CN113469551A - Fabric order scheduling method and device - Google Patents

Fabric order scheduling method and device Download PDF

Info

Publication number
CN113469551A
CN113469551A CN202110796917.7A CN202110796917A CN113469551A CN 113469551 A CN113469551 A CN 113469551A CN 202110796917 A CN202110796917 A CN 202110796917A CN 113469551 A CN113469551 A CN 113469551A
Authority
CN
China
Prior art keywords
information
scheduling
fabric
processing
order
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110796917.7A
Other languages
Chinese (zh)
Inventor
吴海彬
骆小来
邓雪清
罗天云
张键彪
周波
冯炳坤
朱理辉
梁月华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Esquel Textiles Co Ltd
Original Assignee
Guangdong Esquel Textiles Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Esquel Textiles Co Ltd filed Critical Guangdong Esquel Textiles Co Ltd
Priority to CN202110796917.7A priority Critical patent/CN113469551A/en
Publication of CN113469551A publication Critical patent/CN113469551A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

The invention discloses a method and a device for scheduling fabric orders, which relate to the technical field of process scheduling, wherein the method comprises the following steps: obtaining processing plan information of a fabric order, wherein the processing plan information comprises first process information of a processing process of the fabric order; determining die change information of the fabric order according to the processing plan information, wherein the die change information comprises second process information of auxiliary processes among processing technological processes of the fabric order; the fabric orders are scheduled according to the first process information and the second process information, the scheduling comprises scheduling of processing process procedures of the fabric orders and scheduling of auxiliary processes among the processing process procedures of the fabric orders, auxiliary non-process procedures among the processing process procedures can be scheduled, accuracy of the scheduling of the fabric order procedures is improved, fabric production quality is improved, and user experience is improved.

Description

Fabric order scheduling method and device
Technical Field
The invention relates to the technical field of process scheduling, in particular to a fabric order scheduling method and device.
Background
This section is intended to provide a background or context to the embodiments of the invention that are recited in the claims. The description herein is not admitted to be prior art by inclusion in this section.
The process scheduling in the present textile dyeing and finishing industry is tedious and time-consuming, and the present rule is generally through the manual judgment scheduling, and the condition that the staff forgets the rule and leaks the scheduling, and the judgment is wrong may appear to reduce the scheduling accuracy, influence surface fabric production quality, lead to user experience not good.
Disclosure of Invention
The embodiment of the invention provides a fabric order scheduling method, which is used for improving the accuracy of fabric order procedure scheduling, improving the fabric production quality and improving the user experience and comprises the following steps:
obtaining processing plan information of a fabric order, wherein the processing plan information comprises first process information of a processing process of the fabric order;
determining die change information of the fabric order according to the processing plan information, wherein the die change information comprises second process information of auxiliary processes among processing technological processes of the fabric order;
and scheduling the fabric order according to the first process information and the second process information, wherein the scheduling comprises scheduling of the processing process of the fabric order and scheduling of auxiliary processes between the processing process of the fabric order.
The embodiment of the invention also provides a fabric order scheduling device, which is used for improving the accuracy of fabric order process scheduling, improving the fabric production quality and improving the user experience, and comprises the following components:
the processing plan information obtaining module is used for obtaining processing plan information of the fabric order, and the processing plan information comprises first process information of a processing process of the fabric order;
the die change information determining module is used for determining die change information of the fabric order according to the processing plan information, and the die change information comprises second process information of auxiliary processes among processing technological processes of the fabric order;
and the scheduling module is used for scheduling the fabric order according to the first process information and the second process information, wherein the scheduling comprises scheduling of processing procedures of the fabric order and scheduling of auxiliary procedures among the processing procedures of the fabric order.
The embodiment of the invention also provides computer equipment which comprises a memory, a processor and a computer program which is stored on the memory and can run on the processor, wherein the processor realizes the fabric order scheduling method when executing the computer program.
The embodiment of the invention also provides a computer readable storage medium, which stores a computer program for executing the fabric order scheduling method.
The method comprises the steps of bringing auxiliary non-process procedures into scheduling to obtain processing plan information of a fabric order, wherein the processing plan information comprises first procedure information of the processing process procedures of the fabric order; determining die change information of the fabric order according to the processing plan information, wherein the die change information comprises second process information of auxiliary processes among processing technological processes of the fabric order; the fabric order is scheduled according to the first process information and the second process information, the scheduling comprises scheduling of processing process procedures of the fabric order and scheduling of auxiliary procedures among the processing process procedures of the fabric order, auxiliary non-process procedures among the processing process procedures can be scheduled, the method is different from the existing process scheduling method which only schedules the process procedures, accuracy of fabric order procedure scheduling can be improved, and user experience is improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts. In the drawings:
FIG. 1 is a process flow diagram of a fabric order scheduling method according to an embodiment of the present invention;
FIG. 2 is an interactive diagram of a specific application of the fabric order scheduling method according to the embodiment of the present invention;
fig. 3 is a schematic structural diagram of a fabric order scheduling device according to an embodiment of the present invention;
fig. 4 is a schematic structural diagram of an embodiment of a fabric order scheduling apparatus according to an embodiment of the present invention;
fig. 5 is a schematic structural diagram of an embodiment of a fabric order scheduling apparatus according to an embodiment of the present invention;
fig. 6 is a schematic structural diagram of an embodiment of a fabric order scheduling apparatus according to an embodiment of the present invention;
fig. 7 is a schematic structural diagram of a computer device according to an embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention more apparent, the embodiments of the present invention are further described in detail below with reference to the accompanying drawings. The exemplary embodiments and descriptions of the present invention are provided to explain the present invention, but not to limit the present invention.
The inventor finds that the accuracy of the scheduling of the existing fabric order process is not high, and the main reason for poor user experience is that the process scheduling in the industry is usually performed only for the process, and auxiliary non-process processes are not incorporated into the scheduling, for example, in the textile dyeing and finishing industry, the auxiliary non-process processes may include: some auxiliary works between the main processes of traditional singeing, desizing, mercerizing, sizing, preshrinking and the like, such as cleaning machine, lifting machine oven temperature, sampling, vehicle loading/package conversion of cropping, material changing, water changing and the like, and if the auxiliary works are not added into the scheduling, the accuracy of the whole scheduling of the process can be influenced; in addition, the machine has more operating and processing rules, the conversion among all the processes needs to be performed by mold changing, and if no scheduling is performed, the scheduling is easy to fail, so that the scheduling accuracy is reduced, the fabric production quality is affected, and the user experience is poor. Therefore, the present invention provides a fabric order scheduling method, and fig. 1 is a process flow diagram of the fabric order scheduling method according to the present invention. As shown in fig. 1, the fabric order scheduling method in the embodiment of the present invention may include:
step 101, obtaining processing plan information of a fabric order, wherein the processing plan information comprises first process information of a processing process of the fabric order;
102, determining die change information of the fabric order according to the processing plan information, wherein the die change information comprises second process information of auxiliary processes among processing technological processes of the fabric order;
and 103, scheduling the fabric order according to the first process information and the second process information, wherein the scheduling comprises scheduling of processing processes of the fabric order and scheduling of auxiliary processes among the processing processes of the fabric order.
As can be seen from the process shown in fig. 1, the fabric order scheduling method in the embodiment of the present invention is different from the prior art in that only the process procedures are scheduled, and the auxiliary non-process procedures are included in the schedule, so that the auxiliary non-process procedures in the fabric order processing process can be scheduled, the accuracy of the procedure schedule is improved, the fabric production quality is improved, and the user experience is improved.
The auxiliary processes among the processing process processes of the fabric order consume more time, which may cause inaccurate process scheduling of the fabric order and influence on fabric processing, so that when the fabric order is scheduled, the auxiliary processes among the processing process processes of the fabric order can be scheduled in addition to the processing process processes of the fabric order.
In one embodiment, the process steps of the fabric order may include one or more of the following process steps: singeing, desizing, mercerizing, shaping, preshrinking, scouring and bleaching, cold pad-batch dyeing, cold pad-batch whitening, steaming, liquid ammonia, digital printing, loose washing, open washing, dewatering, scutching, sanding, calendering, fluffing, shearing, baking and the like.
In one embodiment, the auxiliary processes between the processing processes of the fabric order may include one or more of the following auxiliary processes: cleaning a machine table, lifting the temperature of a machine table oven, sampling, turning or packaging conversion of cropping, material changing, water changing and the like.
In specific implementation, firstly, processing plan information made by a plan-making person according to a fabric order can be obtained, that is, first process information of a processing process procedure of the fabric order can be included, and then, second process information of an auxiliary process between the processing process procedures of the fabric order can be determined according to the first process information of the processing process procedure of the fabric order, for example, if the known processing plan is singeing, it can be determined that the auxiliary process before the singeing process is the temperature of an oven of a lifting machine.
In one embodiment, scheduling the material order based on the first process information and the second process information may include: inquiring first preset scheduling rule information corresponding to the first process information according to the first process information; scheduling the processing process of the material order according to the first process information and the first preset scheduling rule information; inquiring second preset scheduling rule information corresponding to the second process information according to the second process information; and scheduling the auxiliary processes among the processing process processes of the material order according to the second process information and the second preset scheduling rule information.
In one embodiment, before scheduling the material order according to the first process information and the second process information, the method may further include: receiving first preset scheduling rule information preset by a planning customizing person, and storing the first preset scheduling rule information; and/or receiving second preset scheduling rule information preset by the planning customizing personnel, and storing the second preset scheduling rule information.
In specific implementation, after first process information of a processing process procedure of a fabric order is obtained and second process information of an auxiliary procedure between the processing process procedures of the fabric order is determined, first preset scheduling rule information corresponding to the first process information and second preset scheduling rule information corresponding to the second process information preset by a planning person can be received and stored respectively; when the fabric order is scheduled, first preset scheduling rule information can be inquired according to the first process information, and the processing process of the fabric order is scheduled according to the first process information and the first preset scheduling rule information; the second preset scheduling rule information may be queried according to the second process information, and the auxiliary processes between the processing processes of the material order may be scheduled according to the second process information and the second preset scheduling rule information.
In one embodiment, the storing the second preset scheduling rule information may include: converting the second preset scheduling rule information into a rule judgment script which can be identified by a Drools rule engine, and storing the rule judgment script; querying second preset scheduling rule information corresponding to the second process information according to the second process information may include: inquiring the rule judgment script according to the second procedure information; scheduling the auxiliary processes among the processing process processes of the material order according to the second process information and the second preset scheduling rule information may include: and calling a Drools rule engine to compile the rule judgment script, deducing the compiled rule judgment script through a RETE algorithm, and determining the schedule of auxiliary procedures among the processing technological procedures of the fabric order.
In specific implementation, the storing the first preset scheduling rule information may also include: converting the first preset scheduling rule information into a rule judgment script which can be identified by a Drools rule engine, and storing the rule judgment script; inquiring first preset scheduling rule information corresponding to the first process information according to the first process information, wherein the inquiring may also include: inquiring a rule judgment script according to the first process information; scheduling the processing technology process of the material order according to the first process information and the first preset scheduling rule information, and may also include: and calling a Drools rule engine to compile the rule judgment script, deducing the compiled rule judgment script through a RETE algorithm, and determining the schedule of the processing process procedure of the fabric order.
In one embodiment, after storing the second preset scheduling rule information, the method may further include: receiving a request for modifying the second preset scheduling rule information submitted by the planning personnel; and modifying the stored second preset scheduling rule information according to the request.
In a specific implementation, after storing the first preset scheduling rule information, the method may further include: receiving a request for modifying first preset scheduling rule information submitted by a planning person; and modifying the stored first preset scheduling rule information according to the request.
In one embodiment, after scheduling the material order according to the first process information and the second process information, the method may further include: receiving a correction request for correcting the schedule of the fabric order submitted by a planning person; and correcting the schedule of the fabric order according to the request.
In specific implementation, the scheduling of the fabric order may include: receiving a correction request for correcting the schedule of the fabric order submitted by a planning person, wherein the correction request can comprise a correction request for correcting the schedule of the process steps of the fabric order or a correction request for correcting the schedule of the auxiliary steps among the process steps of the fabric order; correspondingly, the modification of the schedule of the fabric order may include modification of the schedule of the processing procedures of the fabric order, or modification of the schedule of the auxiliary procedures between the processing procedures of the fabric order.
In one embodiment, scheduling the material order based on the first process information and the second process information may include: and determining content information, notice information and required time information of auxiliary processes among the processing process processes of the fabric order according to the second process information.
In specific implementation, according to the process information of the auxiliary processes among the processing processes of the fabric order, specific contents, notice information and required time information of the auxiliary processes among the processing processes of the fabric order, such as cleaning machine, lifting machine oven temperature, sampling, vehicle loading or package conversion of cropping, material changing, water changing and the like, can be determined, so that the accuracy of the process scheduling of the fabric order can be improved, an operator is reminded to perform mold changing operation, and user experience is improved.
In one embodiment, after scheduling the material order according to the first process information and the second process information, the method may further include: receiving a confirmation instruction of completion of the auxiliary process operation submitted by an operator; and updating the processing state of the fabric order according to the confirmation instruction.
In specific implementation, after the fabric orders are scheduled, fabric processing can be performed according to the fabric order scheduling, and after the auxiliary processes among any processing technology process are completed, confirmation instructions of completion of the auxiliary process operation submitted by operators can be received, so that the completion of the auxiliary process operation is ensured, the processing state of the fabric orders is updated, and the next process processing is performed.
Fig. 2 is an interactive diagram of a specific application of the fabric order scheduling method according to the embodiment of the present invention. As shown in fig. 2, the application interaction process of the fabric order scheduling method in the embodiment of the present invention may include:
planning customizers 201, planning system 202, rule maintenance platform 203, rule engine 204, machine terminal 205, operator 206.
A plan customizing person 201 formulates a processing plan in a planning system 202 according to the fabric order; the machine station terminal 205 receives the processing plan information of the fabric order sent by the plan system 202; the machine station terminal 205 sends the processing plan information of the fabric order to the rule engine 204; a plan customizing person 201 presets a first preset scheduling rule corresponding to a processing process procedure of a fabric order on a rule maintenance platform 203 and a second preset scheduling rule corresponding to an auxiliary procedure between the processing process procedures of the fabric order; the rule maintenance platform 203 sends a first preset scheduling rule corresponding to the processing procedures of the fabric order and a second preset scheduling rule corresponding to an auxiliary procedure between the processing procedures of the fabric order to the rule engine 204; the rule engine 204 acquires first process information of the processing process of the fabric order according to the processing plan information, and determines second process information of auxiliary processes between the processing process of the fabric order; the rule engine 204 schedules the processing procedures of the material order according to the first procedure information and the first preset scheduling rule information, and schedules auxiliary procedures among the processing procedures of the material order according to the second procedure information and the second preset scheduling rule information; the machine station terminal 205 processes the fabric according to the fabric order schedule; the machine station terminal 205 receives a confirmation instruction of completion of the auxiliary process operation submitted by the operator 206; and the machine station terminal 205 updates the processing state of the fabric order according to the confirmation instruction.
The embodiment of the invention also provides a fabric order scheduling device, which is described in the following embodiment. Because the principle of the device for solving the problems is similar to the method for scheduling the fabric orders, the implementation of the device can be referred to the implementation of the method, and repeated details are not repeated.
Fig. 3 is a schematic structural diagram of a fabric order scheduling apparatus according to an embodiment of the present invention. As shown in fig. 3, the fabric order scheduling apparatus in the embodiment of the present invention may specifically include:
a processing plan information obtaining module 301, configured to obtain processing plan information of a fabric order, where the processing plan information includes first process information of a processing process of the fabric order;
a die change information determining module 302, configured to determine die change information of the fabric order according to the processing plan information, where the die change information includes second process information of auxiliary processes between processing processes of the fabric order;
the scheduling module 303 is configured to schedule the fabric order according to the first process information and the second process information, where the scheduling includes scheduling of a processing process of the fabric order and scheduling of an auxiliary process between the processing processes of the fabric order.
In one embodiment, the processing steps of the fabric order comprise one or more of the following processing steps:
singeing, desizing, mercerizing, shaping, preshrinking, scouring and bleaching, cold pad-batch dyeing, cold pad-batch whitening, steaming, liquid ammonia, digital printing, loose washing, open washing, dewatering, scutching, sanding, calendering, fluffing, shearing and baking.
In one embodiment, the auxiliary processes between the processing process processes of the fabric order comprise one or more of the following auxiliary processes:
cleaning a machine table, lifting the temperature of a machine table oven, sampling, turning or packaging conversion of cropping, material changing and water changing.
In one embodiment, the scheduling module 303 is specifically configured to:
inquiring first preset scheduling rule information corresponding to the first process information according to the first process information;
scheduling the processing process of the material order according to the first process information and the first preset scheduling rule information;
inquiring second preset scheduling rule information corresponding to the second process information according to the second process information;
and scheduling the auxiliary processes among the processing process processes of the material order according to the second process information and the second preset scheduling rule information.
Fig. 4 is a schematic structural diagram of an embodiment of a fabric order scheduling apparatus according to an embodiment of the present invention. As shown in fig. 4, in an embodiment, the fabric order scheduling apparatus shown in fig. 3 may further include:
the scheduling rule information receiving module 401 is configured to, before the scheduling module 303 schedules the material order according to the first process information and the second process information:
receiving first preset scheduling rule information preset by a planning customizing person, and storing the first preset scheduling rule information;
and/or receiving second preset scheduling rule information preset by the planning customizing personnel, and storing the second preset scheduling rule information.
In one embodiment, the scheduling rule information receiving module 401 is specifically configured to:
converting the second preset scheduling rule information into a rule judgment script which can be identified by a Drools rule engine, and storing the rule judgment script;
the scheduling module 303 is specifically configured to:
inquiring the rule judgment script according to the second procedure information;
and calling a Drools rule engine to compile the rule judgment script, deducing the compiled rule judgment script through a RETE algorithm, and determining the schedule of auxiliary procedures among the processing technological procedures of the fabric order.
In one embodiment, the scheduling rule information modification request receiving module 402 may further include, after the scheduling rule information receiving module 401 stores the second preset scheduling rule information:
receiving a request for modifying the second preset scheduling rule information submitted by the planning personnel;
and modifying the stored second preset scheduling rule information according to the request.
Fig. 5 is a schematic structural diagram of an embodiment of a fabric order scheduling apparatus according to an embodiment of the present invention. As shown in fig. 5, in an embodiment, the fabric order scheduling apparatus shown in fig. 3 may further include:
the fabric order scheduling modification request receiving module 501 is configured to, after the scheduling module 303 schedules the fabric order according to the first process information and the second process information:
receiving a correction request for correcting the schedule of the fabric order submitted by a planning person;
and correcting the schedule of the fabric order according to the request.
The fabric order scheduling apparatus shown in fig. 5 may include the scheduling rule information receiving module 401 and the scheduling rule information modification request receiving module 402 shown in fig. 4.
In one embodiment, the scheduling module 303 is specifically configured to:
and determining content information, notice information and required time information of auxiliary processes among the processing process processes of the fabric order according to the second process information.
Fig. 6 is a schematic structural diagram of an embodiment of a fabric order scheduling apparatus according to an embodiment of the present invention. As shown in fig. 6, in an embodiment, the fabric order scheduling apparatus shown in fig. 3 may further include:
the confirmation instruction receiving module 601 is configured to, after the scheduling module 303 schedules the material order according to the first process information and the second process information:
receiving a confirmation instruction of completion of the auxiliary process operation submitted by an operator;
and updating the processing state of the fabric order according to the confirmation instruction.
The fabric order scheduling apparatus shown in fig. 6 may include the scheduling rule information receiving module 401, the scheduling rule information modification request receiving module 402 in fig. 4, and the fabric order schedule modification request receiving module 501 in fig. 5.
Based on the aforementioned inventive concept, as shown in fig. 7, the present invention further provides a computer apparatus 700, which includes a memory 710, a processor 720, and a computer program 730 stored in the memory 710 and executable on the processor 720, wherein the processor 720 implements the aforementioned fabric order scheduling method when executing the computer program 730.
Based on the above inventive concept, an embodiment of the present invention further provides a computer-readable storage medium, in which a computer program for executing the above fabric order scheduling method is stored.
In summary, the embodiment of the present invention includes auxiliary non-process steps into the schedule, and obtains the processing plan information of the fabric order, where the processing plan information includes first process information of the processing process steps of the fabric order; determining die change information of the fabric order according to the processing plan information, wherein the die change information comprises second process information of auxiliary processes among processing technological processes of the fabric order; the fabric order is scheduled according to the first process information and the second process information, the scheduling comprises scheduling of processing process procedures of the fabric order and scheduling of auxiliary processes among the processing process procedures of the fabric order, auxiliary non-process procedures among the processing process procedures can be scheduled, the method is different from the existing process scheduling method which only schedules the process procedures, the accuracy of the scheduling of the fabric order procedures can be improved, the production quality of the fabric is improved, and the user experience is improved.
As will be appreciated by one skilled in the art, embodiments of the present invention may be provided as a method, system, or computer program product. Accordingly, the present invention may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present invention may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
The present invention is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the invention. It will be understood that each flow and/or block of the flow diagrams and/or block diagrams, and combinations of flows and/or blocks in the flow diagrams and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
The above-mentioned embodiments are intended to illustrate the objects, technical solutions and advantages of the present invention in further detail, and it should be understood that the above-mentioned embodiments are only examples of the present invention, and are not intended to limit the scope of the present invention, and any modifications, equivalents, improvements and the like made within the spirit and principle of the present invention should be included in the scope of the present invention.

Claims (22)

1. A fabric order scheduling method is characterized by comprising the following steps:
obtaining processing plan information of a fabric order, wherein the processing plan information comprises first process information of a processing process of the fabric order;
determining die change information of the fabric order according to the processing plan information, wherein the die change information comprises second process information of auxiliary processes among processing technological processes of the fabric order;
and scheduling the fabric order according to the first process information and the second process information, wherein the scheduling comprises scheduling of the processing process of the fabric order and scheduling of auxiliary processes between the processing process of the fabric order.
2. The method of claim 1, wherein the fabric order process comprises one or more of the following processes:
singeing, desizing, mercerizing, shaping, preshrinking, scouring and bleaching, cold pad-batch dyeing, cold pad-batch whitening, steaming, liquid ammonia, digital printing, loose washing, open washing, dewatering, scutching, sanding, calendering, fluffing, shearing and baking.
3. The method of claim 1, wherein the auxiliary processes between the processing of the fabric order include one or more of the following auxiliary processes:
cleaning a machine table, lifting the temperature of a machine table oven, sampling, turning or packaging conversion of cropping, material changing and water changing.
4. The method of claim 1, wherein scheduling the material order based on the first process information and the second process information comprises:
inquiring first preset scheduling rule information corresponding to the first process information according to the first process information;
scheduling the processing process of the material order according to the first process information and the first preset scheduling rule information;
inquiring second preset scheduling rule information corresponding to the second process information according to the second process information;
and scheduling the auxiliary processes among the processing process processes of the material order according to the second process information and the second preset scheduling rule information.
5. The method of claim 4, wherein prior to scheduling the order for the material based on the first process information and the second process information, further comprising:
receiving first preset scheduling rule information preset by a planning customizing person, and storing the first preset scheduling rule information;
and/or receiving second preset scheduling rule information preset by the planning customizing personnel, and storing the second preset scheduling rule information.
6. The method of claim 5, wherein storing the second predetermined scheduling rule information comprises: converting the second preset scheduling rule information into a rule judgment script which can be identified by a Drools rule engine, and storing the rule judgment script;
according to the second process information, inquiring second preset scheduling rule information corresponding to the second process information, wherein the second preset scheduling rule information comprises: inquiring the rule judgment script according to the second procedure information;
scheduling auxiliary processes among the processing technology processes of the material order according to the second process information and the second preset scheduling rule information, wherein the scheduling auxiliary processes include:
and calling a Drools rule engine to compile the rule judgment script, deducing the compiled rule judgment script through a RETE algorithm, and determining the schedule of auxiliary procedures among the processing technological procedures of the fabric order.
7. The method of claim 5, wherein after storing the second predetermined scheduling rule information, further comprising:
receiving a request for modifying the second preset scheduling rule information submitted by the planning personnel;
and modifying the stored second preset scheduling rule information according to the request.
8. The method of claim 4, wherein after scheduling the order for the material based on the first process information and the second process information, further comprising:
receiving a correction request for correcting the schedule of the fabric order submitted by a planning person;
and correcting the schedule of the fabric order according to the request.
9. The method of claim 1, wherein scheduling the material order based on the first process information and the second process information comprises:
and determining content information, notice information and required time information of auxiliary processes among the processing process processes of the fabric order according to the second process information.
10. The method of claim 1, wherein after scheduling the order for the material based on the first process information and the second process information, further comprising:
receiving a confirmation instruction of completion of the auxiliary process operation submitted by an operator;
and updating the processing state of the fabric order according to the confirmation instruction.
11. A fabric order scheduling device is characterized by comprising:
the processing plan information obtaining module is used for obtaining processing plan information of the fabric order, and the processing plan information comprises first process information of a processing process of the fabric order;
the die change information determining module is used for determining die change information of the fabric order according to the processing plan information, and the die change information comprises second process information of auxiliary processes among processing technological processes of the fabric order;
and the scheduling module is used for scheduling the fabric order according to the first process information and the second process information, wherein the scheduling comprises scheduling of processing procedures of the fabric order and scheduling of auxiliary procedures among the processing procedures of the fabric order.
12. The apparatus of claim 11, wherein the process sequence of the fabric order comprises one or more of the following process sequences:
singeing, desizing, mercerizing, shaping, preshrinking, scouring and bleaching, cold pad-batch dyeing, cold pad-batch whitening, steaming, liquid ammonia, digital printing, loose washing, open washing, dewatering, scutching, sanding, calendering, fluffing, shearing and baking.
13. The apparatus of claim 11, wherein the ancillary operations between the processing operations of the fabric order include one or more of the following ancillary operations:
cleaning a machine table, lifting the temperature of a machine table oven, sampling, turning or packaging conversion of cropping, material changing and water changing.
14. The apparatus of claim 11, wherein the scheduling module is specifically configured to:
inquiring first preset scheduling rule information corresponding to the first process information according to the first process information;
scheduling the processing process of the material order according to the first process information and the first preset scheduling rule information;
inquiring second preset scheduling rule information corresponding to the second process information according to the second process information;
and scheduling the auxiliary processes among the processing process processes of the material order according to the second process information and the second preset scheduling rule information.
15. The apparatus of claim 14, further comprising a scheduling rule information receiving module configured to, prior to the scheduling module scheduling the material order based on the first process information and the second process information:
receiving first preset scheduling rule information preset by a planning customizing person, and storing the first preset scheduling rule information;
and/or receiving second preset scheduling rule information preset by the planning customizing personnel, and storing the second preset scheduling rule information.
16. The apparatus of claim 15, wherein the scheduling rule information receiving module is specifically configured to:
converting the second preset scheduling rule information into a rule judgment script which can be identified by a Drools rule engine, and storing the rule judgment script;
the scheduling module is specifically configured to:
inquiring the rule judgment script according to the second procedure information;
and calling a Drools rule engine to compile the rule judgment script, deducing the compiled rule judgment script through a RETE algorithm, and determining the schedule of auxiliary procedures among the processing technological procedures of the fabric order.
17. The apparatus of claim 15, further comprising a scheduling rule information modification request receiving module for, after the scheduling rule information receiving module stores the second predetermined scheduling rule information:
receiving a request for modifying the second preset scheduling rule information submitted by the planning personnel;
and modifying the stored second preset scheduling rule information according to the request.
18. The apparatus of claim 14, further comprising a fabric order scheduling modification request receiving module configured to, after the scheduling module schedules the fabric order based on the first process information and the second process information:
receiving a correction request for correcting the schedule of the fabric order submitted by a planning person;
and correcting the schedule of the fabric order according to the request.
19. The apparatus of claim 11, wherein the scheduling module is specifically configured to:
and determining content information, notice information and required time information of auxiliary processes among the processing process processes of the fabric order according to the second process information.
20. The apparatus of claim 11, further comprising a confirmation instruction receiving module for, after the scheduling module schedules the order for the material based on the first process information and the second process information:
receiving a confirmation instruction of completion of the auxiliary process operation submitted by an operator;
and updating the processing state of the fabric order according to the confirmation instruction.
21. A computer device comprising a memory, a processor and a computer program stored on the memory and executable on the processor, wherein the processor implements the method of any one of claims 1 to 10 when executing the computer program.
22. A computer-readable storage medium, characterized in that the computer-readable storage medium stores a computer program for executing the method of any one of claims 1 to 10.
CN202110796917.7A 2021-07-14 2021-07-14 Fabric order scheduling method and device Pending CN113469551A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110796917.7A CN113469551A (en) 2021-07-14 2021-07-14 Fabric order scheduling method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110796917.7A CN113469551A (en) 2021-07-14 2021-07-14 Fabric order scheduling method and device

Publications (1)

Publication Number Publication Date
CN113469551A true CN113469551A (en) 2021-10-01

Family

ID=77880353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110796917.7A Pending CN113469551A (en) 2021-07-14 2021-07-14 Fabric order scheduling method and device

Country Status (1)

Country Link
CN (1) CN113469551A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107450919A (en) * 2017-07-25 2017-12-08 上海壹账通金融科技有限公司 BPM method, equipment and computer-readable recording medium
CN109034618A (en) * 2018-07-26 2018-12-18 温州庄吉服饰有限公司 A kind of clothes processing intelligent flexible process streaming system
CN109300001A (en) * 2018-09-13 2019-02-01 陈小莲 Tailoring technique analysis method, device, electronic equipment and storage medium
CN109507966A (en) * 2018-11-20 2019-03-22 东华大学 A kind of intelligent managing and control system towards Weft Knitted Shell Fabric production
CN111260320A (en) * 2020-01-15 2020-06-09 广东溢达纺织有限公司 Fabric order scheduling method and device
CN111461540A (en) * 2020-03-31 2020-07-28 绍兴数智科技有限公司 Dyeing scheduling auxiliary management system
CN112163776A (en) * 2020-10-12 2021-01-01 广东溢达纺织有限公司 Method and device for determining fabric production process, computer equipment and storage medium
CN112907215A (en) * 2021-03-08 2021-06-04 广东溢达纺织有限公司 Production control method and device for textile order, computer equipment and storage medium

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107450919A (en) * 2017-07-25 2017-12-08 上海壹账通金融科技有限公司 BPM method, equipment and computer-readable recording medium
CN109034618A (en) * 2018-07-26 2018-12-18 温州庄吉服饰有限公司 A kind of clothes processing intelligent flexible process streaming system
CN109300001A (en) * 2018-09-13 2019-02-01 陈小莲 Tailoring technique analysis method, device, electronic equipment and storage medium
CN109507966A (en) * 2018-11-20 2019-03-22 东华大学 A kind of intelligent managing and control system towards Weft Knitted Shell Fabric production
CN111260320A (en) * 2020-01-15 2020-06-09 广东溢达纺织有限公司 Fabric order scheduling method and device
CN111461540A (en) * 2020-03-31 2020-07-28 绍兴数智科技有限公司 Dyeing scheduling auxiliary management system
CN112163776A (en) * 2020-10-12 2021-01-01 广东溢达纺织有限公司 Method and device for determining fabric production process, computer equipment and storage medium
CN112907215A (en) * 2021-03-08 2021-06-04 广东溢达纺织有限公司 Production control method and device for textile order, computer equipment and storage medium

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《纺织企业管理手册》编审委员会: "《纺织企业管理手册》", 30 April 1997, 中国纺织出版社, pages: 161 - 162 *

Similar Documents

Publication Publication Date Title
US5216617A (en) Group management system for injection molding machines
KR102178663B1 (en) Dyeing and Finishing system and Method therefor
CN110387635B (en) Hosiery machine and pattern knitting method and storage medium thereof
CN114895642A (en) Multi-device cooperative operation system and method based on digital twin technology
CN112111613B (en) Automatic cutting method, device and system for leather and readable storage medium
CN113469551A (en) Fabric order scheduling method and device
CN113778041B (en) Method, system, equipment and storage medium for generating communication data between DCS controllers
CN108628271B (en) Artificial intelligence production line control method
AU726116B2 (en) Method and controller for the graphical control of processes in a network management system
CN111868646B (en) Container processing apparatus and method for securely managing settings of the container processing apparatus
CN109483536B (en) Additional axis adding method and device for robot, storage medium and robot
CN111475159B (en) Method, device and storage medium for automatically generating program
CN111924660B (en) Chemical fiber filament doffing method and system based on twin model and automatic doffing equipment
CN114755987A (en) Work order switching method and device, electronic control equipment and storage medium
CN113657769B (en) Automatic scheduling method and device for fabric order post-finishing production
CN110334061A (en) Method, system, device and the storage medium of batch modification device data model
CN106529753A (en) Identification control method and device of semiconductor technical segment
CN115437757A (en) Scheduling method, system, server and computer readable storage medium
KR101935849B1 (en) Method for controlling textile machine
CN116643546B (en) Running water type process flow control method and equipment
CN111461142B (en) Yarn-based fabric simulation method, system and storage medium
CN113296483A (en) Method and system for full-automatic execution of technological process of dyeing machine
JP3624939B2 (en) Plant operating device
Kwon et al. An expert system for yarn spinning process planning and quality characteristics control in textile industry
CN107991979A (en) A kind of array scan-type control method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination