CN214246557U - Hanging flower basket device is used in construction of roof steel construction platform glass curtain wall - Google Patents
Hanging flower basket device is used in construction of roof steel construction platform glass curtain wall Download PDFInfo
- Publication number
- CN214246557U CN214246557U CN202023246270.0U CN202023246270U CN214246557U CN 214246557 U CN214246557 U CN 214246557U CN 202023246270 U CN202023246270 U CN 202023246270U CN 214246557 U CN214246557 U CN 214246557U
- Authority
- CN
- China
- Prior art keywords
- curtain wall
- glass curtain
- column
- construction
- basket device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000011521 glass Substances 0.000 title claims abstract description 38
- 238000010276 construction Methods 0.000 title claims abstract description 35
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 19
- 239000010959 steel Substances 0.000 title claims abstract description 19
- 238000000034 method Methods 0.000 description 4
- 230000009471 action Effects 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 2
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model discloses a hanging basket device for roof steel structure platform glass curtain wall construction, which comprises a hanging basket piece and a base, wherein the hanging basket piece is arranged at the top end of the base, a connecting column is connected with a rotating body, one end of a support column is connected with one side of a connecting ring, the other end is movably connected between two groups of side columns, the rotating body drives the support column to move, the side columns slide along a limiting groove, the connecting column rotates, when the connecting column is level with the construction ground, a threaded column is rotated to fix the column body, the hanging basket device is convenient to use, otherwise, the device is convenient to pack up and convenient to use, one end of a connecting spring is connected with the side end of a touch panel, the other end is connected with the side end of a side plate, one side of the touch panel is provided with a rubber layer, when the hanging basket device is in contact with the glass curtain wall, the connecting spring contracts to absorb the impact force between the hanging basket device and the glass curtain wall, and the rubber layer is soft, can produce deformation, avoid hanging flower basket ware and glass curtain wall direct contact, cause glass curtain wall damaged.
Description
Technical Field
The utility model relates to a hanging flower basket technical field specifically is a hanging flower basket device is used in construction of roof steel construction platform glass curtain wall.
Background
The hanging basket is a construction machine for high-altitude operation in construction engineering, and is used for curtain wall installation and outer wall cleaning. The hanging basket is a novel high-altitude operation device which can replace a traditional scaffold, reduce labor intensity, improve working efficiency and be repeatedly used. The hanging basket is frequently used in high-rise operations such as outer wall construction, curtain wall installation, heat insulation construction, outer wall maintenance and cleaning of high-rise multi-storey buildings.
When the existing hanging basket device is used, the rubber layer is not arranged at the side end of the hanging basket device, so that the hanging basket device is easy to collide with a glass curtain wall when descending, the glass curtain wall is damaged, and the hanging basket device is inconvenient to use.
To the problem, the utility model provides a hanging flower basket device is used in construction of roof steel construction platform glass curtain wall.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a hanging flower basket device is used in construction of roof steel construction platform glass curtain wall, possessed the dismouting of being convenient for and used, protection glass curtain wall's advantage to the problem among the background has been solved.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a hanging flower basket device is used in construction of roof steel construction platform glass curtain wall, includes hanging flower basket spare and base, hanging flower basket spare sets up the top at the base, hanging flower basket spare is including side piece, fore-set, rotary column, a controller, the spliced pole, hanging flower basket ware and connection rope, the side piece is equipped with two sets ofly, and be equipped with fore-set and rotary column between two sets of side pieces, the fore-set sets up the upper end at the rotary column, the side of a set of side piece is equipped with the controller, the controller is connected with the rotary column, the spliced pole all is equipped with two sets ofly with the connection rope, two sets of spliced poles set up same one side at the fore-set, two sets of spliced poles one side bottoms are equipped with two sets of connection ropes respectively, two sets of connection ropes are connected in hanging flower basket ware top both sides.
Preferably, the side block comprises a block body, a threaded column and a movable sleeve, the threaded column is arranged on one side of the block body, and the movable sleeve is arranged inside the block body.
Preferably, the fore-set includes that cylinder, side connect ring and screw hole, and the side connects ring and screw hole all to be equipped with two sets ofly, and side connects ring one side to be equipped with the screw hole, and the side connects the ring setting at the surface of cylinder, and the screw hole runs through the cylinder both sides.
Preferably, the rotary column comprises two groups of rotary bodies, connecting rings and side sleeves, the connecting rings are arranged on the outer surfaces of the rotary bodies, the side sleeves are arranged at one ends of the rotary bodies, and one ends of the rotary bodies penetrate through the side ends of the side blocks.
Preferably, the outer surface of the connecting ring is provided with a support column.
Preferably, the controller includes the pillar and changes handle, and the side of side piece is run through to pillar one end, and the pillar other end is equipped with changes handle.
Preferably, the connecting column comprises a sliding groove, a limiting groove and side columns, the sliding groove is formed in the bottom end of the connecting column, the limiting groove is formed in each of two sides of the sliding groove, and the side columns are arranged in the limiting grooves.
Preferably, the hanging basket device comprises a side frame plate, a side plate, a connecting spring, a touch plate and a rubber layer, wherein the side plate is arranged on one side of the side frame plate, the connecting spring is provided with a plurality of groups, the touch plate is connected with the side plate through the connecting spring, and the rubber layer is arranged on one side of the touch plate.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model provides a hanging flower basket device is used in construction of roof steel construction platform glass curtain wall, the pillar with turn and be connected, support one end and connect in one side of go-between, other end swing joint is between two sets of side posts, rotate and change the handle, turn and drive and support the post and remove, the side post slides along the spacing groove, the spliced pole rotates, when spliced pole and construction ground parallel and level, the screw thread post rotates, the screw thread post is fixed with the cylinder, make things convenient for the use of hanging flower basket ware, otherwise, conveniently pack up equipment, convenient to use.
2. The utility model provides a hanging flower basket device is used in construction of roof steel construction platform glass curtain wall, the side of touch panel is connected to coupling spring one end, and the side of curb plate is connected to the other end, and touch panel one side is equipped with the rubber layer, and when hanging flower basket ware and glass curtain wall contacted, coupling spring shrunk, absorbed the impact force between hanging flower basket ware and the glass curtain wall, and the rubber matter is soft, can produce deformation, avoids hanging flower basket ware and glass curtain wall direct contact, causes the glass curtain wall damaged.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic structural view of a hanging basket of the present invention;
FIG. 3 is a schematic view of the structure of the connection column of the present invention;
fig. 4 is a schematic structural view of the basket device of the present invention.
In the figure: 1. a basket piece; 11. a side block; 111. a block body; 112. a threaded post; 113. a movable sleeve; 12. a top pillar; 121. a cylinder; 122. a side connecting ring; 123. a threaded hole; 13. turning the column; 131. a swivel; 132. a connecting ring; 1321. supporting columns; 133. a side connecting sleeve; 14. a controller; 141. connecting columns; 142. turning a handle; 15. connecting columns; 151. a chute; 152. a limiting groove; 153. a side post; 16. a basket hanging device; 161. a side frame plate; 162. a side plate; 163. a connecting spring; 164. a touch panel; 165. a rubber layer; 17. connecting ropes; 2. a base.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Please refer to fig. 1, a hanging basket device for construction of a roof steel structure platform glass curtain wall, comprising a hanging basket part 1 and a base 2, wherein the hanging basket part 1 is arranged on the top end of the base 2, the hanging basket part 1 comprises side blocks 11, a top column 12, a rotary column 13, a controller 14, connecting columns 15, a hanging basket device 16 and connecting ropes 17, the side blocks 11 are provided with two groups, the top column 12 and the rotary column 13 are arranged between the two groups of side blocks 11, the top column 12 is arranged on the upper end of the rotary column 13, the controller 14 is arranged on the side end of one group of side blocks 11, the controller 14 is connected with the rotary column 13, the connecting columns 15 and the connecting ropes 17 are respectively provided with two groups, the two groups of connecting columns 15 are arranged on the same side of the top column 12, the bottom ends of one side of the two groups of connecting columns 15 are respectively provided with the two groups of connecting ropes 17, and the two groups of connecting ropes 17 are connected on the two sides of the top end of the hanging basket device 16.
Referring to fig. 1 and 2, the side block 11 includes a block 111, a threaded post 112 and a movable sleeve 113, the threaded post 112 is disposed on one side of the block 111, the movable sleeve 113 is disposed inside the block 111, the top post 12 includes a cylinder 121, two sets of side connection rings 122 and two sets of threaded holes 123, the side connection rings 122 and the two sets of threaded holes 123 are disposed on one side of the side connection rings 122, the side connection rings 122 are disposed on the outer surface of the cylinder 121, the threaded holes 123 penetrate through two sides of the cylinder 121, the rotation post 13 includes a rotation body 131, a connection ring 132 and two sets of side connection sleeves 133, the connection ring 132 is disposed on the outer surface of the rotation body 131, one end of the rotation body 131 is disposed with the side connection sleeve 133, one end of the rotation body 131 penetrates through the side end of the side block 11, the outer surface of the connection ring 132 is disposed with a support post 1321, the controller 14 includes a connection post 141 and a rotation handle 142, one end of the connection post 141 penetrates through the side end of the side block 11, and the other end of the connection post 141 is disposed with a rotation handle 142.
Referring to fig. 3, the connection column 15 includes a sliding groove 151, a limiting groove 152 and side columns 153, the sliding groove 151 is disposed inside the bottom end of the connection column 15, the limiting grooves 152 are disposed on both sides of the sliding groove 151, the side columns 153 are disposed inside the limiting groove 152, the connection column 141 is connected with the rotation body 131, one end of the support column 1321 is connected to one side of the connection ring 132, the other end of the support column 1321 is movably connected between the two sets of side columns 153, the rotation handle 142 is rotated, the rotation body 131 drives the support column 1321 to move, the side columns 153 slide along the limiting groove 152, the connection column 15 rotates, when the connection column 15 is parallel and level with the construction ground, the threaded column 112 is rotated, the threaded column 112 fixes the column 121, and the hanging basket 16 is convenient to use, otherwise, the equipment is convenient to pack up and is convenient to use.
Referring to fig. 4, the basket device 16 includes a side frame plate 161, a side plate 162, a plurality of sets of connecting springs 163, a contact plate 164 and a rubber layer 165, the side plate 162 is disposed on one side of the side frame plate 161, the connecting springs 163 are disposed in a plurality of sets, the contact plate 164 is connected with the side plate 162 through the connecting springs 163, the rubber layer 165 is disposed on one side of the contact plate 164, one end of each connecting spring 163 is connected with the side end of the contact plate 164, the other end of each connecting spring is connected with the side end of the side plate 162, the rubber layer 165 is disposed on one side of the contact plate 164, when the basket device 16 is in contact with the glass curtain wall, the connecting springs 163 contract to absorb impact force between the basket device 16 and the glass curtain wall, and the rubber layer 165 is soft and can deform to prevent the basket device 16 from being in direct contact with the glass curtain wall to damage the glass curtain wall.
In summary, the following steps: the utility model provides a hanging flower basket device for roof steel structure platform glass curtain wall construction, the pillar 141 is connected with the rotation body 131, pillar 1321 one end is connected in one side of go-between 132, the other end swing joint is between two sets of side posts 153, rotate and change 142, the rotation body 131 drives pillar 1321 and removes, the side post 153 slides along spacing groove 152, spliced pole 15 rotates, when spliced pole 15 is level with the construction ground, rotate screw thread post 112, screw thread post 112 fixes cylinder 121, make things convenient for the use of hanging flower basket ware 16, otherwise, conveniently pack up equipment, convenient to use, connecting spring 163 one end is connected with the side of touch panel 164, the other end is connected with the side of curb plate 162, touch panel 164 one side is equipped with rubber layer 165, when hanging flower basket ware 16 contacts with glass curtain wall, connecting spring 163 contracts, absorb the impact force between hanging flower basket ware 16 and the glass curtain wall, rubber layer 165 is soft, can generate deformation, and avoid the direct contact of the hanging basket device 16 and the glass curtain wall to cause the damage of the glass curtain wall.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (8)
1. The utility model provides a roof steel structure platform glass curtain wall construction is with hanging flower basket device, includes hanging flower basket spare (1) and base (2), and hanging flower basket spare (1) sets up the top at base (2), its characterized in that: hanging flower basket spare (1) is including side piece (11), fore-set (12), rotary column (13), controller (14), spliced pole (15), hanging flower basket ware (16) and connection rope (17), side piece (11) are equipped with two sets ofly, and be equipped with fore-set (12) and rotary column (13) between two sets of side piece (11), fore-set (12) set up the upper end at rotary column (13), the side of a set of side piece (11) is equipped with controller (14), controller (14) are connected with rotary column (13), spliced pole (15) all are equipped with two sets ofly with connection rope (17), two sets of spliced pole (15) set up in the same one side of fore-set (12), two sets of spliced pole (15) one side bottom is equipped with two sets of connection rope (17) respectively, two sets of connection ropes (17) are connected in hanging flower basket ware (16) top both sides.
2. The hanging basket device for construction of the glass curtain wall of the roof steel structure platform as claimed in claim 1, wherein: the side block (11) comprises a block body (111), a threaded column (112) and a movable sleeve (113), wherein the threaded column (112) is arranged on one side of the block body (111), and the movable sleeve (113) is arranged inside the block body (111).
3. The hanging basket device for construction of the glass curtain wall of the roof steel structure platform as claimed in claim 1, wherein: the support pillar (12) comprises a pillar body (121), side connection rings (122) and threaded holes (123), the side connection rings (122) and the threaded holes (123) are respectively provided with two groups, the threaded holes (123) are formed in one side of each side connection ring (122), the side connection rings (122) are arranged on the outer surface of the pillar body (121), and the threaded holes (123) penetrate through two sides of the pillar body (121).
4. The hanging basket device for construction of the glass curtain wall of the roof steel structure platform as claimed in claim 1, wherein: the rotary column (13) comprises a rotary body (131), connecting rings (132) and side sleeves (133), the connecting rings (132) are arranged in two groups, the connecting rings (132) are arranged on the outer surface of the rotary body (131), one end of the rotary body (131) is provided with the side sleeve (133), and one end of the rotary body (131) penetrates through the side end of the side block (11).
5. The hanging basket device for construction of the glass curtain wall of the roof steel structure platform as claimed in claim 4, wherein: the outer surface of the connecting ring (132) is provided with a support column (1321).
6. The hanging basket device for construction of the glass curtain wall of the roof steel structure platform as claimed in claim 1, wherein: the controller (14) comprises a connecting column (141) and a rotating handle (142), one end of the connecting column (141) penetrates through the side end of the side block (11), and the rotating handle (142) is arranged at the other end of the connecting column (141).
7. The hanging basket device for construction of the glass curtain wall of the roof steel structure platform as claimed in claim 1, wherein: the connecting column (15) comprises a sliding groove (151), a limiting groove (152) and side columns (153), the sliding groove (151) is arranged in the bottom end of the connecting column (15), the limiting groove (152) is arranged on two sides of the sliding groove (151), and the side columns (153) are arranged in the limiting groove (152).
8. The hanging basket device for construction of the glass curtain wall of the roof steel structure platform as claimed in claim 1, wherein: the hanging basket device (16) comprises a side frame plate (161), a side plate (162), a connecting spring (163), a touch plate (164) and a rubber layer (165), wherein the side plate (162) is arranged on one side of the side frame plate (161), the connecting spring (163) is provided with a plurality of groups, the touch plate (164) is connected with the side plate (162) through the connecting spring (163), and the rubber layer (165) is arranged on one side of the touch plate (164).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023246270.0U CN214246557U (en) | 2020-12-29 | 2020-12-29 | Hanging flower basket device is used in construction of roof steel construction platform glass curtain wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023246270.0U CN214246557U (en) | 2020-12-29 | 2020-12-29 | Hanging flower basket device is used in construction of roof steel construction platform glass curtain wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214246557U true CN214246557U (en) | 2021-09-21 |
Family
ID=77743850
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202023246270.0U Expired - Fee Related CN214246557U (en) | 2020-12-29 | 2020-12-29 | Hanging flower basket device is used in construction of roof steel construction platform glass curtain wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214246557U (en) |
-
2020
- 2020-12-29 CN CN202023246270.0U patent/CN214246557U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205702556U (en) | A kind of auxiliary device for knocking in nail | |
CN214246557U (en) | Hanging flower basket device is used in construction of roof steel construction platform glass curtain wall | |
CN113605670A (en) | Construction hanging basket with good stability and installation method thereof | |
CN111331718B (en) | Ceramic cup and processing system and processing method thereof | |
CN218541305U (en) | Assembled is exterior wallboard fossil fragments for building | |
CN211341690U (en) | Hanging basket for outer wall of large building | |
CN210239082U (en) | Temporary hydropower integrated bracket for construction site | |
CN209820971U (en) | Steel construction welding department quality detection device | |
CN210342584U (en) | Fragment of brick soaking equipment for construction | |
CN220167441U (en) | Building climbing frame | |
CN215107625U (en) | Truss concatenation steel construction bed-jig of supplementary installation usefulness is hung on gymnasium top | |
CN110714606B (en) | Hanging basket fixing device and method | |
CN210920687U (en) | Fixing device for electromechanical maintenance of coal mine | |
CN217269075U (en) | Protective support frame for steel structure engineering construction | |
CN213655908U (en) | Building pipeline fixing device with good using effect | |
CN215212236U (en) | Steel frame structure supporting device | |
CN218264859U (en) | Hanging basket structure for building exterior wall decoration | |
CN212224906U (en) | Movable protective fence for building construction | |
CN213391106U (en) | Combined construction table for building external wall construction | |
CN215254365U (en) | Movable steel structure scaffold convenient to disassemble and assemble | |
CN221778937U (en) | Building construction platform convenient to remove that building construction was used | |
CN215107103U (en) | Scaffold for building construction | |
CN214141324U (en) | Material lifting device for building decoration | |
CN214034695U (en) | Corner pole setting base of attached lifting scaffold | |
CN221823457U (en) | Building engineering bearing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210921 |