CN104328808A - Waterproof construction process of underground engineering - Google Patents
Waterproof construction process of underground engineering Download PDFInfo
- Publication number
- CN104328808A CN104328808A CN201410449388.3A CN201410449388A CN104328808A CN 104328808 A CN104328808 A CN 104328808A CN 201410449388 A CN201410449388 A CN 201410449388A CN 104328808 A CN104328808 A CN 104328808A
- Authority
- CN
- China
- Prior art keywords
- coating
- brushing
- water
- construction
- waterproof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0001—Rubbers
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0051—Including fibers
- E02D2300/0054—Including fibers made from plastic
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0075—Textiles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2450/00—Gaskets
- E02D2450/10—Membranes
- E02D2450/105—Membranes impermeable
- E02D2450/106—Membranes impermeable for liquids
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2450/00—Gaskets
- E02D2450/10—Membranes
- E02D2450/108—Membranes multi-layered
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The invention relates to a waterproof construction process of underground engineering. The waterproof construction process comprises the following steps of processing polyester cloth and an ethylene propylene rubber waterproof liquid coating, and brushing a primer; brushing a waterproof coating, using the polyester cloth well fixed on a base surface as the basis, and brushing the ethylene propylene rubber waterproof liquid coating onto the polyester cloth; sparsely spreading surface slag; performing acceptance on the coating film waterproof layer; constructing a protecting layer. After a coating film is qualified in acceptance, the coating film can be used as a cement mortar protecting layer or can be used for paving tiles. The construction process solves the problems of damage to the traditional waterproof construction and difficulty in remedy after the next procedure is started. The construction process has the characteristics that the construction is simple, the damage is conveniently remedied, the control is favorably realized, and the waterproof effect is good.
Description
Technical field
The present invention relates to a kind of Waterproofing Technology of Underground Works technique.
Background technology
Along with fast development and the construction of underground construction, Waterproofing Technology of Underground Works technique not section is emerged in large numbers, and waterproofing materials significantly increases, and waterproof effect is uneven, and waterproofing is an inevitable work progress in Underground Construction.Construction period, process control and the later stage waterproof effect of waterproof cannot be guaranteed.
Current waterproofing materials mostly is finished-product material; carry out lapping construction at the construction field (site); lap length; and sweat soldering difficult quality controls; and the finished product after having constructed not easily is protected; be difficult to remedy after causing destruction, so that affect later stage structure construction and waterproof effect, be unfavorable for the control of construction speed, quality and benefits.
Summary of the invention
Its object of the present invention is just to provide a kind of Waterproofing Technology of Underground Works technique, solves conventional waterproof construction destroyed, and the problem that next procedure has been difficult to remedy after having started construction.Have that construction is simple, conveniently remedy after breakage, be conducive to controlling and the feature of good water-proof effect.
Realize above-mentioned purpose and the technical scheme taked, comprise step,
(1) woven dacron and second third water-proof liquid rubber coating is processed
Need lay woven dacron length according to construction Size calculation, and cutting is intact in advance, stirs second third water-proof liquid rubber coating;
(2) brushing primer
Brushing primer, dry 4-6 hour after coating;
(3) brushing water-repellent paint
By woven dacron be fixed on basal plane intact based on, first vertical brushing second third water-proof liquid rubber coating first pass on woven dacron, evenly be coated with vulcanite scraper or hairbrush and scrape, second coating can be carried out after cured, adopt and evenly brush at coating surface with the orthogonal direction of first coating, after solidification, then the 3rd road film is scraped in painting, and coating thickness adds woven dacron thickness and reaches designing requirement;
(4) rarely face slag is spread
If wallboard facade will be plastered, last one coating construction complete but also uncured time, should surface be rare sprinkles sand grains clean on a small quantity, to increase the adhesion stress of film and cement mortar at it;
(5) examination of film waterproof material
Conscientiously must check the construction quality of film waterproof material before doing topping, require that full coat is continuous, thin and thick uniformity, tight-closed, not allowed shows money or valuables one carries unintentionally sees the bottom, play that drum comes off, the existence of the defect such as tiltings of ftracture, if desired can retaining inspection, and extremely non-leakage is qualified;
(6) topping construction
When after film acceptance(check), get final product making cement mortar cover or use paving brick.
beneficial effect
Compared with prior art the present invention has the following advantages.
1) waterproofing course material of main part second third water-proof liquid rubber coating has the characteristic of good weather resisteant, resistance to ozone and resistant to chemical media corrosion, and physical and chemical performance is excellent, uses birthday noodle to reach 50 years; There is complete waterproof detail treatment structure, adopt Special seal cream to close detail treatment position, with the multiple-sealed defence line of the supporting formation of main material bonding adhesive, improve the whole structure of waterproofing course;
2) technique is simple, and material requested and machining tool are and on-the-spotly often use, and processing is simple, speed of application is fast, be conducive to controlling.
Detailed description of the invention
Comprise step,
(1) woven dacron and second third water-proof liquid rubber coating is processed
Need lay woven dacron length according to construction Size calculation, and cutting is intact in advance, stirs second third water-proof liquid rubber coating;
(2) brushing primer
Brushing primer, dry 4-6 hour after coating;
(3) brushing water-repellent paint
By woven dacron be fixed on basal plane intact based on, first vertical brushing second third water-proof liquid rubber coating first pass on woven dacron, evenly be coated with vulcanite scraper or hairbrush and scrape, second coating can be carried out after cured, adopt and evenly brush at coating surface with the orthogonal direction of first coating, after solidification, then the 3rd road film is scraped in painting, and coating thickness adds woven dacron thickness and reaches designing requirement;
(4) rarely face slag is spread
If wallboard facade will be plastered, last one coating construction complete but also uncured time, should surface be rare sprinkles sand grains clean on a small quantity, to increase the adhesion stress of film and cement mortar at it;
(5) examination of film waterproof material
Conscientiously must check the construction quality of film waterproof material before doing topping, require that full coat is continuous, thin and thick uniformity, tight-closed, not allowed shows money or valuables one carries unintentionally sees the bottom, play that drum comes off, the existence of the defect such as tiltings of ftracture, if desired can retaining inspection, and extremely non-leakage is qualified;
(6) topping construction
When after film acceptance(check), get final product making cement mortar cover or use paving brick.
During described brushing primer, second third water-proof liquid rubber coating can be added water and stir, so that brushing, to be 0.2 ~ 0.3 Gong Jin/㎡ be coating weight.
Described brushing water-repellent paint first pass every square metre of consumption is 0.8kg/m2, and second coating painting amount is identical with first, the 3rd road film, and painting amount is 0.4-0.5kg/m2.
Embodiment
Second third water-proof liquid rubber adhesion of coatings woven dacron enhancement Layer, comprise second third water-proof liquid rubber coating, woven dacron, described material carries out combination construction, woven dacron can isolated preferably near space enclosing structure one deck, second third water-proof liquid rubber coating can not be subject to external constraint, better plays waterproof action.
1, basement process
(1) bottom cushion adopts plate vibrator jolt ramming, and manual compaction is used on surface, troweling, and planeness should meet D/L≤1/5, D: the depth capacity between adjacent two convex surfaces, L: the minimum range between adjacent two convex surfaces;
(2) need to reach the mixed substrate surface of underground exterior-protected structure spray smooth-going for side wall operating condition, and residual hard object must be evened out, negative and positive angle place should adopt 1:2.5 cement mortar to smear into R≤5cm circular arc or 5*5cm obtuse angle;
2, second third water-proof liquid rubber adhesion of coatings woven dacron enhancement Layer construction
(1) woven dacron and second third water-proof liquid rubber coating is processed
Need lay woven dacron length according to construction Size calculation, and cutting is intact in advance, stirs second third water-proof liquid rubber coating;
(2) brushing primer
During brushing primer, this material suitably can be added a little water, then stir by electric blender, so that brushing, general 0.2 ~ 0.3 public jin/㎡ of coating weight is advisable, and needs dry 4-6 hour, then do the construction of next process after coating;
(3) brushing water-repellent paint
By woven dacron be fixed on basal plane intact based on, first vertical brushing second third water-proof liquid rubber coating first pass on woven dacron, evenly be coated with vulcanite scraper or hairbrush and scrape, every square metre of consumption 0.8kg/m2, second coating can be carried out after cured, adopt and evenly brush at coating surface with the orthogonal direction of first coating, painting amount is identical with first, after solidification, be coated with by above-mentioned formula and method again and scrape the 3rd road film, painting amount is advisable with 0.4-0.5kg/m2, and coating thickness adds woven dacron thickness and reaches designing requirement;
(4) rarely face slag is spread
If wallboard facade will be plastered, last one coating construction complete but also uncured time, should surface be rare sprinkles sand grains clean on a small quantity, to increase the adhesion stress of film and cement mortar at it;
(5) examination of film waterproof material
Conscientiously must check the construction quality of film waterproof material before doing topping, require that full coat is continuous, thin and thick uniformity, tight-closed, not allowed shows money or valuables one carries unintentionally sees the bottom, play that drum comes off, the existence of the defect such as tiltings of ftracture, if desired can retaining inspection, and extremely non-leakage is qualified;
(6) topping construction
When after film acceptance(check), can making cement mortar cover or with conventional method paving brick etc.
Claims (3)
1. a Waterproofing Technology of Underground Works technique, is characterized in that, comprises step,
(1) woven dacron and second third water-proof liquid rubber coating is processed
Need lay woven dacron length according to construction Size calculation, and cutting is intact in advance, stirs second third water-proof liquid rubber coating;
Brushing primer
Brushing primer, dry 4-6 hour after coating;
(3) brushing water-repellent paint
By woven dacron be fixed on basal plane intact based on, first vertical brushing second third water-proof liquid rubber coating first pass on woven dacron, evenly be coated with vulcanite scraper or hairbrush and scrape, second coating can be carried out after cured, adopt and evenly brush at coating surface with the orthogonal direction of first coating, after solidification, then the 3rd road film is scraped in painting, and coating thickness adds woven dacron thickness and reaches designing requirement;
Rarely spread face slag
If wallboard facade will be plastered, last one coating construction complete but also uncured time, should surface be rare sprinkles 2-3mm sand grains clean on a small quantity, to increase the adhesion stress of film and cement mortar at it;
The examination of film waterproof material
Conscientiously must check the construction quality of film waterproof material before doing topping, require that full coat is continuous, thin and thick uniformity, tight-closed, not allowed shows money or valuables one carries unintentionally sees the bottom, play that drum comes off, the existence of the defect such as tiltings of ftracture, if desired can retaining inspection, and extremely non-leakage is qualified;
(6) topping construction
When after film acceptance(check), get final product making cement mortar cover or use paving brick.
2. a kind of Waterproofing Technology of Underground Works technique according to claim 1, is characterized in that, during described brushing primer, second third water-proof liquid rubber coating can be added water and stir, so that brushing, to be 0.2 ~ 0.3 Gong Jin/㎡ be coating weight.
3. a kind of Waterproofing Technology of Underground Works technique according to claim 1, it is characterized in that, described brushing water-repellent paint first pass every square metre of consumption is 0.8kg/m2, and second coating painting amount is identical with first, 3rd road film, painting amount is 0.4-0.5kg/m2.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410449388.3A CN104328808A (en) | 2014-09-05 | 2014-09-05 | Waterproof construction process of underground engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410449388.3A CN104328808A (en) | 2014-09-05 | 2014-09-05 | Waterproof construction process of underground engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104328808A true CN104328808A (en) | 2015-02-04 |
Family
ID=52403608
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410449388.3A Pending CN104328808A (en) | 2014-09-05 | 2014-09-05 | Waterproof construction process of underground engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104328808A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104895119A (en) * | 2015-04-07 | 2015-09-09 | 中国建筑第六工程局有限公司 | Waterproof construction method for river channel down-crossing underground structure |
CN105780819A (en) * | 2016-02-22 | 2016-07-20 | 中国华冶科工集团有限公司 | Basement waterproof construction method |
-
2014
- 2014-09-05 CN CN201410449388.3A patent/CN104328808A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104895119A (en) * | 2015-04-07 | 2015-09-09 | 中国建筑第六工程局有限公司 | Waterproof construction method for river channel down-crossing underground structure |
CN105780819A (en) * | 2016-02-22 | 2016-07-20 | 中国华冶科工集团有限公司 | Basement waterproof construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102061798B (en) | Construction method of epoxy self-leveling floor with concrete sealing curing agent and thereof | |
CN101935196A (en) | Putty for building external wall | |
CN101832015B (en) | Construction process for outer wall metal fluorocarbon coating | |
CN107254954A (en) | Ground paving ceramic tile construction technology | |
CN109356295A (en) | The construction technique of toilet and kitchen antiseep | |
CN204826464U (en) | Waterproof construction of parapet | |
CN104153400B (en) | A kind of construction method of soft foundation pouring pile head waterproof | |
CN101565997A (en) | Construction method for large-area irregular floor tile | |
CN203783173U (en) | Mold-proof structure for wall surface repair construction | |
CN106284998A (en) | Plastering on inner walls completely spreads fiberglass gridding cloth construction method | |
CN112575979A (en) | Construction method of plastering waterproof mortar for building exterior wall | |
CN104328808A (en) | Waterproof construction process of underground engineering | |
CN101545269B (en) | Method for rigid waterproof construction of beam and slab type basement | |
CN107386681A (en) | Puttying and the construction technology of brush emulsion paint | |
CN103774696A (en) | Construction process of cement-based permeable-crystallization type waterproof material | |
CN209958651U (en) | Ceramic tile outer wall waterproof construction | |
CN107476448A (en) | A kind of construction method for waterproof at toilet doorway | |
CN107989329A (en) | A kind of method of toilet and kitchen waterproof construction | |
CN106284735A (en) | Lightgage steel joist cement plate external wall construction method | |
JP3170209U (en) | Dirt floor coating | |
CN205577324U (en) | Vitrified tile spreads and pastes structure | |
CN211949245U (en) | Roof stone flashing structure | |
CN110409747B (en) | Ground waterproof construction method | |
CN203905203U (en) | Polyurethane-coated composite heat-preserving wall body | |
CN206752955U (en) | A kind of Anti-corrosion ceramic tile ground structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150204 |