CN113487451A - Amusement park management system and method based on internet - Google Patents

Amusement park management system and method based on internet Download PDF

Info

Publication number
CN113487451A
CN113487451A CN202110635918.3A CN202110635918A CN113487451A CN 113487451 A CN113487451 A CN 113487451A CN 202110635918 A CN202110635918 A CN 202110635918A CN 113487451 A CN113487451 A CN 113487451A
Authority
CN
China
Prior art keywords
information
module
facility
management
playground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110635918.3A
Other languages
Chinese (zh)
Inventor
王必强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haikou Jimi Internet Technology Co ltd
Original Assignee
Haikou Jimi Internet Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Haikou Jimi Internet Technology Co ltd filed Critical Haikou Jimi Internet Technology Co ltd
Priority to CN202110635918.3A priority Critical patent/CN113487451A/en
Publication of CN113487451A publication Critical patent/CN113487451A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/14Travel agencies
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Abstract

The application discloses a playground management system and method based on the internet, which are used for collecting people number distribution information and queuing information of each project in a playground, acquiring information of maintenance and detection of each facility in the playground by workers, and uploading the acquired information to a cloud management platform and a cloud database. The number distribution information, the queuing information and the facility maintenance detection information are analyzed respectively, the analysis results are transmitted to the playground management department, the playground management department makes work response according to the analysis results, the analysis results and the work response results are summarized, and the summarized results are stored in the cloud database, so that the playground management department can manage the information conveniently, and clients can obtain information related to the playground conveniently. The system solves the technical problems that the existing playground management system is simple, the client cannot remotely know the queuing condition of each project and the state information of each facility in the playground, and the client experience is low.

Description

Amusement park management system and method based on internet
Technical Field
The application belongs to the technical field of playground management, and particularly relates to a playground management system and method based on the Internet.
Background
With the continuous improvement of living standard of people, many people enjoy amusement parks to play when traveling outside, tourists usually select amusement projects according to a map provided by the amusement park, and since the tourists do not know the specific situation of each amusement project in the amusement park, after the tourists arrive at the selected amusement project, a lot of people probably queue the amusement project, and no matter the tourists select to play other projects or wait in queue, a lot of time is wasted. The existing playground management system is simple, a client cannot remotely know the queuing condition of each project and the state information of each facility in the playground, and the experience of the client is low.
Disclosure of Invention
The application provides a playground management system and method based on the internet, which are used for solving the technical problems that the existing playground management system is simple, customers cannot remotely know the queuing conditions of all projects of a playground and the state information of all facilities, and the customer experience is low.
In view of the above, the present application provides an internet-based casino management system, comprising: the system comprises an information acquisition module and a cloud management platform;
the information acquisition module comprises a people flow acquisition module and a facility management module;
the system comprises a people flow acquisition module, a cloud management platform and a cloud database, wherein the people flow acquisition module is used for acquiring people number distribution information and queuing information of each project in a recreation ground and uploading the information to the cloud management platform and the cloud database;
the system comprises a facility management module, a cloud management platform and a cloud database, wherein the facility management module is used for acquiring information of maintenance and detection of each facility in the amusement park by workers and uploading the information to the cloud management platform and the cloud database;
the cloud management platform comprises an information analysis module and an information processing module;
the information analysis module is used for analyzing and summarizing the people number distribution information and the queuing information and analyzing the operation safety of the facility information;
the information processing module is used for transmitting the analysis result obtained by the information analysis module to the playground management terminal, so that the playground management terminal returns a response result to the information processing module after a playground management department makes a work response according to the analysis result;
the information processing module is also used for summarizing the analysis result and the response result and storing the analysis result and the response result in a cloud database.
Optionally, the people flow collecting module comprises a people number collecting module and a project queuing information module;
the number acquisition module is used for acquiring the number distribution information of each region in the amusement park acquired by the preset acquisition device;
and the project queuing information module is used for acquiring real-time queuing information of each project in the playground.
Optionally, the preset acquisition device comprises cameras arranged at various areas of the amusement park and positioning wearing pieces worn on each person in the amusement park.
Optionally, the facility management module comprises a facility maintenance module and a facility detection module;
the facility maintenance module is used for acquiring image information for maintaining each facility by a worker;
and the facility detection module is used for acquiring detection information of detecting each facility by a worker before the operation of each facility.
Optionally, the information acquisition module further comprises a service supervision module;
and the service supervision module is used for acquiring image information and voice information operated by a worker in working time and uploading the image information and the voice information to the cloud management platform and the cloud database.
Optionally, the service supervision module comprises a behavior supervision module and a voice supervision module;
the behavior supervision module is used for acquiring image information of operating facilities and service clients of workers in the working process;
and the voice supervision module is used for collecting voice information of a service customer of a worker during working.
Optionally, the information acquisition module further comprises an environmental quality detection module;
and the environment quality detection module is used for detecting the sanitation information and the air quality information of each area in the amusement park and uploading the sanitation information and the air quality information to the cloud management platform and the cloud database.
Optionally, the information processing module comprises an information summarizing module and a character input module;
the information summarizing module is used for summarizing the analysis result and the work response result into an information table;
and the character input module is used for naming the information table summarized by the information summarizing module.
Optionally, the cloud management platform further comprises a customer evaluation management module;
and the client evaluation management module is used for acquiring the evaluation uploaded by the client and classifying the evaluation into advantages and disadvantages.
The second aspect of the present application further provides an internet-based casino management method, including:
collecting the number distribution information of people in the amusement park and the queuing information of each project, and uploading the information to a cloud management platform and a cloud database;
the method comprises the steps that information of maintenance and detection of each facility in the amusement park by workers is obtained and uploaded to a cloud management platform and a cloud database;
analyzing and summarizing the people number distribution information and the queuing information, and analyzing the operation safety of the facility information;
and transmitting the analysis result to the amusement park management department, so that the amusement park management department makes a work response according to the analysis result, and summarizing and processing the analysis result and the work response result and storing the result in a cloud database.
According to the technical scheme, the embodiment of the application has the following advantages:
the internet-based playground management system and method collect people number distribution information and queuing information of each project in a playground, acquire information of maintenance and detection of each facility in the playground by workers, and upload the acquired information to a cloud management platform and a cloud database. The number distribution information, the queuing information and the facility maintenance detection information are analyzed respectively, the analysis results are transmitted to the playground management department, the playground management department makes work response according to the analysis results, the analysis results and the work response results are summarized, and the summarized results are stored in the cloud database, so that the playground management department can manage the information conveniently, and clients can obtain information related to the playground conveniently. The system solves the technical problems that the existing playground management system is simple, the client cannot remotely know the queuing condition of each project and the state information of each facility in the playground, and the client experience is low.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings needed to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments described in the present application, and other drawings can be obtained by those skilled in the art according to the drawings.
FIG. 1 is a schematic diagram of an Internet-based casino management system provided in an embodiment of the present application;
fig. 2 is another schematic structural diagram of an internet-based casino management system provided in an embodiment of the present application;
fig. 3 is a schematic flow chart of an internet-based casino management method provided in an embodiment of the present application.
Detailed Description
In order to make the technical solutions of the present application better understood, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
Example 1
For ease of understanding, referring to fig. 1, the present application provides an internet-based casino management system, comprising: the system comprises an information acquisition module and a cloud management platform;
the information acquisition module comprises a people flow acquisition module and a facility management module;
the system comprises a people flow acquisition module, a cloud management platform and a cloud database, wherein the people flow acquisition module is used for acquiring people number distribution information and queuing information of each project in a recreation ground and uploading the information to the cloud management platform and the cloud database;
the system comprises a facility management module, a cloud management platform and a cloud database, wherein the facility management module is used for acquiring information of maintenance and detection of each facility in the amusement park by workers and uploading the information to the cloud management platform and the cloud database;
the cloud management platform comprises an information analysis module and an information processing module;
the information analysis module is used for analyzing and summarizing the people number distribution information and the queuing information and analyzing the operation safety of the facility information;
the information processing module is used for transmitting the analysis result obtained by the information analysis module to the playground management terminal, so that the playground management terminal returns a response result to the information processing module after a playground management department makes a work response according to the analysis result;
the information processing module is also used for summarizing the analysis result and the response result and storing the analysis result and the response result in a cloud database.
It should be noted that the people flow rate acquisition module is used for acquiring the people number distribution information and the queuing information of each project in the playground, the people flow rate acquisition module is arranged in each area in the playground, the people number condition and the project queuing information of each time period of each area are acquired in real time, the people flow rate acquisition module can be set to update and upload acquired data every 3-5 minutes, warm prompts can be sent when the total number of people exceeds 150 and the number of people queued exceeds 50, a client is advised to play other projects with less people number in queue first, the playing time is reasonably arranged, and the people number condition mentioned in the embodiment can be set according to the actual condition of the playground. The user can remotely reserve and queue the event through the item queuing information of each item in the playground collected by the people flow collecting module, but the user can reserve only two items at the same time, and when the item queuing information changes, the user can send a prompt to the user who reserves the event. The system comprises a plurality of facilities management modules, wherein the facilities management modules are used for acquiring information of maintenance and detection of each facility in a playground by a worker, the facilities management modules record the daily maintenance process, the maintenance time, the maintenance worker information of each facility and the detection data of each part of each facility before operation and upload the data to a cloud management platform for analysis and processing, each item of data of the facility is ensured to accord with the corresponding operation standard, meanwhile, the information acquired by a people flow acquisition module and the facilities management modules is uploaded to a cloud database for storage, and the information can be checked in time when problems occur.
An information analysis module in the cloud management platform analyzes and summarizes the people number distribution information and the queuing information, analyzes the people number conditions of each area in the people number distribution information, screens out the areas with more people numbers, analyzes whether the area meets the conditions that the total people number exceeds 150 and the queuing people number exceeds 50 by combining the project queuing information of the area, and obtains the analysis result of whether the playground management department needs to arrange the staff for support and whether the attentive prompt is sent to the user. The region with less people in the people number distribution information is screened out, the total number of people in the region and the queuing condition are noted, and the tourists can conveniently look up and select the region. And reminding the client to reasonably arrange the play plan by combining the project characteristics of the project with more queuing people, the queuing rule of people in each time period of the project and the real-time queuing progress change rule of each project. Performing operation safety analysis on the facility information, and comparing and analyzing the daily maintenance process information of each facility with the relevant national operating standard to ensure that the operation of the staff in the maintenance process conforms to the corresponding operating standard; the detected data before the facility is operated is compared with the corresponding national specified operation standard of the facility, so that the facility is operated after meeting the national specified operation standard, and the customer is more relieved when playing.
And the analysis result obtained by the information analysis module is transmitted to the playground management terminal, so that the playground management terminal returns a response result to the information processing module after the playground management department makes a work response according to the analysis result, the playground management department can respond to the work in time, and the information processing module is convenient to summarize the analysis result and the response result. For example: the number of workers in a region with a large number of people is small, the phenomenon of insufficient service occurs, and the management department of the amusement park needs to arrange the workers for support, so that the service quality is ensured, and the satisfaction degree of customers is improved; when the operation of the facility maintained by the staff is improper, the error of the staff is corrected in time, the unnecessary damage to the facility is avoided, and the service life is shortened; when the analysis result of the data detected by the facilities before operation does not meet the specification, the facilities are paused, the clients are informed of the information of the paused facilities and are informed of maintenance personnel to maintain, each facility can be ensured to operate safely, and each worker transmits the response result to the information processing module after responding, so that the management of the management department of the amusement park is facilitated, and the evidence can be provided in time when problems occur. And finally, summarizing the analysis results and the work response results, classifying and summarizing the analysis results and the response process of the amusement park management department, packaging the corresponding analysis results and the response results into the same folder, and storing the folder in a cloud database, so that the amusement park management department can manage the results conveniently. The client sends a data acquisition request through the Internet, the cloud management platform analyzes the IP and ID numbers of the clients and verifies the IP and ID numbers, corresponding playground information is opened according to a verification result and is acquired by the clients, and if the clients want to upload data such as suggestions for playground management, the cloud management platform can audit the data, so that the data are uploaded after the safety of the data is ensured. The cloud database is used as the data storage library, so that the database does not need to be periodically backed up, a uniform data access interface can be provided, the operation is convenient and quick, and the data can be opened according to the authority of a user in the data access process, so that the safety in the data scheduling process is ensured. And a corresponding reward mechanism can be set on the cloud management platform, and when the suggestion of the client is adopted, the client can obtain the corresponding reward, so that the experience of the client is improved.
The amusement park management system based on the internet provided in the embodiment of the application comprises: the system comprises an information acquisition module and a cloud management platform, wherein people number distribution information and queuing information of each project in the amusement park are acquired by a people flow acquisition module in the information acquisition module, maintenance and detection information of each facility in the amusement park is acquired by a worker by a facility management module in the information acquisition module, and the information acquired by the information acquisition module is uploaded to the cloud management platform and a cloud database. And an information analysis module in the cloud management platform analyzes and summarizes the people number distribution information and the queuing information and analyzes the operation safety of the facility information. And the information processing module in the cloud management platform transmits the analysis result obtained by the information analysis module to the playground management terminal, so that the playground management terminal returns a response result to the information processing module after a playground management department makes a work response according to the analysis result, and the information processing module is also used for summarizing the analysis result and the response result and storing the analysis result and the response result in a cloud database. The cloud database is used for storing the information acquired by the information acquisition module and the information uploaded by the cloud management platform. When a client wants to know about the playground related situation, the client can access the cloud management platform through the login client to call and consult. The system solves the technical problems that the existing playground management system is simple, the client cannot remotely know the queuing condition of each project and the state information of each facility in the playground, and the client experience is low.
Example 2
As a further improvement to embodiment 1, referring to fig. 2, the present application provides another embodiment of an internet-based casino management system, comprising: the system comprises an information acquisition module and a cloud management platform;
the information acquisition module comprises a people flow acquisition module, a facility management module, a service supervision module and an environment quality detection module;
and the people flow acquisition module is used for acquiring the people number distribution information and the queuing information of each project in the amusement park and uploading the information to the cloud management platform and the cloud database.
And the facility management module is used for acquiring information of maintenance and detection of each facility in the amusement park by workers and uploading the information to the cloud management platform and the cloud database.
And the service supervision module is used for acquiring image information and voice information operated by a worker in working time and uploading the image information and the voice information to the cloud management platform and the cloud database.
And the environment quality detection module is used for detecting the sanitation information and the air quality information of each area in the amusement park and uploading the sanitation information and the air quality information to the cloud management platform and the cloud database.
The cloud management platform comprises an information analysis module, an information processing module and a customer evaluation management module;
and the information analysis module is used for analyzing and summarizing the people number distribution information and the queuing information and analyzing the operation safety of the facility information.
The information processing module is used for transmitting the analysis result obtained by the information analysis module to the playground management terminal, so that the playground management terminal returns a response result to the information processing module after a playground management department makes a work response according to the analysis result; the information processing module is also used for summarizing the analysis result and the response result and storing the analysis result and the response result in a cloud database.
And the client evaluation management module is used for acquiring the evaluation uploaded by the client and classifying the evaluation into advantages and disadvantages.
The people flow collecting module comprises a people number collecting module and a project queuing information module, and the people number obtaining module is used for obtaining the people number distribution information of each area in the amusement park collected by the preset collecting device. The preset acquisition device comprises cameras arranged in all areas in the amusement park and positioning wearing pieces worn on all people in the amusement park, and the cameras and the positioning wearing pieces can detect the number distribution condition of all the areas in the amusement park in real time. The staff wears the location wearing piece for each customer that gets into the recreation ground, and every location wearing piece all binds this customer's information, and when the customer lost, the staff can be according to the location wearing piece find customer's position, improves customer's satisfaction. And the project queuing information module is used for acquiring real-time queuing information of each project in the playground, so that a client can log in a cloud management platform through the client to remotely know the queuing condition of each project in the playground, and a play plan is reasonably arranged. The facility management module comprises a facility maintenance module and a facility detection module, and the facility maintenance module is used for collecting image information of each facility maintained by a worker; the utility model has the advantages of utilize the facility detection module to obtain the detection information that the staff detected each facility before each facility operation, not only make things convenient for the recreation ground management department to supervise the staff, can also make the customer know the management condition of recreation ground to the facility more directly perceivedly, improve customer's satisfaction. The service monitoring module comprises a behavior monitoring module and a voice monitoring module, and the behavior monitoring module is used for acquiring image information of operating facilities and service clients of workers in the working process; the voice supervision module is used for collecting voice information of a worker for serving the customer during working, when the customer complains the worker, evidence can be found out in time, and the worker can be urged to improve service quality. The environment quality detection module is used for detecting the sanitary information and the air quality information of each area in the amusement park, and workers can timely make work response according to detection results, so that the customers can play in a clean and comfortable environment.
The information processing module comprises an information summarizing module and a character input module, the information summarizing module summarizes the analysis result and the work response result transmitted by the information analysis module into an information table, and the character input module is used for naming the information table summarized by the information summarizing module. And uploading the named information table to a cloud database for storage, so that the management of an amusement park management department and the consultation of customers are facilitated. A customer evaluation management module is arranged on the cloud management platform, and the evaluation uploaded by customers is classified into advantages and disadvantages, so that management of a management department of an amusement park is facilitated, and corresponding staff are identified and punished.
Example 3
For ease of understanding, referring to fig. 3, the present application provides an internet-based casino management method, comprising:
step 101, collecting people number distribution information and queuing information of each project in the amusement park, and uploading the information to a cloud management platform and a cloud database.
And 102, obtaining information of maintenance and detection of each facility in the amusement park by staff, and uploading the information to a cloud management platform and a cloud database.
And 103, analyzing and summarizing the number distribution information and the queuing information, and analyzing the operation safety of the facility information.
And step 104, transmitting the analysis result to the amusement park management department, enabling the amusement park management department to make a work response according to the analysis result, summarizing the analysis result and the work response result, and storing the analysis result and the work response result into a cloud database.
It should be noted that, the number distribution information of people in the amusement park, the queuing information of each project, and the information of maintenance and detection of each facility in the amusement park by the staff are collected and uploaded to the cloud management platform and the cloud database. And analyzing and summarizing the number distribution information and the queuing information, analyzing the operation safety of the information, transmitting the analysis result to the playground management department, enabling the playground management department to make a work response according to the analysis result, summarizing the analysis result and the work response result, and storing the result in a cloud database. The system solves the technical problems that the existing playground management system is simple, the client cannot remotely know the queuing condition of each project and the state information of each facility in the playground, and the client experience is low.
The above embodiments are only used for illustrating the technical solutions of the present application, and not for limiting the same; although the present application has been described in detail with reference to the foregoing embodiments, it should be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions in the embodiments of the present application.

Claims (10)

1. An internet-based casino management system, comprising: the system comprises an information acquisition module and a cloud management platform;
the information acquisition module comprises a people flow acquisition module and a facility management module;
the people flow collecting module is used for collecting people number distribution information and queuing information of each project in the amusement park and uploading the information to the cloud management platform and the cloud database;
the facility management module is used for acquiring information of maintenance and detection of each facility in the amusement park by workers and uploading the information to the cloud management platform and the cloud database;
the cloud management platform comprises an information analysis module and an information processing module;
the information analysis module is used for analyzing and summarizing the people number distribution information and the queuing information and analyzing the operation safety of the facility information;
the information processing module is used for transmitting the analysis result obtained by the information analysis module to the playground management terminal, so that the playground management terminal returns a response result to the information processing module after a playground management department makes a work response according to the analysis result;
the information processing module is further used for summarizing the analysis result and the response result and storing the summarized analysis result and the response result in the cloud database.
2. The internet-based casino management system of claim 1, wherein the people flow collection module comprises a people number collection module and a project queue information module;
the number acquisition module is used for acquiring the number distribution information of each region in the amusement park acquired by the preset acquisition device;
and the project queuing information module is used for acquiring real-time queuing information of each project in the playground.
3. The internet-based casino management system of claim 2, wherein the preset gathering devices comprise cameras positioned at various areas within the casino and positioning wear worn on each person within the casino.
4. The internet-based casino management system of claim 1, wherein the facilities management module comprises a facilities maintenance module and a facilities detection module;
the facility maintenance module is used for acquiring the image information of the staff maintaining each facility;
the facility detection module is used for acquiring detection information of the staff for detecting each facility before the operation of each facility.
5. The internet-based casino management system of claim 1, wherein the information collection module further comprises a service supervision module;
and the service supervision module is used for acquiring image information and voice information operated by the staff in working time and uploading the image information and the voice information to the cloud management platform and the cloud database.
6. The internet-based casino management system of claim 5, wherein the service supervision module comprises a behaviour supervision module and a voice supervision module;
the behavior supervision module is used for acquiring the image information of the operating facilities and the service clients of the workers in the working process;
the voice supervision module is used for collecting the voice information of the service customers of the staff during working.
7. The internet-based casino management system of claim 1, wherein the information collection module further comprises an environmental quality detection module;
the environment quality detection module is used for detecting the sanitation information and the air quality information of each area in the amusement park and uploading the sanitation information and the air quality information to the cloud management platform and the cloud database.
8. The internet-based casino management system of claim 1, wherein the information processing module comprises an information aggregation module and a text entry module;
the information summarizing module is used for summarizing the analysis result and the work response result into an information table;
and the character input module is used for naming the information table summarized by the information summarizing module.
9. The internet-based casino management system of claim 1, wherein the cloud management platform further comprises a customer rating management module;
and the client evaluation management module is used for acquiring the evaluation uploaded by the client and classifying the evaluation into advantages and disadvantages.
10. An internet-based casino management method, comprising:
collecting the number distribution information of people in the amusement park and the queuing information of each project, and uploading the information to a cloud management platform and a cloud database;
acquiring information of maintenance and detection of each facility in the amusement park by staff, and uploading the information to the cloud management platform and the cloud database;
analyzing and summarizing the people number distribution information and the queuing information, and analyzing the operation safety of the facility information;
and transmitting the analysis result to an amusement park management department, so that the amusement park management department makes a work response according to the analysis result, and summarizing the analysis result and the work response result and storing the results in the cloud database.
CN202110635918.3A 2021-06-08 2021-06-08 Amusement park management system and method based on internet Pending CN113487451A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110635918.3A CN113487451A (en) 2021-06-08 2021-06-08 Amusement park management system and method based on internet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110635918.3A CN113487451A (en) 2021-06-08 2021-06-08 Amusement park management system and method based on internet

Publications (1)

Publication Number Publication Date
CN113487451A true CN113487451A (en) 2021-10-08

Family

ID=77934466

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110635918.3A Pending CN113487451A (en) 2021-06-08 2021-06-08 Amusement park management system and method based on internet

Country Status (1)

Country Link
CN (1) CN113487451A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109492811A (en) * 2018-11-12 2019-03-19 深圳市赛为智能股份有限公司 A kind of recreation ground intelligent management, device, computer equipment and storage medium
CN110415476A (en) * 2018-04-26 2019-11-05 中冶建筑研究总院(上海)有限公司 A kind of amusement park management system based on big data
CN110660149A (en) * 2019-09-07 2020-01-07 创新奇智(广州)科技有限公司 Park amusement park equipment management method and device based on machine vision equipment
CN111063091A (en) * 2019-12-27 2020-04-24 惠州视维新技术有限公司 Play yard management method, system, terminal equipment and storage medium

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110415476A (en) * 2018-04-26 2019-11-05 中冶建筑研究总院(上海)有限公司 A kind of amusement park management system based on big data
CN109492811A (en) * 2018-11-12 2019-03-19 深圳市赛为智能股份有限公司 A kind of recreation ground intelligent management, device, computer equipment and storage medium
CN110660149A (en) * 2019-09-07 2020-01-07 创新奇智(广州)科技有限公司 Park amusement park equipment management method and device based on machine vision equipment
CN111063091A (en) * 2019-12-27 2020-04-24 惠州视维新技术有限公司 Play yard management method, system, terminal equipment and storage medium

Similar Documents

Publication Publication Date Title
CN115272037B (en) Smart city based on Internet of things regional public security management early warning method and system
CN204463272U (en) reservation queuing system
CN107610266B (en) Station inspection system
CN111126715B (en) Scenic spot passenger flow control system
CN105120217A (en) Intelligent camera motion detection alarm system and method based on big data analysis and user feedback
CN110545558B (en) High-speed service area crowd density estimation system based on Wi-Fi data
CN108495329B (en) Method and device for evaluating reliability of base station
JP6675860B2 (en) Data processing method and data processing system
CN109775501B (en) Projection touch Internet of things rescue system applied to elevator
CN112884325A (en) Method and system for application analysis and health condition evaluation of customer station equipment
CN106817708B (en) A kind of inspection cluster construction method and device
CN210150534U (en) Elevator maintenance system with early warning function
CN113283753A (en) Safety management system for personnel on construction site
CN109460938A (en) A kind of city intelligent central control system and its method
CN109858949A (en) A kind of customer satisfaction appraisal procedure and assessment system based on monitoring camera
CN112037892A (en) Intelligent health examination scheduling system, terminal and intelligent health examination scheduling method
CN114254982A (en) Smart factory cloud management system
CN112598184B (en) Method and device for predicting repeated air suction risk of drug addict
CN111652659A (en) VR product evaluation system based on big data
CN113487451A (en) Amusement park management system and method based on internet
CN112800910A (en) Communication machine room maintenance operation efficiency evaluation method and system
CN111915196A (en) Information scheduling management system for maintenance
Mohottige et al. Evaluating Emergency Evacuation Events Using Building WiFi Data.
CN110737697A (en) Internal control management system of labor arbitration information platform
CN114897488A (en) Method and device for scenic spot work planning and manpower allocation based on working condition

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20211008

RJ01 Rejection of invention patent application after publication