CN211473026U - Light steel lamp slot closing-in keel structure - Google Patents

Light steel lamp slot closing-in keel structure Download PDF

Info

Publication number
CN211473026U
CN211473026U CN201920892954.6U CN201920892954U CN211473026U CN 211473026 U CN211473026 U CN 211473026U CN 201920892954 U CN201920892954 U CN 201920892954U CN 211473026 U CN211473026 U CN 211473026U
Authority
CN
China
Prior art keywords
keel
gypsum board
light
fossil fragments
close
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920892954.6U
Other languages
Chinese (zh)
Inventor
张茂生
徐建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN JUZHONG DECORATION DESIGN ENGINEERING CO LTD
Original Assignee
SHENZHEN JUZHONG DECORATION DESIGN ENGINEERING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN JUZHONG DECORATION DESIGN ENGINEERING CO LTD filed Critical SHENZHEN JUZHONG DECORATION DESIGN ENGINEERING CO LTD
Priority to CN201920892954.6U priority Critical patent/CN211473026U/en
Application granted granted Critical
Publication of CN211473026U publication Critical patent/CN211473026U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Non-Portable Lighting Devices Or Systems Thereof (AREA)

Abstract

The utility model relates to the technical field of building materials, in particular to a light steel light groove closing-in keel structure, which comprises a hanging rib, wherein a first top explosion screw is coaxially and tightly welded at the top end of the hanging rib, a first gypsum board is arranged at one side of the hanging rib, a second gypsum board is arranged below the first gypsum board, and a light groove closing-in keel is arranged at the position, close to the front side edge, of the top surface of the second gypsum board; this light steel light slot binding off fossil fragments structure is through being equipped with light slot binding off fossil fragments and the first fossil fragments that are the F type, make the false keel can peg graft between two light slot binding off fossil fragments and first fossil fragments, and second gypsum board and light slot binding off fossil fragments adopt rivet connection's mode, its simple easy operation of design, and complete light steel keel structure has been constituted, it is more convenient to install, also have better structural strength simultaneously, the unnecessary potential safety hazard has been avoided, the light slot binding off of having solved light steel keel gypsum board furred ceiling adopts wood to close up the problem that the hidden danger of installation easily appears.

Description

Light steel lamp slot closing-in keel structure
Technical Field
The utility model relates to a building material technical field specifically is a light steel lamp groove binding off fossil fragments structure.
Background
Light gauge steel is a novel building material, light gauge steel furred ceiling has light in weight, intensity is high, adapt to waterproofly, take precautions against earthquakes, prevent dust, give sound insulation, inhale the sound, efficiency such as constant temperature, be applicable to the molding decoration of multiple building roof, the interior outer wall body of building and the base material of rack-type furred ceiling, still have advantages such as time limit for a project is short, construction is simple and convenient simultaneously, its technology of traditional mixed keel frame of taking is complicated and the unstable structure, the ceiling fracture easily appears and then leads to the incident, traditional light trough binding off adopts the mode that battens or stuff are fixed simultaneously, its operation is complicated, the installation problem easily appears, in view of this, we propose a light gauge steel binding off keel structure.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a light steel light slot binding off fossil fragments structure to the light slot binding off of the light steel fossil fragments gypsum furred ceiling that proposes in solving above-mentioned background art adopts wood to close up the problem that the installation hidden danger easily appears.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a light steel light trough binding off fossil fragments structure, includes and hangs the muscle, it has first top explosion screw to hang the coaxial inseparable welding in top of muscle, it is equipped with first gypsum board to hang one side of muscle, the below of first gypsum board is equipped with the second gypsum board, the top surface of second gypsum board is close to front edge and is equipped with light trough binding off fossil fragments, the top surface of second gypsum board is close to right side edge and is equipped with first edge fossil fragments, light trough binding off fossil fragments with be equipped with the false keel between the first edge fossil fragments.
Hang the outer wall of muscle and be close to top department close welding have first fixed block, the top of first fixed block is equipped with second limit fossil fragments, the outer wall of hanging the muscle is close to bottom department close welding and has the second fixed block, the top of second fixed block is equipped with main joist, main joist with hang muscle sliding connection.
Be equipped with two first self tapping screws that are parallel to each other on the left surface of first gypsum board, first self tapping screw passes first gypsum board and respectively with second limit fossil fragments with main joist threaded connection, the light trough has been seted up on the top surface of second gypsum board, the bottom surface of second gypsum board is close to right side edge and is equipped with second self tapping screw, second self tapping screw passes the second gypsum board and with first limit fossil fragments threaded connection.
The two ends of the auxiliary keel are respectively in plug-in fit with the light groove closing-in keel and the first edge keel, a second top explosion screw is tightly welded on the right side face of the first edge keel, and the bottom end of the hanging rib is matched with the auxiliary keel.
Preferably, the first gypsum board and the second gypsum board are of an integrally formed structure.
Preferably, the integral shape of the light groove closing-in keel is F-shaped.
Preferably, the false keel, the light groove closing-in keel and the second gypsum board are fixedly connected through rivets.
Preferably, the light groove closing-in keel and the first side keel are positioned on the same vertical surface.
Preferably, the first gypsum board and the second gypsum board have a thickness of 12 mm.
Preferably, the material of the lifting rib is 8mm galvanized round steel with a screw mouth.
Compared with the prior art, the beneficial effects of the utility model are that: this light steel light slot binding off fossil fragments structure is through being equipped with light slot binding off fossil fragments and the first fossil fragments that are the F type, make the false keel can peg graft between two light slot binding off fossil fragments and first fossil fragments, and second gypsum board and light slot binding off fossil fragments adopt rivet connection's mode, its simple easy operation of design, and complete light steel keel structure has been constituted, it is more convenient to install, also have better structural strength simultaneously, the unnecessary potential safety hazard has been avoided, the light slot binding off of having solved light steel keel gypsum board furred ceiling adopts wood to close up the problem that the hidden danger of installation easily appears.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is an enlarged schematic view of the structure at A of the present invention;
fig. 3 is an enlarged schematic view of the structure at the position B of the present invention.
In the figure: 1. hanging the ribs; 11. a first fixed block; 12. a second edge keel; 13. a second fixed block; 14. a main keel; 2. a first gypsum board; 21. a first self-tapping screw; 3. a second gypsum board; 31. a lamp slot; 32. a second self-tapping screw; 4. a lamp groove closing keel; 5. a false keel; 6. a first edge keel; 7. a second knock-out screw; 8. a first knock-out screw.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature.
Example 1
A light steel light groove closing-in keel structure is shown in figures 1 to 3 and comprises a hanging rib 1, a first top explosion screw 8 is coaxially and tightly welded at the top end of the hanging rib 1, a first gypsum board 2 is arranged on one side of the hanging rib 1, a second gypsum board 3 is arranged below the first gypsum board 2, a light groove closing-in keel 4 is arranged at the edge of the top surface of the second gypsum board 3 close to the front side, a first side keel 6 is arranged at the edge of the top surface of the second gypsum board 3 close to the right side, a secondary keel 5 is arranged between the light groove closing-in keel 4 and the first side keel 6, a first fixing block 11 is tightly welded at the outer wall of the hanging rib 1 close to the top end, a second side keel 12 is arranged above the first fixing block 11, a second fixing block 13 is tightly welded at the outer wall of the hanging rib 1 close to the bottom end, a main keel 14 is arranged above the second fixing block 13, the main keel 14 is in sliding connection with the hanging rib 1, two first self, first self tapping screw 21 passes first gypsum board 2 and respectively with second limit fossil fragments 12 and main joist 14 threaded connection, light trough 31 has been seted up on the top surface of second gypsum board 3, the bottom surface of second gypsum board 3 is close to right side edge and is equipped with second self tapping screw 32, second self tapping screw 32 passes second gypsum board 3 and with first limit fossil fragments 6 threaded connection, the cooperation of pegging graft with light trough binding off fossil fragments 4 and first limit fossil fragments 6 respectively in the both ends of false keel 5, close welding has second top explosion screw 7 on the right flank of first limit fossil fragments 6, the bottom of hanging muscle 1 agrees with mutually with false keel 5.
Specifically, first gypsum board 2 and second gypsum board 3 are integrated into one piece structure, and integrated into one piece structure has better structural strength.
Specifically, the overall shape of the light groove closing-in keel 4 is F-shaped, which is convenient for inserting the auxiliary keel 5 on the light groove closing-in keel 4.
Specifically, false keel 5, light groove binding off fossil fragments 4 and second gypsum board 3 pass through rivet fixed connection, and rivet connection's mode convenient and fast has improved the efficiency of work.
Specifically, light trough binding off fossil fragments 4 and first edge fossil fragments 6 are located same vertical face, and its both ends of being convenient for false keel 5 can be pegged graft on light trough binding off fossil fragments 4 and first edge fossil fragments 6.
Further, the thickness of the first gypsum board 2 and the second gypsum board 3 is 12mm, and the gypsum boards are used for decoration.
In addition, the material of hanging muscle 1 adopts the galvanized round steel of 8mm area screw mouth, and the galvanized round steel has less quality and better structural strength, uses this material can promote the holistic life of fossil fragments.
Before the light steel light groove closing-in keel structure of the embodiment is used, a user firstly installs a first top-explosion screw 8 in a mounting hole which is punched in advance on a ceiling, then the user respectively penetrates a first self-tapping screw 21 through a first gypsum board 2 and is in threaded connection with a second side keel 12 and a main keel 14, namely a first gypsum board 2 and a second gypsum board 3 can be installed on a hanging rib 1, then the user installs a second top-explosion screw 7 in the mounting hole which is punched in advance on a wall, then the user places the light groove closing-in keel on the top surface of the second gypsum board 3, simultaneously inserts a secondary keel 5 between a light groove closing-in keel 4 and a first side keel 6 respectively, and finally the user rivets the second gypsum board 3, the light groove closing-in keel and the secondary keel through a riveting gun;
when the light steel light groove closing-in keel structure of the embodiment is used, the hanging ribs 1, the second side keels 12, the main keels 14, the auxiliary keels 5 and the first side keels 6 can bear the weight of the first gypsum board 2 and the second gypsum board 3.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only preferred examples of the present invention, and is not intended to limit the present invention, and that the present invention can have various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (7)

1. The utility model provides a light steel light trough binding off fossil fragments structure, includes hangs muscle (1), its characterized in that: a first top explosion screw (8) is coaxially and tightly welded at the top end of the hanging rib (1), a first gypsum board (2) is arranged on one side of the hanging rib (1), a second gypsum board (3) is arranged below the first gypsum board (2), a light groove closing-in keel (4) is arranged at the edge of the top surface of the second gypsum board (3) close to the front side, a first side keel (6) is arranged at the edge of the top surface of the second gypsum board (3) close to the right side, and a secondary keel (5) is arranged between the light groove closing-in keel (4) and the first side keel (6);
a first fixing block (11) is tightly welded on the outer wall of the lifting rib (1) close to the top end, a second side keel (12) is arranged above the first fixing block (11), a second fixing block (13) is tightly welded on the outer wall of the lifting rib (1) close to the bottom end, a main keel (14) is arranged above the second fixing block (13), and the main keel (14) is connected with the lifting rib (1) in a sliding manner;
two first self-tapping screws (21) which are parallel to each other are arranged on the left side face of the first gypsum board (2), the first self-tapping screws (21) penetrate through the first gypsum board (2) and are in threaded connection with the second side keel (12) and the main keel (14) respectively, a lamp groove (31) is formed in the top face of the second gypsum board (3), a second self-tapping screw (32) is arranged on the bottom face, close to the right side edge, of the second gypsum board (3), and the second self-tapping screw (32) penetrates through the second gypsum board (3) and is in threaded connection with the first side keel (6);
the both ends of false keel (5) respectively with light groove binding off fossil fragments (4) with first side fossil fragments (6) are pegged graft and are cooperated, it has second top explosion screw (7) to closely weld on the right flank of first side fossil fragments (6), hang the bottom of muscle (1) with false keel (5) agree with mutually.
2. The light steel light trough necking-in keel structure of claim 1, wherein: the first gypsum board (2) and the second gypsum board (3) are of an integrally formed structure.
3. The light steel light trough necking-in keel structure of claim 1, wherein: the integral shape of the light groove closing-in keel (4) is F-shaped.
4. The light steel light trough necking-in keel structure of claim 1, wherein: the auxiliary keel (5), the light groove closing-in keel (4) and the second gypsum board (3) are fixedly connected through rivets.
5. The light steel light trough necking-in keel structure of claim 1, wherein: the light groove closing-in keel (4) and the first side keel (6) are located on the same vertical surface.
6. The light steel light trough necking-in keel structure of claim 1, wherein: the thickness of the first gypsum board (2) and the second gypsum board (3) is 12 mm.
7. The light steel light trough necking-in keel structure of claim 1, wherein: the hanging rib (1) is made of 8mm galvanized round steel with a threaded opening.
CN201920892954.6U 2019-06-14 2019-06-14 Light steel lamp slot closing-in keel structure Active CN211473026U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920892954.6U CN211473026U (en) 2019-06-14 2019-06-14 Light steel lamp slot closing-in keel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920892954.6U CN211473026U (en) 2019-06-14 2019-06-14 Light steel lamp slot closing-in keel structure

Publications (1)

Publication Number Publication Date
CN211473026U true CN211473026U (en) 2020-09-11

Family

ID=72378431

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920892954.6U Active CN211473026U (en) 2019-06-14 2019-06-14 Light steel lamp slot closing-in keel structure

Country Status (1)

Country Link
CN (1) CN211473026U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113565252A (en) * 2021-07-21 2021-10-29 济南观唐装饰设计有限公司 Reflective lamp groove outward-exploring construction process
CN113700206A (en) * 2021-09-24 2021-11-26 苏州美瑞德建筑装饰有限公司 Gypsum board suspended ceiling structure with modular design lamp area pipeline

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113565252A (en) * 2021-07-21 2021-10-29 济南观唐装饰设计有限公司 Reflective lamp groove outward-exploring construction process
CN113700206A (en) * 2021-09-24 2021-11-26 苏州美瑞德建筑装饰有限公司 Gypsum board suspended ceiling structure with modular design lamp area pipeline

Similar Documents

Publication Publication Date Title
CN211473026U (en) Light steel lamp slot closing-in keel structure
CN212129774U (en) Mounting structure of interior decoration board
CN108661180B (en) Roof of container house
CN210710243U (en) Car with can dismantle decorative layer
CN214614964U (en) Integral type joint fossil fragments furred ceiling structure
CN209277406U (en) A kind of aluminium-plastic panel safety mounting system for flat lock metal Roof
CN214170394U (en) Invisible protective net
CN216340617U (en) Clamping and hanging design and installation structure for prefabricated wall corrugated board
CN204876447U (en) Fixed fossil fragments of using of composite wall panel
CN216239286U (en) Grade-falling suspended ceiling
CN218668049U (en) Energy-saving building interior wall partition wall structure
CN216276404U (en) Aluminum ceiling with high connection tightness for market decoration
CN217759516U (en) Glass magnesium color steel spliced ceiling beam
CN212304103U (en) Lamp socket with hidden hook
CN214498218U (en) Adjustable wallboard back-hanging piece
CN212478371U (en) Metal composite board fillet mounting structure
CN216840345U (en) Assembled decorative board and wall structure
CN213334665U (en) Clamping type section bar fixing structure
CN219704902U (en) Spanner for expansion joint of suspended ceiling straight plug
CN215442821U (en) Easily install shingle nail
CN213897882U (en) Mounting structure of assembled hole board
CN216883665U (en) Vertical serging clamp
CN214329537U (en) Beam-slab connecting structure and suspended ceiling using same
CN216446414U (en) Decorative board dry hanging assembly
CN213806107U (en) Partition ceiling profile structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant