CN113590676A - Drainage basin flood control scheduling method and system based on step joint equivalent flood control storage capacity - Google Patents

Drainage basin flood control scheduling method and system based on step joint equivalent flood control storage capacity Download PDF

Info

Publication number
CN113590676A
CN113590676A CN202110729436.4A CN202110729436A CN113590676A CN 113590676 A CN113590676 A CN 113590676A CN 202110729436 A CN202110729436 A CN 202110729436A CN 113590676 A CN113590676 A CN 113590676A
Authority
CN
China
Prior art keywords
flood control
flood
reservoir
combined
cascade
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110729436.4A
Other languages
Chinese (zh)
Other versions
CN113590676B (en
Inventor
欧阳硕
徐高洪
聂强
徐长江
缪益平
邵骏
朱成涛
黄光伦
郭卫
杜涛
王琨
卜慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bureau of Hydrology Changjiang Water Resources Commission
Yalong River Hydropower Development Co Ltd
Original Assignee
Bureau of Hydrology Changjiang Water Resources Commission
Yalong River Hydropower Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bureau of Hydrology Changjiang Water Resources Commission, Yalong River Hydropower Development Co Ltd filed Critical Bureau of Hydrology Changjiang Water Resources Commission
Priority to CN202110729436.4A priority Critical patent/CN113590676B/en
Publication of CN113590676A publication Critical patent/CN113590676A/en
Application granted granted Critical
Publication of CN113590676B publication Critical patent/CN113590676B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2458Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
    • G06F16/2462Approximate or statistical queries
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B1/00Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/40Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Probability & Statistics with Applications (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Fuzzy Systems (AREA)
  • Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Mathematical Physics (AREA)
  • Software Systems (AREA)
  • Computational Linguistics (AREA)
  • Data Mining & Analysis (AREA)
  • Databases & Information Systems (AREA)
  • General Health & Medical Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)

Abstract

The invention belongs to the technical field of flood control scheduling of a cascade reservoir in a drainage basin, and discloses a method and a system for flood control scheduling of the drainage basin based on cascade joint equivalent flood control reservoir capacity, which are used for identifying a flood control target and a main control factor of the cascade reservoir; extracting flood encounter representatives of different main streams and tributaries; establishing a step reservoir combined flood control scheduling scheme set; constructing a step reservoir combined flood control dispatching fitness function CF (); initializing a step reservoir combined flood control initial process; calculating a combined operation state set of the cascade reservoirs; and extracting a step combined equivalent flood control storage capacity scheme set. The step combined equivalent flood control storage capacity scheme set by the invention can meet basic scheduling operation modes and constraint limits of reservoir flood control, water storage, power generation and the like, provides theory and data support for setting a reasonable operation mode of a drainage basin flood control system, has engineering practicability, can meet the drainage basin flood control requirement and the step hydroenergy power generation benefit, and provides a new idea for the optimized operation of the drainage basin flood control system.

Description

Drainage basin flood control scheduling method and system based on step joint equivalent flood control storage capacity
Technical Field
The invention belongs to the technical field of flood control scheduling of a drainage basin cascade reservoir, and particularly relates to a drainage basin flood control scheduling method and system based on cascade joint equivalent flood control reservoir capacity.
Background
In 2020, in the water engineering combined dispatching of Yangtze river basin, 22 controlled reservoirs and flood control reservoir capacity of 352 hundred million m above three gorges in Yangtze river3(Wudongde-free 24.4 hundred million m)3) The flood control storage capacity of the three gorges reservoir is 221.5 hundred million m3And accounts for 63% of the flood control capacity of the reservoir group. The controllable reservoir to be built and put into operation has two river mouths, Udongde and white crane beachAnd (4) four seats. The flood control storage capacity of four step reservoirs of two estuaries, two rivers, Wudongde and white crane beach is 124 hundred million meters3The flood control storage capacity of the controlled reservoir with more than three gorges is increased by 35 percent to 476 hundred million meters3. Along with the development and construction of the watershed hydro-junction engineering, the flood control capacity, the flood control object, the flood control task and the regulation and control mode of the watershed are greatly changed.
At present, the flood control storage capacity of the hydro-junction is set for providing flood control safety for dam or downstream protection objects, and the flood control safety of specific protection objects is guaranteed mainly through independent operation of the hydro-junction for defending standard flood. Domestic and foreign research is also mostly focused on analyzing the operation mode research of a single or step reservoir on a specific flood control task, and the regional step reservoir flood control scheduling is less quantitatively researched to play a role in full-watershed flood defense.
Meanwhile, in the prior art, when the problem of the full-range flood is defended, although an overall defense scheme is tried to be formed, the combined operation mode of the hydro-junction group is still to be perfected, and the regulation and storage function of the partitioned controllable reservoir is difficult to be fully exerted; in the prior art, when the problem of flood control in a drainage basin is solved, a mode of reducing the operating water level of a reservoir to a flood limit water level and reserving a planned flood control reservoir capacity is adopted, the comprehensive benefits of a cascade reservoir cannot be taken into consideration, and the efficient utilization of water resources in the drainage basin cannot be realized.
Through the above analysis, the problems and defects of the prior art are as follows:
(1) in the prior art, each hydro junction still needs to reach the preset flood control limit water level for flood control at first, and the regulation and storage function of the zone-controlled reservoir is difficult to be fully exerted when the problem of the full-river flood of different types is prevented.
(2) In the prior art, when the problem of flood control in a drainage basin is solved, a mode of reducing the operating water level of a reservoir to a flood limit water level and reserving a planned flood control reservoir capacity is adopted, the comprehensive benefits of a cascade reservoir cannot be taken into consideration, and the efficient utilization of water resources in the drainage basin cannot be realized.
(3) Domestic and foreign research mostly focuses on analyzing the operation mode of a single or step reservoir to a specific flood control task, and few quantitative researches on the flood control scheduling of the step reservoir in the subareas play a role in full-watershed flood defense.
The difficulty in solving the above problems and defects is:
aiming at the problem of watershed flood, the cascade reservoir joint scheduling research is being developed at home and abroad, and the aim is to fully play the integral flood control function of the cascade reservoir to the watershed. However, at present, research work is still in an initial practical stage, control indexes such as single-reservoir flood control limit water level, reserved flood control reservoir capacity and the like defined in a reservoir design stage or a scheduling regulation are maintained, a drainage basin combined reserved flood control reservoir capacity strategy taking the drainage basin as a whole as an object is not formed, and the regulation and storage function of the partitioned controllable reservoir is difficult to fully exert.
The significance of solving the problems and the defects is as follows:
aiming at the problem of cascade reservoir combined flood control scheduling under the new flood control situation of the drainage basin, the cascade reservoir combined flood control scheduling mode of each subarea is further researched, a cascade combined equivalent flood control reservoir capacity strategy oriented to drainage basin flood control safety and comprehensive benefits is sought, the reservation mode of the flood control reservoir capacity of the subarea cascade reservoir in the flood season is optimized, a cascade combined equivalent flood control reservoir capacity scheme set is formulated from the unified flood control scheduling of the drainage basin reservoir group, the cascade reservoir combined blocking effect can be fully exerted, the drainage basin flood control safety can be guaranteed, meanwhile, the comprehensive utilization benefits of drainage basin water resources can be considered, and technical support can be provided for efficient development and utilization of the drainage basin water resources and improvement of the comprehensive utilization benefits of the water resources.
Disclosure of Invention
Aiming at the problems in the prior art, the invention provides a drainage basin flood control scheduling method based on cascade combined equivalent flood control storage capacity, and particularly relates to a cascade combined equivalent flood control storage capacity strategy oriented to drainage basin flood control safety and comprehensive benefits.
The invention is realized in such a way that a drainage basin flood control dispatching method based on a cascade joint equivalent flood control storage capacity comprises the following steps:
step one, identifying a flood control target and a main control factor of a cascade reservoir;
step two, extracting flood encounter representatives of different main streams and tributaries;
step three, establishing a step reservoir combined flood control scheduling scheme set;
step four, constructing a step reservoir combined flood control dispatching fitness function CF ();
step five, initializing a step reservoir combined flood control initial process;
step six, calculating a combined operation state set of the cascade reservoirs;
and step seven, extracting a step combined equivalent flood control storage capacity scheme set.
Further, in step one, discerning step reservoir flood control target and major control factor includes:
the flood control task of the watershed cascade reservoir comprises three levels, wherein firstly, the flood control safety of the cascade reservoir is ensured; secondly, the flood control safety of downstream protection objects is guaranteed; and thirdly, the downstream watershed flood control task is undertaken in cooperation with the watershed control reservoir group. Aiming at different flood control targets and flood control tasks of the cascade reservoir, starting from the unified flood control scheduling of the reservoir group in the drainage basin, the flood control targets and the main control conditions of the flood control scheduling operation of the cascade reservoir are mainly analyzed, and the flood control targets and the main control factors of the cascade reservoir are identified.
The first-level self flood control safety is used for reflecting that the front water level of the cascade reservoir dam needs to be lower than a flood control high water level FHL, and the downward discharge flow needs to obey the maximum flood discharge capacity MFC; the second-level downstream flood control object flood control safety is used for reflecting that the discharge flow of the cascade reservoir is required to be smaller than the riverway flood discharge capacity RFC in the downstream protection object flood control standard; and the third layer is matched with and bears the downstream watershed flood control task and is used for reflecting that the requirement of the watershed flood control for the combined flood storage capacity CFS of the cascade reservoir in the dispatching period needs to be met. Therefore, according to the characteristics of the flood control tasks of the three levels of the cascade reservoir, the first level and the second level can be used as hard constraint conditions, and the third level can be used as a target fitness function in the cascade reservoir combined dispatching model.
Figure BDA0003138782780000031
Wherein, F1For the first flood control mission, F2For the purpose of the second level flood protection task,F3for the third level flood protection task.
Further, in step one, discerning step reservoir flood control target and major control factor still includes:
(1) if the regional cascade reservoir flood control task comprises the three levels, the cascade reservoir dispatching model can convert the first-level flood control target and the second-level flood control target into water level and flow constraint conditions, the maximum combined flood interception and storage volume is taken as a main objective function, the maximum comprehensive utilization benefit of water resources is taken as a secondary objective function, and after the combined flood interception and storage volume of the cascade reservoir meets the requirements of the drainage basin flood control task, the comprehensive utilization benefit of the drainage basin water resources is optimized;
(2) if the second-level flood control task is not available in the flood control tasks of the regional step reservoir, the flood control target set of the step reservoir can be simplified to F1And F3(ii) a The cascade reservoir dispatching model can convert the first layer flood control target into water level and flow constraint conditions, the maximum combined flood blocking amount is a main objective function, the maximum comprehensive utilization benefit of water resources is a secondary objective function, and after the combined flood blocking amount of the cascade reservoir meets the requirements of the flood control task of the drainage basin, the comprehensive utilization benefit of the drainage basin water resources is optimized;
(3) if the third-level flood control task is not available in the flood control tasks of the regional step reservoir, the flood control target set of the step reservoir can be simplified to F1And F2(ii) a Therefore, the cascade reservoir dispatching model can convert the flood control target into water level and flow constraint conditions, and further, the maximum comprehensive utilization benefit of water resources is the target function.
Further, in the second step, the flood exposure of the different main streams includes:
(1) analyzing and determining the flood characteristics and the regional composition of the drainage basin: collecting historical Flood data and long-series actual-measured Flood data of different partitions of a main control section of a drainage basin, analyzing the times of Flood occurrence of different partitions by counting the law of the occurrence time and times of the Flood, and forming a typical Flood Set (FS ═1,FS2,…,FSn,…,FSN}). On the basis, flood propagation time is considered, flood volumes with different durations of each control section are respectively counted to obtain drainage basins in different yearsFlood area composition condition Wt General assembly
Wt General assembly={Wt 1,Wt 2,...,Wt a,...,Wt A}
t∈{1d,3d,5d,7d,15d,30d,60d};
Wherein, Wt aThe time period t is the flood of the a-th subarea, and A is the number of the subareas. Particularly, t can be selected according to the regional flood characteristics, the flood process of the Yangtze river basin can reach 60d, and the duration of 7d, 15d or shorter time can be selected as the flood calculation time period for common medium and small basins.
(2) According to the cascade reservoir flood control tasks and the flood control targets, by combining the dispatching modes of the flood periods of all reservoirs, analyzing the flood control effect exerted by the upstream cascade reservoir group combined dispatching aiming at different typical annual flood processes in a typical flood set FS under the condition that the downstream control section has the same frequency of flood, and determining the most unfavorable typical flood composition of all the flood control targets.
Figure BDA0003138782780000051
i∈{1,2,...,D};
Wherein, CFSiTotal impounded flood for ith target, Qt,sAnd D is the number of flood control targets.
Further, in step three, the establishing of the step reservoir combined flood control scheduling scheme set includes:
setting an initial scheme OS of a flood season water level control process line according to a flood season scheduling mode of each reservoir on the basis of identification of a flood control target and a main control factor of a cascade reservoir0(ii) a Combine the flood areas of main and branch to form a result, and use the step reservoir total flood control storage capacity VTotalAnd (4) adjusting the reserved flood control storage capacity of the cascade reservoir in the main flood season by using the fixed step length delta V without changing the principle, deriving M cascade reservoir combined flood control dispatching derivation scheme sets OS (the term is the { OS })1,OS2,…,OSm,…,OSM}。
Further, in step four, the constructing of the step reservoir combined flood control dispatching fitness function CF (), includes:
starting from the uniform flood control scheduling of the reservoir group in the drainage basin, starting from the full play of the combined retaining function of the cascade reservoir and taking the maximum combined retaining flood volume of the cascade reservoir as the main optimization target CF1Taking the maximum total power generation TP as a secondary objective function CF2The expression is as follows:
Figure BDA0003138782780000052
wherein, CFSn mAnd the total impounding flood volume of the nth typical flood and the mth combined flood control scheduling scheme is obtained.
Figure BDA0003138782780000053
Wherein, TPn mStep total power generation amount, P, of nth typical flood and mth combined flood control scheduling schemetIndicating the amount of power generation in the reservoir at time t.
Further, in the fifth step, the initialization step reservoir combined flood control initial process includes:
controlling the process line initial scheme OS according to the flood season water level0Sequentially adopting a typical flood set FS as a model water supply condition, and obtaining an initial scheme OS under different typical flood conditions through flood control scheduling rules f () of each reservoir flood season0The combined flood blocking and controlling dispatching process of the cascade reservoir forms an initial combined flood blocking and storing set INIV (INIV) { INIV }1,INIV2,…,INIVn,…,INIVNAnd initial collection INIP of reservoir flood control scheduling process ═ INIP1,INIP2,…,INIPn,…,INIPN}:
INIn(INIVn,INIPn)=f(FSn,OS0,CF(F2,F3))。
Wherein, F1Is the first layerSecond flood control task, F2For second level flood control tasks, F3For the third level flood protection task.
Further, in the sixth step, the estimating of the combined operation state set of the cascade reservoirs includes:
combined flood storage and flood control scheduling process INI in cascade reservoirn(INIVn,INIPn) Under the determined condition, according to the combined flood control dispatching derivation scheme of the M cascade reservoirs, considering that the requirements of flood control dispatching regulations in the flood season of the reservoir are met, the initial flood control process of the cascade reservoirs may not meet the derivation scheme OSmRegulating the water level and flow constraint of the cascade reservoir in different periods of flood season according to water balance calculation to obtain the nth typical flood and the mth combined flood control scheduling result RESn,mThe method comprises the steps of the flood storage capacity of the step reservoir, and the flood peak and the flood capacity of the river channel where the downstream protection object is located, and forms a step reservoir combined flood control scheduling result set RES (N multiplied by M). The model constraint conditions are as follows:
reservoir water balance constraint:
Vt=Vt-1+(It-Qt-St)Δt
t=2,3,...,T;
constraint of upper and lower limits of reservoir capacity (water level):
Figure BDA0003138782780000061
and thirdly, restriction of upper and lower limits of ex-warehouse flow:
Figure BDA0003138782780000062
fourthly, amplitude restriction of water level/flow in a time period:
Figure BDA0003138782780000063
scheduling end-of-term water level constraints:
Zc=Zg
wherein, Vt、It、QtThe reservoir capacity, the warehousing flow and the ex-warehouse flow of the reservoir at the t time interval of the dispatching period are respectively; stIs the flow rate of the water supply;
Figure BDA0003138782780000071
respectively an upper limit and a lower limit of the water level of the reservoir at the time t;
Figure BDA0003138782780000072
respectively is the upper and lower limits of the discharge quantity of the reservoir at the time t; the delta Z and the delta Q are respectively the maximum water level amplitude and the flow amplitude allowed in the reservoir time interval; zcAnd ZgAnd calculating the final water level and the dispatching period final water level control value for the reservoir respectively.
Further, in the seventh step, the extracting of the step combined equivalent flood control storage capacity scheme set includes:
through a fitness function CF (), the combined impounding flood volume CFS and the step total generating capacity TP of a step reservoir combined flood control dispatching result set RES (NxM) are analyzed in a statistical manner, and a combined equivalent flood control storage capacity strategy existing in the result set is judged.
(1) If CFSn m>INIVn,RESn,mNamely a combined equivalent flood control storage capacity scheme JFCn,j
(2) If CFSn m<INIVn,RESn,mNamely a non-union equivalent flood control reservoir capacity scheme NJFCn,k
Synthesize equivalent flood control storage scheme in RES (N × M), synthesize a certain typical flood FSnCombined equivalent flood control storage capacity strategy set JFCnSelecting CFS by comparing the variation relationship between CFS and TP in different schemes in strategy setn m=INIVnAs a solution to FSnThe optimal combined equivalent flood control storage capacity strategy.
The invention provides a drainage basin flood control dispatching method based on a cascade joint equivalent flood control reservoir capacity, which is applied to a drainage basin flood control dispatching system and comprises the following steps:
the target and master control factor identification module is used for identifying the flood control target and the master control factor of the cascade reservoir;
the flood encounter typical extraction module is used for extracting flood encounter typical of different main and branch flows;
the flood control dispatching scheme set establishing module is used for establishing a cascade reservoir combined flood control dispatching scheme set;
the fitness function building module is used for building a step reservoir combined flood control dispatching fitness function CF ();
the process initialization module is used for initializing a cascade reservoir combined flood control initial process;
the operation state set calculation module is used for calculating a combined operation state set of the step reservoir;
and the flood control storage capacity scheme set extraction module is used for extracting a cascade combined equivalent flood control storage capacity scheme set.
Another object of the present invention is to provide a computer-readable storage medium, which stores a computer program, and when the computer program is executed by a processor, the processor executes the method for scheduling flood control in a drainage basin based on a cascade federation equivalent flood control reservoir capacity.
Another object of the present invention is to provide an information data processing terminal, which includes a memory and a processor, wherein the memory stores a computer program, and the computer program, when executed by the processor, causes the processor to execute the method for dispatching flood control in a drainage basin based on a cascade joint equivalent flood control reservoir capacity.
By combining all the technical schemes, the invention has the advantages and positive effects that: the river basin flood control dispatching method based on the cascade combined equivalent flood control storage capacity aims at the problem of cascade reservoir combined flood control dispatching under the new river basin flood control situation, seeks a cascade combined equivalent flood control storage capacity strategy oriented to river basin flood control safety and comprehensive benefits, optimizes a regional cascade reservoir flood control storage capacity reservation mode in the flood season, and improves river basin water resource comprehensive utilization benefits. The invention also provides a cascade combined equivalent flood control storage capacity strategy oriented to the flood control safety and comprehensive benefits of the drainage basin, and a flood control scheduling scheme which can ensure the flood control safety of the drainage basin and also can give consideration to the comprehensive utilization benefits of water resources of the drainage basin is formulated.
The invention can satisfy the flood control requirement of the drainage basin, simultaneously can give consideration to the cascade hydropower benefit, and fully exerts the regulation and storage function of the reservoir with zone control. The flood scheduling scheme formulated by the invention can meet basic scheduling operation modes and constraint limits of reservoir flood control, water storage, power generation and the like, can provide theoretical and data support for formulating a reasonable operation mode of a drainage basin flood control system, and has certain practical application value. Meanwhile, the invention innovatively provides a concept of a partition combined equivalent flood control storage capacity strategy and provides a new idea for the optimized operation of a drainage basin flood control system.
According to the effect after the implementation of the technical scheme, the optimal combined equivalent flood control strategy fully utilizes the combined regulation and storage capacity of the two estuaries, the first-class screen and the second beach reservoir, and can give consideration to the cascade hydropower generation benefit and improve the comprehensive utilization benefit of the drainage basin water resource on the basis of meeting the drainage basin flood control requirement. Fig. 2 and 3 show that the flow process and the water level process of the yamo river outlet and the downstream flood control section of the typical optimal flood combined equivalent flood control storage capacity strategy in 1998 all meet the flood control requirements of the drainage basin. Therefore, the step reservoir combined equivalent flood control storage capacity strategy obtained by the invention can meet the actual operation management requirements of the drainage basin flood control system, and has certain engineering practicability.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required to be used in the embodiments of the present invention will be briefly described below, and it is obvious that the drawings described below are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain a corresponding set of step-combined equivalent flood protection storage solutions for other research objects according to the drawings without creative efforts.
Fig. 1 is a flowchart of a drainage basin flood control scheduling method based on a cascade joint equivalent flood control storage capacity according to an embodiment of the present invention.
Fig. 2 is a block diagram of a drainage basin flood control dispatching system based on a cascade joint equivalent flood control storage capacity according to an embodiment of the present invention;
in the figure: 1. a target and master factor identification module; 2. flood encounter typical extraction module; 3. a flood control scheduling scheme set building module; 4. a fitness function building module; 5. a process initialization module; 6. a running state set calculation module; 7. and the flood control storage capacity scheme set extraction module.
Fig. 3 is a graph showing the relationship between the step reservoir reserved flood control storage capacity scheme and the step combined flood storage capacity.
Fig. 4 is a process diagram of small flood water obtained after impoundment by the Sanya river huller step according to the scheme provided by the embodiment of the invention.
Fig. 5 is a process diagram of flood in zeng rock after the impoundment of the Sanya river hulling step provided by the embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail with reference to the following embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Aiming at the problems in the prior art, the invention provides a drainage basin flood control scheduling method based on a cascade joint equivalent flood control storage capacity, and the invention is described in detail below with reference to the accompanying drawings.
As shown in fig. 1, the method for dispatching flood control in drainage basin based on cascade joint equivalent flood control reservoir capacity according to the embodiment of the present invention includes the following steps:
s101, identifying a flood control target and a main control factor of a cascade reservoir;
s102, extracting flood encounter representatives of different main streams and tributaries;
s103, establishing a step reservoir combined flood control scheduling scheme set;
s104, constructing a step reservoir combined flood control dispatching fitness function CF ();
s105, initializing a step reservoir combined flood control initial process;
s106, calculating a combined operation state set of the cascade reservoirs;
and S107, extracting a step combined equivalent flood control storage capacity scheme set.
As shown in fig. 2, the drainage basin flood control scheduling system based on the cascade joint equivalent flood control reservoir capacity according to the embodiment of the present invention includes:
the target and main control factor identification module 1 is used for identifying the flood control target and the main control factor of the cascade reservoir;
the flood encounter typical extraction module 2 is used for extracting flood encounter typical of different main streams and tributaries;
the flood control dispatching scheme set establishing module 3 is used for establishing a cascade reservoir combined flood control dispatching scheme set;
the fitness function building module 4 is used for building a step reservoir combined flood control dispatching fitness function CF ();
the process initialization module 5 is used for initializing a cascade reservoir combined flood control initial process;
the operation state set calculation module 6 is used for calculating a step reservoir combined operation state set;
and the flood control storage capacity scheme set extraction module 7 is used for extracting a cascade combined equivalent flood control storage capacity scheme set.
The technical solution of the present invention will be further described with reference to the following examples.
The method for dispatching flood control in the drainage basin based on the cascade joint equivalent flood control reservoir capacity comprises the following steps:
(1) controlled reservoir and scheduling scale selection
The method takes two estuaries, a first-class screen reservoir and a second-beach reservoir of a downstream controlled reservoir in the Yangtze river basin as an embodiment, takes the day as a scheduling period, simulates the combined flood control scheduling of the two estuaries, the first-class screen reservoir and the second-beach reservoir according to a step reservoir combined equivalent flood control capacity strategy flow oriented to flood control safety and comprehensive benefits of the basin, obtains a typical combined equivalent flood control capacity strategy set aiming at floods encountering different dry branches, and selects a typical scheme for comparative analysis so as to show the effect achieved by the method.
(2) Combined equivalent flood control storage capacity solving step
The method comprises the following steps: and identifying flood control targets and main control factors of the cascade reservoir.
The reservoir is an important component of the flood control system in Yangtze river basin. According to integrated planning of Yangtze river basin (2012 and 2030), integrated planning of Yashujiang river basin and united dispatching and application plan of water engineering of Yangtze river basin in 2020, flood control targets of reservoirs with two river mouths, a first-level screen and two beach steps are as follows: cooperates with the three gorges reservoir to undertake the flood control task of the middle and lower reaches of the Yangtze river, and reduces the flood control pressure of the lower reaches of the elegant hulling river, the lower reaches of the Jinshajiang river and the river section of the Chongqing river if necessary. The main control factors are the flood control tasks of the middle and lower reaches of the Yangtze river: the flood in 1954 is defended, and the flood diversion amount and the use probability of the flood storage area are reduced. When flood occurs in Jingjiang river channels and the region of Gong Ling rock, river channels and lakes are fully utilized to discharge and accumulate flood, and reservoirs above three gorges are utilized to jointly accumulate flood. Two estuaries, the first level of the brocade screen and the second beach implement a dispatching mode of synchronously retaining the flood with the three gorges reservoir, and the reservoir is properly controlled to discharge.
Step two: extracting flood encounter representatives of different main streams and tributaries;
according to the flood control task of the reservoir in the step of Yashujiang river, 7 stations of the Yashujiang river two river mouths, the Jinshajiang river control station branch climbing station, the Yangshan station, the Changjiang river trunk flow Li zhuang station, the cun station, the Yichang station, the spiral mountain station and the like are selected as analysis objects, and the flood encountering rules of the Yashujiang river, the Jinshajiang river downstream, the Chuanjiang river and the Changjiang river middle and lower reaches are analyzed.
1) Flood encounter frequency
Respectively counting the time of the maximum flood in 1959-2018 of 7 control stations and the times of the maximum flood in the year of the corresponding Xiao Diao stone station when the maximum flood occurs in the year to obtain flood encountering results of the Xiao Diao stone station and hydrological stations such as climbing flowers, holding mountains, plum houses, cun beaches, Yichang, spiral mountains and the like, and showing in table 1.
TABLE 1 Yazhenjiang and Changjiang river Dry flood encounter statistics
Figure BDA0003138782780000111
Through the flood encounter analysis of the Yajiangxiaojiang Xiaobeijing river stone station and the Jinshajiang climbing flower station, the Yanshan mountain, the Li zhang and the Titan station, the frequency of the Yajiangjiang flood and the Jinshajiang flood is high, and the frequency of the corresponding Xiaojiangshi stone station is low when the flood below 7d occurs at the Yichang station and the spiral mountain station every year.
2) Flood composition
Taking maximum flood time of Yichang and spiral mountain stations in 1965-2018 as a main time, respectively counting the flood volume of time periods corresponding to a climbing flower station, a Xiaocai stone station, a Yangshan station, a Li Zhuang station and a shou station by considering flood propagation time, and obtaining the average annual maximum flood composition condition of 7 control stations in multiple years, which is shown in Table 2.
Table 27 statistics table of average annual maximum flood composition of control sites over years
Figure BDA0003138782780000121
It can be seen that the yazhenjiang flood is one of the main sources of the floods in the lower reaches of Jinshajiang and Chuanjiang, but the proportion of the floods in the middle and lower reaches of Yangtze river is very small, and the proportion of the floods is close to the proportion of the area. For the protection objects below the cun shoal, the proportion of the Yazhenjiang flood is small.
According to the analysis of the measured hydrological data in 1965-2018, the whole-watershed flood occurs in the Yangtze river basin in 1998, which is the whole-watershed flood in the second 20 th century, and is only next to 1954. Although the flood magnitude is less than 1954, the water level in the middle and downstream is generally higher than 1954, and the highest flood level of a river reach of 360 kilometers exceeds the highest record of history. Combining the step of the Yashujiang river with the three gorges reservoir to undertake flood control tasks in the middle and lower reaches of the Yangtze river, comprehensively considering, selecting the typical flood of the Yashujiang river and the Yangtze river in 1998 to be the most unfavorable, and therefore selecting the typical flood of the 1998 year as the model input.
Step three: and establishing a step reservoir combined flood control scheduling scheme set.
Selecting typical flood of 1998, considering dynamic control indexes of the operating water level of the step reservoir at the downstream of the Yangtze river, and quantitatively analyzing the influence of the step reservoir at the downstream of the Yangtze river on the flood of the middle and the downstream of the Yangtze river by simulating various scheduling schemes of the typical flood. The flood control storage capacity combined reservation scheme is set in table 3, and the four scheduling schemes are respectively:
firstly, a flood control storage capacity combined reservation scheme 1 is adopted to maintain the operation of flood limiting water level, and the reservoir does not play a flood blocking role;
secondly, a flood control reservoir capacity combined reservation scheme 2 is adopted, flood limiting water level operation is maintained in the early stage, and flood is synchronously blocked and stored when three gorges are matched to start to block flood in the middle and lower reaches;
thirdly, a flood control reservoir capacity combined reservation scheme 3 is adopted, flood limiting water level operation is maintained in the early stage, and flood is synchronously blocked and stored when three gorges are matched to start to block flood to the middle and the lower reaches;
and fourthly, adopting a flood control reservoir capacity combined reservation scheme 4, maintaining the flood limiting water level operation in the early stage, and synchronously storing flood when the three gorges are matched to start to block flood in the middle and lower reaches.
TABLE 3 flood control reservoir capacity combined reservation scheme for two estuaries, first-level brocade screen and second beach step control reservoir
Scheme number Two river mouths The brocade screen is at one level Beach of the two
Scheme 1 0 0 0
Scheme 2 20 16 9
Scheme 3 30 6 9
Scheme 4 35 3 7
Step four: and constructing a step reservoir combined flood control dispatching fitness function CF ().
Starting from the uniform flood control scheduling of the reservoir group in the drainage basin, starting from the full play of the combined retaining function of the cascade reservoir and taking the maximum combined retaining flood volume of the cascade reservoir as the main optimization target CF1Taking the maximum total power generation TP as a secondary objective function CF2The concrete expression is as follows:
Figure BDA0003138782780000131
Figure BDA0003138782780000132
in the present example, only the typical flood of 1998 is selected, n is 1, and m is 4.
Step five: and initializing a combined flood control initial process of the cascade reservoir.
Controlling the process line initial scheme OS according to the flood season water level0Namely, the second step reservoir combined flood control scheduling scheme adopts the typical flood of 1998 as the model water supply condition, and obtains the initial scheme OS under the typical flood condition through the flood control scheduling regulation of each reservoir in the flood season0The cascade reservoir combines the flood storage capacity and flood control scheduling process, and the flood storage capacity is shown in table 4.
Step six: and (5) calculating a combined operation state set of the cascade reservoirs.
According to the derivation scheme of the 4-step reservoir combined flood control dispatching, the requirements of reservoir flood control dispatching regulations in the flood season are considered, adjustment is carried out according to water balance calculation, and 4 combined flood control dispatching results meeting the water level and flow constraint conditions in different periods of the flood season are obtained, and the results are shown in table 4.
TABLE 41998 years old Multi-Schedule plan comparative analysis
Figure BDA0003138782780000141
Step seven: and extracting a step combined equivalent flood control storage capacity scheme set.
In 1998, the sand station started to exceed the warning level at 7 months 2 and exited the warning level at 9 months 4. Considering that the Sanxia reservoir starts to block and store flood in 7 months and 2 days, and the Yayijiang river starts to block and store synchronously. The regulation process is shown in fig. 3.
The first scheme is as follows: the steps at the downstream of Yajiajiang do not play any flood-blocking role.
Scheme two to scheme four: considering the water level of the desert in 7 months and 2 days, the water level of the desert is beyond the warning water level of 43m, the flood is blocked, and the exit of the drainage basin is 6000m from 7 months and 2 days to 9 months and 3 days3The total storage flood volume is about 44 hundred million m under the control of/s3
As can be seen from Table 4, compared with the first scheme, the second to fourth schemes have obvious reservoir retaining effect, and the retained flood volume is about 38.4 to 43.6 hundred million m3The second scheme and the third scheme have different scheduling modes, but have basically equivalent influence on the three gorges warehouse-in, while the fourth scheme has the least obvious influence on the flood-blocking effect, and the three gorges warehouse-in flood volume is increased by 5.3 hundred million meters compared with the second scheme and the third scheme3. On the other hand, on the premise that the total impounding and surging amount of the stair is not reduced, the total generating capacity of the stair is increased by 7.97 hundred million kWh compared with the second scheme. As can be seen from FIG. 3, when the reserved flood control storage capacity of two river mouths is 20 hundred million meters3Increased to 30 hundred million m3In time, the total impounding flood volume of the steps is kept unchanged; when the reserved flood control storage capacity of two river mouths is 30 hundred million meters3The total cascade flood blocking quantity is in a decreasing trend, so the third scheme is an inflection point that the total cascade flood blocking quantity changes along with the scheme of reserving flood control storage capacity of the cascade reservoir”。
In conclusion, the third scheduling scheme is an optimal combined equivalent flood control storage capacity strategy for typical flood in 1998, and by adopting the scheme, the flood control can effectively defend against the adverse conditions encountered by Yajiangjiang river and Yangtze river dry flood.
(3) According to the result after the implementation of the technical scheme, the optimal combined equivalent flood control strategy fully utilizes the combined regulation and storage capacity of the two estuaries, the first-class screen and the second beach reservoir, and can give consideration to the cascade hydropower generation benefit and improve the comprehensive utilization benefit of the drainage basin water resource on the basis of meeting the drainage basin flood control requirement. Fig. 4 and 5 show that the flow process and the water level process of the yamo river outlet and the downstream flood control section of the typical flood optimal combined equivalent flood control storage capacity strategy in 1998 all meet the flood control requirements of the drainage basin. Therefore, the step reservoir combined equivalent flood control storage capacity strategy obtained by the invention can meet the actual operation management requirements of the drainage basin flood control system, and has certain engineering practicability.
The above description is only for the purpose of illustrating the present invention and the appended claims are not to be construed as limiting the scope of the invention, which is intended to cover all modifications, equivalents and improvements that are within the spirit and scope of the invention as defined by the appended claims.

Claims (9)

1. A drainage basin flood control scheduling method based on a cascade joint equivalent flood control reservoir capacity comprises the following steps: identifying a cascade reservoir flood control target and main control factors, and extracting flood encounter representatives of different main streams and tributaries, wherein the drainage basin flood control scheduling method based on the cascade joint equivalent flood control reservoir capacity further comprises the following steps:
establishing a step reservoir combined flood control scheduling scheme set;
constructing a step reservoir combined flood control dispatching fitness function CF ();
initializing a step reservoir combined flood control initial process;
calculating a combined operation state set of the cascade reservoirs;
and extracting a step combined equivalent flood control storage capacity scheme set.
2. The method for dispatching flood control in drainage basin based on the step combined equivalent flood control reservoir capacity as claimed in claim 1, wherein the step reservoir combined flood control dispatching scheme set is established and comprises the following steps:
setting an initial scheme OS of a flood season water level control process line according to a flood season scheduling mode of each reservoir on the basis of identification of a flood control target and a main control factor of a cascade reservoir0(ii) a Combine the flood areas of main and branch to form a result, and use the step reservoir total flood control storage capacity VTotalAnd (4) adjusting the reserved flood control storage capacity of the cascade reservoir in the main flood season by using the fixed step length delta V without changing the principle, deriving M cascade reservoir combined flood control dispatching derivation scheme sets OS (the term is the { OS })1,OS2,…,OSm,…,OSM}。
3. The method for dispatching flood control in a drainage basin based on the cascade joint equivalent flood control reservoir capacity as claimed in claim 1, wherein the step reservoir joint flood control dispatching fitness function CF () is constructed, and the method comprises the following steps:
starting from the uniform flood control scheduling of the reservoir group in the drainage basin, starting from the full play of the combined retaining function of the cascade reservoir and taking the maximum combined retaining flood volume of the cascade reservoir as the main optimization target CF1Taking the maximum total power generation TP as a secondary objective function CF2The expression is as follows:
Figure FDA0003138782770000011
wherein, CFSn mThe total interception and storage flood volume Q of the nth typical flood and the mth combined flood control scheduling schemet,sThe stored water flow rate of the reservoir at the time t,
Figure FDA0003138782770000012
wherein, TPn mFor the nth typical flood, the mth steps of the joint flood control scheduling schemeTotal power generation, PtIndicating the amount of power generation in the reservoir at time t.
4. The method for dispatching flood control in drainage basin based on the cascade combined equivalent flood control storage capacity of claim 1, wherein the initialization of the cascade reservoir combined flood control initial process comprises the following steps:
controlling the process line initial scheme OS according to the flood season water level0Sequentially adopting a typical flood set FS as a model water supply condition, and obtaining an initial scheme OS under different typical flood conditions through flood control scheduling rules f () of each reservoir flood season0The combined flood blocking and controlling dispatching process of the cascade reservoir forms an initial combined flood blocking and storing set INIV (INIV) { INIV }1,INIV2,…,INIVn,…,INIVNAnd initial collection INIP of reservoir flood control scheduling process ═ INIP1,INIP2,…,INIPn,…,INIPN}:
INIn(INIVn,INIPn)=f(FSn,OS0,CF(F2,F3));
Wherein, FSnIs the nth typical flood, F1For the first flood control mission, F2For second level flood control tasks, F3For the third level flood protection task.
5. The method for dispatching flood control in drainage basin based on cascade combined equivalent flood control reservoir capacity according to claim 1, wherein the step reservoir combined operation state set is calculated by the steps of:
combined flood storage and flood control scheduling process INI in cascade reservoirn(INIVn,INIPn) Under the determined condition, according to the combined flood control dispatching derivation scheme of the M cascade reservoirs, considering that the requirements of flood control dispatching regulations in the flood season of the reservoir are met, the initial flood control process of the cascade reservoirs may not meet the derivation scheme OSmRegulating the water level and flow constraint of the cascade reservoir in different periods of flood season according to water balance calculation to obtain the nth typical flood and the mth combined flood control scheduling result RESn,mIncluding step reservoir flood containment and downstream protectionFlood peak and flood volume of the river channel where the object is located, and forming a step reservoir combined flood control scheduling result set RES (N multiplied by M); the model constraint conditions are as follows:
reservoir water balance constraint:
Vt=Vt-1+(It-Qt-St)Δt
t=2,3,...,T;
constraint of upper and lower limits of reservoir capacity (water level):
Figure FDA0003138782770000021
and thirdly, restriction of upper and lower limits of ex-warehouse flow:
Figure FDA0003138782770000031
fourthly, amplitude restriction of water level/flow in a time period:
Figure FDA0003138782770000032
scheduling end-of-term water level constraints:
Zc=Zg
wherein, Vt、It、QtThe reservoir capacity, the warehousing flow and the ex-warehouse flow of the reservoir at the t time interval of the dispatching period are respectively; stIs the flow rate of the water supply;
Figure FDA0003138782770000033
respectively an upper limit and a lower limit of the water level of the reservoir at the time t;
Figure FDA0003138782770000034
respectively is the upper and lower limits of the discharge quantity of the reservoir at the time t; the delta Z and the delta Q are respectively the maximum water level amplitude and the flow amplitude allowed in the reservoir time interval; zcAnd ZgAnd calculating the final water level and the dispatching period final water level control value for the reservoir respectively.
6. The method for dispatching flood control in drainage area based on cascade united equivalent flood control storage capacity according to claim 1, wherein the extracting of the cascade united equivalent flood control storage capacity scheme set comprises:
through a fitness function CF (), the combined impounding flood volume CFS and the step total generating capacity TP of a step reservoir combined flood control dispatching result set RES (NxM) are statistically analyzed, and a combined equivalent flood control storage capacity strategy existing in the result set is judged;
(1) if CFSn m>INIVn,RESn,mNamely a combined equivalent flood control storage capacity scheme JFCn,j
(2) If CFSn m<INIVn,RESn,mNamely a non-union equivalent flood control reservoir capacity scheme NJFCn,k
Synthesize equivalent flood control storage scheme in RES (N × M), synthesize a certain typical flood FSnCombined equivalent flood control storage capacity strategy set JFCnSelecting CFS by comparing the variation relationship between CFS and TP in different schemes in strategy setn m=INIVnAs a solution to FSnThe optimal combined equivalent flood control storage capacity strategy.
7. A drainage basin flood control dispatching system based on a cascade combined equivalent flood control reservoir capacity, which applies the drainage basin flood control dispatching method based on the cascade combined equivalent flood control reservoir capacity according to any one of claims 1 to 6, and is characterized in that the drainage basin flood control dispatching system based on the cascade combined equivalent flood control reservoir capacity comprises:
the target and master control factor identification module is used for identifying the flood control target and the master control factor of the cascade reservoir;
the flood encounter typical extraction module is used for extracting flood encounter typical of different main and branch flows;
the flood control dispatching scheme set establishing module is used for establishing a cascade reservoir combined flood control dispatching scheme set;
the fitness function building module is used for building a step reservoir combined flood control dispatching fitness function CF ();
the process initialization module is used for initializing a cascade reservoir combined flood control initial process;
the operation state set calculation module is used for calculating a combined operation state set of the step reservoir;
and the flood control storage capacity scheme set extraction module is used for extracting a cascade combined equivalent flood control storage capacity scheme set.
8. A computer-readable storage medium storing a computer program which, when executed by a processor, causes the processor to execute the method for dispatching flood control in a drainage basin based on a cascade connection equivalent flood control reservoir capacity according to any one of claims 1 to 6.
9. An information data processing terminal, characterized in that the information data processing terminal comprises a memory and a processor, the memory stores a computer program, and the computer program, when executed by the processor, causes the processor to execute the method for dispatching flood control in a drainage basin based on the cascade joint equivalent flood control reservoir capacity according to any one of claims 1 to 6.
CN202110729436.4A 2021-06-29 2021-06-29 Drainage basin flood control scheduling method and system based on step joint equivalent flood control storage capacity Expired - Fee Related CN113590676B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110729436.4A CN113590676B (en) 2021-06-29 2021-06-29 Drainage basin flood control scheduling method and system based on step joint equivalent flood control storage capacity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110729436.4A CN113590676B (en) 2021-06-29 2021-06-29 Drainage basin flood control scheduling method and system based on step joint equivalent flood control storage capacity

Publications (2)

Publication Number Publication Date
CN113590676A true CN113590676A (en) 2021-11-02
CN113590676B CN113590676B (en) 2023-03-24

Family

ID=78245166

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110729436.4A Expired - Fee Related CN113590676B (en) 2021-06-29 2021-06-29 Drainage basin flood control scheduling method and system based on step joint equivalent flood control storage capacity

Country Status (1)

Country Link
CN (1) CN113590676B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115035421A (en) * 2022-06-30 2022-09-09 珠江水利委员会珠江水利科学研究院 Mangrove forest ecological beach-fixing sand-binding method, device, equipment and storage medium
CN115217060A (en) * 2022-07-06 2022-10-21 长江勘测规划设计研究有限责任公司 Method for determining flood control characteristic water level of cascade reservoir
CN117436619A (en) * 2023-12-20 2024-01-23 长江水利委员会水文局 Cascade reservoir flood control reservoir capacity combined reservation method based on equivalent flood control effect
CN118095782A (en) * 2024-04-17 2024-05-28 长江水利委员会水文局 Cascade reservoir flood control storage capacity equivalent distribution method suitable for flood area composition

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019006733A1 (en) * 2017-07-06 2019-01-10 大连理工大学 Long-term joint peak regulation dispatching method for trans-provincial interconnected hydropower station cluster

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019006733A1 (en) * 2017-07-06 2019-01-10 大连理工大学 Long-term joint peak regulation dispatching method for trans-provincial interconnected hydropower station cluster

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
WANG, XUEMIN 等: "Research on Joint Impoundment Dispatching Model for Cascade Reservoir", 《WATER RESOURCES MANAGEMENT》 *
周新春等: "长江上游干流梯级水库群防洪库容互用性初探", 《水科学进展》 *
周研来等: "溪洛渡-向家坝-三峡梯级水库联合蓄水方案与多目标决策研究", 《水利学报》 *
欧阳硕: "流域梯级及全流域巨型水库群洪水资源化联合优化调度研究", 《中国博士学位论文全文数据库工程科技Ⅱ辑》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115035421A (en) * 2022-06-30 2022-09-09 珠江水利委员会珠江水利科学研究院 Mangrove forest ecological beach-fixing sand-binding method, device, equipment and storage medium
CN115217060A (en) * 2022-07-06 2022-10-21 长江勘测规划设计研究有限责任公司 Method for determining flood control characteristic water level of cascade reservoir
CN115217060B (en) * 2022-07-06 2023-05-26 长江勘测规划设计研究有限责任公司 Method for determining flood control characteristic water level of cascade reservoir
CN117436619A (en) * 2023-12-20 2024-01-23 长江水利委员会水文局 Cascade reservoir flood control reservoir capacity combined reservation method based on equivalent flood control effect
CN117436619B (en) * 2023-12-20 2024-03-15 长江水利委员会水文局 Cascade reservoir flood control reservoir capacity combined reservation method based on equivalent flood control effect
CN118095782A (en) * 2024-04-17 2024-05-28 长江水利委员会水文局 Cascade reservoir flood control storage capacity equivalent distribution method suitable for flood area composition

Also Published As

Publication number Publication date
CN113590676B (en) 2023-03-24

Similar Documents

Publication Publication Date Title
CN113590676B (en) Drainage basin flood control scheduling method and system based on step joint equivalent flood control storage capacity
CN107992989B (en) Reservoir group flood reclamation pre-storage and pre-discharge risk decision-making method
CN109685256B (en) Basin water quantity dynamic optimization distribution method facing total amount control
CN104268653B (en) Cascade reservoir optimal scheduling method based on ESP
CN109063901B (en) Method for analyzing medium-term and long-term power generation capacity of provincial power grid hydropower system
CN110555239A (en) River surge sluice optimization scheduling method based on drainage pipe network model
CN113449993B (en) Urban water source water supply scheduling method
CN107506894A (en) A kind of water power group&#39;s dispatching method for considering non-constant coupling constraint
CN112884232A (en) Reservoir ecological scheduling method considering inflow forecasting uncertainty difference of rich and low water periods
CN115271304A (en) Cross-basin water transfer engineering optimal scheduling method based on climate change
Yang et al. Method for quantitatively assessing the impact of an inter-basin water transfer project on ecological environment-power generation in a water supply region
CN107862408B (en) Minimum early warning coordinated rolling optimization method for water abandonment of hydraulic power plant
CN104674748A (en) Quantitative method for water abandon probability of cascade hydroelectric station groups
CN114707879A (en) Flood season staged dynamic flood limit water level determination method based on pre-discharge rule
CN116703134B (en) Multi-target scheduling method and system for large cross-river basin water diversion reservoir
CN108090671B (en) Cross-basin load distribution method for multi-stage inter-domain-intra-domain feedback iteration
CN105160443A (en) Optimal complex reservoir group dispatching method based on extended linear quadratic Gaussian method
Lamond et al. Water reservoir applications of Markov decision processes
Tricarico et al. Optimal water supply system management by leakage reduction and energy recovery
Wang et al. Optimal early refill rules for Danjiangkou Reservoir
CN111079066B (en) Analysis method for two-objective competition relationship of power generation ecology of reservoir group
CN112488564A (en) Cascade power station scheduling method and system based on random fractal-successive approximation algorithm
Guo et al. Optimal operation of cascade hydropower plants
CN110991759A (en) Comprehensive utilization reservoir water storage and discharge rule making method considering forecast information
CN117933712B (en) Reservoir scheduling scheme risk assessment method based on fuzzy cloud

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: OuYang Shuo

Inventor after: Wang Kun

Inventor after: Bu Hui

Inventor after: Xu Changjiang

Inventor after: Nie Qiang

Inventor after: Miao Yiping

Inventor after: Shao Jun

Inventor after: Zhu Chengtao

Inventor after: Huang Guanglun

Inventor after: Guo Wei

Inventor after: Du Tao

Inventor before: OuYang Shuo

Inventor before: Du Tao

Inventor before: Wang Kun

Inventor before: Bu Hui

Inventor before: Xu Gaohong

Inventor before: Nie Qiang

Inventor before: Xu Changjiang

Inventor before: Miao Yiping

Inventor before: Shao Jun

Inventor before: Zhu Chengtao

Inventor before: Huang Guanglun

Inventor before: Guo Wei

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230324