CN113431651A - Low-load operation system with one furnace and two machines - Google Patents

Low-load operation system with one furnace and two machines Download PDF

Info

Publication number
CN113431651A
CN113431651A CN202110729127.7A CN202110729127A CN113431651A CN 113431651 A CN113431651 A CN 113431651A CN 202110729127 A CN202110729127 A CN 202110729127A CN 113431651 A CN113431651 A CN 113431651A
Authority
CN
China
Prior art keywords
steam
pressure cylinder
low
boiler
communicated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110729127.7A
Other languages
Chinese (zh)
Inventor
王远
赵帅
孟勇
赵永坚
王国忠
徐远纲
王慧青
刘振琪
王伟锋
王昭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Thermal Power Research Institute Co Ltd
Original Assignee
Xian Thermal Power Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Thermal Power Research Institute Co Ltd filed Critical Xian Thermal Power Research Institute Co Ltd
Priority to CN202110729127.7A priority Critical patent/CN113431651A/en
Publication of CN113431651A publication Critical patent/CN113431651A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K11/00Plants characterised by the engines being structurally combined with boilers or condensers
    • F01K11/02Plants characterised by the engines being structurally combined with boilers or condensers the engines being turbines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D15/00Adaptations of machines or engines for special use; Combinations of engines with devices driven thereby
    • F01D15/10Adaptations for driving, or combinations with, electric generators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D17/00Regulating or controlling by varying flow
    • F01D17/10Final actuators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K7/00Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating
    • F01K7/16Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being only of turbine type

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Control Of Turbines (AREA)

Abstract

The invention discloses a low-load operation system with two machines in one furnace, which comprises two unit-making machine sets; the superheated steam of the boiler is communicated to the high-pressure cylinder steam inlets of the first steam turbine and the second steam turbine through a main steam pipeline, and the steam flow is controlled through a regulating valve and a shutoff valve. The exhaust steam of the first turbine high-pressure cylinder enters the intermediate-pressure cylinder through reheating, and the exhaust steam of the second turbine high-pressure cylinder directly enters the intermediate-pressure cylinder. The main pipe reheating system of the low-load unit is realized by a simpler structure, has better economical efficiency and development potential, and can effectively meet the long-time low-load operation requirement of the thermal power unit under the condition of great development of new energy power.

Description

Low-load operation system with one furnace and two machines
Technical Field
The invention belongs to the field of thermal power generation, and particularly relates to a low-load operation system with two machines in one furnace.
Background
At present, the scales of wind power and photovoltaic power generation are gradually enlarged, and for thermal power generation, the wind power photovoltaic power generation which ensures lower load operation capacity to make up for the problem of incapability of generating power stably is more and more important. The increase of new forms of energy generated energy can cause very big impact to existing thermal power generating unit, and in order to adapt to more and more new forms of energy electric power, the flexibility transformation needs to be carried out to existing thermal power generating unit to reinforcing degree of depth peak regulation ability. At present, the flexible peak regulation modification generally adopts a thermoelectric decoupling mode, which has certain limitation, firstly, the output of a boiler is not reduced, namely, the coal burning quantity is not reduced, and the carbon emission is not reduced; secondly, the power plant must also have significant thermal consumers around it.
For the existing thermal power generation system, because the boiler can not be operated at low load for a long time, and the existing domestic large-capacity power station unit adopts a steam intermediate reheating system, unit systems are adopted, namely, each boiler only supplies steam to one steam turbine matched with the boiler, then the steam turbine drives a generator to form an independent power generation unit, and when the unit operates normally, the steam and the service power needed by the unit are only taken from the unit. Therefore, the load of the reheating unit cannot be lower than the minimum load of the boiler at present.
For a main control system, namely a power generation system in which a plurality of units with the same parameters of water supply and superheated steam are respectively connected together by using a common pipeline, the operation mode that one boiler is provided with two turbines can be realized, and the ultra-low load operation of a large-capacity thermal power generating unit can be realized.
Disclosure of Invention
The invention aims to provide a low-load operation system with one furnace and two machines, aiming at the improvement requirement of the flexibility of the existing thermal power generating unit and enhancing the deep peak regulation capability.
In order to achieve the purpose, the invention adopts the following technical scheme:
a low-load operation system with one furnace and two machines comprises two unit-making units, a main steam bypass connecting pipe and a high-pressure-medium pressure cylinder connecting pipe; the steam outlet of the high-pressure cylinder of the second steam turbine is communicated to the steam inlet of the intermediate-pressure cylinder of the second steam turbine through a high-pressure-intermediate-pressure cylinder connecting pipe, and the steam outlet of the intermediate-pressure cylinder of the second steam turbine is communicated to the low-pressure cylinder through a pipeline.
The invention is further improved in that the superheated steam of the first boiler is communicated to the steam inlet of the high-pressure cylinder of the first steam turbine through a main steam pipeline and communicated to the steam inlet of the high-pressure cylinder of the second steam turbine through a main steam bypass communication pipe, and the steam flow is controlled by a regulating valve and a shutoff valve.
The invention is further improved in that the steam outlet of the high-pressure cylinder of the first steam turbine is communicated to the inlet main pipe of the low-temperature reheater of the first boiler through a steam communication pipe, the outlet main pipe of the low-temperature reheater of the first boiler is communicated to the steam inlet of the intermediate-pressure cylinder of the first steam turbine through a reheating pipeline, and the steam outlet of the intermediate-pressure cylinder of the first steam turbine is communicated to the low-pressure cylinder through a pipeline.
The invention is further improved in that the inlet main pipe of the low-temperature reheater is provided with temperature-reducing water, and the flow velocity of steam in the reheater pipeline is 35-60 m/s.
The invention has the further improvement that the system also comprises a second boiler, wherein the second boiler is in a shutdown or hot standby state, and both the two turbines are in a running state.
The invention has the further improvement that the two units are in a grid-connected power generation state, and the two units share the power load instruction.
The invention has the further improvement that the first unit runs under high load and the second unit runs under low load.
The invention is further improved in that before the second boiler is started, the shut-off valve of the main steam pipeline between the first boiler and the second steam turbine is closed, and the normal operation state of one boiler and one machine is recovered.
The invention has at least the following beneficial technical effects:
in the invention, the steam outlet of the high-pressure cylinder of the second steam turbine is communicated to the steam inlet of the intermediate-pressure cylinder of the second steam turbine through the high-pressure-intermediate-pressure cylinder connecting pipe, and the steam outlet of the intermediate-pressure cylinder of the second steam turbine is communicated to the low-pressure cylinder through a pipeline. The superheated steam of the first boiler is communicated to a high-pressure cylinder steam inlet of the first steam turbine through a main steam pipeline, is communicated to a high-pressure cylinder steam inlet of the second steam turbine through a main steam bypass connecting pipe, and the steam flow is controlled through a regulating valve and a shutoff valve. Compared with the existing unit reheating system, the invention uses the main pipe system to realize the operation mode of one furnace with two machines, so as to ensure the safe operation of the generator set under low load and enhance the deep peak regulation capability of the power plant.
Drawings
FIG. 1 is a schematic view of a low-load one-furnace two-machine operation system of the present invention.
Detailed Description
Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art. It should be noted that the embodiments and features of the embodiments may be combined with each other without conflict. The present invention will be described in detail below with reference to the embodiments with reference to the attached drawings.
Referring to fig. 1, the low-load one-furnace two-machine operation system provided by the invention comprises two unit-making units, a main steam bypass connecting pipe, a high-pressure-medium pressure cylinder connecting pipe, a regulating valve and a shut-off valve. Wherein: the superheated steam of the first boiler is communicated to a high-pressure cylinder steam inlet of the first steam turbine through a main steam pipeline and communicated to a high-pressure cylinder steam inlet of the second steam turbine through a main steam bypass communication pipe, and the steam flow is controlled through a regulating valve and a shutoff valve, so that the generated energy of the two units is controlled. The steam outlet of the high-pressure cylinder of the first steam turbine is communicated to an inlet main pipe of a low-temperature reheater of the first boiler through a pipeline, desuperheating water is arranged on the inlet main pipe, the steam flow rate in the low-temperature reheater and the high-temperature reheater is 35m/s-60m/s, an outlet main pipe of the low-temperature reheater of the first boiler is communicated to a steam inlet of a medium-pressure cylinder of the first steam turbine through a first reheating pipeline, and a steam outlet of the medium-pressure cylinder of the first steam turbine is communicated to a low-pressure cylinder through a pipeline; the steam outlet of the high-pressure cylinder of the second steam turbine is communicated to the steam inlet of the intermediate-pressure cylinder of the second steam turbine through a high-pressure-intermediate-pressure cylinder connecting pipe. In order to avoid safety problems when the steam with different parameters is mixed, the steam outlet of the high-pressure cylinder of the second steam turbine with lower load is directly communicated to the steam inlet of the intermediate-pressure cylinder of the second steam turbine through a pipeline, and the steam outlet of the intermediate-pressure cylinder of the second steam turbine is communicated to the low-pressure cylinder through a pipeline. At this time, the second boiler can be kept in a safe shutdown state or in a hot standby state.
Because the main steam of the boiler is communicated with the two turbines, compared with a unit system unit, the exhaust steam flow of a high-pressure cylinder of a single turbine is correspondingly reduced, so that the high exhaust pressure is reduced, the steam density is reduced, and the volume flow is increased on the premise of keeping the mass flow unchanged. In order to avoid overlarge steam flow velocity in the reheater, the invention adopts a single steam turbine reheating mode to reduce the mass flow of the steam in the reheater and ensure that the steam flow velocity in the reheater is controlled to be 35m/s-60 m/s. Meanwhile, the temperature of steam at the inlet of the reheater is coordinately controlled by the desuperheating water, so that the overheating of the reheater is avoided.
The two sets are in a grid-connected power generation state, the two sets share an electric load instruction, the first set runs at a high load, and the second set runs at a low load. Before the second boiler is started, a shut-off valve of a main steam pipeline between the first boiler and the second steam turbine is closed, and the normal running state of one boiler and one machine is recovered.
In conclusion, compared with other main pipe system, the low-load operation system with one furnace and two machines has a simpler structure, and compared with a conventional thermal power generating unit, the low-load operation system with one furnace and two machines only increases a communication pipeline for communicating superheated steam of a boiler to another steam turbine and a matched flow regulating valve and a matched shutoff valve, has lower cost, and is a main pipe reheating system which is easier to realize.
Although the invention has been described in detail hereinabove with respect to a general description and specific embodiments thereof, it will be apparent to those skilled in the art that modifications or improvements may be made thereto based on the invention. Accordingly, such modifications and improvements are intended to be within the scope of the invention as claimed.

Claims (8)

1. A low-load operation system with one furnace and two machines is characterized by comprising two unit-making machine sets, a main steam bypass connecting pipe and a high-pressure-intermediate pressure cylinder connecting pipe; the steam outlet of the high-pressure cylinder of the second steam turbine is communicated to the steam inlet of the intermediate-pressure cylinder of the second steam turbine through a high-pressure-intermediate-pressure cylinder connecting pipe, and the steam outlet of the intermediate-pressure cylinder of the second steam turbine is communicated to the low-pressure cylinder through a pipeline.
2. A low load operation system with two machines in one furnace according to claim 1, wherein the superheated steam of the first boiler is communicated to the steam inlet of the high pressure cylinder of the first steam turbine through the main steam pipeline and communicated to the steam inlet of the high pressure cylinder of the second steam turbine through the main steam bypass communication pipe, and the steam flow is controlled by the adjusting valve and the shutoff valve.
3. The operating system of claim 1, wherein the steam outlet of the high-pressure cylinder of the first steam turbine is communicated to the inlet main pipe of the low-temperature reheater of the first boiler through a steam communication pipe, the outlet main pipe of the low-temperature reheater of the first boiler is communicated to the steam inlet of the intermediate-pressure cylinder of the first steam turbine through a first reheating pipeline, and the steam outlet of the intermediate-pressure cylinder of the first steam turbine is communicated to the low-pressure cylinder through a pipeline.
4. The system of claim 1, wherein the low-load one-furnace-with-two-machine operation system is characterized in that the inlet main pipe of the low-temperature reheater is provided with temperature-reducing water, and the flow rate of steam in the reheater pipe is 35m/s-60 m/s.
5. The system of claim 1, further comprising a second boiler, wherein the second boiler is in a shutdown or hot standby state, and both turbines are in operation.
6. The operating system of claim 1, wherein both units are in a grid-connected power generation state, and the two units share the electrical load command.
7. The operating system of claim 1, wherein the first unit operates under high load and the second unit operates under low load.
8. A low-load operation system with two machines in one furnace is characterized in that before the second boiler is started, a shut-off valve of a main steam pipeline between the first boiler and the second steam turbine is closed, and the normal operation state of one furnace and one machine is recovered.
CN202110729127.7A 2021-06-29 2021-06-29 Low-load operation system with one furnace and two machines Pending CN113431651A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110729127.7A CN113431651A (en) 2021-06-29 2021-06-29 Low-load operation system with one furnace and two machines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110729127.7A CN113431651A (en) 2021-06-29 2021-06-29 Low-load operation system with one furnace and two machines

Publications (1)

Publication Number Publication Date
CN113431651A true CN113431651A (en) 2021-09-24

Family

ID=77757702

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110729127.7A Pending CN113431651A (en) 2021-06-29 2021-06-29 Low-load operation system with one furnace and two machines

Country Status (1)

Country Link
CN (1) CN113431651A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114922701A (en) * 2022-05-25 2022-08-19 哈尔滨汽轮机厂有限责任公司 Three-furnace two-machine main pipe system biomass power plant steam turbine pressure and power control system
CN115013097A (en) * 2022-05-27 2022-09-06 华电郑州机械设计研究院有限公司 Large unit peak shaving system capable of flexibly performing peak shaving operation and operation mode

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10212907A (en) * 1997-01-30 1998-08-11 Mitsubishi Heavy Ind Ltd Axial flow exhaust condenser
CN105736068A (en) * 2016-03-09 2016-07-06 华北电力大学 High-back pressure combined heat and power generation system coupled with exhaust steam and supply heat of non-reheat steam turbine
CN105756729A (en) * 2016-04-18 2016-07-13 国电科学技术研究院 Supercritical or ultra-supercritical coal-fired electricity generation system adopting main mode
CN107747503A (en) * 2017-11-29 2018-03-02 东南大学 A kind of system and operation method of Thermal generation unit Ultra-low load operation
CN109653810A (en) * 2019-02-25 2019-04-19 哈尔滨锅炉厂有限责任公司 A kind of two machine switchover operation therrmodynamic system of a furnace zone
CN110671161A (en) * 2019-10-28 2020-01-10 西安热工研究院有限公司 High-parameter industrial steam supply system and method suitable for large coal-fired unit
CN112145244A (en) * 2020-09-22 2020-12-29 西安热工研究院有限公司 System and method for improving water supply temperature and steam supply capacity of coal-fired power generating unit

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10212907A (en) * 1997-01-30 1998-08-11 Mitsubishi Heavy Ind Ltd Axial flow exhaust condenser
CN105736068A (en) * 2016-03-09 2016-07-06 华北电力大学 High-back pressure combined heat and power generation system coupled with exhaust steam and supply heat of non-reheat steam turbine
CN105756729A (en) * 2016-04-18 2016-07-13 国电科学技术研究院 Supercritical or ultra-supercritical coal-fired electricity generation system adopting main mode
CN107747503A (en) * 2017-11-29 2018-03-02 东南大学 A kind of system and operation method of Thermal generation unit Ultra-low load operation
CN109653810A (en) * 2019-02-25 2019-04-19 哈尔滨锅炉厂有限责任公司 A kind of two machine switchover operation therrmodynamic system of a furnace zone
CN110671161A (en) * 2019-10-28 2020-01-10 西安热工研究院有限公司 High-parameter industrial steam supply system and method suitable for large coal-fired unit
CN112145244A (en) * 2020-09-22 2020-12-29 西安热工研究院有限公司 System and method for improving water supply temperature and steam supply capacity of coal-fired power generating unit

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114922701A (en) * 2022-05-25 2022-08-19 哈尔滨汽轮机厂有限责任公司 Three-furnace two-machine main pipe system biomass power plant steam turbine pressure and power control system
CN114922701B (en) * 2022-05-25 2023-09-05 哈尔滨汽轮机厂有限责任公司 Pressure and power control system of three-furnace two-machine main pipe biomass power plant steam turbine
CN115013097A (en) * 2022-05-27 2022-09-06 华电郑州机械设计研究院有限公司 Large unit peak shaving system capable of flexibly performing peak shaving operation and operation mode

Similar Documents

Publication Publication Date Title
CN110145376B (en) Boiler and steam turbine decoupling system based on increase steam turbine
CN111852597A (en) Variable-parameter multi-element cascade thermoelectric decoupling system of thermal power heat supply unit and adjusting method
CN113431651A (en) Low-load operation system with one furnace and two machines
CN113175363A (en) Master pipe connection system for adjusting high-pressure cylinder to do work and operation method
CN113530615A (en) BEST mini-machine system started in multiple modes and operation method thereof
CN113175367B (en) Master control system for improving peak regulation capacity and flexibility of unit and operation method
CN114592928A (en) BEST small-machine steam inlet and outlet system and steam outlet pressure control operation method thereof
CN112879110A (en) Thermodynamic system with one furnace and two machines operating at ultralow load and switching method thereof
CN113756893A (en) Multi-unit combined operation flexibility adjusting system among multiple power plants
CN212296519U (en) Variable-parameter multi-element cascade thermoelectric decoupling system of thermal power heat supply unit
CN113431648B (en) Reheater structure of header reheating system
CN210088955U (en) Combined cycle device for steam extraction integration and heat storage peak regulation coupling
CN116537899A (en) Flexible peak shaving nuclear power unit adopting molten salt for energy storage and working method
CN110735677A (en) natural gas compressor station gas turbine-steam turbine combined cycle control system
CN113494321B (en) High-pressure cylinder zero-output-force-based bus pipe connection system and operation method
CN112282875A (en) Factory-level multi-unit coupling combined transportation system for improving flexibility of thermal power generating unit
CN214660396U (en) Coupling peak shaving system based on middle row and cooling of middle row among units
CN214464457U (en) Peak regulation system based on steam turbine intermediate pressure cylinder exhaust coupling
CN214660379U (en) Thermodynamic system with one furnace and two machines operating at ultralow load
CN214464456U (en) Coupling peak regulation system based on medium-pressure exhaust and low-pressure steam extraction cooling
CN214464455U (en) Depth peak regulation system based on thermodynamic system coupling among units
CN214464454U (en) Coupling peak regulation system based on main steam, medium exhaust and steam extraction cooling
CN218763604U (en) High-low side combined heating system
CN113153470A (en) Coupling peak shaving system based on middle row and cooling of units and operation method thereof
CN113153469A (en) Coupling peak regulation system based on medium-exhaust and low-pressure extraction cooling and operation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210924