CN113605670B - Construction hanging basket with good stability and installation method thereof - Google Patents

Construction hanging basket with good stability and installation method thereof Download PDF

Info

Publication number
CN113605670B
CN113605670B CN202111062247.2A CN202111062247A CN113605670B CN 113605670 B CN113605670 B CN 113605670B CN 202111062247 A CN202111062247 A CN 202111062247A CN 113605670 B CN113605670 B CN 113605670B
Authority
CN
China
Prior art keywords
hanging basket
ring
locking
movable
integrally formed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111062247.2A
Other languages
Chinese (zh)
Other versions
CN113605670A (en
Inventor
周权炳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Chemical Urban Investment Co Ltd
Original Assignee
China National Chemical Urban Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Chemical Urban Investment Co Ltd filed Critical China National Chemical Urban Investment Co Ltd
Priority to CN202111062247.2A priority Critical patent/CN113605670B/en
Publication of CN113605670A publication Critical patent/CN113605670A/en
Application granted granted Critical
Publication of CN113605670B publication Critical patent/CN113605670B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • E04G3/325Safety devices for stabilising the mobile platform, e.g. to avoid it swinging in the wind

Abstract

The invention discloses a construction hanging basket with good stability, which comprises a hanging basket body, a limiting mechanism and a locking structure, wherein the hanging basket body is provided with a hanging basket body; the hanging basket comprises a hanging basket body and is characterized in that support frames are symmetrically welded at two ends of the hanging basket body, a movable rotating shaft is movably arranged on each support frame, and rollers are integrally formed in the middle of the movable rotating shaft; according to the construction hanging basket designed by the invention, the rope for hanging the hanging basket is well limited by the support frame, the limiting mechanism and the locking structure, so that the phenomenon that the hanging basket shakes because the rope drives the hanging basket to lift is avoided, the hanging basket has excellent stability in the lifting process is ensured, the safety of high-altitude construction is improved by the installation method of the construction hanging basket with good stability, the construction requirement is met, and the construction working efficiency is improved.

Description

Construction hanging basket with good stability and installation method thereof
Technical Field
The invention relates to the technical field of building construction equipment, in particular to a building hanging basket with good stability and an installation method thereof.
Background
The hanging flower basket is one kind and can replaces traditional scaffold frame, can alleviate intensity of labour, improve work efficiency, and novel aerial work equipment that can used repeatedly, the use of construction hanging flower basket has become a trend gradually, obtain extensive approval in high-altitude operations such as the outer wall construction of high-rise multilayer high building, the curtain installation, the construction of keeping warm and maintenance washing outer wall, can be used to the operation of the engineering such as the large-scale jar body, bridge and dam simultaneously, the hanging flower basket can avoid taking the scaffold frame, the hanging flower basket flexible operation, it is easy to shift, convenient and practical, safety and reliability.
In order to satisfy the construction demand, need often rise and descend work to the construction hanging flower basket under the prior art, lifting control to the hanging flower basket realizes through the lifting machine that sets up and the rope of connection on the hanging flower basket, the rope overlaps on the gyro wheel, carry out the lift work to the hanging flower basket through the control to the rope, but when carrying out the lift work, there is the gap production between rope and the gyro wheel, and then when carrying out the lift work, do not have fine spacing work to the rope, the stationarity that leads to the hanging flower basket is lower, can bring certain potential safety hazard, can not satisfy the construction demand.
Therefore, the invention provides a construction hanging basket with good stability and an installation method thereof, which are used for solving the problems.
Disclosure of Invention
The invention aims to provide a construction hanging basket with good stability and an installation method thereof, and aims to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: a construction hanging basket with good stability comprises a hanging basket body, a limiting mechanism and a locking structure;
the hanging basket comprises a hanging basket body and is characterized in that support frames are symmetrically welded at two ends of the hanging basket body, a movable rotating shaft is movably arranged on each support frame, and rollers are integrally formed in the middle of the movable rotating shaft;
the supporting frame is characterized in that supporting pipes are symmetrically welded on two sides of the supporting frame in an integrated forming mode, a limiting mechanism and a locking structure are connected to the supporting pipes, the locking structure is arranged on the side of the limiting mechanism, and the limiting mechanism is locked and fixed through the locking structure.
Preferably, the outer side wall of the roller is provided with an annular placing groove.
Preferably, stop gear includes solid fixed ring, activity post, first spacing ring, auxiliary ring, second spacing ring, ball, arc extrusion chute, the activity lantern ring, handle, gu fixed ring integrated into one piece sets up on the stay tube to the symmetry activity is provided with the activity post in the fixed ring, the both sides integrated into one piece symmetry of activity post is provided with first lug, and integrated into one piece is provided with first reset spring on the first lug, and the first reset spring other end sets up in the fixed ring, and the one end integrated into one piece setting of activity post is on first spacing ring, and the other end activity sets up in arc extrusion chute, the activity is provided with the second spacing ring in the first spacing ring, and one side integrated into one piece of second spacing ring is provided with the auxiliary ring to the second spacing ring passes through the ball activity and sets up in first spacing ring, and the equidistance sets up in first spacing ring, arc extrusion chute sets up in the activity lantern ring, the activity lantern ring activity cup joints and sets up on the stay tube to the welding of stay tube lateral wall is provided with the handle.
Preferably, the end part of one end of the movable column movably arranged in the arc extrusion chute is an arc curved surface.
Preferably, locking structure includes fixed block, T type activity fixture block, circular slot, locking screw, locking draw-in groove, fixed block integrated into one piece sets up on the stay tube to the setting is in the avris position of the movable lantern ring, and the activity is provided with T type activity fixture block in the fixed block, one side integrated into one piece of T type activity fixture block is provided with the second lug, and integrated into one piece is provided with second reset spring on the second lug, and the second reset spring other end sets up in the fixed block, and one side of T type activity fixture block is provided with circular slot, be provided with the screw hole in the avris position of T type activity fixture block in the fixed block, threaded connection is provided with locking screw in the screw hole, locking draw-in groove equidistance arc sets up one side at the movable lantern ring.
Preferably, the locking clamping groove corresponds to the T-shaped movable clamping block in position and is in adaptive clamping connection with the T-shaped movable clamping block, namely the cross section of the notch of the locking clamping groove is the same as that of the end part of the T-shaped movable clamping block, namely the cross sections of the locking clamping groove and the T-shaped movable clamping block are equal in length and width.
Preferably, the locking screws and the circular clamping grooves are arranged at corresponding positions and are arranged in the same number, and the diameters of the locking screws and the circular clamping grooves are equal.
A method for installing a construction hanging basket with good stability comprises the following steps:
s1; in the construction process of the hanging basket designed by the invention, firstly, the rope passes through the support frame and is sleeved on the roller, and then the rope is limited by adjusting the limiting mechanism, so that the rope is prevented from being shifted when the hanging basket is driven to lift, the phenomenon that the hanging basket shakes is avoided, and the running stability of the hanging basket is ensured;
s2: after the rope is subjected to limiting work, the limiting mechanism is locked through the locking structure, and the stability of the rope limiting work is improved, so that the stability of the hanging basket is further improved, and the use safety is improved.
Compared with the prior art, the invention has the beneficial effects that:
according to the construction hanging basket designed by the invention, through the support frame, the limiting mechanism and the locking structure, the rope for hanging the hanging basket is well limited, so that the phenomenon that the hanging basket shakes because the rope drives the hanging basket to lift is avoided, the hanging basket has excellent stability in the lifting process, the safety of high-altitude construction is improved, the construction requirement is met, and the construction work efficiency is improved.
Drawings
FIG. 1 is a schematic view of the structural connection of the hanging basket of the present invention;
FIG. 2 is an enlarged partial view of the structural connection of FIG. 1 according to the present invention;
FIG. 3 is a schematic view of the structural connection of the limiting mechanism of the present invention;
FIG. 4 is an enlarged partial view of the structural joint of FIG. 3 according to the present invention;
FIG. 5 is a left side view of the present invention showing the connection between the fixed ring and the movable collar;
FIG. 6 is a right side view of the structure of the fixed ring and the movable collar of the present invention;
fig. 7 is a partially enlarged view of the structural connection of fig. 6 according to the present invention.
In the figure: the hanging basket comprises a hanging basket body 1, a support frame 2, a movable rotating shaft 3, a roller 4, a support pipe 5, a limiting mechanism 6, a fixing ring 601, a movable column 602, a first limiting ring 603, an auxiliary ring 604, a second limiting ring 605, a ball 606, an arc-shaped extrusion chute 607, a movable lantern ring 608, a handle 609, a locking structure 7, a fixing block 701, a T-shaped movable clamping block 702, a circular clamping groove 703, a locking screw 704 and a locking clamping groove 705.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below. The embodiments of the present invention, and all other embodiments obtained by a person of ordinary skill in the art without any inventive work, belong to the scope of protection of the present invention.
Referring to fig. 1 to 7, the present invention provides a technical solution: the invention relates to a construction hanging basket with good stability, which comprises a hanging basket body 1, a limiting mechanism 6 and a locking structure 7;
the hanging basket comprises a hanging basket body 1, wherein two ends of the hanging basket body 1 are symmetrically welded with supporting frames 2, movable rotating shafts 3 are movably arranged on the supporting frames 2, idler wheels 4 are integrally formed in the middle of the movable rotating shafts 3, and annular placing grooves are formed in the outer side walls of the idler wheels 4;
the support frame 2 is provided with support pipes 5 in an integrally formed and symmetrical mode on two sides, the support pipes 5 are provided with limiting mechanisms 6 and locking structures 7 in a connected mode, the locking structures 7 are arranged on the side positions of the limiting mechanisms 6, and the limiting mechanisms 6 are locked and fixed through the locking structures 7.
The limiting mechanism 6 herein comprises a fixing ring 601, a movable column 602, a first limiting ring 603, an auxiliary ring 604, a second limiting ring 605, a ball 606, an arc extrusion chute 607, a movable collar 608, and a handle 609, wherein the fixing ring 601 is integrally formed on the support tube 5, the fixing ring 601 is symmetrically and movably provided with the movable column 602, two sides of the movable column 602 are integrally formed and symmetrically provided with a first bump, the first bump is integrally formed and provided with a first return spring, the other end of the first return spring is arranged in the fixing ring 601, one end of the movable column 602 is integrally formed and provided on the first limiting ring 603, the other end is movably provided in the arc extrusion chute 607, the end of one end of the movable column 602 movably provided in the arc extrusion chute 607 is provided with an arc curved surface, the first limiting ring 603 is movably provided with the second limiting ring 605, one side of the second limiting ring 605 is integrally formed and provided with the auxiliary ring 604, the second limiting ring 605 is movably provided in the first limiting ring by the ball 606, the ball 606 is equidistantly provided in the first limiting ring 603, the arc extrusion chute 607 is equidistantly provided in the movable collar 609, the movable collar is sleeved on the support tube 5, and the outer side wall of the support tube 609 is welded.
The locking structure 7 here includes a fixed block 701, a T-shaped movable fixture block 702, a circular slot 703, a locking screw 704, and a locking slot 705, the fixed block 701 is integrally formed on the support tube 5 and is disposed at an edge side position of the movable collar 608, the fixed block 701 is movably provided with the T-shaped movable fixture block 702, one side of the T-shaped movable fixture block 702 is integrally formed with a second protrusion, a second return spring is integrally formed on the second protrusion, the other end of the second return spring is disposed in the fixed block 701, one side of the T-shaped movable fixture block 702 is provided with the circular slot 703, the fixed block 701 is provided with a threaded hole at the edge side position of the T-shaped movable fixture block 702, the threaded hole is threadedly connected with the locking screw 704, the locking screw 704 and the circular slot 703 are disposed at the same positions and the same numbers, and diameters of the two are equal, the locking screw 705 is arcuately disposed at one side of the movable collar 608, the locking slot 705 and the T-shaped movable fixture block 702 are disposed at the same positions and are adapted to each other, that a cross section shape of the locking slot 705 is the T-shaped movable fixture block 702 is the same as a cross section shape of the T-shaped movable fixture block 702, that is equal to the cross section of the locking slot 705.
The actual operation process comprises the following steps:
in the construction process of the hanging basket designed by the invention, firstly, the rope passes through the support frame 2 and is sleeved on the roller 4, then the rope is limited by adjusting the limiting mechanism 6, the purpose is to prevent the rope from deviating when the hanging basket is driven to lift, further to avoid the phenomenon that the hanging basket shakes, and to ensure the running stability of the hanging basket, the specific operation of the process is that after the rope is sleeved on the roller 4, the handle 609 is rotated, the handle 609 drives the movable lantern ring 608 to rotate, further, the arc extrusion chute 607 in the movable lantern ring 608 extrudes the movable column 602, the movable column 602 pushes the first limiting ring 603 to approach the position of the rope until the second limiting ring 605 arranged in the first limiting ring 603 is contacted with the side of the rope, after the rope is limited, the limiting mechanism 6 is locked by the locking structure 7, the process is specifically implemented by directly pressing the T-shaped movable fixture block 702, the other end of the T-shaped movable fixture block 702 is clamped into the locking clamping groove 705 at the corresponding position of the movable lantern ring 608, then the locking screw 704 is screwed, one end of the locking screw 704 is clamped into the circular clamping groove 703 on the T-shaped movable fixture block 702, the position of the T-shaped movable fixture block 702 is locked, the position of the movable lantern ring 608 is locked, the limiting mechanism 6 and the locking structure 7 at two sides of the rope are subjected to the same operation, when the rope drives the hanging basket to lift, the arranged auxiliary ring 604 rotates along with the sliding of the rope, further friction damage to the rope is avoided, the use safety of the hanging basket is guaranteed, the stability of the rope limiting work is improved, the stability of the rope is further improved, and the use safety is improved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (2)

1. The utility model provides a construction hanging basket that stationarity is good which characterized in that: comprises a hanging basket main body (1), a limiting mechanism (6) and a locking structure (7);
two ends of the hanging basket main body (1) are symmetrically welded with support frames (2), a movable rotating shaft (3) is movably arranged on the support frames (2), and rollers (4) are integrally formed in the middle of the movable rotating shaft (3);
the supporting tubes (5) are symmetrically welded on two sides of the supporting frame (2) in an integrally-formed mode, the supporting tubes (5) are connected and provided with limiting mechanisms (6) and locking structures (7), the locking structures (7) are arranged on the side positions of the limiting mechanisms (6), and the limiting mechanisms (6) are locked and fixed through the locking structures (7);
the limiting mechanism (6) comprises a fixing ring (601), a movable column (602), a first limiting ring (603), an auxiliary ring (604), a second limiting ring (605), balls (606), an arc extrusion chute (607), a movable sleeve ring (608) and a handle (609), wherein the fixing ring (601) is integrally formed on a support tube (5), the movable column (602) is symmetrically and movably arranged in the fixing ring (601), first convex blocks are symmetrically and integrally formed on two sides of the movable column (602) and are provided with first convex blocks, a first return spring is integrally formed on the first convex blocks, the other end of the first return spring is arranged in the fixing ring (601), one end of the movable column (602) is integrally formed on the first limiting ring (603), the other end of the movable column is movably arranged in the arc extrusion chute (607), the second limiting ring (605) is movably arranged in the first limiting ring (603), the auxiliary ring (604) is integrally formed on one side of the second limiting ring (605), the second limiting ring (605) is movably arranged in the first limiting ring (603) through the balls (606), the movable sleeve ring (608) is arranged in the first limiting ring (603), and the movable sleeve ring (608) is equidistantly arranged in the support tube (607), a handle (609) is welded on the outer side wall of the supporting tube (5);
the end part of one end of the movable column (602) movably arranged in the arc extrusion chute (607) is set to be an arc curved surface;
the locking structure (7) comprises a fixing block (701), a T-shaped movable clamping block (702), a circular clamping groove (703), a locking screw (704) and a locking clamping groove (705), wherein the fixing block (701) is integrally formed on the support tube (5) and is arranged at the side position of the movable sleeve ring (608), the T-shaped movable clamping block (702) is movably arranged in the fixing block (701), a second protruding block is integrally formed on one side of the T-shaped movable clamping block (702), a second restoring spring is integrally formed on the second protruding block, the other end of the second restoring spring is arranged in the fixing block (701), the circular clamping groove (703) is arranged on one side of the T-shaped movable clamping block (702), a threaded hole is formed in the side position of the T-shaped movable clamping block (702) in the fixing block (701), the locking screw (704) is connected in the threaded hole in a threaded manner, and the locking clamping groove (705) is equidistantly and arcuately arranged on one side of the movable sleeve ring (608);
the locking clamping groove (705) corresponds to the T-shaped movable clamping block (702) in arrangement position and is clamped in a matched manner, namely the cross section of the groove opening of the locking clamping groove (705) is the same as that of the end part of the T-shaped movable clamping block (702), namely the cross sections of the locking clamping groove and the T-shaped movable clamping block are equal in length and width;
the locking screws (704) correspond to the round clamping grooves (703) in arrangement positions and are arranged in the same number, and the diameters of the locking screws and the round clamping grooves are equal.
2. A construction basket with good smoothness as claimed in claim 1, wherein: the outer side wall of the roller (4) is provided with an annular placing groove.
CN202111062247.2A 2021-09-10 2021-09-10 Construction hanging basket with good stability and installation method thereof Active CN113605670B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111062247.2A CN113605670B (en) 2021-09-10 2021-09-10 Construction hanging basket with good stability and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111062247.2A CN113605670B (en) 2021-09-10 2021-09-10 Construction hanging basket with good stability and installation method thereof

Publications (2)

Publication Number Publication Date
CN113605670A CN113605670A (en) 2021-11-05
CN113605670B true CN113605670B (en) 2023-01-17

Family

ID=78310328

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111062247.2A Active CN113605670B (en) 2021-09-10 2021-09-10 Construction hanging basket with good stability and installation method thereof

Country Status (1)

Country Link
CN (1) CN113605670B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114215235B (en) * 2021-12-06 2023-07-07 中建八局第二建设有限公司 Super high-rise inclined double-layer special-shaped curtain wall construction device and method
CN114622448B (en) * 2022-05-16 2022-08-09 中铁上海工程局集团第三工程有限公司 High-stability adjustable railway track positioning accessory and operation method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204185074U (en) * 2014-10-20 2015-03-04 朱淑英 A kind of building engineering safety hanging cradle
CN211324678U (en) * 2019-10-18 2020-08-25 中铁八局集团昆明铁路建设有限公司 Curtain wall maintenance equipment for high-speed rail station
CN112482739A (en) * 2020-12-08 2021-03-12 邵立飞 Hanging basket for construction based on stable lifting clamping fixation
CN112523488A (en) * 2020-12-08 2021-03-19 陈晓艳 Construction hanging basket with parking safety device for electric-based construction

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9963889B2 (en) * 2013-12-17 2018-05-08 Shenzhen Techen Technology Co., Ltd Sealed and integrated climbing scaffold and method for using the same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204185074U (en) * 2014-10-20 2015-03-04 朱淑英 A kind of building engineering safety hanging cradle
CN211324678U (en) * 2019-10-18 2020-08-25 中铁八局集团昆明铁路建设有限公司 Curtain wall maintenance equipment for high-speed rail station
CN112482739A (en) * 2020-12-08 2021-03-12 邵立飞 Hanging basket for construction based on stable lifting clamping fixation
CN112523488A (en) * 2020-12-08 2021-03-19 陈晓艳 Construction hanging basket with parking safety device for electric-based construction

Also Published As

Publication number Publication date
CN113605670A (en) 2021-11-05

Similar Documents

Publication Publication Date Title
CN113605670B (en) Construction hanging basket with good stability and installation method thereof
CN110370193B (en) Clamping structure for steel pipe machining
CN214921980U (en) Steel pipe welding fixture for steel structure building
CN208575434U (en) One kind can be used for boiler tube wall welding climbing robot
CN208122264U (en) A kind of external wall finishing hanging basket
CN111992473B (en) Fluorocarbon curtain wall decorative material aluminum plate surface spraying process
CN203484446U (en) Worm gear screw rod lifting structure
CN215845722U (en) Steam turbine baffle location turning frock
CN111922615B (en) Material roller surface welding processing system
CN212072471U (en) Stone building material processing equipment convenient to adjust stone material shape
CN210239082U (en) Temporary hydropower integrated bracket for construction site
CN210192521U (en) Automatic conveyor of wallboard for building with it is multi-functional
CN215009322U (en) Threading device is used in building engineering construction
CN211173102U (en) Large-diameter steel sleeve reinforcing device
CN210032543U (en) Scaffold for building external wall construction
CN108797567B (en) Large-diameter reinforcement cage framework forming machine and method
CN214866358U (en) Stainless steel pipe fitting bending equipment
CN214220552U (en) Hanging basket for constructional engineering
CN214246557U (en) Hanging flower basket device is used in construction of roof steel construction platform glass curtain wall
CN208968063U (en) The split type wall-hanging solar water heater of plate
CN217232268U (en) Novel outer wall screw hole blocking device
CN211572222U (en) Ceiling panel installation is with aligning levelling device
CN217998894U (en) Hand pressing prevention safety device for hanging basket installation
CN218556813U (en) Piston rod positioning tool for repairing aircraft actuator cylinder
CN217000164U (en) Movable steel construction for building engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20221230

Address after: 710000 Room 211, No. 800, Xitai Road, Hi tech Zone, Xi'an, Shaanxi

Applicant after: Sinochem City Investment Co.,Ltd.

Address before: 314500 92 Wutong Street revitalization West Road, Tongxiang, Jiaxing, Zhejiang

Applicant before: Zhou Quanbing

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant