/0022Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device
    • G06K17/0025Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device the arrangement consisting of a wireless interrogation device in combination with a device for optically marking the record carrier
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • General Engineering & Computer Science (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Data Mining & Analysis (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The application discloses a decoration project construction process management method and system based on the technology of the Internet of things, wherein the method comprises the following steps: acquiring an initial construction scheme of a decoration project; when construction is carried out, construction information is obtained in real time based on the technology of the Internet of things; judging whether the initial construction scheme can be completed or not according to the construction information; and when the initial construction scheme can not be completed, optimizing the initial construction scheme to obtain a subsequent optimized construction scheme. Construction information acquisition based on internet of things technology and optimization to the initial construction scheme can be accomplished in time to follow-up and accurate management and control to huge construction materials and engineering volume, have impeld the smooth completion of construction scheme, have solved the decoration project, and supervisory personnel can't accomplish in time to follow-up and accurate management and control condition to huge construction materials and engineering volume.

Description

Decoration project construction process management method and system based on Internet of things technology
Technical Field
The application relates to the field of architectural decoration construction, in particular to a decoration project construction process management method and system based on the technology of the Internet of things.
Background
With the development of infrastructure construction, the living standard of people is improved. The requirements for the aesthetic appearance, practicality and quality of architectural decorations are also increasing. The design concept and construction process of housing and public facilities of real estate enterprises and design houses are continuously updated.
The traditional management of decoration project construction is generally managed by a supervisory personnel of a construction group, and supervision and tracking are carried out on decorative materials, construction quality, construction tasks and the like.
However, under the conditions that the engineering quantity is increased year by year, the construction difficulty is increased, and the types of construction materials are more and more huge, the decoration projects are managed by people, so that the large construction materials and the engineering quantity cannot be followed up and accurately controlled in time, and the requirements of the construction development of the decoration projects cannot be met.
Disclosure of Invention
In order to solve the problem that supervision personnel cannot follow up and accurately control the conditions of huge construction materials and engineering quantities in a decoration project, the application provides a decoration project construction process management method and system based on the Internet of things technology.
In a first aspect, the application provides a decoration project construction process management method based on the internet of things technology, which adopts the following technical scheme:
a decoration project construction process management method based on the technology of the Internet of things comprises the following steps:
acquiring an initial construction scheme of a decoration project;
when construction is carried out, construction information is obtained in real time based on the technology of the Internet of things;
judging whether the initial construction scheme can be completed or not according to the construction information;
and when the initial construction scheme cannot be completed, optimizing the initial construction scheme to obtain a subsequent optimized construction scheme.
By adopting the technical scheme, before the decoration project is carried out, the real estate company or the entrusted decoration company needs to carry out the construction design of the decoration project firstly to obtain the construction scheme for construction, so that the initial construction scheme of the decoration project can be obtained, when a constructor carries out construction through the initial construction scheme, the construction information can be obtained in real time based on a terminal or equipment of the internet of things technology, whether the initial construction scheme can be completed or not is judged by calculating and deducing on the basis of the construction information, when the initial construction scheme can not be completed, the problem that the design or construction mode is poor in the initial construction scheme is shown, the initial construction scheme needs to be optimized, and finally the subsequent optimized construction scheme is obtained. Construction information acquisition based on the internet of things technology and optimization of an initial construction scheme can be achieved, follow-up and accurate management and control can be achieved for huge construction materials and engineering quantities, and smooth completion of the construction scheme is promoted.
Optionally, the obtaining of the construction information in real time based on the internet of things technology includes:
during construction, the construction machine type, construction machine operation data, decorative material type, decorative material use data, decorative material residual data, the number of constructors and each constructor identification of a construction site are collected in real time through a collection terminal based on the Internet of things technology;
obtaining construction progress information according to the type of the construction machine and the operation data of the construction machine;
obtaining construction material information according to the decorative material type, the decorative material use data and the decorative material residual data;
according to the number of the constructors and the identification of each constructor, the information of the constructors is obtained;
and summarizing the construction progress information, the construction material information and the constructor information to obtain construction information.
By adopting the technical scheme, the acquisition terminal based on the internet of things technology can be label scanning equipment, the type of the decorative material, the use data of the decorative material and the residual data of the decorative material can be obtained by scanning the bar code and the two-dimensional code identification attached to the decorative material, or the number of constructors and the identification of each constructor can be obtained by scanning the RFID electronic label used by the constructor; the acquisition terminal based on the internet of things technology can also be a sensor installed on mechanical equipment, and the type of the construction machinery and the operation data of the construction machinery are acquired through the sensor. The construction progress information is obtained according to the type of the construction machine and the operation data of the construction machine, the construction material information is obtained according to the type of the decorative material, the use data of the decorative material and the residual data of the decorative material, the constructor information is obtained according to the number of constructors and the identification of each constructor, and the construction progress information, the construction material information and the constructor information are gathered to obtain the construction information. Since important information that affects whether the initial construction scheme can be completed is construction progress, construction materials, and constructors, the important explanation is the acquisition of construction progress information, construction material information, and constructor information.
Optionally, the determining whether the initial construction scheme can be completed according to the construction information includes:
analyzing the construction information to obtain construction progress information, construction material information and constructor information;
judging whether the construction progress requirement of the initial construction scheme is met or not according to the construction progress information;
if the construction progress requirement is not met, determining that the initial construction scheme cannot be completed;
if the construction progress requirement is met, judging whether the construction material requirement of the initial construction scheme is met or not according to the construction material information;
if the construction material requirement is not met, determining that the initial construction scheme cannot be completed;
if the construction material requirement is met, judging whether the construction material requirement meets the requirement of the constructors of the initial construction scheme or not according to the constructor information;
if the construction personnel requirements are not met, determining that the initial construction scheme cannot be completed;
and if the requirement of the constructor is met, determining that the initial construction scheme can be completed.
By adopting the technical scheme, after the construction information is obtained, the construction information is analyzed to obtain construction progress information, construction material information and constructor information, whether the construction progress requirement of the initial construction scheme is met or not is judged according to the construction progress information, and if the construction progress requirement is not met, the initial construction scheme cannot be completed is determined; if the construction material information meets the construction material requirements of the initial construction scheme, judging whether the construction material information meets the construction material requirements of the initial construction scheme according to the construction material information, if not, determining that the initial construction scheme cannot be completed; if yes, judging whether the construction personnel requirements of the initial construction scheme are met or not according to the construction personnel information; if not, determining that the initial construction scheme cannot be completed; and if so, determining that the initial construction scheme can be completed. Whether the initial construction scheme can be completed or not is judged step by judging the construction progress information firstly, judging the construction material information and judging the information of constructors finally, so that supervision on the initial construction scheme is enhanced, and the management and control degree of a decoration project is improved.
Optionally, the determining whether the construction progress requirement of the initial construction scheme is met according to the construction progress information includes:
acquiring the construction progress requirement of the initial construction scheme;
dividing the initial construction scheme into at least two construction stages according to the construction progress requirement, and determining the time starting point of each construction stage;
obtaining the type and operation data of the construction machine at the current construction time point according to the construction progress information, and determining the current construction stage of the current construction time point;
judging whether the current construction stage of the current construction time point corresponds to the corresponding construction stage set by the construction progress requirement;
if not, the construction progress requirement is not met;
and if so, meeting the construction progress requirement.
By adopting the technical scheme, the construction progress requirement is that the initial construction scheme is divided into at least two construction stages, so that the time starting point of each construction stage can be determined, the construction machine type and the construction machine operation data of the current construction time point are obtained according to the construction progress information, the current construction stage of the current construction time point is determined, whether the current construction stage of the current construction time point corresponds to the corresponding construction stage set by the construction progress requirement is judged, and if the current construction stage does not correspond to the corresponding construction stage, the construction progress requirement is not met; if so, the construction progress requirement is met. Whether the construction progress requirements are met or not is judged through the construction stage, and the decoration projects are determined to be completed on time because the construction stage represents whether the construction progress meets the time requirements or not.
Optionally, the determining whether the construction material requirement of the initial construction scheme is met according to the construction material information includes:
acquiring the construction material requirement of the initial construction scheme;
dividing the initial construction scheme into two construction stages according to the construction material requirements, and determining the type and the usage amount of the decorative material at each construction stage;
obtaining the type of the decorative material, the use data of the decorative material and the residual data of the decorative material at the current construction time point according to the construction material information, and determining the type, the use amount and the residual amount of the decorative material at the current construction time point;
judging whether the type of the decorative material of the current construction stage at the current construction time point is consistent with the type of the decorative material of the corresponding construction stage required to be set by the construction material;
if not, the construction material requirement is not met;
if so, judging whether the use amount of the decorative material at the current construction stage at the current construction time point exceeds the use amount of the decorative material at the corresponding construction stage required to be set by the construction material;
if so, the construction material requirement is not met;
if not, judging whether the residual quantity of the decorative material in the current construction stage at the current construction time point meets the sum of the decorative material usage quantity of the subsequent construction stage set by the construction material requirement;
if not, the construction material requirement is not met;
if so, the construction material requirement is met.
By adopting the technical scheme, the construction material requirement is that the initial construction scheme is divided into two construction stages, the type and the use amount of the decorative material at each construction stage are determined, the type, the use data and the remaining data of the decorative material at the current construction time point are obtained according to the construction material information, the type, the use amount and the remaining amount of the decorative material at the current construction time point are determined, and whether the type of the decorative material at the current construction stage at the current construction time point is consistent with or inconsistent with the type of the decorative material at the corresponding construction stage required to be set by the construction material is judged, so that the requirement of the construction material is not met; if the current construction time point is consistent with the construction material requirement, judging whether the use amount of the decorative material at the current construction stage of the current construction time point exceeds the use amount of the decorative material at the corresponding construction stage set by the construction material requirement, if so, not meeting the construction material requirement; if the sum of the decorative material usage amount of the current construction stage at the current construction time point does not exceed the preset value, judging whether the residual amount of the decorative material of the current construction stage at the current construction time point meets the sum of the decorative material usage amount of the subsequent construction stage set by the construction material requirement, if not, meeting the construction material requirement; and if the requirement is met, the requirement of the construction material is met. Whether the requirements of the construction materials are met is judged by firstly judging the types of the decoration materials, then judging the use amount of the decoration materials and finally judging the residual amount of the decoration materials, so that the construction materials meet the requirements of the initial construction scheme, the use amount of the decoration materials meet the requirements of the initial construction scheme and the residual amount of the decoration materials meet the follow-up construction in the construction process.
Optionally, the determining whether to meet the requirement of the constructor of the initial construction scheme according to the constructor information includes:
acquiring the requirement of constructors of the initial construction scheme;
dividing the initial construction scheme into two construction stages according to the requirement of the constructors, and determining the number of the constructors in each construction stage;
obtaining the number of constructors at the current construction time point according to the constructor information, and determining the number of the constructors at the current construction time point;
judging whether the number of constructors in the current construction stage at the current construction time point is less than the number of constructors in the corresponding construction stage required to be set by the constructors or not;
if the number of the construction objects is less than the preset number, the requirement of the constructor is not met;
if not, the requirement of the constructor is met.
By adopting the technical scheme, the requirement of the constructors is that the initial construction scheme is divided into two construction stages according to the requirement of the constructors, the number of the constructors in each construction stage is determined, the number of the constructors in the current construction time point is obtained according to the information of the constructors, the number of the constructors in the current construction time point is determined, whether the number of the constructors in the current construction stage in which the current construction time point is located is greater than the number of the constructors in the corresponding construction stage set by the requirement of the constructors is judged, and if the number of the constructors in the current construction stage is less than the number of the constructors, the requirement of the constructors is not met; if not, the requirement of constructors is met. The constructor quantity can influence the construction progress, consequently, is less than the constructor quantity that the constructor required the corresponding construction stage who sets up at constructor quantity, probably can't accomplish the construction progress on time, also can increase other constructors' work load, is not conform to the constructor requirement.
Optionally, before meeting the requirement of the constructor, the method further includes:
when the number of the constructors in the current construction stage at the current construction time point is not less than the number of the constructors in the corresponding construction stage required to be set by the constructors, determining all the constructors corresponding to each construction stage in the initial construction scheme;
obtaining each constructor mark of the current construction time point according to the constructor information, and determining each constructor of the current construction time point;
comparing all constructors of the current construction stage at the current construction time point with all constructors of the corresponding construction stage required to be set by the constructors;
when all constructors in the current construction stage do not cover all constructors in the corresponding construction stage set by the constructor requirement, determining that target constructors do not exist and do not meet the constructor requirement;
and when all constructors in the current construction stage completely cover all constructors in the corresponding construction stage required to be set by the constructors, recording newly added constructors and determining that the constructors meet the requirements.
By adopting the technical scheme, when the number of the constructors in the current construction stage at the current construction time point is not less than the number of the constructors in the corresponding construction stage required to be set by the constructors, only new constructors are added possibly, or partial constructors leave, more new constructors are added, so that the constructors are required to be checked, each constructor identifier of the current construction time point is obtained according to the information of the constructors, each constructor of the current construction time point is determined, all the constructors in the current construction stage at the current construction time point are compared with all the constructors in the corresponding construction stage required to be set by the constructors, and when all the constructors in the current construction stage do not cover all the constructors in the corresponding construction stage required to be set by the constructors, the target constructor is determined not to appear, does not meet the requirements of constructors; and when all constructors in the current construction stage completely cover all constructors in the corresponding construction stage required to be set by the constructors, recording the newly added constructors and determining that the requirements of the constructors are met. Whether the construction personnel requirements are met or not is determined according to the judgment of the construction personnel, and the management and control of the construction personnel are further enhanced.
In a second aspect, the application provides a decoration project construction process management system based on internet of things technology, which adopts the following technical scheme:
a decoration project construction process management system based on the technology of the Internet of things comprises the following steps:
the acquisition module is used for acquiring an initial construction scheme of the decoration project;
the acquisition module is also used for acquiring construction information in real time based on the technology of the Internet of things when construction is carried out;
the judging module is used for judging whether the initial construction scheme can be completed or not according to the construction information;
and the optimization module is used for optimizing the initial construction scheme to obtain a subsequent optimized construction scheme when the initial construction scheme cannot be completed.
By adopting the technical scheme, before decoration projects are carried out, construction design of the decoration projects needs to be carried out by real estate companies or entrusted decoration companies, construction schemes for construction are obtained, then the initial construction schemes of the decoration projects can be obtained by the obtaining module, when a constructor carries out construction through the initial construction schemes, the judging module can obtain construction information in real time based on terminals or equipment of the internet of things technology, the judging module carries out calculation and deduction on the basis of the construction information to judge whether the initial construction schemes can be completed or not, when the initial construction schemes cannot be completed, the problem that the initial construction schemes have design flaws or construction modes is shown, the optimizing module needs to optimize the initial construction schemes, and finally, the follow-up optimized construction schemes are obtained. Construction information acquisition based on the internet of things technology and optimization of an initial construction scheme can be achieved, follow-up and accurate management and control can be achieved for huge construction materials and engineering quantities, and smooth completion of the construction scheme is promoted.
Optionally, the determining module includes: the device comprises an analysis unit, a first judgment unit, a second judgment unit, a third judgment unit and a determination unit;
the analysis unit is used for analyzing the construction information to obtain construction progress information, construction material information and constructor information;
the first judging unit is used for judging whether the construction progress requirement of the initial construction scheme is met or not according to the construction progress information;
the determining unit is used for determining that the initial construction scheme cannot be completed if the construction progress requirement is not met;
the second judging unit is used for judging whether the construction material requirement of the initial construction scheme is met or not according to the construction material information if the construction progress requirement is met;
the determining unit is further used for determining that the initial construction scheme cannot be completed if the construction material requirement is not met;
the third judging unit is used for judging whether the construction material requirement is met or not according to the constructor information if the construction material requirement is met;
the determination unit is further used for determining that the initial construction scheme cannot be completed if the construction personnel requirement is not met;
and the determining unit is also used for determining that the initial construction scheme can be completed if the requirement of the constructor is met.
By adopting the technical scheme, after the construction information is obtained, the analysis unit analyzes the construction information to obtain construction progress information, construction material information and constructor information, the first judgment unit judges whether the construction progress requirement of the initial construction scheme is met or not according to the construction progress information, and if the construction progress requirement is not met, the determination unit determines that the initial construction scheme cannot be completed; if the construction material information meets the requirement, the second judging unit judges whether the construction material requirement of the initial construction scheme is met according to the construction material information, and if the construction material requirement does not meet the requirement, the determining unit determines that the initial construction scheme cannot be completed; if yes, the third judging unit judges whether the construction personnel requirements of the initial construction scheme are met or not according to the construction personnel information; if not, the determining unit determines that the initial construction scheme cannot be completed; and if so, the determining unit determines that the initial construction scheme can be completed. Whether the initial construction scheme can be completed or not is judged step by judging the construction progress information firstly, judging the construction material information and judging the information of constructors finally, so that supervision on the initial construction scheme is enhanced, and the management and control degree of a decoration project is improved.
To sum up, the application comprises the following beneficial technical effects:
the method comprises the steps of obtaining an initial construction scheme of a decoration project, when a constructor constructs through the initial construction scheme, obtaining construction information in real time based on a terminal or equipment of the Internet of things technology, calculating and deducing on the basis of the construction information, judging whether the initial construction scheme can be completed, and when the initial construction scheme cannot be completed, explaining that the initial construction scheme has a design leak or construction mode problem, optimizing the initial construction scheme and finally obtaining a follow-up optimized construction scheme. Construction information acquisition based on the internet of things technology and optimization of an initial construction scheme can be achieved, follow-up and accurate management and control can be achieved for huge construction materials and engineering quantities, and smooth completion of the construction scheme is promoted.
Drawings
Fig. 1 is a schematic flow chart of a decoration project construction process management method based on internet of things technology according to the present application.
Fig. 2 is a schematic flow chart illustrating the determination of whether the initial construction plan can be completed according to the construction information.
Fig. 3 is a schematic flow chart of the present application for determining whether the construction progress requirement of the initial construction scheme is met according to the construction progress information.
FIG. 4 is a schematic flow chart of the present application for determining compliance with the construction material requirements of the initial construction plan based on the construction material information.
FIG. 5 is a schematic flow chart illustrating the determination of whether to meet the constructor requirements of the initial construction plan based on constructor information.
FIG. 6 is a schematic flow chart of the present application that combines the number of constructors and the constructors to determine whether the constructor requirements of the initial construction plan are met.
Fig. 7 is a first structural schematic diagram of the decoration project construction process management system based on the internet of things technology.
Fig. 8 is a second structural diagram of the decoration project construction process management system based on the internet of things technology.
Detailed Description
In order to make the objects, technical solutions and advantages of the present application more apparent, the present application is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the present application and are not intended to limit the present application.
The embodiment of the application discloses a decoration project construction process management method based on the technology of the Internet of things.
Referring to fig. 1, the method includes:
101, obtaining an initial construction scheme of the decoration project.
The real estate company or entrusted decoration company needs to firstly carry out construction design of decoration items to obtain a construction scheme for construction, and then an electronic file of an initial construction scheme can be obtained through the internet or the initial construction scheme can be obtained through an entity drawing.
102, when construction is carried out, construction information is obtained in real time based on the technology of the internet of things.
Wherein, when the constructor is under construction through initial construction scheme, obtain construction information in real time based on internet of things, specifically as follows:
the acquisition terminal based on the internet of things technology can be label scanning equipment, and the type of the decorative material, the use data of the decorative material and the residual data of the decorative material can be obtained by scanning bar codes and two-dimensional code marks attached to the decorative material, or the acquisition terminal based on the internet of things technology can be an RFID reader, and the number of constructors and the marks of each constructor can be obtained by scanning RFID electronic labels used on constructor marks (such as I-brand);
the acquisition terminal based on the technology of the Internet of things can also be a sensor arranged on mechanical equipment, and the type of the construction machinery and the operation data of the construction machinery are acquired through the sensor;
the construction progress information is obtained according to the type of the construction machine and the operation data of the construction machine, the construction material information is obtained according to the type of the decorative material, the use data of the decorative material and the residual data of the decorative material, the constructor information is obtained according to the number of constructors and the identification of each constructor, and the construction progress information, the construction material information and the constructor information are gathered to obtain the construction information. Since important information that affects whether the initial construction scheme can be completed is construction progress, construction materials, and constructors, the important explanation is the acquisition of construction progress information, construction material information, and constructor information.
103, judging whether the initial construction scheme can be completed according to the construction information, and if not, executing the step 104.
Calculating and deducing on the basis of the construction information to judge whether an initial construction scheme can be completed or not, if so, indicating that the decoration project can be completed smoothly without any treatment, and only needing to continue construction information acquisition; if not, then an optimization is required and step 104 is performed.
And 104, optimizing the initial construction scheme to obtain a subsequent optimized construction scheme.
When the initial construction scheme cannot be completed, the problem that the initial construction scheme has design flaws or construction modes is solved, the initial construction scheme needs to be optimized, and finally a subsequent optimized construction scheme is obtained, so that the decoration project can be completed smoothly.
The implementation principle of the embodiment is as follows: the method comprises the steps of obtaining an initial construction scheme of a decoration project, when a constructor constructs through the initial construction scheme, obtaining construction information in real time based on a terminal or equipment of the Internet of things technology, calculating and deducing on the basis of the construction information, judging whether the initial construction scheme can be completed, and when the initial construction scheme cannot be completed, explaining that the initial construction scheme has a design leak or construction mode problem, optimizing the initial construction scheme and finally obtaining a follow-up optimized construction scheme. Construction information acquisition based on the internet of things technology and optimization of an initial construction scheme can be achieved, follow-up and accurate management and control can be achieved for huge construction materials and engineering quantities, and smooth completion of the construction scheme is promoted.
Step 103 in the embodiment of fig. 1 is explained by the embodiment of fig. 2 in conjunction with the above embodiment shown in fig. 1.
As shown in fig. 2, the step of determining whether the initial construction plan can be completed according to the construction information includes:
and 201, analyzing the construction information to obtain construction progress information, construction material information and constructor information.
After the construction information is obtained, the construction information is analyzed according to the content described in step 102 in the embodiment of fig. 1 to obtain construction progress information, construction material information, and constructor information.
And 202, judging whether the construction progress requirement of the initial construction scheme is met or not according to the construction progress information.
Judging whether the construction progress requirement of the initial construction scheme is met or not according to the construction progress information, and if not, executing a step 203; if yes, go to step 204.
And 203, determining that the initial construction scheme cannot be completed.
And when the construction progress information does not meet the construction progress requirement of the initial construction scheme, determining that the initial construction scheme cannot be completed.
And 204, judging whether the construction material requirements of the initial construction scheme are met or not according to the construction material information.
When the construction progress information meets the construction progress requirement of the initial construction scheme, further judging whether the construction progress information meets the construction material requirement of the initial construction scheme according to the construction material information, and if not, executing a step 203; if so, step 205 is performed.
And 205, judging whether the construction personnel requirements of the initial construction scheme are met or not according to the construction personnel information.
When the construction material information judges that the construction material requirements of the initial construction scheme are met, further judging whether the construction material requirements of the initial construction scheme are met according to the constructor information, and if the construction material requirements of the initial construction scheme are not met, executing a step 203; if so, step 206 is performed.
206, it is determined that the initial construction plan can be completed.
And finally, when the construction progress requirement, the construction material requirement and the constructor requirement are simultaneously met, the construction scheme is not influenced, and the initial construction scheme is determined to be completed.
The implementation principle of the embodiment is as follows: whether the initial construction scheme can be completed or not is judged step by judging the construction progress information firstly, judging the construction material information and judging the information of constructors finally, so that supervision on the initial construction scheme is enhanced, and the management and control degree of a decoration project is improved.
With reference to the example shown in fig. 2, as shown in fig. 3, in a preferred embodiment of the present application, determining whether the construction progress requirement of the initial construction scheme is met according to the construction progress information includes:
301, obtaining the construction progress requirement of the initial construction scheme.
The construction progress requirement is a requirement of a constructor on the construction process of a decoration project, namely, the construction progress requirement is guaranteed to be completed on time.
And 302, dividing the initial construction scheme into at least two construction stages according to the construction progress requirement, and determining the time starting point of each construction stage.
The initial construction scheme is divided into at least two construction stages according to the construction progress requirement, and the time starting point of each construction stage is determined, for example, the time requirement of the initial construction scheme is from 3 months 15 days to 4 months 15 days, taking the division into two construction stages as an example, the first construction stage is from 3 months 15 days to 4 months 1 days, and the second construction stage is from 4 months 2 days to 4 months 15 days.
303, obtaining the type of the construction machine and the operation data of the construction machine at the current construction time point according to the construction progress information, and determining the current construction stage of the current construction time point.
The construction machine type and the construction machine operation data of the current construction time point are obtained according to the construction progress information, and the construction stage in which the current construction time point is located can be determined through the construction machine type and the construction machine operation data, namely the current construction stage.
And 304, judging whether the current construction stage of the current construction time point corresponds to the corresponding construction stage set by the construction progress requirement.
Wherein, if the current time point is 4 months and 1 day and the current construction stage is the first construction stage, the current construction stage corresponds to the first construction stage, and step 306 is executed; if the current time point is 4 months and 2 days, the current construction stage is the first construction stage, and if the current time point is the second construction stage, the step 305 is not executed.
305, not meeting the construction progress requirement.
And 306, meeting the construction progress requirement.
The implementation principle of the embodiment is as follows: whether the construction progress requirements are met or not is judged through the construction stage, and the decoration projects are determined to be completed on time because the construction stage represents whether the construction progress meets the time requirements or not.
With reference to the example shown in fig. 2, as shown in fig. 4, in a preferred embodiment of the present application, determining whether the construction material requirement of the initial construction plan is met according to the construction material information includes:
401, the construction material requirements of the initial construction plan are obtained.
The construction material requirement is a requirement of a construction party for using the construction material for a decoration project, and specifically, the type of the used decoration material, the amount of the used decoration material, and the like may be mentioned.
402, dividing the initial construction scheme into two construction stages according to the construction material requirements, and determining the type and the usage amount of the decorative material at each construction stage.
Dividing an initial construction scheme into two construction stages according to construction material requirements, and determining the type and the use amount of a decorative material in each construction stage, wherein the two construction stages are taken as an example, the decorative material used in the first construction stage is assumed to be cement, and the use amount of the decorative material is 100 kG; the decorative material used in the second construction stage is paint, and the using amount of the decorative material is 50L.
And 403, obtaining the type of the decorative material, the use data of the decorative material and the residual data of the decorative material at the current construction time point according to the construction material information, and determining the type, the use amount and the residual quantity of the decorative material at the current construction time point.
The type of the decorative material, the use data of the decorative material and the residual data of the decorative material at the current construction time point are obtained according to the construction material information, the type of the decorative material at the current construction time point is assumed to be paint, the use amount of the decorative material is 50L, and the residual amount of the decorative material is 100L.
404, judging whether the type of the decoration material of the current construction stage at the current construction time point is consistent with the type of the decoration material of the corresponding construction stage required to be set by the construction material.
Judging whether the type of the decorative material of the current construction stage at the current construction time point is consistent with the type of the decorative material of the corresponding construction stage required to be set by the construction material, if so, executing step 406, wherein the type of the decorative material of the current construction time point is paint, and the type of the decorative material corresponding to the second construction stage is paint; if not, step 405 is performed.
405, not meeting the construction material requirements.
And 406, judging whether the use amount of the decorative material at the current construction stage at the current construction time point exceeds the use amount of the decorative material at the corresponding construction stage required to be set by the construction material.
When the type of the decorative material of the current construction stage at the current construction time point is consistent with the type of the decorative material of the corresponding construction stage required to be set by the construction material, judging whether the use amount of the decorative material of the current construction stage at the current construction time point exceeds the use amount of the decorative material of the corresponding construction stage required to be set by the construction material, and if so, executing the step 405; if not, step 407 is performed.
407, judging whether the residual quantity of the decorating material of the current construction stage at the current construction time point meets the sum of the using quantity of the decorating material of the subsequent construction stage set by the construction material requirement.
When the usage amount of the decorative material at the current construction stage at the current construction time point does not exceed the usage amount of the decorative material at the corresponding construction stage required to be set by the construction material, judging whether the remaining amount of the decorative material at the current construction stage at the current construction time point meets the sum of the usage amounts of the decorative materials at the subsequent construction stages required to be set by the construction material, namely, whether the usage amount of the decorative material required to be used at the subsequent construction stages is met or not is ensured, and if not, executing the step 405; if so, step 408 is performed.
408, meeting the requirements of construction materials.
The implementation principle of the embodiment is as follows: whether the requirements of the construction materials are met is judged by firstly judging the types of the decoration materials, then judging the use amount of the decoration materials and finally judging the residual amount of the decoration materials, so that the construction materials meet the requirements of the initial construction scheme, the use amount of the decoration materials meet the requirements of the initial construction scheme and the residual amount of the decoration materials meet the follow-up construction in the construction process.
With reference to the example shown in fig. 2, as shown in fig. 5, in a preferred embodiment of the present application, determining whether the constructor requirement of the initial construction scheme is met according to the constructor information includes:
501, acquiring the requirement of constructors of the initial construction scheme.
The construction material requirement is the requirement of constructors who require a constructor to construct the decoration project, and specifically can be the number of the constructors.
502, dividing the initial construction scheme into two construction stages according to the requirement of constructors, and determining the number of the constructors in each construction stage.
Dividing the initial construction scheme into two construction stages according to the requirement of constructors, and determining the number of the constructors in each construction stage, wherein the two construction stages are taken as an example, the number of the constructors is 50 on the assumption that the engineering quantity of the first construction stage is large; the work load of the second construction stage is relatively small, and the number of constructors is 10.
503, obtaining the number of the constructors at the current construction time point according to the constructor information, and determining the number of the constructors at the current construction time point.
The number of the constructors at the current construction time point is obtained according to the constructor information, and the number of the constructors at the current construction time point is determined, and is assumed to be 51.
And 504, judging whether the number of the constructors in the current construction stage at the current construction time point is less than the number of the constructors in the corresponding construction stage required to be set by the constructors.
Judging whether the number of constructors in the current construction stage at the current construction time point is less than the number of constructors in the corresponding construction stage required to be set by the constructors or not, wherein the number of the constructors in the current construction time point is 51, the current construction time point corresponds to the first construction stage, and the number of the constructors in the first construction stage is required to be 50, if so, executing the step 506; if the number of the constructors at the current construction time point is less than the number of the constructors at the current construction time point, executing a step 505;
505, not meeting the requirements of the constructors.
506, meeting the requirements of constructors.
The implementation principle of the embodiment is as follows: judging whether the number of constructors in the current construction stage at the current construction time point is greater than the number of constructors in the corresponding construction stage required to be set by the constructors or not, and if so, not meeting the requirement of the constructors; if not, the requirement of constructors is met. The constructor quantity can influence the construction progress, consequently, is less than the constructor quantity that the constructor required the corresponding construction stage who sets up at constructor quantity, probably can't accomplish the construction progress on time, also can increase other constructors' work load, is not conform to the constructor requirement.
In the embodiment shown in fig. 5, only the determination of the number of the constructors is described, and during the specific construction, the problem of the constructors themselves needs to be considered, for example, the types of the constructors are suitable for the work of different construction stages, and it is determined that the constructors are specific in the initial construction plan and cannot be replaced at will, therefore, on the basis of the embodiment shown in fig. 5, as shown in fig. 6, in the preferred embodiment of the present application, the determination of whether the constructor requirements of the initial construction plan are met by combining the number of the constructors and the constructors includes:
601, acquiring the requirement of constructors of the initial construction scheme.
The construction material requirement is the requirement of constructors who require a constructor to construct the decoration project, and specifically can be the number of the constructors.
And 602, dividing the initial construction scheme into two construction stages according to the requirement of constructors, and determining the number of the constructors in each construction stage.
Dividing the initial construction scheme into two construction stages according to the requirement of constructors, and determining the number of the constructors in each construction stage, wherein the two construction stages are taken as an example, the number of the constructors is 50 on the assumption that the engineering quantity of the first construction stage is large; the work load of the second construction stage is relatively small, and the number of constructors is 10.
603, obtaining the number of the constructors at the current construction time point according to the constructor information, and determining the number of the constructors at the current construction time point.
The number of the constructors at the current construction time point is obtained according to the constructor information, and the number of the constructors at the current construction time point is determined, and is assumed to be 51.
604, judging whether the number of the constructors in the current construction stage at the current construction time point is less than the number of the constructors in the corresponding construction stage required to be set by the constructors.
Judging whether the number of constructors in the current construction stage at the current construction time point is less than the number of constructors in the corresponding construction stage required to be set by the constructors or not, wherein the number of the constructors in the current construction time point is 51, the current construction time point corresponds to the first construction stage, and the number of the constructors in the first construction stage is required to be 50, and if so, executing a step 606; if the number of the constructors at the current construction time point is less than that of the constructors at the corresponding construction stage, executing a step 605;
605 not meeting the requirements of the constructors.
And 606, determining all constructors corresponding to each construction stage in the initial construction scheme.
When the number of the constructors in the current construction stage at the current construction time point is not less than the number of the constructors in the corresponding construction stage required to be set by the constructors, the original constructors may not be changed and only new constructors are added, and part of the constructors may leave, so that more new constructors are added, and therefore the constructors need to be checked to determine all the constructors corresponding to each construction stage in the initial construction scheme.
607, obtaining each constructor mark of the current construction time point according to the constructor information, and determining each constructor of the current construction time point.
And determining each constructor at the current construction time point according to the constructor identification of each constructor at the current construction time point.
And 608, comparing all the constructors of the current construction stage at the current construction time point with all the constructors of the corresponding construction stage required to be set by the constructors.
And comparing all constructors of the current construction stage at the current construction time point with all constructors of the corresponding construction stage required to be set by the constructors.
609, when all the constructors in the current construction stage do not cover all the constructors in the corresponding construction stage required to be set by the constructors, determining that the target constructors do not exist and do not meet the requirements of the constructors.
And 610, when all the constructors in the current construction stage completely cover all the constructors in the corresponding construction stage required to be set by the constructors, recording the newly added constructors and determining to meet the requirements of the constructors.
The implementation principle of the embodiment is as follows: when constructor quantity is less than constructor quantity of the corresponding construction stage that constructor required to set up, the construction progress can not be completed on time, the workload of other constructors can be increased, the constructor requirement is not met, when constructor quantity is not less than constructor quantity of the corresponding construction stage that constructor required to set up, whether the constructor requirement is met or not is determined through judgment to the constructor, and further constructor management and control are strengthened.
In the embodiments shown in fig. 1 to fig. 6, the method for managing a construction process of a decoration project based on an internet of things technology is specifically described, and a system for managing a construction process of a decoration project based on an internet of things technology, to which the method is applied, is described below by using an embodiment, as shown in fig. 7, the system for managing a construction process of a decoration project based on an internet of things technology of the present application includes:
an obtaining module 701, configured to obtain an initial construction scheme of a decoration project;
the obtaining module 701 is further configured to obtain construction information in real time based on the internet of things technology when construction is performed;
a judging module 702, configured to judge whether the initial construction scheme can be completed according to the construction information;
and the optimizing module 703 is configured to optimize the initial construction scheme to obtain a subsequent optimized construction scheme when the initial construction scheme cannot be completed.
The implementation principle of the embodiment is as follows: before a decoration project is performed, a real estate company or a entrusted decoration company needs to perform construction design of the decoration project first to obtain a construction scheme for construction, then the obtaining module 701 can obtain an initial construction scheme for the decoration project, when a constructor performs construction through the initial construction scheme, the judging module 702 can obtain construction information in real time based on a terminal or equipment of the internet of things technology, the judging module 702 calculates and deduces on the basis of the construction information to judge whether the initial construction scheme can be completed, when the initial construction scheme cannot be completed, it is described that the initial construction scheme has a design leak or a construction mode problem, the optimizing module 703 needs to optimize the initial construction scheme, and finally a subsequent optimized construction scheme is obtained. Construction information acquisition based on the internet of things technology and optimization of an initial construction scheme can be achieved, follow-up and accurate management and control can be achieved for huge construction materials and engineering quantities, and smooth completion of the construction scheme is promoted.
In combination with the embodiment shown in fig. 7, as shown in fig. 8, in a preferred implementation of the present application, the determining module 702 includes: an analysis unit 801, a first determination unit 802, a second determination unit 803, a third determination unit 804, and a determination unit 805;
an analysis unit 801 for analyzing the construction information to obtain construction progress information, construction material information, and constructor information;
a first judging unit 802, configured to judge whether a construction progress requirement of an initial construction scheme is met according to the construction progress information;
a determining unit 805, configured to determine that the initial construction scheme cannot be completed if the construction progress requirement is not met;
a second judging unit 803, configured to judge, if the construction progress requirement is met, whether the construction material requirement of the initial construction scheme is met according to the construction material information;
the determining unit 805 is further configured to determine that the initial construction scheme cannot be completed if the construction material requirement is not met;
a third judging unit 804, configured to judge whether the requirement of the constructor of the initial construction scheme is met according to the constructor information if the requirement of the construction material is met;
the determining unit 805 is further configured to determine that the initial construction scheme cannot be completed if the requirement of the constructor is not met;
the determining unit 805 is further configured to determine that the initial construction plan can be completed if the requirement of the constructor is met.
The implementation principle of the embodiment is as follows: after the construction information is obtained, the analysis unit 801 analyzes the construction information to obtain construction progress information, construction material information and constructor information, the first judgment unit 802 judges whether the construction progress requirement of the initial construction scheme is met or not according to the construction progress information, and if the construction progress requirement is not met, the determination unit 805 determines that the initial construction scheme cannot be completed; if yes, the second determination unit 803 determines whether the construction material requirement of the initial construction scheme is met according to the construction material information, and if not, the determination unit 805 determines that the initial construction scheme cannot be completed; if yes, the third judging unit 804 judges whether the construction personnel requirements of the initial construction scheme are met according to the construction personnel information; if not, the determination unit 805 determines that the initial construction plan cannot be completed; if yes, the determination unit 805 determines that the initial construction plan can be completed. Whether the initial construction scheme can be completed or not is judged step by judging the construction progress information firstly, judging the construction material information and judging the information of constructors finally, so that supervision on the initial construction scheme is enhanced, and the management and control degree of a decoration project is improved.
The foregoing is a preferred embodiment of the present application and is not intended to limit the scope of the application in any way, and any features disclosed in this specification (including the abstract and drawings) may be replaced by alternative features serving equivalent or similar purposes, unless expressly stated otherwise. That is, unless expressly stated otherwise, each feature is only an example of a generic series of equivalent or similar features.

Claims (9)

1. A decoration project construction process management method based on the technology of the Internet of things is characterized by comprising the following steps:
acquiring an initial construction scheme of a decoration project;
when construction is carried out, construction information is obtained in real time based on the technology of the Internet of things;
judging whether the initial construction scheme can be completed or not according to the construction information;
and when the initial construction scheme cannot be completed, optimizing the initial construction scheme to obtain a subsequent optimized construction scheme.
2. The method for managing the construction process of the decoration project based on the internet of things technology as claimed in claim 1, wherein the acquiring the construction information in real time based on the internet of things technology comprises:
during construction, the construction machine type, construction machine operation data, decorative material type, decorative material use data, decorative material residual data, the number of constructors and each constructor identification of a construction site are collected in real time through a collection terminal based on the Internet of things technology;
obtaining construction progress information according to the type of the construction machine and the operation data of the construction machine;
obtaining construction material information according to the decorative material type, the decorative material use data and the decorative material residual data;
according to the number of the constructors and the identification of each constructor, the information of the constructors is obtained;
and summarizing the construction progress information, the construction material information and the constructor information to obtain construction information.
3. The method for managing the construction process of the decoration project based on the internet of things technology as claimed in claim 2, wherein the determining whether the initial construction scheme can be completed according to the construction information comprises:
analyzing the construction information to obtain construction progress information, construction material information and constructor information;
judging whether the construction progress requirement of the initial construction scheme is met or not according to the construction progress information;
if the construction progress requirement is not met, determining that the initial construction scheme cannot be completed;
if the construction progress requirement is met, judging whether the construction material requirement of the initial construction scheme is met or not according to the construction material information;
if the construction material requirement is not met, determining that the initial construction scheme cannot be completed;
if the construction material requirement is met, judging whether the construction material requirement meets the requirement of the constructors of the initial construction scheme or not according to the constructor information;
if the construction personnel requirements are not met, determining that the initial construction scheme cannot be completed;
and if the requirement of the constructor is met, determining that the initial construction scheme can be completed.
4. The method for managing the construction process of the decoration project based on the internet of things technology as claimed in claim 3, wherein the step of judging whether the construction progress requirement of the initial construction scheme is met according to the construction progress information comprises the steps of:
acquiring the construction progress requirement of the initial construction scheme;
dividing the initial construction scheme into at least two construction stages according to the construction progress requirement, and determining the time starting point of each construction stage;
obtaining the type and operation data of the construction machine at the current construction time point according to the construction progress information, and determining the current construction stage of the current construction time point;
judging whether the current construction stage of the current construction time point corresponds to the corresponding construction stage set by the construction progress requirement;
if not, the construction progress requirement is not met;
and if so, meeting the construction progress requirement.
5. The method for managing the construction process of the decoration project based on the internet of things technology as claimed in claim 3, wherein the determining whether the construction material requirement of the initial construction scheme is met according to the construction material information comprises:
acquiring the construction material requirement of the initial construction scheme;
dividing the initial construction scheme into two construction stages according to the construction material requirements, and determining the type and the usage amount of the decorative material at each construction stage;
obtaining the type of the decorative material, the use data of the decorative material and the residual data of the decorative material at the current construction time point according to the construction material information, and determining the type, the use amount and the residual amount of the decorative material at the current construction time point;
judging whether the type of the decorative material of the current construction stage at the current construction time point is consistent with the type of the decorative material of the corresponding construction stage required to be set by the construction material;
if not, the construction material requirement is not met;
if so, judging whether the use amount of the decorative material at the current construction stage at the current construction time point exceeds the use amount of the decorative material at the corresponding construction stage required to be set by the construction material;
if so, the construction material requirement is not met;
if not, judging whether the residual quantity of the decorative material in the current construction stage at the current construction time point meets the sum of the decorative material usage quantity of the subsequent construction stage set by the construction material requirement;
if not, the construction material requirement is not met;
if so, the construction material requirement is met.
6. The method for managing the construction process of the decoration project based on the internet of things technology as claimed in claim 3, wherein the determining whether the constructor requirement of the initial construction scheme is met according to the constructor information comprises:
acquiring the requirement of constructors of the initial construction scheme;
dividing the initial construction scheme into two construction stages according to the requirement of the constructors, and determining the number of the constructors in each construction stage;
obtaining the number of constructors at the current construction time point according to the constructor information, and determining the number of the constructors at the current construction time point;
judging whether the number of constructors in the current construction stage at the current construction time point is less than the number of constructors in the corresponding construction stage required to be set by the constructors or not;
if the number of the construction objects is less than the preset number, the requirement of the constructor is not met;
if not, the requirement of the constructor is met.
7. The method for managing the construction process of the decoration project based on the internet of things technology as claimed in claim 6, wherein before meeting the requirements of the constructor, the method further comprises:
when the number of the constructors in the current construction stage at the current construction time point is not less than the number of the constructors in the corresponding construction stage required to be set by the constructors, determining all the constructors corresponding to each construction stage in the initial construction scheme;
obtaining each constructor mark of the current construction time point according to the constructor information, and determining each constructor of the current construction time point;
comparing all constructors of the current construction stage at the current construction time point with all constructors of the corresponding construction stage required to be set by the constructors;
when all constructors in the current construction stage do not cover all constructors in the corresponding construction stage set by the constructor requirement, determining that target constructors do not exist and do not meet the constructor requirement;
and when all constructors in the current construction stage completely cover all constructors in the corresponding construction stage required to be set by the constructors, recording newly added constructors and determining that the constructors meet the requirements.
8. The utility model provides a decorate project work progress management system based on internet of things, its characterized in that includes:
the acquisition module is used for acquiring an initial construction scheme of the decoration project;
the acquisition module is also used for acquiring construction information in real time based on the technology of the Internet of things when construction is carried out;
the judging module is used for judging whether the initial construction scheme can be completed or not according to the construction information;
and the optimization module is used for optimizing the initial construction scheme to obtain a subsequent optimized construction scheme when the initial construction scheme cannot be completed.
9. The Internet of things technology-based decoration project construction process management system of claim 6, wherein the judgment module comprises: the device comprises an analysis unit, a first judgment unit, a second judgment unit, a third judgment unit and a determination unit;
the analysis unit is used for analyzing the construction information to obtain construction progress information, construction material information and constructor information;
the first judging unit is used for judging whether the construction progress requirement of the initial construction scheme is met or not according to the construction progress information;
the determining unit is used for determining that the initial construction scheme cannot be completed if the construction progress requirement is not met;
the second judging unit is used for judging whether the construction material requirement of the initial construction scheme is met or not according to the construction material information if the construction progress requirement is met;
the determining unit is further used for determining that the initial construction scheme cannot be completed if the construction material requirement is not met;
the third judging unit is used for judging whether the construction material requirement is met or not according to the constructor information if the construction material requirement is met;
the determination unit is further used for determining that the initial construction scheme cannot be completed if the construction personnel requirement is not met;
and the determining unit is also used for determining that the initial construction scheme can be completed if the requirement of the constructor is met.
CN202110991884.1A 2021-08-27 2021-08-27 Decoration project construction process management method and system based on Internet of things technology Pending CN113743765A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110991884.1A CN113743765A (en) 2021-08-27 2021-08-27 Decoration project construction process management method and system based on Internet of things technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110991884.1A CN113743765A (en) 2021-08-27 2021-08-27 Decoration project construction process management method and system based on Internet of things technology

Publications (1)

Publication Number Publication Date
CN113743765A true CN113743765A (en) 2021-12-03

Family

ID=78733178

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110991884.1A Pending CN113743765A (en) 2021-08-27 2021-08-27 Decoration project construction process management method and system based on Internet of things technology

Country Status (1)

Country Link
CN (1) CN113743765A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117853075A (en) * 2024-03-07 2024-04-09 临沂市金明寓建筑科技有限公司 Intelligent management platform for building engineering data information

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106709703A (en) * 2017-02-28 2017-05-24 天津华惠安信装饰工程有限公司 Method and system of decoration project construction management based on technology of internet of things
CN109492875A (en) * 2018-10-15 2019-03-19 筑梦高科建筑有限公司 Construction site role's management-control method based on BIM
CN109978387A (en) * 2019-03-28 2019-07-05 浙江鑫润工程管理有限公司 A kind of BIM engineering information management method and system
CN110009293A (en) * 2018-11-27 2019-07-12 陈世均 Finishing management system and method
CN111639851A (en) * 2020-05-27 2020-09-08 重庆沃伟思科技有限公司 Decoration construction management method
CN112149954A (en) * 2020-08-18 2020-12-29 果尔佳建筑产业有限公司 Construction project personnel determination method and system, intelligent terminal and storage medium

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106709703A (en) * 2017-02-28 2017-05-24 天津华惠安信装饰工程有限公司 Method and system of decoration project construction management based on technology of internet of things
CN109492875A (en) * 2018-10-15 2019-03-19 筑梦高科建筑有限公司 Construction site role's management-control method based on BIM
CN110009293A (en) * 2018-11-27 2019-07-12 陈世均 Finishing management system and method
CN109978387A (en) * 2019-03-28 2019-07-05 浙江鑫润工程管理有限公司 A kind of BIM engineering information management method and system
CN111639851A (en) * 2020-05-27 2020-09-08 重庆沃伟思科技有限公司 Decoration construction management method
CN112149954A (en) * 2020-08-18 2020-12-29 果尔佳建筑产业有限公司 Construction project personnel determination method and system, intelligent terminal and storage medium

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117853075A (en) * 2024-03-07 2024-04-09 临沂市金明寓建筑科技有限公司 Intelligent management platform for building engineering data information
CN117853075B (en) * 2024-03-07 2024-05-24 临沂市金明寓建筑科技有限公司 Intelligent management platform for building engineering data information

Similar Documents

Publication Publication Date Title
CN100568243C (en) The method and system of a kind of data mining and modeling
WO2007023485A2 (en) A system and a method for managing building projects
CN113743765A (en) Decoration project construction process management method and system based on Internet of things technology
CN116468392A (en) Method, device, equipment and storage medium for monitoring progress of power grid engineering project
JP2018206291A (en) Energy saving effect calculating device and method
CN115601000A (en) BIM5D model engineering cost method and system in complex environment
CN116029682A (en) Construction progress management method and system based on BIM technology
CN116231854B (en) Intelligent campus energy-saving management method and system based on Internet of things
CN116230109A (en) Chiral separation prediction method based on deep learning
CN108132802B (en) Application method of configuration model in system development
CN113590599B (en) Data checking method based on complex data environment
CN114897501A (en) Intelligent rural industry digital treatment service platform
CN114118717A (en) Mine enterprise production state supervision method and system
CN111950133B (en) Engine reliable life prediction method based on digital twinning
CN112162639A (en) Electronic warfare equipment simulation training man-machine interaction collaboration system
CN110689263A (en) River channel quality management and control system based on BIM technology
CN110866690A (en) Application of BIM model data in intelligent construction site
CN110489311A (en) Automatic detection computer user behavior and the method and system for automatically updating detection model
CN109885286A (en) A kind of outer Programming method of the program line of Panasonic's plug-in machine
CN116596401A (en) Evaluation system for engineering cost
Deng Digital intelligent management platform for high-rise building construction based on bim technology
CN104238419A (en) Handheld energy-saving monitoring intelligent working system and working method
CN115329148B (en) Data screening and integrating method and system based on multiple big data processing
CN116754025B (en) Image recognition technology-based auxiliary water balance test water quantity monitoring method
CN215729856U (en) Project background data analysis system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination