CN113506014A - Parameter change notification method, system, storage medium and electronic equipment - Google Patents

Parameter change notification method, system, storage medium and electronic equipment Download PDF

Info

Publication number
CN113506014A
CN113506014A CN202110836323.4A CN202110836323A CN113506014A CN 113506014 A CN113506014 A CN 113506014A CN 202110836323 A CN202110836323 A CN 202110836323A CN 113506014 A CN113506014 A CN 113506014A
Authority
CN
China
Prior art keywords
change
notification
emergency
parameter
node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110836323.4A
Other languages
Chinese (zh)
Inventor
胡一卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Bank Corp
Original Assignee
China Construction Bank Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Bank Corp filed Critical China Construction Bank Corp
Priority to CN202110836323.4A priority Critical patent/CN113506014A/en
Publication of CN113506014A publication Critical patent/CN113506014A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Data Mining & Analysis (AREA)
  • Telephonic Communication Services (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses a method, a system, a storage medium and an electronic device for notifying parameter change, which can obtain a parameter change application form of a process node next to a parameter change application node submitted by the parameter change application node, wherein the parameter change application form comprises the following steps: change information of the target change parameter; analyzing the change information so as to determine the urgency degree of the change of the target change parameter; determining a corresponding notification strategy according to the emergency degree; and controlling at least one node in the process nodes to carry out corresponding parameter change notification according to the notification strategy. The notification modes, the notification times, the notification interval duration and the like used by different notification strategies can be different, so that the importance degree of parameter change corresponds to the notification strategies, actual conditions are met, occupation of the less important parameter change on notification resources can be reduced to a certain extent, and the effective rate of the notification resources is improved.

Description

Parameter change notification method, system, storage medium and electronic equipment
Technical Field
The present invention relates to the field of data transmission, and in particular, to a method, a system, a storage medium, and an electronic device for notifying parameter changes.
Background
The parameter change comprises the links of parameter application, parameter change analysis, parameter customization, parameter approval, parameter maintenance, parameter review and the like, is a common flow in the parameter operation and maintenance work, and the current conventional way of sending a notification to each link of a parameter change network is as follows: and the parameter centralized management platform uniformly sends notification messages in the forms of mails, short messages and the like to all personnel in a certain link to which the parameter change flow is transferred. Of course, before using the parameter change network of the parameter management platform, each department will configure the post authority for the relevant personnel according to the respective post to be circulated, and the parameter change personnel having the post authority can receive the notification message about the post.
Parameter change involves many assemblies and many systems, and the same assembly may have few, several, dozens of parameter change applications within one day. Thus, a large amount of notification resources are occupied for daily parameter change notification, and the consumption of the notification resources is enormous.
Disclosure of Invention
In view of the above, the present invention provides a parameter change notification method, system, storage medium and electronic device that overcome or at least partially solve the above problems.
In a first aspect, a parameter change notification method is applied to a parameter change system, which includes a plurality of change networks and a message module, wherein each change network includes a plurality of process nodes and uses a parameter change application node in the process nodes as a start node;
the method comprises the following steps:
the message module obtains a parameter change application form of a process node next to the parameter change application node submitted by the parameter change application node, wherein the parameter change application form comprises: change information of the target change parameter;
the message module analyzes the change information so as to determine the urgency degree of the change of the target change parameter;
the message module determines a corresponding notification strategy according to the emergency degree;
and the message module controls at least one node in the process nodes to carry out corresponding parameter change notification according to the notification strategy.
With reference to the first aspect, in some optional embodiments, the change information includes: at least one of flow type information, time information, and influence range information;
the degree of urgency includes: first-level emergency, second-level emergency and third-level emergency;
wherein the flow type information includes: a standard flow type, a conventional flow type and a major flow type; the time information includes: the generation time of the parameter change request form and the effective time of the target change parameter; the influence range information includes: the number of the bank outlets influenced by the change of the target change parameters;
the emergency degree of the primary emergency is greater than the emergency degree of the secondary emergency, and the emergency degree of the secondary emergency is greater than the emergency degree of the tertiary emergency.
Optionally, in some optional embodiments, the analyzing the change information to determine the urgency of the change of the target change parameter includes:
if the change information meets at least one of a first condition, a second condition and a third condition, determining the emergency degree as the first-level emergency;
if the change information meets at least one of a condition four, a condition five and a condition six, determining that the emergency degree is the secondary emergency;
if the change information meets at least one of a seventh condition, an eighth condition and a ninth condition, determining that the emergency degree is the third-level emergency;
wherein the first condition is: the flow type information is the major flow type; the second condition is as follows: the time difference between the effective time and the generation time is not greater than a first preset time threshold; the third condition is as follows: the number of the bank outlets is larger than a first preset number threshold;
the fourth condition is that: the flow type information is the conventional flow type; the fifth condition is as follows: the time difference between the effective time and the generating time is greater than a first preset time threshold and not greater than a second preset time threshold; the sixth condition is that: the number of the bank outlets is not more than a first preset number threshold and is more than a second preset number threshold;
the seventh condition is: the process type information is the standard process type; the eighth condition is: the time difference between the effective time and the generation time is greater than the second preset time threshold; the ninth condition is that: the number of the bank outlets is not more than the second preset number threshold.
Optionally, in some optional embodiments, the determining a corresponding notification policy according to the urgency level includes:
if the emergency degree is the first-level emergency, determining that the notification strategy is an emergency notification strategy;
wherein the emergency notification policy is: after the parameter change application single flow is transferred to any flow node after the parameter change application node, controlling the flow node to execute at least one of a first mode, a second mode, a third mode and a fourth mode;
the method comprises the steps that firstly, corresponding mail notifications are continuously sent to preset message receiving personnel for multiple times;
secondly, corresponding short message notifications are continuously sent to the message receiving personnel for multiple times;
thirdly, popping up corresponding pop-up window reminders continuously for multiple times;
and fourthly, continuously and repeatedly broadcasting the corresponding voice prompt.
Optionally, in some optional embodiments, the determining a corresponding notification policy according to the urgency level includes:
if the emergency degree is the secondary emergency, determining that the notification strategy is a conventional notification strategy;
wherein the normal notification policy is: after the parameter change application single flow is transferred to any flow node after the parameter change application node, controlling the flow node to execute at least one of a fifth mode, a sixth mode, a seventh mode and an eighth mode;
sending corresponding mail notification for 1 time to a preset message receiver;
the method six, send 1 corresponding message notice to the said message receiving personnel;
a seventh mode, popping up 1 corresponding popup window prompt;
and the mode eight is used for broadcasting the corresponding voice prompt for 1 time.
Optionally, in some optional embodiments, the determining a corresponding notification policy according to the urgency level includes:
if the emergency degree is the third-level emergency, determining that the notification strategy is a simple notification strategy;
the simple notification policy is as follows: and after the parameter change application single flow is transferred to the last flow node of the standard flow type, controlling the flow node to send 1-time mail notification or send one-time short message notification to a preset message receiver.
In a second aspect, a parameter changing system includes a plurality of changing networks and a message module, where each of the changing networks includes a plurality of process nodes and each of the changing networks uses a parameter change application node in the process nodes as a start node;
the message module specifically includes: the system comprises a request form obtaining unit, an analysis unit, a determination unit and a notification unit;
the application form obtaining unit is configured to execute obtaining of a parameter change application form of the process node next to the parameter change application node submitted by the parameter change application node, where the parameter change application form includes: change information of the target change parameter;
the analysis unit is configured to analyze the change information so as to determine the urgency of the change of the target change parameter;
the determining unit is configured to determine a corresponding notification policy according to the urgency;
and the notification unit is configured to execute and control at least one node in the process nodes to perform corresponding parameter change notification according to the notification policy.
With reference to the second aspect, in some optional embodiments, the change information includes: at least one of flow type information, time information, and influence range information;
the degree of urgency includes: first-level emergency, second-level emergency and third-level emergency;
wherein the flow type information includes: a standard flow type, a conventional flow type and a major flow type; the time information includes: the generation time of the parameter change request form and the effective time of the target change parameter; the influence range information includes: the number of the bank outlets influenced by the change of the target change parameters;
the emergency degree of the primary emergency is greater than the emergency degree of the secondary emergency, and the emergency degree of the secondary emergency is greater than the emergency degree of the tertiary emergency.
In a third aspect, a computer-readable storage medium stores thereon a program that realizes any one of the above-described parameter change notification methods when executed by a processor.
In a fourth aspect, an electronic device includes at least one processor, and at least one memory, a bus, connected to the processor; the processor and the memory complete mutual communication through the bus; the processor is configured to call program instructions in the memory to perform any of the parameter change notification methods described above.
By means of the technical scheme, the parameter change notification method, the system, the storage medium and the electronic equipment are applied to a parameter change system, the system comprises a plurality of change networks and a message module, each change network comprises a plurality of process nodes, and parameter change application nodes in the process nodes are used as starting nodes; a parameter change application form of a next process node submitted to the parameter change application node by the parameter change application node may be obtained by the message module, where the parameter change application form includes: change information of the target change parameter; the message module analyzes the change information so as to determine the urgency degree of the change of the target change parameter; the message module determines a corresponding notification strategy according to the emergency degree; and the message module controls at least one node in the process nodes to carry out corresponding parameter change notification according to the notification strategy. Therefore, the invention can determine the corresponding notification strategy by analyzing the change information in the parameter change application form, and controls the corresponding node to notify according to the notification strategy. The notification modes, the notification times, the notification interval duration and the like used by different notification strategies can be different, and the specific requirement is determined according to the importance degree of the change of specific parameters, so that the importance degree of the change of the parameters corresponds to the notification strategies, and the notification strategies are relatively in line with the actual situation, the occupation of the notification resources (such as short messages and mailboxes) by the parameter change which is not very important can be reduced to a certain extent, and the effective rate of the notification resources is improved.
The foregoing description is only an overview of the technical solutions of the present invention, and the embodiments of the present invention are described below in order to make the technical means of the present invention more clearly understood and to make the above and other objects, features, and advantages of the present invention more clearly understandable.
Drawings
Various other advantages and benefits will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The drawings are only for purposes of illustrating the preferred embodiments and are not to be construed as limiting the invention. Also, like reference numerals are used to refer to like parts throughout the drawings. In the drawings:
FIG. 1 is a flow chart illustrating a parameter change notification method according to the present invention;
FIG. 2 is a schematic structural diagram of a parameter changing system according to the present invention;
fig. 3 shows a schematic structural diagram of an electronic device provided by the present invention.
Detailed Description
Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art.
As shown in fig. 1, the present invention provides a parameter change notification method, which is applied to a parameter change system, where the system includes multiple change networks and a message module, each change network includes multiple process nodes, and each change network uses a parameter change application node in the process nodes as a start node;
the method comprises the following steps: s100, S200, S300, and S400;
s100, the message module obtains a parameter change application form of a process node next to the parameter change application node submitted by the parameter change application node, wherein the parameter change application form comprises: change information of the target change parameter;
optionally, the parameter change system provided by the present invention may include 3 change networks, where the 1 st change network is a standard process, and the process nodes covered by the standard process sequentially are: the method comprises the steps of parameter change application node- > parameter change review node- > parameter change acceptance node- > parameter change maintenance node- > parameter change review node.
The 2 nd network change is a conventional process, and the process nodes covered by the conventional process are: the method comprises the steps of parameter change application node- > parameter change review node- > parameter change acceptance node- > parameter change customization node- > parameter change approval node- > parameter change maintenance node- > parameter change review node.
The 3 rd network change is a major process, and process nodes covered by the major process are: the method comprises the steps of parameter change application node- > parameter change review node- > parameter change acceptance node- > parameter change analysis node- > parameter change customization node- > parameter change review node- > parameter change approval node- > parameter change maintenance node- > parameter change review node.
Optionally, "- >" indicates the flow direction of the changed network, that is, indicates the flow direction of the parameter change request form, for the 3 changed networks, which is not limited in the present invention.
Optionally, the parameter change application node is used as a start node of any change network, and constructs a parameter change application form, and transmits the parameter change application form to a next process node, so that the parameter change application form flows in the corresponding change network, which is not limited in the present invention.
Optionally, the present invention may construct a parameter change application form at the parameter change application node to obtain the parameter change application form actively, or the parameter change application node may send the parameter change application form to a next process node, for example, to a parameter change review node, and also send the parameter change application form to an execution main body executing the present invention, so as to obtain the parameter change application form, which is not limited by the present invention.
That is, it can be understood that: after the parameter change application node constructs the parameter change application form or the parameter change application node sends the parameter change application form, the scheme of the invention is triggered, and the invention is not limited to this.
Optionally, in the change network provided by the present invention, when the parameter change application single flow is transferred to any flow node, a notification may be sent to corresponding personnel, including the parameter change application node, but how to send the notification is specifically determined according to change information of the target change parameter in the parameter change application single flow. That is, the notification policy finally obtained by the present invention may be applied to each process node of the whole change network, and the difference is that the message receiving personnel of each process node may be different, which is not limited by the present invention.
Optionally, the change information may be input and configured by the relevant person through the parameter change system, which is not limited in the present invention.
S200, the message module analyzes the change information so as to determine the emergency degree of the change of the target change parameter;
optionally, the change information includes detailed information of each target change parameter, and the urgency degree of the parameter change request form may be determined by analyzing the change information, where the urgency degree corresponds to a subsequent notification policy, which is not limited in the present invention.
Optionally, the present invention does not limit the specific content included in the modification information, and any feasible manner falls into the protection scope of the present invention. For example, reference may be made to alternative embodiment 1 provided by the present invention, which is not intended to be limiting.
Optionally, the present invention does not limit the specific process of analyzing the change information to obtain the urgency, and any feasible manner is within the scope of the present invention. For example, reference may be made to alternative embodiment 2 provided by the present invention, which is not intended to be limiting.
S300, the message module determines a corresponding notification strategy according to the emergency degree;
optionally, the urgency level and the notification policy in the present invention may be in a one-to-one correspondence relationship, and certainly, the urgency level may also be divided in more detail, so that the urgency level and the notification policy are in a many-to-one relationship, which is not limited in the present invention.
Optionally, the process of determining the corresponding notification policy according to the urgency level is not specifically limited, and any feasible manner is within the scope of the present invention. For example, reference may be made to alternative embodiment 3, alternative embodiment 4, and alternative embodiment 5 provided by the present invention, which is not limited by the present invention.
S400, the message module controls at least one node in the process nodes to carry out corresponding parameter change notification according to the notification strategy.
Optionally, because different parameters are changed in different ways, the affected ranges, the emergency degrees and the importance degrees are different, even the changed networks are different. Therefore, the corresponding parameter change notification can be performed according to the notification policy obtained by analysis, which is not limited by the present invention.
Optionally, the present invention does not limit the process of controlling at least one of the process nodes to perform corresponding parameter change notification according to the notification policy, and any feasible manner is within the protection scope of the present invention. For example, specific contents of the notification policy in optional embodiment 3, optional embodiment 4, and optional embodiment 5 provided by the present invention may be referred to, and the present invention is not limited thereto.
Therefore, the invention can determine the corresponding notification strategy by analyzing the change information in the parameter change application form, and controls the corresponding node to notify according to the notification strategy. The notification modes, the notification times, the notification interval duration and the like used by different notification strategies can be different, and the specific requirement is determined according to the importance degree of the change of specific parameters, so that the importance degree of the change of the parameters corresponds to the notification strategies, and the notification strategies are relatively in line with the actual situation, the occupation of the notification resources (such as short messages and mailboxes) by the parameter change which is not very important can be reduced to a certain extent, and the effective rate of the notification resources is improved.
Furthermore, the invention can reduce the work of the message receiving personnel, the message receiving personnel do not need to distinguish important notification messages from a large number of notification messages, and the working efficiency of related personnel can be improved to a certain extent, which is not limited by the invention.
Alternative embodiment 1:
in some optional embodiments, in combination with the embodiment shown in fig. 1, the change information includes: at least one of flow type information, time information, and influence range information;
the degree of urgency includes: first-level emergency, second-level emergency and third-level emergency;
wherein the flow type information includes: a standard flow type, a conventional flow type and a major flow type; the time information includes: the generation time of the parameter change request form and the effective time of the target change parameter; the influence range information includes: the number of the bank outlets influenced by the change of the target change parameters;
the emergency degree of the primary emergency is greater than the emergency degree of the secondary emergency, and the emergency degree of the secondary emergency is greater than the emergency degree of the tertiary emergency.
Optionally, the process type information may represent a degree of importance of a change network that the parameter change application form needs to pass through. Generally, the more significant the change network, the more flow nodes it passes through. That is, the 1 st change network can correspond to the standard flow type; the 2 nd change network mentioned above may correspond to the conventional flow type herein; the aforementioned 3 rd change network may correspond to a significant flow type, and the present invention is not limited thereto.
Optionally, the time information may represent a degree of urgency of a change of the change parameter related in the parameter change application form. That is, if a specific parameter needs to be changed, the time when the corresponding parameter is changed, i.e., the validation time, needs to be filled in the parameter change application form. The time difference between the generation time and the effective time of the parameter change request form reflects the urgency degree to a certain extent, and the smaller the time difference is, the more urgent is, the invention does not limit this.
Optionally, the influence range information may represent an influence range of the change parameter change in the parameter change request form. The influence range can be represented by the number of the influenced bank outlets, the administrative region covered by the influenced bank outlets, and the hierarchical division of the bank outlets by the insides of the banks. For example, the range of influence may be given by: the whole line, some first-level lines, some branch lines, some mesh points, and some mesh points, etc. are characterized, which is not limited by the present invention.
Alternative embodiment 2:
with reference to alternative embodiment 1, in some alternative embodiments, the S200 includes: step 1.1, step 1.2 and step 1.3;
step 1.1, if the change information meets at least one of a first condition, a second condition and a third condition, determining the emergency degree as the first-level emergency;
step 1.2, if the change information meets at least one of a condition four, a condition five and a condition six, determining that the emergency degree is the secondary emergency;
step 1.3, if the change information meets at least one of a seventh condition, an eighth condition and a ninth condition, determining that the emergency degree is the third-level emergency;
wherein the first condition is: the flow type information is the major flow type; the second condition is as follows: the time difference between the effective time and the generation time is not greater than a first preset time threshold; the third condition is as follows: the number of the bank outlets is larger than a first preset number threshold;
optionally, the first preset time threshold is not specifically limited, and may be set according to an actual situation, which is not limited in the present invention.
Optionally, the first preset number threshold is not specifically limited, and may be set according to an actual situation, which is not limited in the present invention.
The fourth condition is that: the flow type information is the conventional flow type; the fifth condition is as follows: the time difference between the effective time and the generating time is greater than a first preset time threshold and not greater than a second preset time threshold; the sixth condition is that: the number of the bank outlets is not more than a first preset number threshold and is more than a second preset number threshold;
optionally, the second preset time threshold is not specifically limited, and may be set according to an actual situation, but the first preset time threshold is smaller than the second preset time threshold, which is not limited in this regard.
Optionally, the second preset number threshold is not specifically limited, and may be set according to an actual situation, but the first preset number threshold is greater than the second preset number threshold, which is not limited in this regard.
The seventh condition is: the process type information is the standard process type; the eighth condition is: the time difference between the effective time and the generation time is greater than the second preset time threshold; the ninth condition is that: the number of the bank outlets is not more than the second preset number threshold.
Alternative embodiment 3:
with reference to alternative embodiment 1, in some alternative embodiments, the S300 includes: if the emergency degree is the first-level emergency, determining that the notification strategy is an emergency notification strategy;
wherein the emergency notification policy is: after the parameter change application single flow is transferred to any flow node after the parameter change application node, controlling the flow node to execute at least one of a first mode, a second mode, a third mode and a fourth mode;
the method comprises the steps that firstly, corresponding mail notifications are continuously sent to preset message receiving personnel for multiple times;
secondly, corresponding short message notifications are continuously sent to the message receiving personnel for multiple times;
thirdly, popping up corresponding pop-up window reminders continuously for multiple times;
and fourthly, continuously and repeatedly broadcasting the corresponding voice prompt.
Optionally, after the parameter change application single stream is forwarded to any flow node after the parameter change application node, the flow node is controlled to execute at least one of a first manner, a second manner, a third manner, and a fourth manner, which may be understood as follows: for all the process nodes, after the parameter change request form flow arrives, the process nodes can be controlled to perform notification and reminding according to all or part of the first mode, the second mode, the third mode and the fourth mode, and the method is not limited in this respect.
Optionally, the present invention does not limit the specific times of sending corresponding mail notifications for multiple times continuously, and does not limit the time interval between each mail notification, and may be set according to actual needs, which is not limited by the present invention. Similarly, the times and time intervals of the short message notification, the pop-up window reminding and the voice reminding are not particularly limited.
Alternative embodiment 4:
with reference to alternative embodiment 1, in some alternative embodiments, the S300 includes: if the emergency degree is the secondary emergency, determining that the notification strategy is a conventional notification strategy;
wherein the normal notification policy is: after the parameter change application single flow is transferred to any flow node after the parameter change application node, controlling the flow node to execute at least one of a fifth mode, a sixth mode, a seventh mode and an eighth mode;
sending corresponding mail notification for 1 time to a preset message receiver;
the method six, send 1 corresponding message notice to the said message receiving personnel;
a seventh mode, popping up 1 corresponding popup window prompt;
and the mode eight is used for broadcasting the corresponding voice prompt for 1 time.
Optionally, after the parameter change application single stream is transferred to any flow node after the parameter change application node, the flow node is controlled to execute at least one of a fifth mode, a sixth mode, a seventh mode and an eighth mode, which may be understood as follows: for all the process nodes, after the parameter change request form flow arrives, the process nodes can be controlled to perform notification and reminding according to all or part of the modes five, six, seven and eight, and the method is not limited in this respect.
Alternative embodiment 5:
with reference to alternative embodiment 1, in some alternative embodiments, the S300 includes: if the emergency degree is the third-level emergency, determining that the notification strategy is a simple notification strategy;
the simple notification policy is as follows: and after the parameter change application single flow is transferred to the last flow node of the standard flow type, controlling the flow node to send 1-time mail notification or send one-time short message notification to a preset message receiver.
Optionally, the simple notification policy may be understood as: and the parameter change application form does not carry out any notification in the process of circulating in the corresponding change network. And controlling the process nodes to send corresponding notifications only after the parameter change application single flow is transferred to the last process node of the change network.
Of course, besides sending the mail notification and the short message notification, the invention can also perform corresponding pop-up window reminding and voice reminding, and the invention is not limited to this.
As shown in fig. 2, the present invention provides a parameter changing system SYS, where the system SYS includes a plurality of changing networks and a message module 100, each of the changing networks includes a plurality of process nodes, and each of the changing networks uses a parameter change application node 10 in the process nodes as a start node;
the message module 100 specifically includes: a request form obtaining unit 101, an analysis unit 102, a determination unit 103, and a notification unit 104;
the application form obtaining unit 101 is configured to execute obtaining a parameter change application form of the process node next to the parameter change application node submitted by the parameter change application node, where the parameter change application form includes: change information of the target change parameter;
the analysis unit 102 is configured to perform analysis on the change information so as to determine the urgency of the change of the target change parameter;
the determining unit 103 is configured to perform determining a corresponding notification policy according to the urgency;
the notifying unit 104 is configured to execute control of at least one of the process nodes to perform corresponding parameter change notification according to the notification policy.
Optional example a, in combination with the implementation shown in fig. 2, in some optional implementations, the change information includes: at least one of flow type information, time information, and influence range information;
the degree of urgency includes: first-level emergency, second-level emergency and third-level emergency;
wherein the flow type information includes: a standard flow type, a conventional flow type and a major flow type; the time information includes: the generation time of the parameter change request form and the effective time of the target change parameter; the influence range information includes: the number of the bank outlets influenced by the change of the target change parameters;
the emergency degree of the primary emergency is greater than the emergency degree of the secondary emergency, and the emergency degree of the secondary emergency is greater than the emergency degree of the tertiary emergency.
Optional embodiment B, in combination with optional embodiment a, in some optional implementations, the parsing unit 102 includes: the system comprises a first analysis subunit, a second analysis subunit and a third analysis subunit;
the first analysis subunit is configured to determine that the emergency degree is the primary emergency degree if the change information satisfies at least one of a first condition, a second condition and a third condition;
the second analysis subunit is configured to determine that the urgency level is the secondary urgency level if the change information satisfies at least one of a condition four, a condition five, and a condition six;
the third analysis subunit is configured to determine that the urgency level is the third-level urgency if the change information satisfies at least one of a condition seven, a condition eight, and a condition nine;
wherein the first condition is: the flow type information is the major flow type; the second condition is as follows: the time difference between the effective time and the generation time is not greater than a first preset time threshold; the third condition is as follows: the number of the bank outlets is larger than a first preset number threshold;
the fourth condition is that: the flow type information is the conventional flow type; the fifth condition is as follows: the time difference between the effective time and the generating time is greater than a first preset time threshold and not greater than a second preset time threshold; the sixth condition is that: the number of the bank outlets is not more than a first preset number threshold and is more than a second preset number threshold;
the seventh condition is: the process type information is the standard process type; the eighth condition is: the time difference between the effective time and the generation time is greater than the second preset time threshold; the ninth condition is that: the number of the bank outlets is not more than the second preset number threshold.
Optional embodiment C, in combination with optional embodiment a, in some optional implementations, the determining unit 103 includes: a first determining subunit;
the first determining subunit is configured to determine that the notification policy is an emergency notification policy if the emergency degree is the primary emergency;
wherein the emergency notification policy is: after the parameter change application single flow is transferred to any flow node after the parameter change application node, controlling the flow node to execute at least one of a first mode, a second mode, a third mode and a fourth mode;
the method comprises the steps that firstly, corresponding mail notifications are continuously sent to preset message receiving personnel for multiple times;
secondly, corresponding short message notifications are continuously sent to the message receiving personnel for multiple times;
thirdly, popping up corresponding pop-up window reminders continuously for multiple times;
and fourthly, continuously and repeatedly broadcasting the corresponding voice prompt.
Optional embodiment D, in combination with optional embodiment a, in some optional implementations, the determining unit 103 includes: a second determining subunit;
the second determining subunit is configured to perform, if the degree of urgency is the secondary urgency, determining that the notification policy is a normal notification policy;
wherein the normal notification policy is: after the parameter change application single flow is transferred to any flow node after the parameter change application node, controlling the flow node to execute at least one of a fifth mode, a sixth mode, a seventh mode and an eighth mode;
sending corresponding mail notification for 1 time to a preset message receiver;
the method six, send 1 corresponding message notice to the said message receiving personnel;
a seventh mode, popping up 1 corresponding popup window prompt;
and the mode eight is used for broadcasting the corresponding voice prompt for 1 time.
Optional embodiment E, in combination with optional embodiment a, in some optional implementations, the determining unit 103 includes: a third determining subunit;
the third determining subunit is configured to determine that the notification policy is a simple notification policy if the urgency level is the third-level urgency;
the simple notification policy is as follows: and after the parameter change application single flow is transferred to the last flow node of the standard flow type, controlling the flow node to send 1-time mail notification or send one-time short message notification to a preset message receiver.
The present invention provides a computer-readable storage medium having stored thereon a program which, when executed by a processor, implements any of the parameter change notification methods described above.
As shown in fig. 3, the present invention provides an electronic device 70, wherein the electronic device 70 comprises at least one processor 701, at least one memory 702 connected to the processor 701, and a bus 703; the processor 701 and the memory 702 complete communication with each other through the bus 703; the processor 701 is configured to call program instructions in the memory 702 to execute any one of the parameter change notification methods described above.
In this application, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
All the embodiments in the present specification are described in a related manner, and the same and similar parts among the embodiments may be referred to each other, and each embodiment focuses on the differences from the other embodiments. In particular, for the system embodiment, since it is substantially similar to the method embodiment, the description is simple, and for the relevant points, reference may be made to the partial description of the method embodiment.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
The above description is only for the preferred embodiment of the present invention, and is not intended to limit the scope of the present invention. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention shall fall within the protection scope of the present invention.

Claims (10)

1. A parameter change notification method is characterized in that the method is applied to a parameter change system, the system comprises a plurality of change networks and a message module, each change network comprises a plurality of process nodes, and the process nodes take a parameter change application node as a starting node;
the method comprises the following steps:
the message module obtains a parameter change application form of a process node next to the parameter change application node submitted by the parameter change application node, wherein the parameter change application form comprises: change information of the target change parameter;
the message module analyzes the change information so as to determine the urgency degree of the change of the target change parameter;
the message module determines a corresponding notification strategy according to the emergency degree;
and the message module controls at least one node in the process nodes to carry out corresponding parameter change notification according to the notification strategy.
2. The method of claim 1, wherein the change information comprises: at least one of flow type information, time information, and influence range information;
the degree of urgency includes: first-level emergency, second-level emergency and third-level emergency;
wherein the flow type information includes: a standard flow type, a conventional flow type and a major flow type; the time information includes: the generation time of the parameter change request form and the effective time of the target change parameter; the influence range information includes: the number of the bank outlets influenced by the change of the target change parameters;
the emergency degree of the primary emergency is greater than the emergency degree of the secondary emergency, and the emergency degree of the secondary emergency is greater than the emergency degree of the tertiary emergency.
3. The method of claim 2, wherein the parsing the change information to determine the urgency of the change to the target change parameter comprises:
if the change information meets at least one of a first condition, a second condition and a third condition, determining the emergency degree as the first-level emergency;
if the change information meets at least one of a condition four, a condition five and a condition six, determining that the emergency degree is the secondary emergency;
if the change information meets at least one of a seventh condition, an eighth condition and a ninth condition, determining that the emergency degree is the third-level emergency;
wherein the first condition is: the flow type information is the major flow type; the second condition is as follows: the time difference between the effective time and the generation time is not greater than a first preset time threshold; the third condition is as follows: the number of the bank outlets is larger than a first preset number threshold;
the fourth condition is that: the flow type information is the conventional flow type; the fifth condition is as follows: the time difference between the effective time and the generating time is greater than a first preset time threshold and not greater than a second preset time threshold; the sixth condition is that: the number of the bank outlets is not more than a first preset number threshold and is more than a second preset number threshold;
the seventh condition is: the process type information is the standard process type; the eighth condition is: the time difference between the effective time and the generation time is greater than the second preset time threshold; the ninth condition is that: the number of the bank outlets is not more than the second preset number threshold.
4. The method of claim 2, wherein determining a corresponding notification policy based on the urgency comprises:
if the emergency degree is the first-level emergency, determining that the notification strategy is an emergency notification strategy;
wherein the emergency notification policy is: after the parameter change application single flow is transferred to any flow node after the parameter change application node, controlling the flow node to execute at least one of a first mode, a second mode, a third mode and a fourth mode;
the method comprises the steps that firstly, corresponding mail notifications are continuously sent to preset message receiving personnel for multiple times;
secondly, corresponding short message notifications are continuously sent to the message receiving personnel for multiple times;
thirdly, popping up corresponding pop-up window reminders continuously for multiple times;
and fourthly, continuously and repeatedly broadcasting the corresponding voice prompt.
5. The method of claim 2, wherein determining a corresponding notification policy based on the urgency comprises:
if the emergency degree is the secondary emergency, determining that the notification strategy is a conventional notification strategy;
wherein the normal notification policy is: after the parameter change application single flow is transferred to any flow node after the parameter change application node, controlling the flow node to execute at least one of a fifth mode, a sixth mode, a seventh mode and an eighth mode;
sending corresponding mail notification for 1 time to a preset message receiver;
the method six, send 1 corresponding message notice to the said message receiving personnel;
a seventh mode, popping up 1 corresponding popup window prompt;
and the mode eight is used for broadcasting the corresponding voice prompt for 1 time.
6. The method of claim 2, wherein determining a corresponding notification policy based on the urgency comprises:
if the emergency degree is the third-level emergency, determining that the notification strategy is a simple notification strategy;
the simple notification policy is as follows: and after the parameter change application single flow is transferred to the last flow node of the standard flow type, controlling the flow node to send 1-time mail notification or send one-time short message notification to a preset message receiver.
7. A parameter changing system is characterized in that the system comprises a plurality of changing networks and a message module, wherein each changing network comprises a plurality of process nodes and takes a parameter changing application node in the process nodes as a starting node;
the message module specifically includes: the system comprises a request form obtaining unit, an analysis unit, a determination unit and a notification unit;
the application form obtaining unit is configured to execute obtaining of a parameter change application form of the process node next to the parameter change application node submitted by the parameter change application node, where the parameter change application form includes: change information of the target change parameter;
the analysis unit is configured to analyze the change information so as to determine the urgency of the change of the target change parameter;
the determining unit is configured to determine a corresponding notification policy according to the urgency;
and the notification unit is configured to execute and control at least one node in the process nodes to perform corresponding parameter change notification according to the notification policy.
8. The system of claim 7, wherein the change information comprises: at least one of flow type information, time information, and influence range information;
the degree of urgency includes: first-level emergency, second-level emergency and third-level emergency;
wherein the flow type information includes: a standard flow type, a conventional flow type and a major flow type; the time information includes: the generation time of the parameter change request form and the effective time of the target change parameter; the influence range information includes: the number of the bank outlets influenced by the change of the target change parameters;
the emergency degree of the primary emergency is greater than the emergency degree of the secondary emergency, and the emergency degree of the secondary emergency is greater than the emergency degree of the tertiary emergency.
9. A computer-readable storage medium on which a program is stored, the program implementing the parameter change notification method according to any one of claims 1 to 6 when executed by a processor.
10. An electronic device comprising at least one processor, and at least one memory, bus connected to the processor; the processor and the memory complete mutual communication through the bus; the processor is configured to call program instructions in the memory to perform the parameter change notification method of any of claims 1 to 6.
CN202110836323.4A 2021-07-23 2021-07-23 Parameter change notification method, system, storage medium and electronic equipment Pending CN113506014A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110836323.4A CN113506014A (en) 2021-07-23 2021-07-23 Parameter change notification method, system, storage medium and electronic equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110836323.4A CN113506014A (en) 2021-07-23 2021-07-23 Parameter change notification method, system, storage medium and electronic equipment

Publications (1)

Publication Number Publication Date
CN113506014A true CN113506014A (en) 2021-10-15

Family

ID=78013826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110836323.4A Pending CN113506014A (en) 2021-07-23 2021-07-23 Parameter change notification method, system, storage medium and electronic equipment

Country Status (1)

Country Link
CN (1) CN113506014A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106980643A (en) * 2017-02-14 2017-07-25 阿里巴巴集团控股有限公司 Change sending method, device and the electronic equipment of message
CN107770754A (en) * 2017-10-23 2018-03-06 中兴通讯股份有限公司 A kind of notice sending method, device and system
CN110619504A (en) * 2018-06-19 2019-12-27 阿里巴巴集团控股有限公司 Service change processing method, device and system and electronic equipment
CN112070476A (en) * 2020-09-03 2020-12-11 北京百度网讯科技有限公司 Information notification method and device
CN112152778A (en) * 2020-09-22 2020-12-29 腾讯科技(深圳)有限公司 Node management method and device and electronic equipment
CN112347202A (en) * 2020-11-27 2021-02-09 中国工商银行股份有限公司 Method and device for notifying data change message

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106980643A (en) * 2017-02-14 2017-07-25 阿里巴巴集团控股有限公司 Change sending method, device and the electronic equipment of message
CN107770754A (en) * 2017-10-23 2018-03-06 中兴通讯股份有限公司 A kind of notice sending method, device and system
CN110619504A (en) * 2018-06-19 2019-12-27 阿里巴巴集团控股有限公司 Service change processing method, device and system and electronic equipment
CN112070476A (en) * 2020-09-03 2020-12-11 北京百度网讯科技有限公司 Information notification method and device
CN112152778A (en) * 2020-09-22 2020-12-29 腾讯科技(深圳)有限公司 Node management method and device and electronic equipment
CN112347202A (en) * 2020-11-27 2021-02-09 中国工商银行股份有限公司 Method and device for notifying data change message

Similar Documents

Publication Publication Date Title
CN106301919A (en) Alarm system of privatized cloud platform and implementation method thereof
CN111242304B (en) Artificial intelligence model processing method and device based on federal learning in O-RAN system
CN107786949A (en) Method, apparatus, server and the storage medium of information channel switching
CN112749221A (en) Data task scheduling method and device, storage medium and scheduling tool
CN111813524B (en) Task execution method and device, electronic equipment and storage medium
CN110011843A (en) Alarm information processing method, electronic equipment and storage medium
CN109118170A (en) Display methods, device and the computer readable storage medium of house property maintenance task
CN115271130A (en) Dynamic scheduling method and system for maintenance order of ship main power equipment
CN110266777A (en) The robot of intelligent cloud platform alarms and session method
CN113438681A (en) Feasibility evaluation method and device of network slice and computing equipment
CN111626497A (en) People flow prediction method, device, equipment and storage medium
CN113506014A (en) Parameter change notification method, system, storage medium and electronic equipment
CN111126816B (en) Method and device for labor-hour management based on gridding management
CN116402315A (en) Event reporting task response method and device
CN116074260A (en) Service slice scheduling method in power network
Shneer et al. Stability of a standard decentralised medium access
Van Uitert et al. A reduced-load equivalence for Generalised Processor Sharing networks with long-tailed input flows
CN113825149B (en) 5G slice network element function automatic cutting method and device and computing equipment
CN111190788B (en) Data monitoring method and device, electronic equipment and readable medium
Vinogradenko et al. Adaptive System Monitoring of the Technical Condition Technological Objects Based on Wireless Sensor Networks
CN116599911B (en) Data stream scheduling calculation method, device, equipment and readable storage medium
CN111796950B (en) Data processing method and system
CN109600321A (en) Message forwarding method and device
Runggeratigul et al. Link capacity assignment in packet-switched networks: the case of piecewise linear concave cost function
Zhou et al. Study on berth allocation problem with variable service priority in multi-user container terminal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination