CN113482178A - Improved balcony waterproof process - Google Patents
Improved balcony waterproof process Download PDFInfo
- Publication number
- CN113482178A CN113482178A CN202110859456.3A CN202110859456A CN113482178A CN 113482178 A CN113482178 A CN 113482178A CN 202110859456 A CN202110859456 A CN 202110859456A CN 113482178 A CN113482178 A CN 113482178A
- Authority
- CN
- China
- Prior art keywords
- balcony
- waterproof
- leveling
- water
- cleaning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/003—Balconies; Decks
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention discloses an improved balcony waterproof process, which comprises the following processing steps: (1) firstly, cleaning the balcony surface layer, namely cleaning the foundation layer, finishing the cleaning process of the balcony surface, and cleaning and leveling the balcony surface; (2) performing multiple plugging treatment on the periphery of the balcony, and leveling the ground; (3) after leveling, performing waterproofing, wherein the waterproofing construction process comprises the steps of brushing the weakest waterproof of the internal corners around the balcony, uniformly coating the waterproof to the wall from the ground for 10 centimeters, repeating the waterproofing process twice to form a bowl-shaped integral waterproof film on the waterproof layer, and repeating the waterproofing process twice; (4) after the waterproof construction is checked to have no sand points, water can be tested, and after the flexible waterproof is made, water is discharged and tested; (5) after water testing, after no problem is detected, the building material can be paved on the surface of the balcony. The invention has simple implementation steps and convenient operation, and ensures that the balcony has good waterproof function.
Description
Technical Field
The invention relates to the field of waterproofing, in particular to an improved balcony waterproofing process.
Background
The balcony is the house structure that family house family is essential, and people's balcony is when using among the prior art, because lack waterproof technology process, leads to taking place phenomenons such as leaking in its use, though there are some waterproof technologies who are used for the balcony, its waterproof technological effect is not ideal, has not satisfied the demand of people to its waterproof technological effect gradually.
In addition, the balcony waterproof process in the prior art has the defects of complex process, long implementation time, project time delay and project progress delay.
Therefore, an improved waterproof process for balconies becomes a problem to be solved urgently in the whole society.
Disclosure of Invention
The technical problems to be solved by the invention are that the balcony waterproof process in the prior art is complex in process, long in implementation time, delayed in engineering progress and the like.
In order to solve the technical problems, the technical scheme provided by the invention is as follows: an improved waterproof process for a balcony comprises the following processing steps:
(1) firstly, cleaning the balcony surface layer, namely cleaning the foundation layer, finishing the cleaning process of the balcony surface, and cleaning and leveling the balcony surface;
(2) the ceramic tiles or the stone materials of the original building on the three sides of the balcony are removed by the building material with the ceramic tiles or the stone materials on the three sides of the original balcony, then the building material is cleaned, the ground is finely leveled, and the side surfaces on the periphery are uniformly plugged by plugging agent, so that water seepage caused by the problems of the building per se is avoided, the periphery of the balcony is subjected to multiple plugging treatment, and the ground is subjected to a leveling process;
(3) the waterproof construction process comprises the steps of brushing the weakest waterproof of the internal corner around the balcony, uniformly brushing the flexible waterproof to the wall from the ground for 10 centimeters, repeatedly performing the waterproof process twice to enable the waterproof layer to form a bowl-shaped integral waterproof film, enabling the internal corner of the balcony to be arc-shaped to enable water to be hidden everywhere, performing a waterproof structure on the leveling process, and repeatedly performing the flexible waterproof twice;
(4) after the waterproof construction is checked to have no sand points, water can be tested for a period of time, and after the flexible waterproof is well made, water is drained and tested for a period of time;
(5) after the structure is tested for water, building materials can be paved on the surface of the balcony after no problem is detected.
And further, in the step (3), flexible waterproof is carried out on the basis of leveling, and the periphery of the flexible waterproof is made into a bowl shape and extends upwards to the leakage stopping king.
Further, in the water testing process in the step (4), the waterproof layer is immersed for about 6 centimeters, and the water testing time is 48 hours.
Compared with the prior art, the method has the advantages that: the invention adopts the process, can effectively solve the defects of complex balcony waterproof process, long implementation time and the like in the prior art, has simple implementation steps and convenient operation, ensures that the balcony has good waterproof function and stronger practicability, and is proposed to be popularized and used.
Detailed Description
The present invention is described in further detail below.
The invention provides an improved balcony waterproof process in specific implementation, which comprises the following processing steps:
(1) firstly, cleaning the balcony surface layer, namely cleaning the foundation layer, finishing the cleaning process of the balcony surface, and cleaning and leveling the balcony surface;
(2) the method comprises the following steps that the ceramic tiles or stones of the original building on three sides of the balcony are removed by the aid of the building material with the ceramic tiles or stones on the three sides of the original balcony, then the building material is cleaned, the ground is subjected to slope-releasing fine leveling, the side faces on the periphery of the balcony are uniformly plugged by the aid of the plugging agent, the periphery of the balcony is subjected to multiple plugging processes, and the ground is subjected to leveling processes;
(3) the waterproof construction process comprises the steps of brushing the weakest waterproof of the internal corner around the balcony, uniformly brushing the flexible waterproof to the wall from the ground for 10 centimeters, repeatedly performing the waterproof process twice to enable the waterproof layer to form a bowl-shaped integral waterproof film, enabling the internal corner of the balcony to be arc-shaped to enable water to be hidden everywhere, performing a waterproof structure on the leveling process, and repeatedly performing the flexible waterproof twice;
(4) after the waterproof construction is checked to have no sand points, water can be tested for a period of time, and after the flexible waterproof is well made, water is drained and tested for a period of time;
(5) after the structure is tested for water, building materials can be paved on the surface of the balcony after no problem is detected.
As a further elaboration of the invention, in the step (3), flexible waterproof is performed on the basis of leveling, and the periphery of the flexible waterproof is made into a bowl shape and extends upwards to the leakage stoppage king.
As a further elaboration of the invention, in the water testing process in the step (4), the waterproof layer is immersed for about 6 centimeters, and the water testing time is 48 hours.
The present invention and the embodiments thereof have been described above without limitation, and it is within the scope of the present invention that those skilled in the art should be able to devise similar structural modes and embodiments without inventive changes without departing from the spirit and scope of the present invention.
Claims (3)
1. The waterproof process of the improved balcony is characterized in that: the method comprises the following processing steps:
(1) firstly, cleaning the balcony surface layer, namely cleaning the foundation layer, finishing the cleaning process of the balcony surface, and cleaning and leveling the balcony surface;
(2) the method comprises the following steps that the ceramic tiles or stones of the original building on three sides of the balcony are removed by the aid of the building material with the ceramic tiles or stones on the three sides of the original balcony, then the building material is cleaned, the ground is subjected to slope-releasing fine leveling, the side faces on the periphery of the balcony are uniformly plugged by the aid of the plugging agent, the periphery of the balcony is subjected to multiple plugging processes, and the ground is subjected to leveling processes;
(3) the waterproof construction process comprises the steps of brushing the weakest waterproof of the internal corner around the balcony, uniformly brushing the flexible waterproof to the wall from the ground for 10 centimeters, repeatedly performing the waterproof process twice to enable the waterproof layer to form a bowl-shaped integral waterproof film, enabling the internal corner of the balcony to be arc-shaped to enable water to be hidden everywhere, performing a waterproof structure on the leveling process, and repeatedly performing the flexible waterproof twice;
(4) after the waterproof construction is checked to have no sand points, water can be tested for a period of time, and after the flexible waterproof is well made, water is drained and tested for a period of time;
(5) after the structure is tested for water, building materials can be paved on the surface of the balcony after no problem is detected.
2. The improved balcony waterproofing process according to claim 1, wherein: and (4) in the step (3), flexible waterproof is carried out on the basis of leveling, and the periphery of the flexible waterproof is made into a bowl shape and extends upwards to the leakage stopping king.
3. The improved balcony waterproofing process according to claim 1, wherein: and (4) in the water testing process in the step (4), the waterproof layer is immersed by about 6 centimeters, and the water testing time is 48 hours.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110859456.3A CN113482178A (en) | 2021-07-28 | 2021-07-28 | Improved balcony waterproof process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110859456.3A CN113482178A (en) | 2021-07-28 | 2021-07-28 | Improved balcony waterproof process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113482178A true CN113482178A (en) | 2021-10-08 |
Family
ID=77944312
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110859456.3A Pending CN113482178A (en) | 2021-07-28 | 2021-07-28 | Improved balcony waterproof process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113482178A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS63265020A (en) * | 1987-04-21 | 1988-11-01 | Fuji Giken Kogyo Kk | Leak-stopping work for underground concrete structure |
JP2001098639A (en) * | 1999-09-30 | 2001-04-10 | Mitsui Home Co Ltd | Waterproof layer protection structure of balcony, veranda, or the like |
US20050204656A1 (en) * | 2004-01-09 | 2005-09-22 | Shigeru Baba | Breathable waterproof laminate structure |
CN106884484A (en) * | 2017-01-14 | 2017-06-23 | 山东飞越钢结构工程有限公司 | A kind of balcony waterproof PVC film construction method |
CN109356295A (en) * | 2018-11-21 | 2019-02-19 | 陕西中林建筑装饰工程有限公司 | The construction technique of toilet and kitchen antiseep |
CN110409632A (en) * | 2019-07-03 | 2019-11-05 | 广州市艺鸿装饰工程有限公司 | A kind of balcony waterproof technology |
CN112746678A (en) * | 2019-10-31 | 2021-05-04 | 江西伦比新材料科技有限公司 | Kitchen and bathroom waterproof system and construction process thereof |
-
2021
- 2021-07-28 CN CN202110859456.3A patent/CN113482178A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS63265020A (en) * | 1987-04-21 | 1988-11-01 | Fuji Giken Kogyo Kk | Leak-stopping work for underground concrete structure |
JP2001098639A (en) * | 1999-09-30 | 2001-04-10 | Mitsui Home Co Ltd | Waterproof layer protection structure of balcony, veranda, or the like |
US20050204656A1 (en) * | 2004-01-09 | 2005-09-22 | Shigeru Baba | Breathable waterproof laminate structure |
CN106884484A (en) * | 2017-01-14 | 2017-06-23 | 山东飞越钢结构工程有限公司 | A kind of balcony waterproof PVC film construction method |
CN109356295A (en) * | 2018-11-21 | 2019-02-19 | 陕西中林建筑装饰工程有限公司 | The construction technique of toilet and kitchen antiseep |
CN110409632A (en) * | 2019-07-03 | 2019-11-05 | 广州市艺鸿装饰工程有限公司 | A kind of balcony waterproof technology |
CN112746678A (en) * | 2019-10-31 | 2021-05-04 | 江西伦比新材料科技有限公司 | Kitchen and bathroom waterproof system and construction process thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106884536B (en) | Construction method of composite terrace | |
CN108487481B (en) | Anti-leakage assembly type water stop ridge and construction method thereof | |
CN109356295A (en) | The construction technique of toilet and kitchen antiseep | |
CN102061798B (en) | Construction method of epoxy self-leveling floor with concrete sealing curing agent and thereof | |
CN102400525B (en) | Thin-layer plastering method for autoclaved aerated concrete block wall bodies | |
CN103553538B (en) | Architecture indoor percdation solidifies not damaged waterproofing agent | |
CN110330295A (en) | A kind of water-resistant type interfacial agents and its construction method, application | |
CN110644626A (en) | Green and environment-friendly building construction method | |
CN108373305A (en) | A kind of graphene is modified clear-water concrete/protective coating and technology of preparing | |
CN113482178A (en) | Improved balcony waterproof process | |
CN103774696A (en) | Construction process of cement-based permeable-crystallization type waterproof material | |
CN209958651U (en) | Ceramic tile outer wall waterproof construction | |
CN107989329A (en) | A kind of method of toilet and kitchen waterproof construction | |
CN205172303U (en) | A novel gate manger plate platform node construction for waterproof room | |
CN114575550A (en) | Wet pasting process for floor tiles in kitchens and bathrooms | |
CN113235863A (en) | Epoxy terrace construction method for preventing cracking and settlement | |
CN114352057A (en) | Method for repairing surface of wall of hydraulic structure | |
CN110130615B (en) | Indoor composite floor based on phosphorus-magnesium material and self-leveling gypsum and construction method thereof | |
CN208502100U (en) | Inversion-type waterproof heat-retaining roof and parapet connecting node with side row's inlet for stom water | |
CN104328808A (en) | Waterproof construction process of underground engineering | |
CN112031341A (en) | Construction method of building engineering beneficial to environmental protection | |
CN110405911B (en) | Method for decorating exposed bone material by combining positive and negative retarding and flushing on concrete surface | |
CN115491071B (en) | Processing material of bare concrete facing and preparation method of bare concrete facing | |
CN110644732A (en) | Spraying process of waterproof white real stone paint | |
CN115787940B (en) | Water-proof and drainage construction method for large-scale stadium evacuation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20211008 |