CN113626454A - Forest resource one-map progress updating system, cloud platform and method - Google Patents

Forest resource one-map progress updating system, cloud platform and method Download PDF

Info

Publication number
CN113626454A
CN113626454A CN202110919257.7A CN202110919257A CN113626454A CN 113626454 A CN113626454 A CN 113626454A CN 202110919257 A CN202110919257 A CN 202110919257A CN 113626454 A CN113626454 A CN 113626454A
Authority
CN
China
Prior art keywords
progress
database
module
checking
forest
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110919257.7A
Other languages
Chinese (zh)
Other versions
CN113626454B (en
Inventor
李娜娜
高飞
聂丛乐
陈家德
方懿
陈敏
孙昌平
许先鹏
王勇军
黄贝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming Survey And Design Institute Of State Forestry Administration
Sichuan Forestry And Grassland Investigation And Planning Institute Sichuan Forestry And Grassland Ecological Environment Monitoring Center
Sichuan Sample Space Time Technology Co ltd
Chengdu Academy of Agriculture and Forestry Sciences
Original Assignee
Kunming Survey And Design Institute Of State Forestry Administration
Sichuan Forestry Exporation And Design Research Institute
Sichuan Sample Space Time Technology Co ltd
Sichuan Forestry And Grassland Investigation And Planning Institute
Chengdu Academy of Agriculture and Forestry Sciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming Survey And Design Institute Of State Forestry Administration, Sichuan Forestry Exporation And Design Research Institute, Sichuan Sample Space Time Technology Co ltd, Sichuan Forestry And Grassland Investigation And Planning Institute, Chengdu Academy of Agriculture and Forestry Sciences filed Critical Kunming Survey And Design Institute Of State Forestry Administration
Priority to CN202110919257.7A priority Critical patent/CN113626454B/en
Publication of CN113626454A publication Critical patent/CN113626454A/en
Application granted granted Critical
Publication of CN113626454B publication Critical patent/CN113626454B/en
Priority to PCT/CN2022/105860 priority patent/WO2023016187A1/en
Priority to JP2024508107A priority patent/JP2024529104A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/23Updating
    • G06F16/2358Change logging, detection, and notification
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/21Design, administration or maintenance of databases
    • G06F16/219Managing data history or versioning
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/25Integrating or interfacing systems involving database management systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/27Replication, distribution or synchronisation of data between databases or within a distributed database system; Distributed database system architectures therefor
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/29Geographical information databases

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Data Mining & Analysis (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computing Systems (AREA)
  • Remote Sensing (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a one-map-progress updating system, a cloud platform and a method for forest resources. Each module function execution result represents the completion condition of a workflow, boundaries of all workshops of the updating progress are clearly defined, the progress filling standard is unified, the updating progress can be accurately quantified, the progress filling is determined by log records of module function execution, non-county-level users fill in the progress, the progress of the reporting is consistent with the actual progress, the actual working condition is truly reflected, the reporting work is automatically recorded and reported in real time at the background when the users develop the work, personnel are not needed at all levels to maintain the progress updating work, and the working efficiency is greatly improved.

Description

Forest resource one-map progress updating system, cloud platform and method
Technical Field
The invention belongs to the technical field of calculation, identification and processing of geospatial data, and particularly relates to a forest resource one-map progress updating system, a cloud platform and a forest resource one-map progress updating method.
Background
The annual updating of the forest resources in one map adopts province and county two-level updating, the working contents comprise forest supervision, forest resource one map updating, public welfare forest annual updating and the like, and all the working contents relate to field investigation and interior data arrangement, and the whole working process is complicated, so that the accurate grasping of the real working progress in the county level is an important basis for the province level management department to efficiently promote the whole work.
The current working stage is divided into 7 stages of training, archival data collection and processing, forest supervision and verification, one-picture verification, comprehensive database establishment, one-picture updating and report compiling, but the following defects exist: firstly, the progress is difficult to quantify, each working stage covers multiple actual works, the progress filling standard is random, and the working boundary and the progress are difficult to quantify; secondly, the progress is not real, the progress is filled by the county, whether the progress is consistent with the actual work or not is difficult to determine, progress statistics is often ideal for the progress of the work in the whole province, but the actual submitted result cannot be taken out in time, and the actual progress is seriously inconsistent with the reported result. Third, the report needs the responsibility of specially-assigned persons, and personnel need to maintain progress updating work, including progress urging report, county level filling and provincial level statistics.
In summary, it is desirable to provide a system, a cloud platform, and a method for updating a forest resource one-map progress, which achieve accurate quantification of a progress boundary, real progress, and automatic reporting in updating the forest resource one-map updating progress, and ensure transparent and smooth management of forest resource one-map progress at two levels of provinces and counties.
Disclosure of Invention
The invention aims to provide a forest resource one-map progress updating system, a cloud platform and a method, which can accurately quantize a progress boundary, realize real progress and automatically report in the process of updating the forest resource one-map progress and ensure transparent and smooth management of forest resource one-map progress at two levels of provinces and counties.
The above purpose is realized by the following technical scheme: a forest resource one-map progress updating system comprises a county-level client application system and a provincial-level server application system, wherein the county-level client application system comprises
The project creating and data importing module is used for importing local data by a county-level user, wherein the local data at least comprises a forest resource early-stage database, an administrative district database, a forest resource current situation database, a forest supervising database and a forest resource archive database, and establishing county-level forest resource annual update project files;
the system comprises an archive database logic inspection module, a data processing module and a data processing module, wherein the archive database logic inspection module is used for carrying out space and logic inspection on a forest resource archive database comprising construction project used forest lands, forest felling, forest management activities, disasters and forestry cases by a user;
the administrative division database checking module is used for carrying out space topology checking and attribute logic checking on the edited and imported administrative division database by a user, wherein the space topology checking comprises overlapping checking and gap checking, and the attribute logic checking comprises dictionary checking, filling and unfilled item checking and factor logic relationship checking;
the forest supervision database checking module is used for performing space topology checking and attribute logic checking on the edited and imported forest supervision database by a user, wherein the space topology checking comprises overlapping checking and multi-component checking, and the attribute logic checking comprises dictionary checking, filling and unfilled item checking and factor logic relationship checking;
the forest resource current situation database checking module is used for performing space topology checking and attribute logic checking on the finished forest resource current situation database by a user, wherein the space topology checking comprises overlapping, gap, open-air, multi-component, fine crushing, border crossing and forest class boundary crossing checking, and the attribute logic checking comprises dictionary domain checking, zoning factor checking, basic factor checking, management factor checking, forest ecological checking, terrain soil factor checking and forest stand factor checking;
the forest resource change database checking module is used for performing attribute logic checking on the forest resource change database by a user, and the attribute logic checking comprises forest supervision factor checking, change reason checking and abnormal change checking;
the result exporting module is used for exporting an administrative division database, a forest supervising database, a forest resource current situation database, a forest resource change database and a forest resource archive database in the local county-level forest resource annual updating project by a user;
the progress log background generation and reporting module is used for recording the function execution condition and the execution result of the current module to a local progress log database, accessing the provincial progress log database and updating the summary record of the local progress log database to the provincial progress log database after the operation execution engineering establishment and data import module, the archive database logic inspection module, the administrative division database inspection module, the forest supervision database inspection module, the forest resource current status database inspection module, the forest resource change database inspection module or the result export module;
the provincial server side application system comprises
The provincial progress log database creating module is used for creating a provincial progress log database for provincial users and storing all log information in one map updating of county-level forest resources;
the provincial progress summarizing module is used for receiving a data summarizing request of a county-level user for the provincial-level user and automatically updating and summarizing the data summarizing request;
the provincial progress query and statistics module is used for displaying the progress of the provincial user for the county level units and carrying out statistics on the working progress condition;
and the provincial progress exporting module is used for exporting a forest resource map progress updating condition for a provincial user according to the requirement.
The technical scheme is that when the progress of the county-level unit is inquired, quality inspection log results are displayed according to log item names in a itemized mode, the working progress conditions of all the county-level units are visually displayed, when the working progress of the whole province is counted, whether all the quality inspection log items of all the counties are qualified or not is judged, the county-level result is determined to be finished, one item is unqualified, and the result is determined to be not finished. .
In order to achieve the purpose, the invention also provides a forest resource one-map progress updating cloud platform, and the forest resource one-map progress updating cloud platform is deployed with the forest resource one-map progress updating system, which comprises
A map progress management device of forest resources: a county-level client application system is loaded;
a map progress management application system of forest resources: carrying a provincial server application system;
a basic cloud platform: the system is used for providing calculation, storage, network communication and system operation capacity support for a county-level client application system and a provincial-level server application system.
The technical scheme is that the one-map forest resource progress management device comprises various PCs, a notebook, a mobile workstation and a tablet computer which are provided with county-level client application systems, provides progress recording and submitting functions for county-level client application system module functions, generates a working log after each module function is executed, records user quality inspection and progress conditions, and automatically collects the working log and enters a provincial-level progress log database.
The forest resource one-map progress management application system comprises a server, a workstation or a virtual machine which provides calculation, storage and network capacity for the operation of a provincial server application system, a forest resource one-map provincial progress log database establishing module, a provincial progress summarizing module, a provincial progress query counting module and a provincial progress exporting module, wherein the server, the workstation or the virtual machine is provided with an application platform which is necessary for supporting the operation of the provincial server application system and comprises an operating system, a database platform, a GIS platform and network middleware, and the platform capacity of the virtual machine is provided by a basic cloud platform.
The further technical scheme is that the basic cloud platform comprises, but is not limited to, an X86 computing server for constructing a computing resource pool, a storage server for constructing a storage resource pool, a network server and a gateway for constructing a network resource pool, virtualization platform software for performing resource virtualization management, and an application platform for deploying an operating system, a database platform, a GIS platform, and network middleware on a virtualization platform.
In order to achieve the above object, the present invention further provides a forest resource one-map progress updating method, which is executed by the forest resource one-map progress updating system, and specifically includes the following steps:
(1) dividing a forest resource-chart work progress according to each module function of the county-level client application system, wherein each module function execution result represents the completion condition of a workflow;
(2) establishing a provincial progress log database;
(3) executing each module function of a county-level client application system by a county-level user, accessing a local progress log database, judging whether the access is successful, if not, establishing the progress log database locally by the county-level user, wherein the database structure is consistent with that of a provincial-level progress log database;
(4) recording the execution condition and execution result of the current module to a local progress log database, wherein when the execution function is project establishment, data import and result export, the quality inspection result is qualified, the error number is 0, the quality inspection result and the error number of other function execution are filled according to the actual condition,
(5) a county user accesses a provincial progress log database, judges whether updating is successful, if not, prompts that provincial progress log data cannot be accessed, progress information cannot be reported, proposes to check a network or contact a provincial administrator, ends a process, and if so, updates a local progress log database summary record into the provincial progress log database;
(6) provincial users inquire, summarize and count and derive provincial and municipal progress conditions: and when the provincial user inquires the progress of the county level unit, displaying the quality inspection log result in terms according to the name of the log item, and visually displaying the working progress conditions of the county level unit. When the working progress in the whole province is counted, whether all quality inspection log items of each county are qualified or not is judged, all the quality inspection log items are qualified, the county-level achievement is determined to be finished, one quality inspection log item is unqualified, and the achievement is determined to be not finished.
The further technical proposal is that the working progress of the forest resource one map in the step (1) is divided into 7 progresses including project establishment and data import, archive database inspection, administrative division database inspection, forest supervision database inspection, current situation database inspection, change database inspection and result export, which respectively correspond to the execution results of 7 modules of the project establishment and data import module, the archive database logic inspection module, the administrative division database inspection module, the forest supervision database inspection module, the forest resource current situation database inspection module, the forest resource change database inspection module and the result export module, the 7 schedules respectively represent the work flow of work starting, archive data collection, administrative division establishment, forest supervision work completion, one graph establishment, one graph updating completion and achievement database formation.
The technical scheme is that the provincial progress log database has a structure of (ID, county code, log item name, quality inspection result, inspection number, error number, log time and delivery time); wherein, the ID is a self-increment item generated by submitting the quality inspection log each time; the county code is 6-digit code and is executed according to national unified administrative code; the log item name is a progress name updated according to a forest resource map; the quality inspection result is qualified or unqualified; the number of the inspection is the number of statistical inspection pattern spots; the error number is the number of statistical error pattern spots; the log time is the execution time of the log item.
Compared with the prior art, the invention has the following advantages: firstly, the updating progress is accurately quantized, the progress of work is defined according to the execution condition of the module function, the boundary of each workshop is clear, the progress filling standard is unified, and the updating progress can be accurately quantized. And secondly, the progress is real, the progress filling is determined by the log record of the execution of the module function, the filling by the non-county user has no subjectivity, the actual working condition is truly reflected, and the reporting progress is consistent with the actual progress. And thirdly, automatic real-time reporting is carried out, the reporting work is automatically recorded and reported in real time at the background when the user carries out work, and personnel maintenance progress management work is not needed at all levels, so that the working efficiency is greatly improved.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate an embodiment of the invention and, together with the description, serve to explain the invention and not to limit the invention.
Fig. 1 and fig. 2 are respectively a block diagram illustrating a county-level client application system and a provincial-level server application system according to an embodiment of the present invention;
FIG. 3 is a flow chart of the execution of each module of a forest resource map progress updating system according to an embodiment of the present invention;
fig. 4 is a structural block diagram of a forest resource map progress updating cloud platform according to an embodiment of the present invention;
fig. 5 is a flowchart illustrating a forest resource map progress updating method according to an embodiment of the present invention.
Detailed Description
The present invention will now be described in detail with reference to the drawings, which are given by way of illustration and explanation only and should not be construed to limit the scope of the present invention in any way. Furthermore, features from embodiments in this document and from different embodiments may be combined accordingly by a person skilled in the art from the description in this document.
The embodiment of the invention is as follows, referring to fig. 1, a forest resource one-map progress updating system comprises a county-level client application system and a provincial-level server application system, wherein the county-level client application system comprises:
and the project creating and data importing module is used for importing local data by a county-level user according to requirements, and comprises but not limited to a forest resource early-stage database, an administrative district database, a forest resource current situation database, a forest supervising database and a forest resource archive database, and establishing county-level forest resource annual update project files.
And the archive database logic inspection module is used for performing space and logic inspection on 5 types of forest resource archive databases of forest management activities such as forest land use, forest felling, afforestation updating and the like, disasters, forestry cases and the like of the construction project by a user.
And the administrative division database checking module is used for carrying out space topology checking and attribute logic checking on the edited and imported administrative division database by a user, wherein the space topology checking comprises overlapping, gaps and the like, and the attribute logic checking comprises dictionary checking, filling and unfilled item checking, factor logic relationship and the like.
The forest supervision database checking module is used for performing spatial topology checking and attribute logic checking on the edited and imported forest supervision database by a user, wherein the spatial topology checking comprises overlapping, multiple components and the like, and the attribute logic checking comprises dictionary checking, filling and unfilled item checking, factor logic relation and the like.
The forest resource current situation database checking module is used for a user to perform space topology checking and attribute logic checking on the finished forest resource current situation database, wherein the space topology checking comprises overlapping, gap, open air, multiple components, fine crushing, over boundary, cross forest class boundary and the like. The attribute logic check comprises dictionary field check, zoning factor check, basic factor check, management factor check, forest ecological check, terrain soil factor check, forest stand factor check and the like.
And the forest resource change database checking module is used for performing attribute logic checking on the forest resource change database by a user and mainly comprises forest supervision factor checking, change reason checking and abnormal change checking.
And the result export module is used for leading out and packaging an administrative division database, a forest supervising database, a forest resource current situation database, a forest resource change database and a forest resource archive database in the local county-level forest resource annual updating project into a compressed file by a user.
And the progress log background generating and reporting module is used for recording the function execution condition and the execution result of the current module to a local progress log database, accessing the provincial progress log database and updating the summary record of the local progress log database to the provincial progress log database after the progress log background generating and reporting module runs in the execution engineering establishing and data importing module, the archive database logic checking module, the administrative division database checking module, the forest supervision database checking module, the forest resource current status database checking module, the forest resource change database checking module or the achievement exporting module.
As shown in fig. 2, the provincial server side application system includes:
and the provincial progress log database creating module is used for creating a provincial progress log database for provincial users and storing all log information in one map update of county-level forest resources.
And the provincial progress summarizing module is used for receiving the data summarizing request of the county level user for the provincial level user and automatically and correspondingly updating and summarizing the data summarizing request.
And the provincial progress query statistics module is used for displaying quality inspection log results in terms according to the name of the log project when provincial users query the progress of the county level unit, and visually displaying the conditions of various working progresses of the county level unit. When the working progress of the whole province and each city (state) is counted, whether all quality inspection log items of each county are qualified or not is judged, all the quality inspection log items are qualified, the county-level achievement is judged to be finished, one quality inspection log item is unqualified, and the achievement is judged to be not finished.
And the provincial progress exporting module is used for exporting the document achievements of the progress conditions of the provincial users, such as xls, doc and the like according to the requirements.
The implementation flow of the forest resource one-graph progress updating system is as follows, as shown in fig. 3:
1. and executing a provincial progress log database creating module. And establishing a provincial progress log database at the provincial cloud server side application system through a provincial administrator.
2. And 7 modules such as an engineering establishment module and a data import module are executed to complete the work content of one map updating of forest resources.
3. And triggering the background generation and reporting functions of the execution progress log. Recording the function execution condition and the execution result of the current module to a local progress log database, accessing the provincial progress log database, and summarizing and recording the local progress log database and updating the local progress log database to the provincial progress log database.
3. And executing a provincial progress summarizing module. The provincial application system receives the data summarization request from the county user and automatically updates and summarizes the data accordingly.
4. And executing a provincial progress query statistical module. And the provincial users perform progress statistical analysis of city division, region division and taxonomy according to the requirements.
5. And executing a provincial progress exporting module. And exporting the provincial log and the schedule by the provincial user according to the selected type.
The invention also provides a forest resource one-map progress updating cloud platform, and the embodiment is that the forest resource one-map progress updating system is deployed, as shown in fig. 4, and comprises:
a forest resource one-map progress management device is provided with a county-level client application system, comprises various types of equipment such as a PC, a notebook, a mobile workstation and a tablet personal computer which are provided with the county-level client application system, provides progress recording and submitting functions for module functions of the county-level client application system, generates work logs after the module functions of the device are executed, records quality inspection and progress conditions of a user, and automatically collects the work logs into a provincial-level progress log database.
A forest resource one-map progress management application system is loaded with a provincial server application system and comprises a server, a workstation or a virtual machine and other equipment which provide calculation, storage and network capacity for the operation of the provincial server application system, a forest resource one-map provincial progress log database establishing module, a provincial progress summarizing module, a provincial progress query counting module and a provincial progress exporting module. The application platforms such as an operating system, a database platform, a GIS platform and network middleware which are necessary for supporting the operation of the provincial server application system are deployed on the equipment such as the server, the workstation and the like, and the platform capability of the virtual machine is provided by the basic cloud platform.
The basic cloud platform comprises an X86 computing server for constructing a computing resource pool, a storage server for constructing a storage resource pool, a network server and a gateway for constructing a network resource pool and the like, virtualization platform software for performing resource virtualization management, and application platforms such as an operating system, a database platform, a GIS platform and network middleware and the like which are deployed on a virtualization platform.
According to the invention, the forest resource one-map progress updating system and the cloud platform are used for executing the forest resource one-map progress updating method, and the embodiment is as follows, as shown in FIG. 5:
1. dividing a forest resource one-graph work progress according to module functions of the county-level client application system. The execution result of each module function represents the completion condition of a workflow. For example, the engineering establishment and data import module completes the implementation of the technical unit on behalf of the county level unit, and the work enters the implementation stage. Completion of the archive database check represents that the county level unit starts the archive data collection and library construction work, and if the logical check of all records has no error, the completion of the work is indicated. The progress of the forest resource one-graph work is divided into 7 progresses including project establishment and data import, archive database inspection, administrative division database inspection, forest supervision database inspection, current state database inspection, change database inspection and result export, and the 7 progresses respectively correspond to execution results of 7 modules including a project establishment module, a data import module, an archive database logic inspection module, an administrative division database inspection module, a forest supervision database inspection module, a forest resource current state database inspection module, a forest resource change database inspection module and a result export module and respectively represent work start, archive data collection, administrative division establishment, forest supervision work completion, one-graph establishment, one-graph update completion and a result database formation work flow.
2. And establishing a provincial progress log database. And establishing a provincial progress log database by a provincial administrator, setting users and groups accessed by the users of the provincial progress log database, and setting the authority of each user and group. The provincial progress log database has a structure of (ID, county code, log item name, quality inspection result, inspection number, error number, log time, and delivery time).
The ID is a self-increment item generated by submitting the quality inspection log each time;
the county code is 6-digit digital code and is executed according to national unified administrative code;
the log item name represents a progress name updated according to a forest resource one-map, and the log item name is divided into 7 progresses including project establishment, data import, archive database inspection, administrative division database inspection, forest supervision database inspection, current database inspection, change database inspection and result export;
the quality inspection result is qualified or unqualified;
counting the number of the inspection patterns;
counting the number of error patterns;
the log time, the execution time of the log item;
3. and the county-level user executes the module function of the county-level client application system and accesses the local progress log database. And judging whether the access is successful, if not, establishing a progress log database locally by the county-level user, wherein the database structure is consistent with that of the provincial-level progress log database.
4. And recording the current module or function execution condition and the execution result to a local progress log database. When the execution function is project establishment, data import and result export, the quality inspection result is qualified, the error number is 0, the quality inspection results and the error number of other function executions are filled according to actual conditions, for example, the data of the Hoffo county of Sichuan province executes the forest supervision database inspection function to generate the 12 th log record, the code of the Hoffo county is 513327, the execution result is unqualified, the inspection number is 245, the error number is 13, the function execution time is 2021-05-2116:42:32, and then the log item is recorded in the local progress log database as (12,513327), the forest supervision space and attribute inspection function is unqualified, 245, 13, 2021-05-2116:42: 32).
5. The county level user accesses the provincial level progress log database. And judging whether the updating is successful, if not, prompting that the provincial progress log data cannot be accessed, and the progress information cannot be reported, suggesting to check the network or contact a provincial administrator, ending the process, and if so, updating the summary record of the local progress log database into the provincial progress log database.
6. And querying, summarizing and counting by provincial users and exporting the progress conditions of provinces, cities and counties. And when the provincial user inquires the progress of the county level unit, displaying the quality inspection log result in terms according to the name of the log item, and visually displaying the working progress conditions of the county level unit. When the working progress of the whole province and each city (state) is counted, whether all quality inspection log items of each county are qualified or not is judged, all the quality inspection log items are qualified, the county-level achievement is judged to be finished, one quality inspection log item is unqualified, and the achievement is judged to be not finished. And exporting the progress conditions of the documents such as xls, doc and the like according to the requirements.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, various modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

Claims (9)

1. A forest resource one-map progress updating system is characterized by comprising a county-level client application system and a provincial-level server application system, wherein the county-level client application system comprises:
the project creating and data importing module is used for importing local data by a county-level user, wherein the local data at least comprises a forest resource early-stage database, an administrative district database, a forest resource current situation database, a forest supervising database and a forest resource archive database, and establishing county-level forest resource annual update project files;
the system comprises an archive database logic inspection module, a data processing module and a data processing module, wherein the archive database logic inspection module is used for carrying out space and logic inspection on a forest resource archive database comprising construction project used forest lands, forest felling, forest management activities, disasters and forestry cases by a user;
the administrative division database checking module is used for carrying out space topology checking and attribute logic checking on the edited and imported administrative division database by a user, wherein the space topology checking comprises overlapping checking and gap checking, and the attribute logic checking comprises dictionary checking, filling and unfilled item checking and factor logic relationship checking;
the forest supervision database checking module is used for performing space topology checking and attribute logic checking on the edited and imported forest supervision database by a user, wherein the space topology checking comprises overlapping checking and multi-component checking, and the attribute logic checking comprises dictionary checking, filling and unfilled item checking and factor logic relationship checking;
the forest resource current situation database checking module is used for performing space topology checking and attribute logic checking on the finished forest resource current situation database by a user, wherein the space topology checking comprises overlapping, gap, open-air, multi-component, fine crushing, border crossing and forest class boundary crossing checking, and the attribute logic checking comprises dictionary domain checking, zoning factor checking, basic factor checking, management factor checking, forest ecological checking, terrain soil factor checking and forest stand factor checking;
the forest resource change database checking module is used for performing attribute logic checking on the forest resource change database by a user, and the attribute logic checking comprises forest supervision factor checking, change reason checking and abnormal change checking;
the result exporting module is used for exporting an administrative division database, a forest supervising database, a forest resource current situation database, a forest resource change database and a forest resource archive database in the local county-level forest resource annual updating project by a user;
the progress log background generation and reporting module is used for recording the function execution condition and the execution result of the current module to a local progress log database, accessing the provincial progress log database and updating the summary record of the local progress log database to the provincial progress log database after the operation execution engineering establishment and data import module, the archive database logic inspection module, the administrative division database inspection module, the forest supervision database inspection module, the forest resource current status database inspection module, the forest resource change database inspection module or the result export module;
the provincial server side application system comprises:
the provincial progress log database creating module is used for creating a provincial progress log database for provincial users and storing all log information in one map updating of county-level forest resources;
the provincial progress summarizing module is used for receiving a data summarizing request of a county-level user for the provincial-level user and automatically updating and summarizing the data summarizing request;
the provincial progress query and statistics module is used for displaying the progress of the provincial user for the county level units and carrying out statistics on the working progress condition;
and the provincial progress exporting module is used for exporting a forest resource map progress updating condition for a provincial user according to the requirement.
2. The forest resource one-map progress updating system according to claim 1, wherein when the provincial progress inquiry counting module inquires the progress of the county level unit, quality inspection log results are displayed item by item according to the name of a log item, the working progress conditions of the county level unit are visually displayed, and when the working progress in the province is counted, whether all quality inspection log items of each county are qualified or not is judged, all the quality inspection log items are qualified, the county level result is determined to be finished, one of the quality inspection log items is unqualified, and the county level result is determined to be not finished.
3. A forest resource one-map progress updating cloud platform is characterized in that the forest resource one-map progress updating system as claimed in claim 1 or 2 is deployed, and comprises:
a map progress management device of forest resources: a county-level client application system is loaded;
a map progress management application system of forest resources: carrying a provincial server application system;
a basic cloud platform: the system is used for providing calculation, storage, network communication and system operation capacity support for a county-level client application system and a provincial-level server application system.
4. The forest resource one-map progress updating cloud platform as claimed in claim 3, wherein the forest resource one-map progress management device comprises various PCs, notebooks, mobile workstations and tablet computers which are provided with county-level client application systems, provides progress recording and submitting functions for county-level client application system module functions, generates a work log after each module function is executed, records user quality inspection and progress conditions, and automatically collects the work log into a provincial-level progress log database.
5. The forest resource one-map progress updating cloud platform as claimed in claim 4, wherein the forest resource one-map progress management application system comprises a server, a workstation or a virtual machine which provides computing, storage and network capabilities for provincial service end application system operation, a forest resource one-map provincial progress log database establishing module, a provincial progress summarizing module, a provincial progress query statistics module and a provincial progress derivation module are provided for a user, wherein the server, the workstation or the virtual machine is provided with an application platform which comprises an operating system, a database platform, a GIS platform and network middleware and is necessary for supporting the provincial service end application system operation, and the platform capabilities of the virtual machine are provided by a basic cloud platform.
6. The forest resource one-map-progress updating cloud platform as claimed in claim 5, wherein the base cloud platform comprises an X86 computing server for constructing a computing resource pool, a storage server for constructing a storage resource pool, a network server and a gateway for constructing a network resource pool, virtualization platform software for performing resource virtualization management, and an application platform for deploying an operating system, a database platform, a GIS platform and network middleware on the virtualization platform.
7. A forest resource one-map progress updating method is implemented by the forest resource one-map progress updating system of claim 1 or 2, and specifically comprises the following steps:
(1) dividing a forest resource-chart work progress according to each module function of the county-level client application system, wherein each module function execution result represents the completion condition of a workflow;
(2) establishing a provincial progress log database;
(3) executing each module function of a county-level client application system by a county-level user, accessing a local progress log database, judging whether the access is successful, if not, establishing the progress log database locally by the county-level user, wherein the database structure is consistent with that of a provincial-level progress log database;
(4) recording the execution condition and execution result of the current module to a local progress log database, wherein when the execution function is project establishment, data import and result export, the quality inspection result is qualified, the error number is 0, the quality inspection result and the error number of other function execution are filled according to the actual condition,
(5) a county user accesses a provincial progress log database, judges whether updating is successful, if not, prompts that provincial progress log data cannot be accessed, progress information cannot be reported, proposes to check a network or contact a provincial administrator, ends a process, and if so, updates a local progress log database summary record into the provincial progress log database;
(6) provincial users inquire, summarize and count and derive provincial and municipal progress conditions: and when the provincial user inquires the progress of the county level unit, displaying the quality inspection log result in terms according to the name of the log item, and visually displaying the working progress conditions of the county level unit. When the working progress in the whole province is counted, whether all quality inspection log items of each county are qualified or not is judged, all the quality inspection log items are qualified, the county-level achievement is determined to be finished, one quality inspection log item is unqualified, and the achievement is determined to be not finished.
8. The method for updating a forest resource map progress as claimed in claim 7, wherein the progress of the forest resource map work in step (1) is divided into 7 progresses including project establishment and data import, archive database inspection, administrative division database inspection, forest supervision database inspection, current status database inspection, change database inspection and result export, and corresponds to the execution results of 7 modules, namely, project establishment and data import module, archive database logic inspection module, administrative division database inspection module, forest supervision database inspection module, forest resource current status database inspection module, forest resource change database inspection module and result export module, and the 7 progresses represent the start of work, archive data collection, administrative division establishment, supervision work completion, map establishment, forest resource change database inspection module and result export module respectively, And completing the updating of a graph and forming a work flow by a result database.
9. The forest resource one-map progress updating method as claimed in claim 8, wherein the provincial level progress log database structure comprises an ID, a county code, a log item name, a quality inspection result, a check number, an error number, log time and reporting time, wherein the ID is a self-increment item generated by submitting the quality inspection log each time; the county code is 6-digit code and is executed according to national unified administrative code; the log item name is a progress name updated according to a forest resource map; the quality inspection result is qualified or unqualified; the number of the inspection is the number of statistical inspection pattern spots; the error number is the number of statistical error pattern spots; the log time is the execution time of the log item.
CN202110919257.7A 2021-08-11 2021-08-11 Forest resource one-map progress updating system, cloud platform and method Active CN113626454B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN202110919257.7A CN113626454B (en) 2021-08-11 2021-08-11 Forest resource one-map progress updating system, cloud platform and method
PCT/CN2022/105860 WO2023016187A1 (en) 2021-08-11 2022-07-15 Update system for forest resource one-map progress, cloud platform, and method
JP2024508107A JP2024529104A (en) 2021-08-11 2022-07-15 Forest resource single map progress update system, cloud platform and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110919257.7A CN113626454B (en) 2021-08-11 2021-08-11 Forest resource one-map progress updating system, cloud platform and method

Publications (2)

Publication Number Publication Date
CN113626454A true CN113626454A (en) 2021-11-09
CN113626454B CN113626454B (en) 2022-04-08

Family

ID=78384564

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110919257.7A Active CN113626454B (en) 2021-08-11 2021-08-11 Forest resource one-map progress updating system, cloud platform and method

Country Status (3)

Country Link
JP (1) JP2024529104A (en)
CN (1) CN113626454B (en)
WO (1) WO2023016187A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023016187A1 (en) * 2021-08-11 2023-02-16 四川省林业和草原调查规划院(四川省林业和草原生态环境监测中心) Update system for forest resource one-map progress, cloud platform, and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050278386A1 (en) * 2004-06-15 2005-12-15 Geographic Data Technology, Inc. Geospatial information system and method for updating same
US20120166954A1 (en) * 2010-12-23 2012-06-28 Microsoft Corporation Techniques for electronic aggregation of information
CN110648120A (en) * 2019-09-29 2020-01-03 国家林业和草原局西北调查规划设计院 Online forest resource supervision method based on mobile internet
CN111445358A (en) * 2020-03-23 2020-07-24 四川中地云智慧科技有限公司 Territorial space planning one-picture implementation supervision information system
CN112988788A (en) * 2021-05-20 2021-06-18 四川省林业和草原调查规划院 Method for checking mutation of spatial data in territorial space planning, application system and cloud platform

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106547853B (en) * 2016-10-19 2020-04-28 北京航天泰坦科技股份有限公司 Forestry big data construction method based on one graph
CN113626454B (en) * 2021-08-11 2022-04-08 四川省林业和草原调查规划院 Forest resource one-map progress updating system, cloud platform and method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050278386A1 (en) * 2004-06-15 2005-12-15 Geographic Data Technology, Inc. Geospatial information system and method for updating same
US20120166954A1 (en) * 2010-12-23 2012-06-28 Microsoft Corporation Techniques for electronic aggregation of information
CN110648120A (en) * 2019-09-29 2020-01-03 国家林业和草原局西北调查规划设计院 Online forest resource supervision method based on mobile internet
CN111445358A (en) * 2020-03-23 2020-07-24 四川中地云智慧科技有限公司 Territorial space planning one-picture implementation supervision information system
CN112988788A (en) * 2021-05-20 2021-06-18 四川省林业和草原调查规划院 Method for checking mutation of spatial data in territorial space planning, application system and cloud platform

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
林宇: "福建省森林资源"一张图"年度更新系统设计与实现", 《林业资源管理》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023016187A1 (en) * 2021-08-11 2023-02-16 四川省林业和草原调查规划院(四川省林业和草原生态环境监测中心) Update system for forest resource one-map progress, cloud platform, and method

Also Published As

Publication number Publication date
JP2024529104A (en) 2024-08-01
WO2023016187A1 (en) 2023-02-16
CN113626454B (en) 2022-04-08

Similar Documents

Publication Publication Date Title
CN113641658B (en) Forest and grass comprehensive monitoring and evaluation pattern spot monitoring and updating method and system and cloud platform
CN107315776B (en) Data management system based on cloud computing
CN108255712B (en) Test system and test method of data system
CN104252506B (en) Synchronous structure business model and data warehouse model and its method and system of mapping
CN111866121B (en) Safety monitoring and management cloud platform for large crane equipment
CN112199433A (en) Data management system for city-level data middling station
US10430413B2 (en) Data information framework
CN114925045B (en) PaaS platform for big data integration and management
CN111897866B (en) Remote sensing monitoring image spot docking system and application method thereof
CN108681674B (en) Report module creating method and device, computer device and storage medium
CN111159180A (en) Data processing method and system based on data resource directory construction
CN107491558B (en) Metadata updating method and device
CN111383130A (en) Full life cycle management and control platform, mobile operation and maintenance client and terminal
CN114968984A (en) Digital twin full life cycle management platform
CN111143391A (en) Data sharing exchange method and system
CN110704924A (en) BIM preset model creation system and BIM preset model creation method
CN110990620A (en) Intelligent transformer substation drawing and document data management method based on intelligent technology application
CN114880405A (en) Data lake-based data processing method and system
CN113626454B (en) Forest resource one-map progress updating system, cloud platform and method
CN110825641B (en) Micro-service application test system based on simulation data generator
CN116961241B (en) Unified application monitoring platform based on power grid business
CN107423035B (en) Product data management system in software development process
CN114117597A (en) Bridge design management method and device
El Beggar et al. Towards an MDA-oriented UML profiles for data warehouses design and development
KR100796905B1 (en) System for Quality Control of DataBase

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20211116

Address after: 610081 No. 8, Xinghui West Road, Chengdu, Sichuan

Applicant after: Sichuan Forestry and grassland investigation and Planning Institute

Applicant after: Kunming Survey and Design Institute of State Forestry Administration

Applicant after: CHENGDU ACADEMY OF AGRICULTURE AND FORESTRY SCIENCES

Applicant after: Sichuan sample space time Technology Co.,Ltd.

Address before: 610081 No. 8, Xinghui West Road, Chengdu, Sichuan

Applicant before: Sichuan Forestry and grassland investigation and Planning Institute

Applicant before: SICHUAN FORESTRY EXPORATION AND DESIGN Research Institute

Applicant before: Kunming Survey and Design Institute of State Forestry Administration

Applicant before: CHENGDU ACADEMY OF AGRICULTURE AND FORESTRY SCIENCES

Applicant before: Sichuan sample space time Technology Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 610081 section 4, Renmin North Road, Sichuan, Chengdu

Patentee after: Sichuan Forestry and grassland investigation and Planning Institute (Sichuan Forestry and grassland ecological environment monitoring center)

Patentee after: Kunming Survey and Design Institute of State Forestry Administration

Patentee after: CHENGDU ACADEMY OF AGRICULTURE AND FORESTRY SCIENCES

Patentee after: Sichuan sample space time Technology Co.,Ltd.

Address before: Sichuan province Chengdu City Star Road 610081 No. 8

Patentee before: Sichuan Forestry and grassland investigation and Planning Institute

Patentee before: Kunming Survey and Design Institute of State Forestry Administration

Patentee before: CHENGDU ACADEMY OF AGRICULTURE AND FORESTRY SCIENCES

Patentee before: Sichuan sample space time Technology Co.,Ltd.