CN113565252A - Reflective lamp groove outward-exploring construction process - Google Patents
Reflective lamp groove outward-exploring construction process Download PDFInfo
- Publication number
- CN113565252A CN113565252A CN202110822018.XA CN202110822018A CN113565252A CN 113565252 A CN113565252 A CN 113565252A CN 202110822018 A CN202110822018 A CN 202110822018A CN 113565252 A CN113565252 A CN 113565252A
- Authority
- CN
- China
- Prior art keywords
- keel
- exploring
- construction process
- installing
- outward
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000010276 construction Methods 0.000 title claims abstract description 14
- 229910052602 gypsum Inorganic materials 0.000 claims abstract description 23
- 239000010440 gypsum Substances 0.000 claims abstract description 23
- 238000005553 drilling Methods 0.000 claims abstract description 7
- 238000013507 mapping Methods 0.000 claims abstract description 4
- 238000007789 sealing Methods 0.000 claims abstract description 4
- 238000009434 installation Methods 0.000 claims description 5
- 238000007790 scraping Methods 0.000 claims description 3
- 206010023204 Joint dislocation Diseases 0.000 claims description 2
- 238000010586 diagram Methods 0.000 claims description 2
- 210000001503 joint Anatomy 0.000 claims description 2
- 239000012634 fragment Substances 0.000 abstract description 8
- 230000008021 deposition Effects 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/006—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation with means for hanging lighting fixtures or other appliances to the framework of the ceiling
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/18—Means for suspending the supporting construction
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F21—LIGHTING
- F21V—FUNCTIONAL FEATURES OR DETAILS OF LIGHTING DEVICES OR SYSTEMS THEREOF; STRUCTURAL COMBINATIONS OF LIGHTING DEVICES WITH OTHER ARTICLES, NOT OTHERWISE PROVIDED FOR
- F21V21/00—Supporting, suspending, or attaching arrangements for lighting devices; Hand grips
- F21V21/02—Wall, ceiling, or floor bases; Fixing pendants or arms to the bases
- F21V21/04—Recessed bases
- F21V21/047—Mounting arrangements with fastening means engaging the inner surface of a hole in a ceiling or wall, e.g. for solid walls or for blind holes
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Non-Portable Lighting Devices Or Systems Thereof (AREA)
Abstract
The invention discloses a reflector lamp groove outward-exploring construction process, which comprises the following steps: s1, surveying and mapping the snapping line; s2, drilling; s3, mounting a side keel; s4, installing hanging ribs; s5, mounting a main keel and a secondary keel; s6, sealing cover gypsum board; and S7, installing the lamp strip. Has the advantages that: form fossil fragments outward and visit through limit fossil fragments, main joist, inferior keel, later carry out the gypsum board in the fossil fragments outside of visiting outward and seal flat, the lamp area of easy to assemble, light reflection is even, and pleasing to the eye degree is good, and the inside difficult deposition of reflection of light groove, and the clearance is convenient, and reflection of light groove compares with single gypsum board, and the stability of fixation is better, is difficult for the fracture.
Description
Technical Field
The invention relates to the technical field of indoor decoration processes, in particular to a reflector groove outward-exploring construction process.
Background
The lamp groove is a groove for hiding the lamp and changing the light direction. The difference between a troffer and a troffer with an additional keel is that the troffer is a partial strip of light, or the troffer is a light and the strip of light is full length. The lamp slot is a lamp or a group of lamps; the lamp strip is composed of a plurality of groups or a plurality of groups to form the lamp strip.
When the installation of current reflection of light groove, reflection of light groove fossil fragments are visited outward, and the outer fossil fragments of visiting are not sealed flat with the gypsum board, and later stage installation lamp area, lamp area are unable fixed, and it is inhomogeneous to turn on the lamp reflection of light, and inside easy deposition dust, inconvenient clearance.
Disclosure of Invention
The invention aims to solve the problems and provide a reflector groove outward-probing construction process.
The invention realizes the purpose through the following technical scheme:
a reflective lamp groove outward-exploring construction process comprises the following steps:
s1, surveying and mapping a snapping line, using a level gauge to write a horizontal point on a wall, popping up the horizontal line, marking the actual height of a suspended ceiling, snapping the line below a floor slab, marking the hanging point position of a suspender, popping up the position of a main keel, arranging middle-layer gypsum boards and paper-surface gypsum boards of each room according to the actually measured size of each room, drawing a plane drawing of the arranged boards, and popping up the position line of the main keel at the bottom of the floor slab according to the actual board arranging condition;
s2, drilling holes, and drilling holes along a horizontal line according to the installation requirement;
s3, installing side keels, and paving nailed side keels on walls and columns according to the marked elevation control lines and the elevation requirements of drawings;
s4, installing a hanging rib, and installing the hanging rib between the side keel and the top beam;
s5, installing a main keel and a secondary keel, installing the main keel on a ceiling through a hanging rib, installing the secondary keel according to a keel arrangement plate arrangement diagram, and enabling a bottom framework to extend 150 mm and 250mm outwards in a keel framework formed by the main keel, the secondary keel and side keels;
s6, sealing a cover surface gypsum board, mounting the gypsum board outside the main keel, the secondary keel and the side keel to form a gypsum board light groove which is externally detected, and then performing white scraping treatment;
s7, installing the lamp strip in the lamp groove.
Further, in step S3, the edge keel is fixed to the wall or the column by using an expansion bolt.
Further, in the step S3, the distance between the side keel and the wall fixing point is 600-1000 mm.
Further, in step S5, the keels are fixed by rivet connection.
Further, in step S5, the end of the main keel should not exceed 300mm, and if the end of the main keel exceeds 300mm, a hanger bar needs to be installed, and the distance between the hanger bars is less than 1200 mm.
Further, in the step S5, the distance between the cross runners is not greater than 400mm, and the joint misalignment deviation of the cross runners is not greater than 2 mm.
Further, in step S6, the gypsum board is laid to be flat.
The invention has the beneficial effects that: form fossil fragments outward and visit through limit fossil fragments, main joist, inferior keel, later carry out the gypsum board in the fossil fragments outside of visiting outward and seal flat, the lamp area of easy to assemble, light reflection is even, and pleasing to the eye degree is good, and the inside difficult deposition of reflection of light groove, and the clearance is convenient, and reflection of light groove compares with single gypsum board, and the stability of fixation is better, is difficult for the fracture.
Detailed Description
A reflective lamp groove outward-exploring construction process comprises the following steps:
s1, surveying and mapping a snapping line, using a level gauge to write a horizontal point on a wall, popping up the horizontal line, marking the actual height of a suspended ceiling, snapping the line below a floor slab, marking the hanging point position of a suspender, popping up the position of a main keel, arranging middle-layer gypsum boards and paper-surface gypsum boards of each room according to the actually measured size of each room, drawing a plane drawing of the arranged boards, and popping up the position line of the main keel at the bottom of the floor slab according to the actual board arranging condition;
s2, drilling holes, and drilling holes along a horizontal line according to the installation requirement;
s3, installing side keels, and paving and nailing the side keels on walls and columns through expansion bolts according to the copied elevation control lines and the elevation requirements of drawings, wherein the fixed positions and the intervals are 800 mm;
s4, installing a hanging rib, and installing the hanging rib between the side keel and the top beam;
s5, installing a main keel and a secondary keel, installing the main keel on a ceiling through a hanging rib, wherein the end part of the main keel is not more than 300mm, if the end part of the main keel is more than 300mm, installing suspenders, the distance between the suspenders is 1000mm, installing the secondary keel according to a keel arrangement layout, connecting and fixing the keels through rivets, the distance between the secondary keels is 300mm, the butt joint dislocation deviation of the joints of the secondary keels is not more than 2mm, and the bottom skeleton is 200mm outwards extended in a keel skeleton formed by the main keel, the secondary keel and side keels;
s6, sealing a cover surface gypsum board, flatly installing the gypsum board on the outer sides of the main keel, the secondary keel and the side keel to form an outward extending gypsum board light groove, and then performing white scraping treatment;
s7, installing the lamp strip in the lamp groove.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.
Claims (7)
1. A reflective lamp groove outward-exploring construction process is characterized by comprising the following steps: the method comprises the following steps:
s1, surveying and mapping a snapping line, using a level gauge to write a horizontal point on a wall, popping up the horizontal line, marking the actual height of a suspended ceiling, snapping the line below a floor slab, marking the hanging point position of a suspender, popping up the position of a main keel, arranging middle-layer gypsum boards and paper-surface gypsum boards of each room according to the actually measured size of each room, drawing a plane drawing of the arranged boards, and popping up the position line of the main keel at the bottom of the floor slab according to the actual board arranging condition;
s2, drilling holes, and drilling holes along a horizontal line according to the installation requirement;
s3, installing side keels, and paving nailed side keels on walls and columns according to the marked elevation control lines and the elevation requirements of drawings;
s4, installing a hanging rib, and installing the hanging rib between the side keel and the top beam;
s5, mounting a main keel and a secondary keel, mounting the main keel on a ceiling through a hanging rib, mounting the secondary keel according to a keel layout plate diagram, and externally detecting a bottom framework in a keel framework formed by the main keel, the secondary keel and a side keel;
s6, sealing a cover surface gypsum board, mounting the gypsum board outside the main keel, the secondary keel and the side keel to form a gypsum board light groove which is externally detected, and then performing white scraping treatment;
s7, installing the lamp strip in the lamp groove.
2. The reflector groove outward-exploring construction process according to claim 1, characterized in that: in the step S3, the side keel is fixed to the wall or the column by using an expansion bolt.
3. The reflector groove outward-exploring construction process according to claim 1, characterized in that: in the step S3, the distance between the side keel and the wall fixing point is 600-1000 mm.
4. The reflector groove outward-exploring construction process according to claim 1, characterized in that: in the step S5, the keels are fixed by rivets.
5. The reflector groove outward-exploring construction process according to claim 1, characterized in that: in the step S5, the end of the main keel should not exceed 300mm, and if the end of the main keel exceeds 300mm, suspenders need to be installed, and the distance between the suspenders is less than 1200 mm.
6. The reflector groove outward-exploring construction process according to claim 1, characterized in that: in the step S5, the distance between the secondary keels is not more than 400mm, and the butt joint dislocation deviation of the joints of the secondary keels is not more than 2 mm.
7. The reflector groove outward-exploring construction process according to claim 1, characterized in that: in step S6, the gypsum board needs to be laid flat.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110822018.XA CN113565252A (en) | 2021-07-21 | 2021-07-21 | Reflective lamp groove outward-exploring construction process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110822018.XA CN113565252A (en) | 2021-07-21 | 2021-07-21 | Reflective lamp groove outward-exploring construction process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113565252A true CN113565252A (en) | 2021-10-29 |
Family
ID=78165862
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110822018.XA Pending CN113565252A (en) | 2021-07-21 | 2021-07-21 | Reflective lamp groove outward-exploring construction process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113565252A (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204510578U (en) * | 2014-12-18 | 2015-07-29 | 深圳市建艺装饰集团股份有限公司 | A kind of plaster tablet suspended ceiling light trough |
CN104975672A (en) * | 2015-06-21 | 2015-10-14 | 寻杰 | Modular plasterboard suspended ceiling and installation process thereof |
KR20170122507A (en) * | 2016-04-27 | 2017-11-06 | 에스케이건설 주식회사 | Variable partition wall |
CN206957025U (en) * | 2017-06-19 | 2018-02-02 | 韩合桥 | Light steel keel gypsum board furred ceiling integration module |
CN209011409U (en) * | 2018-10-26 | 2019-06-21 | 山东集顶装饰科技有限公司 | A kind of integrated plaster tablet suspended ceiling |
CN111156477A (en) * | 2018-11-08 | 2020-05-15 | 北新集团建材股份有限公司 | Lamp slot system |
CN211473026U (en) * | 2019-06-14 | 2020-09-11 | 深圳市居众装饰设计工程有限公司 | Light steel lamp slot closing-in keel structure |
CN112726931A (en) * | 2021-01-26 | 2021-04-30 | 武汉市华天仑建筑装饰工程有限公司 | Green construction method of light steel keel gypsum plasterboard |
-
2021
- 2021-07-21 CN CN202110822018.XA patent/CN113565252A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204510578U (en) * | 2014-12-18 | 2015-07-29 | 深圳市建艺装饰集团股份有限公司 | A kind of plaster tablet suspended ceiling light trough |
CN104975672A (en) * | 2015-06-21 | 2015-10-14 | 寻杰 | Modular plasterboard suspended ceiling and installation process thereof |
KR20170122507A (en) * | 2016-04-27 | 2017-11-06 | 에스케이건설 주식회사 | Variable partition wall |
CN206957025U (en) * | 2017-06-19 | 2018-02-02 | 韩合桥 | Light steel keel gypsum board furred ceiling integration module |
CN209011409U (en) * | 2018-10-26 | 2019-06-21 | 山东集顶装饰科技有限公司 | A kind of integrated plaster tablet suspended ceiling |
CN111156477A (en) * | 2018-11-08 | 2020-05-15 | 北新集团建材股份有限公司 | Lamp slot system |
CN211473026U (en) * | 2019-06-14 | 2020-09-11 | 深圳市居众装饰设计工程有限公司 | Light steel lamp slot closing-in keel structure |
CN112726931A (en) * | 2021-01-26 | 2021-04-30 | 武汉市华天仑建筑装饰工程有限公司 | Green construction method of light steel keel gypsum plasterboard |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2009201902B2 (en) | Suspended ceiling gusset stay | |
WO2016086480A1 (en) | House structure and construction method therefor | |
US10047936B2 (en) | Ceiling system | |
RU2014136093A (en) | INSULATION ELEMENT AND SYSTEM CONTAINING INSULATION ELEMENT | |
CN113565252A (en) | Reflective lamp groove outward-exploring construction process | |
CN113431244A (en) | Adjustable ceiling mounting assembly, ceiling structure and mounting method of ceiling structure | |
US20120167513A1 (en) | Magnetic cross tees | |
RU2008114348A (en) | BEARING STRUCTURE OF THE BUILDING, IN PARTICULAR OF A HEIGHT BUILDING | |
CN112064876A (en) | Z-shaped edge folding process for light steel keel | |
CN204475534U (en) | A kind of syndeton of column node | |
CN113323250B (en) | Assembled double-layer keel structure and installation method thereof | |
CN209511788U (en) | Pendent lamp mounting structure | |
CN211421945U (en) | Container building structure convenient to assemble | |
JPH0210179Y2 (en) | ||
JP2017020208A (en) | Unit type building structure | |
CN215563749U (en) | Novel grid suspended ceiling | |
CN217150785U (en) | Adjustable building decoration partition wall integrated structure | |
US20190093358A1 (en) | Brackets using trapezoidal metallic construction | |
KR200352245Y1 (en) | Apparatus for constructing finishing panels of ceiling or wall | |
CN214785638U (en) | Grid overhead frame and overhead floor | |
CN218779760U (en) | Assembled furred ceiling individual layer keel structure | |
CN112031253B (en) | Keel structure convenient to hang and fix and installation method thereof | |
CN211850182U (en) | Vertical keel hanging and partition wall fixing and mounting structure | |
WO2023054014A1 (en) | Panel device and installation structure therefor | |
CN112746701A (en) | Steel bar truss floor support plate with suspension ribs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20211029 |