CN113638593A - 脚手架搭拆全过程安全带系挂方法 - Google Patents
脚手架搭拆全过程安全带系挂方法 Download PDFInfo
- Publication number
- CN113638593A CN113638593A CN202110682790.6A CN202110682790A CN113638593A CN 113638593 A CN113638593 A CN 113638593A CN 202110682790 A CN202110682790 A CN 202110682790A CN 113638593 A CN113638593 A CN 113638593A
- Authority
- CN
- China
- Prior art keywords
- safety belt
- hanging
- scaffold
- platform
- safety
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/001—Safety or protective measures against falling down relating to scaffoldings
-
- A—HUMAN NECESSITIES
- A62—LIFE-SAVING; FIRE-FIGHTING
- A62B—DEVICES, APPARATUS OR METHODS FOR LIFE-SAVING
- A62B35/00—Safety belts or body harnesses; Similar equipment for limiting displacement of the human body, especially in case of sudden changes of motion
- A62B35/0043—Lifelines, lanyards, and anchors therefore
- A62B35/0075—Details of ropes or similar equipment, e.g. between the secured person and the lifeline or anchor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/007—Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
Abstract
本发明公开了脚手架搭拆全过程安全带系挂方法,涉及到施工安全领域,包括以下方法:A、攀爬时挂设方法;B、立杆接长时挂设方法;C、搭设大横杆时挂设方法;D、搭设小横杆时挂设方法;E、铺设上层跳板时挂设方法;F、挂安全网、踢脚板时挂设方法;G、材料倒运时挂设方法;H、脚手架拆除时挂设方法,本发明涵盖了脚手架搭拆全过程中的安全带系挂,确保高处作业人员100%系挂。本发明保证了高处作业人员对于安全带“高挂低用”的原则,在发生意外时,减少人员因坠落高度增加而导致的风险增加,本发明未明显增加成本,利于大面积推广,仅在现有技术的基础上,增设了作为辅助用具的生命绳,该生命绳可以在工程建设时重复利用。
Description
技术领域
本发明涉及施工安全领域,特别涉及脚手架搭拆全过程安全带系挂方法。
背景技术
只要是建筑工程项目,无论项目投资大小,必然会用到人员操作平台,即狭义的脚手架操作平台;而建筑业“五大伤害”的头名为高处坠落,而脚手架搭拆作业最直接的安全事故后果即高处坠落。故脚手架搭拆过程的安全风险管控是建筑安全管理的重中之重。现民用建筑施工中,一线建筑工人大多使用的是三点式安全带,且屡屡出现不系挂安全带、将安全带附件随意拆除、安全带无可靠系挂点、安全带不能高挂低用等缺陷,对人民生命财产安全带来了较大的威胁。因此,发明脚手架搭拆全过程安全带系挂方法来解决上述问题很有必要。
发明内容
本发明的目的在于提供脚手架搭拆全过程安全带系挂方法,以解决上述背景技术中提出的问题。
为实现上述目的,本发明提供如下技术方案:脚手架搭拆全过程安全带系挂方法,包括以下方法:
A:攀爬时挂设方法
1):搭设过程中向上一个平台攀爬:向上攀爬时,安全带一个大钩挂于下一层平台的上部栏杆,另一个大钩挂于上一层平台的大横杆上,人员通过踩踏两步栏杆翻越至上部平台前,将挂于下一层上部栏杆的大钩解除,在到达上部平台后,在附近的立杆+1m处加锁一个直角扣件作为安全带系挂点,再把设于脚底的挂于大横杆的大钩解除;
2):向下攀爬时,安全带两个挂钩交替在上部平台立杆、上部平台大横杆、下部平台上部栏杆使用,保证安全带大钩至少有一个大钩处于有效使用中,满足安全带100%系挂要求;
B:立杆接长时安全带挂设方法
单根6m标准钢管重量在25.4kg,架子工通过手部力量将立杆接长时,身体重心容易偏移,且该阶段平台无防护栏杆,在此阶段安全风险极大,必须确保架子工安全带可靠系挂;
C:搭设大横杆时安全带挂设方法
在立杆接长后,脚手架搭设进入大横杆接长阶段,在此过程中生命绳仍然存在,架子工在平台行走时,可将安全带挂于生命绳上来回移动,单根钢管长度小于钢丝绳长度,故可保证在大横杆接长过程中,始终保证安全带挂于生命绳上,满足安全带100%系挂要求;
D:搭设小横杆时安全带挂设方法
在大横杆接长后,生命绳可以拆除,安全带系挂于刚刚搭设完成的大横杆上,如遇到立杆阻碍,可将双大钩交替使用,满足安全带100%系挂要求;
E:铺设上层跳板时挂设方法
在下层平台的大横杆、小横杆和上层平台底部的大横杆、小横杆均设置完成后,需铺设上层跳板,当脚手架单步高度在1.8m,人员直接站立于下部平台将上层平台的跳板铺设完成,在工人直接站立于刚刚铺设好的跳板上向前摊铺跳板这个非正常施工状态时,安全带挂钩应该系挂于上部平台的大横杆上,以确保满足安全带100%系挂要求;
F:材料倒运时挂设方法
在脚手架搭设过程中,脚手架材料一般通过塔吊等垂直运输工具置放于最上层的作业平台上,在此阶段,司索人员解钩过程和架子工搬运过程中均应将安全带100%系挂;
G:挂安全网、踢脚板时挂设方法
在有防护栏杆的平台施工时,工人可将安全带挂于已设置的防护栏杆上;
H:脚手架拆除过程挂设方法
与上述搭设过程的安全带系挂方案保持一致。
优选的,所述攀爬时挂设方法中,向上攀爬时可以保证安全带大钩至少有一个大钩处于有效使用中,满足安全带100%系挂要求。
优选的,所述立杆接长时安全带挂设方法中,安全带双大钩均挂设于生命绳上。
优选的,所述立杆接长时安全带挂设方法中,在攀爬至上部平台后,需设置生命绳作为辅助措施作为安全带系挂点。
优选的,所述铺设上层跳板时挂设方法内,在摊铺过程中,跳板摊铺完成后,应立即使用铁丝将刚铺的跳板绑扎固定牢固。
优选的,所述材料倒运时挂设方法中,作业人员可采用两种安全带系挂点方式:一是利用立杆中部的单扣件作为安全带系挂点,另一个是利用挂设好的生命绳作为安全带系挂点。
优选的,所述挂安全网、踢脚板时挂设方法中,在移动时,可临时将安全带摘除。
本发明的技术效果和优点:
1、本发明涵盖了脚手架搭拆全过程中的安全带系挂,确保高处作业人员 100%系挂;
2、本发明使用的双大钩五点式安全带优于现阶段使用的三点式安全带;
3、本发明保证了高处作业人员对于安全带“高挂低用”的原则,在发生意外时,减少人员因坠落高度增加而导致的风险增加;
4、本发明未明显增加成本,利于大面积推广,仅在现有技术的基础上,增设了作为辅助用具的生命绳,该生命绳可以在工程建设时重复利用。
附图说明
图1为本发明流程示意图。
图2为本发明安全带的示意图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
本发明提供了如图1-2所示的脚手架搭拆全过程安全带系挂方法,包括以下方法:
A:攀爬时挂设方法
1):搭设过程中向上一个平台攀爬:向上攀爬时,安全带一个大钩挂于下一层平台的上部栏杆,另一个大钩挂于上一层平台的大横杆上,人员通过踩踏两步栏杆翻越至上部平台前,将挂于下一层上部栏杆的大钩解除,在到达上部平台后,在附近的立杆+1m处加锁一个直角扣件作为安全带系挂点,再把设于脚底的挂于大横杆的大钩解除,可以保证安全带大钩至少有一个大钩处于有效使用中,满足安全带100%系挂要求;
2):向下攀爬时,安全带两个挂钩交替在上部平台立杆、上部平台大横杆、下部平台上部栏杆使用,保证安全带大钩至少有一个大钩处于有效使用中,满足安全带100%系挂要求;
B:立杆接长时安全带挂设方法
单根6m标准钢管重量在25.4kg,架子工通过手部力量将立杆接长时,身体重心容易偏移,且该阶段平台无防护栏杆,在此阶段安全风险极大,必须确保架子工安全带可靠系挂,安全带双大钩均挂设于生命绳上,在攀爬至上部平台后,需设置生命绳作为辅助措施作为安全带系挂点;
C:搭设大横杆时安全带挂设方法
在立杆接长后,脚手架搭设进入大横杆接长阶段,在此过程中生命绳仍然存在,架子工在平台行走时,可将安全带挂于生命绳上来回移动,单根钢管长度小于钢丝绳长度,故可保证在大横杆接长过程中,始终保证安全带挂于生命绳上,满足安全带100%系挂要求;
D:搭设小横杆时安全带挂设方法
在大横杆接长后,生命绳可以拆除,安全带系挂于刚刚搭设完成的大横杆上,如遇到立杆阻碍,可将双大钩交替使用,满足安全带100%系挂要求;
E:铺设上层跳板时挂设方法
在下层平台的大横杆、小横杆和上层平台底部的大横杆、小横杆均设置完成后,需铺设上层跳板,当脚手架单步高度在1.8m,人员直接站立于下部平台将上层平台的跳板铺设完成,在工人直接站立于刚刚铺设好的跳板上向前摊铺跳板这个非正常施工状态时,安全带挂钩应该系挂于上部平台的大横杆上,以确保满足安全带100%系挂要求,在摊铺过程中,跳板摊铺完成后,应立即使用铁丝将刚铺的跳板绑扎固定牢固;
F:材料倒运时挂设方法
在脚手架搭设过程中,脚手架材料一般通过塔吊等垂直运输工具置放于最上层的作业平台上,在此阶段,司索人员解钩过程和架子工搬运过程中均应将安全带100%系挂,作业人员可采用两种安全带系挂点方式:一是利用立杆中部的单扣件作为安全带系挂点,另一个是利用挂设好的生命绳作为安全带系挂点;
G:挂安全网、踢脚板时挂设方法
在有防护栏杆的平台施工时,工人可将安全带挂于已设置的防护栏杆上,在移动时,可临时将安全带摘除;
H:脚手架拆除过程挂设方法
与上述搭设过程的安全带系挂方案保持一致。
本发明中安全带的选型:
架子工选择佩戴双大钩五点式安全带,解决了安全带不满足规范要求的问题,主要包括:
1.三点式安全带防护效果不佳,在坠落时容易发生次生伤害;
2.安全带缺失缓冲包,在坠落时增加对人体的意外伤害;
3.安全带小钩使用便利性不足,降低工人佩戴安全带的主观意向;
4.单钩安全带在攀爬时无法满足100%系挂要求;
5.该安全带和生命绳配套使用,可将防护效果扩大至全过程。
本发明的辅助用具—生命绳:
生命绳采用8mm以上的钢丝绳材质。生命绳设置方法如下:在脚手架一个平面两端各站立一名架子工,将生命绳端头设置于立杆+1.2m处,使用三个卡扣锁止;单段钢丝绳长度原则上不超过8m,中部最大弧垂高度不大于20cm;如脚手架单面长度超过8m,可在脚手架中部间隔8m处增设一个系挂点,中继系挂点利用直角扣件设置,生命绳穿过直角扣件并环绕立杆至少一圈,再用一个卡扣锁止,确保在发生意外时,系挂点强度满足使用要求。
查阅相关规范可知,7.7mm直径6*19的钢丝绳破断拉力在31KN左右,在安全系数取6时,最大载荷可达500kg,可以满足6人以上成年人同时使用的需求;内部制度规定只允许同一断面只允许4人同时作业,满足安全要求。
最后应说明的是:以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (7)
1.脚手架搭拆全过程安全带系挂方法,其特征在于,包括以下方法:
A:攀爬时挂设方法
1):搭设过程中向上一个平台攀爬:向上攀爬时,安全带一个大钩挂于下一层平台的上部栏杆,另一个大钩挂于上一层平台的大横杆上,人员通过踩踏两步栏杆翻越至上部平台前,将挂于下一层上部栏杆的大钩解除,在到达上部平台后,在附近的立杆+1m处加锁一个直角扣件作为安全带系挂点,再把设于脚底的挂于大横杆的大钩解除;
2):向下攀爬时,安全带两个挂钩交替在上部平台立杆、上部平台大横杆、下部平台上部栏杆使用,保证安全带大钩至少有一个大钩处于有效使用中,满足安全带100%系挂要求;
B:立杆接长时安全带挂设方法
单根6m标准钢管重量在25.4kg,架子工通过手部力量将立杆接长时,身体重心容易偏移,且该阶段平台无防护栏杆,在此阶段安全风险极大,必须确保架子工安全带可靠系挂;
C:搭设大横杆时安全带挂设方法
在立杆接长后,脚手架搭设进入大横杆接长阶段,在此过程中生命绳仍然存在,架子工在平台行走时,可将安全带挂于生命绳上来回移动,单根钢管长度小于钢丝绳长度,故可保证在大横杆接长过程中,始终保证安全带挂于生命绳上,满足安全带100%系挂要求;
D:搭设小横杆时安全带挂设方法
在大横杆接长后,生命绳可以拆除,安全带系挂于刚刚搭设完成的大横杆上,如遇到立杆阻碍,可将双大钩交替使用,满足安全带100%系挂要求;
E:铺设上层跳板时挂设方法
在下层平台的大横杆、小横杆和上层平台底部的大横杆、小横杆均设置完成后,需铺设上层跳板,当脚手架单步高度在1.8m,人员直接站立于下部平台将上层平台的跳板铺设完成,在工人直接站立于刚刚铺设好的跳板上向前摊铺跳板这个非正常施工状态时,安全带挂钩应该系挂于上部平台的大横杆上,以确保满足安全带100%系挂要求;
F:材料倒运时挂设方法
在脚手架搭设过程中,脚手架材料一般通过塔吊等垂直运输工具置放于最上层的作业平台上,在此阶段,司索人员解钩过程和架子工搬运过程中均应将安全带100%系挂;
G:挂安全网、踢脚板时挂设方法
在有防护栏杆的平台施工时,工人可将安全带挂于已设置的防护栏杆上;
H:脚手架拆除过程挂设方法
与上述搭设过程的安全带系挂方案保持一致。
2.根据权利要求1所述的脚手架搭拆全过程安全带系挂方法,其特征在于:所述攀爬时挂设方法中,向上攀爬时可以保证安全带大钩至少有一个大钩处于有效使用中,满足安全带100%系挂要求。
3.根据权利要求2所述的脚手架搭拆全过程安全带系挂方法,其特征在于:所述立杆接长时安全带挂设方法中,安全带双大钩均挂设于生命绳上。
4.根据权利要求3所述的脚手架搭拆全过程安全带系挂方法,其特征在于:所述立杆接长时安全带挂设方法中,在攀爬至上部平台后,需设置生命绳作为辅助措施作为安全带系挂点。
5.根据权利要求4所述的脚手架搭拆全过程安全带系挂方法,其特征在于:所述铺设上层跳板时挂设方法内,在摊铺过程中,跳板摊铺完成后,应立即使用铁丝将刚铺的跳板绑扎固定牢固。
6.根据权利要求5所述的脚手架搭拆全过程安全带系挂方法,其特征在于:所述材料倒运时挂设方法中,作业人员可采用两种安全带系挂点方式:一是利用立杆中部的单扣件作为安全带系挂点,另一个是利用挂设好的生命绳作为安全带系挂点。
7.根据权利要求6所述的脚手架搭拆全过程安全带系挂方法,其特征在于:所述挂安全网、踢脚板时挂设方法中,在移动时,可临时将安全带摘除。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110682790.6A CN113638593B (zh) | 2021-06-18 | 2021-06-18 | 脚手架搭拆全过程安全带系挂方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110682790.6A CN113638593B (zh) | 2021-06-18 | 2021-06-18 | 脚手架搭拆全过程安全带系挂方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113638593A true CN113638593A (zh) | 2021-11-12 |
CN113638593B CN113638593B (zh) | 2023-01-20 |
Family
ID=78415962
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110682790.6A Active CN113638593B (zh) | 2021-06-18 | 2021-06-18 | 脚手架搭拆全过程安全带系挂方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113638593B (zh) |
Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0430075A (ja) * | 1990-05-24 | 1992-02-03 | Touden Kogyo Kk | 水平親綱展張治具及び該治具を使用して足場を組立てる方法 |
CA2119054A1 (en) * | 1993-03-16 | 1994-09-17 | Michael Bell | System and Method for Extending a Safety Line Over an Electrical Transmission Tower |
AU2003233751A1 (en) * | 2002-04-10 | 2003-10-27 | Lutz Corvey | Scaffolding |
AU2002301550B2 (en) * | 2001-10-25 | 2007-09-20 | John Leslie Heggs | Fall Restraint Device |
CA2638490A1 (en) * | 2008-07-31 | 2010-01-31 | 9020-4983 Quebec Inc. | Scaffolding safety device |
AU2011226802A1 (en) * | 2010-09-21 | 2012-04-05 | Spanset Australia Ltd | Safety Harness |
JP5654710B1 (ja) * | 2014-07-17 | 2015-01-14 | 株式会社新成工業 | 親綱支柱 |
CN204767097U (zh) * | 2015-06-05 | 2015-11-18 | 国家电网公司 | 高空作业安全带悬挂装置 |
CN105888269A (zh) * | 2016-04-14 | 2016-08-24 | 中国建筑第六工程局有限公司 | 一种建筑施工高空作业悬索式安全防护装置及其施工方法 |
CN105926917A (zh) * | 2016-06-16 | 2016-09-07 | 中建七局建筑装饰工程有限公司 | 钢构挑檐外饰面施工用悬挂平台及其搭建方法与拆除方法 |
CN205796286U (zh) * | 2016-05-04 | 2016-12-14 | 温州德拓电力器材有限公司 | 一种移动式防坠落保护装置 |
JP2017008516A (ja) * | 2015-06-18 | 2017-01-12 | アルインコ株式会社 | 緊結式足場における安全手摺 |
CN107461023A (zh) * | 2017-09-28 | 2017-12-12 | 韩丹 | 一种安装有防护结构的电梯井操作平台 |
CN207041761U (zh) * | 2017-07-12 | 2018-02-27 | 叶永菲 | 一种脚手架用便捷式安全带 |
CN210563357U (zh) * | 2019-07-10 | 2020-05-19 | 中交一航局第一工程有限公司 | 一种建筑脚手架施工安全支杆 |
CN210828284U (zh) * | 2019-06-27 | 2020-06-23 | 中建三局第一建设工程有限责任公司 | 一种外架搭设人员保护装置 |
KR20200110720A (ko) * | 2020-09-07 | 2020-09-25 | 초연결 주식회사 | 로프 고정 유닛 및 그 로프 고정 유닛 설치방법 |
CN111851982A (zh) * | 2020-07-31 | 2020-10-30 | 左跃华 | 一种脚手架可升降防坠安全装置 |
CN213268821U (zh) * | 2020-07-06 | 2021-05-25 | 中建八局第一建设有限公司 | 一种便于高空钢梁焊接的抱箍挂篮装置 |
-
2021
- 2021-06-18 CN CN202110682790.6A patent/CN113638593B/zh active Active
Patent Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0430075A (ja) * | 1990-05-24 | 1992-02-03 | Touden Kogyo Kk | 水平親綱展張治具及び該治具を使用して足場を組立てる方法 |
CA2119054A1 (en) * | 1993-03-16 | 1994-09-17 | Michael Bell | System and Method for Extending a Safety Line Over an Electrical Transmission Tower |
AU2002301550B2 (en) * | 2001-10-25 | 2007-09-20 | John Leslie Heggs | Fall Restraint Device |
AU2003233751A1 (en) * | 2002-04-10 | 2003-10-27 | Lutz Corvey | Scaffolding |
CA2638490A1 (en) * | 2008-07-31 | 2010-01-31 | 9020-4983 Quebec Inc. | Scaffolding safety device |
AU2011226802A1 (en) * | 2010-09-21 | 2012-04-05 | Spanset Australia Ltd | Safety Harness |
JP5654710B1 (ja) * | 2014-07-17 | 2015-01-14 | 株式会社新成工業 | 親綱支柱 |
CN204767097U (zh) * | 2015-06-05 | 2015-11-18 | 国家电网公司 | 高空作业安全带悬挂装置 |
JP2017008516A (ja) * | 2015-06-18 | 2017-01-12 | アルインコ株式会社 | 緊結式足場における安全手摺 |
CN105888269A (zh) * | 2016-04-14 | 2016-08-24 | 中国建筑第六工程局有限公司 | 一种建筑施工高空作业悬索式安全防护装置及其施工方法 |
CN205796286U (zh) * | 2016-05-04 | 2016-12-14 | 温州德拓电力器材有限公司 | 一种移动式防坠落保护装置 |
CN105926917A (zh) * | 2016-06-16 | 2016-09-07 | 中建七局建筑装饰工程有限公司 | 钢构挑檐外饰面施工用悬挂平台及其搭建方法与拆除方法 |
CN207041761U (zh) * | 2017-07-12 | 2018-02-27 | 叶永菲 | 一种脚手架用便捷式安全带 |
CN107461023A (zh) * | 2017-09-28 | 2017-12-12 | 韩丹 | 一种安装有防护结构的电梯井操作平台 |
CN210828284U (zh) * | 2019-06-27 | 2020-06-23 | 中建三局第一建设工程有限责任公司 | 一种外架搭设人员保护装置 |
CN210563357U (zh) * | 2019-07-10 | 2020-05-19 | 中交一航局第一工程有限公司 | 一种建筑脚手架施工安全支杆 |
CN213268821U (zh) * | 2020-07-06 | 2021-05-25 | 中建八局第一建设有限公司 | 一种便于高空钢梁焊接的抱箍挂篮装置 |
CN111851982A (zh) * | 2020-07-31 | 2020-10-30 | 左跃华 | 一种脚手架可升降防坠安全装置 |
KR20200110720A (ko) * | 2020-09-07 | 2020-09-25 | 초연결 주식회사 | 로프 고정 유닛 및 그 로프 고정 유닛 설치방법 |
Non-Patent Citations (8)
Title |
---|
伍荣璋: "图解系挂安全带五步法", 《HTTPS://WWW.DOCIN.COM/P-1778433519.HTML》 * |
叶鹏: "论油罐清罐检维修作业监护人监护内容", 《中国石油和化工标准与质量》 * |
李悦林: "认真做好高处作业的安全防护", 《建筑安全》 * |
杨飞等: "扣件式钢管脚手架在施工中的常见危险分析", 《建筑安全》 * |
林锦坤: "探讨高层建筑扣件式钢管脚手架施工的安全问题", 《广东建材》 * |
王志义: "921-3工程中心区7号建筑物脚手架工程设计", 《中国建筑金属结构》 * |
王超 等: "《建设工程生产安全事故典型案例分析》", 30 June 2016, 冶金工业出版社 * |
胡沛等: "浅析建筑施工现场用电安全的隐患", 《建筑安全》 * |
Also Published As
Publication number | Publication date |
---|---|
CN113638593B (zh) | 2023-01-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6758306B2 (en) | Construction safety screen system | |
US10030397B2 (en) | Fall protection system | |
US20090120718A1 (en) | Multi-level safety net support system for high-rise construction | |
US7896132B2 (en) | Multi-level fall protection system for high-rise construction | |
US8245816B2 (en) | Integral safety system which can be used for construction | |
CN104074349B (zh) | 一种新式防护型附着式升降脚手架 | |
US20120055738A1 (en) | Construction safety hanger | |
US6321872B1 (en) | Support davit arm for retractable fall proctection lanyard | |
KR101246665B1 (ko) | 지지 브라켓 및 이를 이용한 낙하방지용 안전망 지지장치 | |
CN201580865U (zh) | 物料提升机架体装拆的防坠落装置 | |
CN113638593B (zh) | 脚手架搭拆全过程安全带系挂方法 | |
WO2009044405A2 (en) | Anchor plate for use with fall protection and maintenance equipment. | |
AU2020100560B4 (en) | A shroud | |
CN218434640U (zh) | 一种伸缩式塔吊安全通道 | |
US20050161284A1 (en) | Safety device | |
KR100812130B1 (ko) | 구명줄 겸용 안전네트 | |
CN220365506U (zh) | 防倾倒防坠落便于登杆的施工梯子 | |
CN208749208U (zh) | 通信杆塔 | |
US8157057B1 (en) | Safety apparatus for scaffolding | |
CN212406038U (zh) | 高空大悬挑钢屋架的下挂施工平台模块 | |
CN116905955A (zh) | 防倾倒防坠落便于登杆的施工梯子及其使用方法 | |
CN211256690U (zh) | 墩柱高空作业固定网式安全防护体系 | |
EP1876315A1 (en) | Integral safety system which can be used for construction | |
CN2267294Y (zh) | 钢丝绳悬挂式爬架 | |
CN209428957U (zh) | 一种高大墩柱无支架施工安全防护网架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |