CN113404645A - Wind power hybrid tower prefabricated tower cylinder connected by bolt U rings and construction method thereof - Google Patents

Wind power hybrid tower prefabricated tower cylinder connected by bolt U rings and construction method thereof Download PDF

Info

Publication number
CN113404645A
CN113404645A CN202110664937.9A CN202110664937A CN113404645A CN 113404645 A CN113404645 A CN 113404645A CN 202110664937 A CN202110664937 A CN 202110664937A CN 113404645 A CN113404645 A CN 113404645A
Authority
CN
China
Prior art keywords
tower
sleeve
section
shaped
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110664937.9A
Other languages
Chinese (zh)
Other versions
CN113404645B (en
Inventor
谭奇峰
朱德荣
吴涛
刘喜
赵兴鑫
杨涵辛
马铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changan University
China Railway Shanghai Design Institute Group Co Ltd
Original Assignee
Changan University
China Railway Shanghai Design Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changan University, China Railway Shanghai Design Institute Group Co Ltd filed Critical Changan University
Priority to CN202110664937.9A priority Critical patent/CN113404645B/en
Publication of CN113404645A publication Critical patent/CN113404645A/en
Application granted granted Critical
Publication of CN113404645B publication Critical patent/CN113404645B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/10Assembly of wind motors; Arrangements for erecting wind motors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Wind Motors (AREA)

Abstract

The invention relates to a wind power hybrid tower prefabricated tower cylinder connected by a U-shaped bolt ring and a construction method thereof. The invention has the advantages that: the design of the pre-embedded U-shaped screw improves the connection rigidity and the integrity of the component is enhanced; the design of the large sleeve on the small screw reduces the hole aligning difficulty; the low yield strength and high plasticity sleeve deforms under stress to fill the gap, so that the relative slippage between the concrete prefabricated part with unstable precision and the bolt is reduced; simple and reasonable structure, convenient assembly and disassembly and suitability for popularization.

Description

Wind power hybrid tower prefabricated tower cylinder connected by bolt U rings and construction method thereof
Technical Field
The invention relates to the technical field of wind power hybrid tower prefabricated towers, in particular to a wind power hybrid tower prefabricated tower adopting bolt U-ring connection and a construction method thereof.
Background
With the development of the wind power industry, wind power resources are continuously developed and utilized, and the demand of the wind power hybrid tower is increasingly seen under the form. Traditional tower section of thick bamboo adopts cast-in-place formula, but can produce the engineering time long like this, and the difficult scheduling problem that guarantees of construction quality winter, and adopts precast concrete tower section of thick bamboo to have the reduction of erection time, solves the characteristics of construction difficulty in winter.
The traditional prefabricated part connecting and fastening device adopts a bolt connecting mode, the connecting mode usually causes hole aligning difficulty and often needs secondary hole opening, and the rigidity is insufficient. Meanwhile, the bearing capacity is not easy to guarantee.
Disclosure of Invention
The invention aims to provide a wind power hybrid tower prefabricated tower cylinder connected by bolt U rings and a construction method thereof according to the defects of the prior art, the tensile U-shaped bolt connecting device is used, so that the rigidity of a connecting surface is increased, the pulling resistance of a sleeve is improved, and the U-shaped bolts are also used as shear pieces from the vertical stress angle to improve the shearing resistance among the plate sections; the sleeve gaps are filled with the low-yield-strength high-plasticity sleeves, so that the bolt connection rigidity is improved, stress concentration is weakened, hole aligning difficulty is reduced, relative slippage between the concrete prefabricated part with unstable precision and the bolts is reduced, and high-strength and high-precision assembling between the tower barrel sub-pieces is realized.
The purpose of the invention is realized by the following technical scheme:
the utility model provides an adopt wind-powered electricity generation of bolt U ring connection to mix prefabricated tower section of thick bamboo of tower which characterized in that: this wind-powered electricity generation mixes tower prefabricated tower section of thick bamboo is assembled by tower section of thick bamboo segmental arc piece and tower section of thick bamboo straight section piece and is constituted, wherein tower section of thick bamboo segmental arc piece with tower section of thick bamboo straight section piece has the connection face respectively, the connection face of tower section of thick bamboo segmental arc piece with tower section of thick bamboo straight section piece is connected the looks adaptation, both connect the face and be provided with U type bolted connection device, U type bolted connection device will connect the face connection fixed, make tower section of thick bamboo segmental arc piece with tower section of thick bamboo straight section piece constitutes wholly.
The U-shaped bolt connecting device comprises an unthreaded sleeve, a base plate, a low-yield-strength high-plasticity sleeve, a high-strength bolt and a U-shaped sleeve, wherein the unthreaded sleeve is embedded in the arc-shaped section of the tower barrel, the U-shaped sleeve is embedded in the straight section of the tower barrel and corresponds to the unthreaded sleeve in position, the high-strength bolt is screwed into the unthreaded sleeve and fixedly connected with the U-shaped sleeve, the low-yield-strength high-plasticity sleeve is located between the unthreaded sleeve and the high-strength bolt, and the base plate is located between a nut of the high-strength bolt and the connecting surface of the arc-shaped section of the tower barrel.
The backing plate is provided with a hole through which the low-yield-strength high-plasticity sleeve can pass, and the aperture of the hole is smaller than that of a nut of the high-strength bolt; the outer diameter of the unthreaded sleeve is larger than the holes in the base plate, the inner diameter of the unthreaded sleeve is larger than the outer diameter of the low-yield-strength high-plasticity sleeve, and the length of the unthreaded sleeve is equal to the thickness of the arc-shaped section of the tower barrel; the inner diameter of the low-yield-strength high-plasticity sleeve is larger than the outer diameter of the U-shaped sleeve.
The U-shaped sleeve comprises a bent section and a flat section, the two ends of the bent section are respectively connected with the flat section, the bent section is embedded in the flat section split piece of the tower barrel, and part of the flat section extends out of the surface of the connecting surface of the flat section split piece of the tower barrel.
The bending section is solid U-shaped steel, and the straight section is a sleeve with internal threads.
The outer diameter of the low yield strength high plasticity sleeve is smaller than the inner diameter of the unthreaded sleeve, and the length of the low yield strength high plasticity sleeve is longer than the unthreaded sleeve.
The unthreaded sleeve is welded on the longitudinal steel bars of the tower barrel arc-shaped section segment.
The arc-shaped segment of the tower drum is internally provided with two unthreaded sleeves corresponding to the U-shaped sleeves, the axes of the unthreaded sleeves are perpendicular to the axes of the arc-shaped segment of the tower drum, and the two unthreaded sleeves are parallel.
According to the assembling method of the wind power hybrid tower prefabricated tower cylinder connected by the bolt U ring, the assembling method is characterized in that: the assembling method comprises the following steps:
embedding a non-threaded sleeve in an arc section segment of a tower drum, embedding a U-shaped sleeve in a straight section segment of the tower drum, and enabling the straight section of the U-shaped sleeve to partially extend out of the surface of a connecting surface of the U-shaped sleeve;
hoisting the arc-shaped section fragments of the tower drum to a designed position, hoisting the straight section fragments of the tower drum to a corresponding position, aligning the extending part of the U-shaped sleeve and inserting the extending part into the unthreaded sleeve, so that the arc-shaped section fragments of the tower drum and the straight section fragments of the tower drum are aligned and form primary positioning;
inserting a low-yield-strength high-plasticity sleeve into the unthreaded sleeve, covering a base plate, screwing in a high-strength bolt to enable the low-yield-strength high-plasticity sleeve to be gradually pressed into the unthreaded sleeve, and applying pretightening force to the high-strength bolt after the low-yield-strength high-plasticity sleeve is completely pressed into the unthreaded sleeve to complete assembling connection.
The unthreaded sleeve is welded with the steel bars of the arc-shaped section fragments of the tower barrel, and the U-shaped sleeve is welded with the steel bars of the straight section fragments of the tower barrel; and pouring the component after welding.
The invention has the advantages that: the design of the pre-embedded U-shaped screw improves the connection rigidity and the integrity of the component is enhanced; the design of the large sleeve on the small screw reduces the hole aligning difficulty; the low yield strength and high plasticity sleeve deforms under stress to fill the gap, so that the relative slippage between the concrete prefabricated part with unstable precision and the bolt is reduced; simple and reasonable structure, convenient assembly and disassembly and suitability for popularization.
Drawings
FIG. 1 is a schematic view of the present invention in use;
FIG. 2 is a front view of the U-ring tensile connector of the present invention;
FIG. 3 is a schematic structural view of a U-ring tensile connector according to the present invention;
fig. 4 is a flow chart of the use of the present invention.
Detailed Description
The features of the present invention and other related features are described in further detail below by way of example in conjunction with the following drawings to facilitate understanding by those skilled in the art:
as shown in fig. 1-4, the labels 1-12 are respectively shown as: the device comprises a tower drum arc section segment 1, a tower drum straight section segment 2, a U-shaped bolt connecting device 3, a backing plate 4, a non-threaded sleeve 5, a low-yield-strength high-plasticity sleeve 6, a high-strength bolt 7, a U-shaped sleeve 8, a butt joint surface 9, a butt joint surface 10, solid U-shaped steel 11 and a sleeve 12.
Example (b): as shown in fig. 1, in the embodiment, the wind power hybrid tower prefabricated tower barrel connected by the bolt U ring is divided into a tower barrel arc-shaped segment sub-segment 1 and a tower barrel straight segment sub-segment 2, and the prefabricated tower barrel is formed by assembling four tower barrel arc-shaped segment sub-segments 1 and four tower barrel straight segment sub-segments 2 to form a closed structure; the tower barrel is divided into the arc section and the straight section, so that the modularization degree of the prefabricated tower barrel can be effectively improved, and the design and the production are facilitated.
As shown in fig. 1, the butt joint surfaces 9 and 10 of the tower arc segment sub-piece 1 and the tower straight segment sub-piece 2 are respectively provided with a butt joint surface 9 and a butt joint surface 10 which are matched with each other at the butt joint position of the two, wherein the butt joint surface 9 of the tower arc segment sub-piece 1 is recessed from one side of the tower straight segment sub-piece 2, and the butt joint surface 10 of the tower straight segment sub-piece 2 is recessed from one side of the tower arc segment sub-piece 1, so that the butt joint surfaces 9 and the butt joint surfaces 10 form a matched concave-convex fit and the inner and outer side surfaces of the tower arc segment sub-piece 1 and the tower straight segment sub-piece 2 are flush with each other.
The U-shaped bolt connecting device 3 is arranged at the butt joint position of each tower barrel arc section fragment 1 and each tower barrel straight section fragment 2, and the butt joint surface 9 and the butt joint surface 10 are fixedly connected through the U-shaped bolt connecting device 3, so that each tower barrel arc section fragment 1 and each tower barrel straight section fragment 2 are spliced to form an integral structure.
Specifically, as shown in fig. 2 and 3, the U-bolt connecting device 3 includes: the device comprises a base plate 4, a non-threaded sleeve 5, a low-yield-strength high-plasticity sleeve 6, a high-strength bolt 7 and a U-shaped sleeve 8. Wherein, an unthreaded sleeve 5 is pre-embedded in the arc-shaped segment sub-piece 1 of the tower barrel; the straight subsection 2 of tower section of thick bamboo is pre-buried U shaped steel pipe sleeve 8. The backing plate 4 is provided with a round hole which can pass through the low yield strength high plasticity sleeve 6, and the nut of the high strength bolt 7 can not pass through the round hole. The external diameter of the unthreaded sleeve 5 is larger than the reserved hole of the backing plate, the internal diameter of the unthreaded sleeve is larger than the external diameter of the low-yield-strength high-plasticity sleeve 6, and the length of the unthreaded sleeve is equal to the thickness of the tower barrel arc-shaped section segment 1. The outer diameter of the steel sleeve of the low-yield-strength high-plasticity sleeve 6 is smaller than the inner diameter of the unthreaded sleeve 5, the inner diameter of the low-yield-strength high-plasticity sleeve is larger than the outer diameter of the U-shaped sleeve 8, the length of the low-yield-strength high-plasticity sleeve is longer than that of the unthreaded sleeve 5, and the strength of high-plasticity steel is 176 MPa. The high-strength bolt 7 is a high-strength bolt of 10.9 grade or above. The U-shaped sleeve 8 is a sleeve 12 with an internal thread on a straight section, a solid U-shaped steel 11 on a bent section, and the sleeves 12 are respectively arranged at two ends of the solid U-shaped steel 11.
In the present embodiment, a part of the U-shaped sleeve 8 is embedded in the flat tower segment 2, and the embedded part includes the whole solid U-shaped steel 11 and a part of the sleeve 12, i.e. a part of the sleeve 12 is exposed and extends out of the inner side surface of the abutting surface 10, and the exposed part of the sleeve can pass through the non-threaded sleeve 5.
Referring to fig. 1 and 2, when the U-bolt connecting device 3 in this embodiment is used to assemble arc segment segments 1 and straight segment segments 2 of a tower, the method includes the following steps:
1) pre-buried component: embedding the unthreaded sleeve 5 in the arc section segment 1 of the tower cylinder, embedding the U-shaped sleeve 8 in the straight section segment 2 of the tower cylinder, welding the unthreaded sleeve with the longitudinal steel bars of the corresponding section, and pouring a component. In the pre-embedded mode, the sleeves 12 on both sides of the U-shaped sleeve 8 are exposed out of the inner side surface of the abutting surface 10.
2) Hoisting and aligning: hoisting the tower drum arc section segment 1 to the design position of the prefabricated tower drum, hoisting the tower drum straight section segment 2 to one side of the tower drum arc section segment 1, and aligning the butt joint surface 10 with the butt joint surface 9. And then, respectively aligning the sleeves 12 of the exposed parts of the U-shaped sleeves 8, penetrating the sleeves into the two unthreaded sleeves 5 embedded in the arc-shaped section sub-pieces 1 of the tower barrel one by one, and aligning the plate pieces of the arc-shaped section sub-pieces 1 of the tower barrel and the plate pieces of the straight section sub-pieces 2 of the tower barrel.
3) And (3) tightening the bolt: inserting the low-yield-strength high-plasticity sleeve 6 into the unthreaded sleeve 5, covering the backing plate 4, screwing the high-strength bolt 7 to enable the low-yield-strength high-plasticity sleeve 6 to be gradually pressed into the unthreaded sleeve 5, and applying pretightening force to the high-strength bolt 7 after the low-yield-strength high-plasticity sleeve 6 is completely pressed into the unthreaded sleeve 5 to complete the splicing connection.
Through the U type bolted connection device 3 that uses the tensile type connect prefabricated tower section of thick bamboo burst, increased the rigidity of connecting the face, improve sleeve resistance to plucking ability, also regard as shear force spare from the angle of vertical atress U type bolt, promote the ability of shearing between the board section. Meanwhile, the deformation characteristic of the low-yield-strength high-plasticity sleeve 6 is utilized to fill the gap between the threaded sleeve 5 and the high-strength bolt 7, so that the bolt connection rigidity is improved, the problem of stress concentration is weakened, the hole aligning difficulty is reduced, and the relative slippage between the concrete prefabricated part with unstable precision and the bolt is reduced.
In this embodiment, the axis of each of the unthreaded sleeves 5 in step 1) is perpendicular to the axis of each of the prefabricated tower segments, and the two unthreaded sleeves 5 are arranged in parallel. And 3) applying the pretightening force in the step 3), controlling each high-strength bolt 7 to apply the pretightening force to be consistent by using a torque wrench or a force limiting wrench, and checking and detecting the pretightening force loss through the tightening torque after 24 hours to ensure that the pretightening force reaches the standard.
In the embodiment, in specific implementation: the unthreaded sleeve 5 and the U-shaped sleeve 8 may be made of a nodular cast iron sleeve, or may be made of a sleeve made of other materials, such as a stainless steel sleeve.
During actual construction, the values of the outer diameters of the middle part and the upper and lower ends of the U-shaped sleeve 8 can be correspondingly adjusted according to specific requirements.
The backing plate 4 is a rigid backing plate; the unthreaded sleeve 5 is a rigid sleeve.
Although the conception and the embodiments of the present invention have been described in detail with reference to the drawings, those skilled in the art will recognize that various changes and modifications can be made therein without departing from the scope of the appended claims, and therefore, they are not to be considered repeated herein.

Claims (10)

1. The utility model provides an adopt wind-powered electricity generation of bolt U ring connection to mix prefabricated tower section of thick bamboo of tower which characterized in that: this wind-powered electricity generation mixes tower prefabricated tower section of thick bamboo is assembled by tower section of thick bamboo segmental arc piece and tower section of thick bamboo straight section piece and is constituted, wherein tower section of thick bamboo segmental arc piece with tower section of thick bamboo straight section piece has the connection face respectively, the connection face of tower section of thick bamboo segmental arc piece with tower section of thick bamboo straight section piece is connected the looks adaptation, both connect the face and be provided with U type bolted connection device, U type bolted connection device will connect the face connection fixed, make tower section of thick bamboo segmental arc piece with tower section of thick bamboo straight section piece constitutes wholly.
2. The wind power hybrid tower prefabricated tower barrel connected by the bolt U rings according to claim 1, is characterized in that: the U-shaped bolt connecting device comprises an unthreaded sleeve, a base plate, a low-yield-strength high-plasticity sleeve, a high-strength bolt and a U-shaped sleeve, wherein the unthreaded sleeve is embedded in the arc-shaped section of the tower barrel, the U-shaped sleeve is embedded in the straight section of the tower barrel and corresponds to the unthreaded sleeve in position, the high-strength bolt is screwed into the unthreaded sleeve and fixedly connected with the U-shaped sleeve, the low-yield-strength high-plasticity sleeve is located between the unthreaded sleeve and the high-strength bolt, and the base plate is located between a nut of the high-strength bolt and the connecting surface of the arc-shaped section of the tower barrel.
3. The wind power hybrid tower prefabricated tower barrel connected by the bolt U rings according to claim 2, is characterized in that: the backing plate is provided with a hole through which the low-yield-strength high-plasticity sleeve can pass, and the aperture of the hole is smaller than that of a nut of the high-strength bolt; the outer diameter of the unthreaded sleeve is larger than the holes in the base plate, the inner diameter of the unthreaded sleeve is larger than the outer diameter of the low-yield-strength high-plasticity sleeve, and the length of the unthreaded sleeve is equal to the thickness of the arc-shaped section of the tower barrel; the inner diameter of the low-yield-strength high-plasticity sleeve is larger than the outer diameter of the U-shaped sleeve.
4. The wind power hybrid tower prefabricated tower barrel connected by the bolt U rings according to claim 2, is characterized in that: the U-shaped sleeve comprises a bent section and a flat section, the two ends of the bent section are respectively connected with the flat section, the bent section is embedded in the flat section split piece of the tower barrel, and part of the flat section extends out of the surface of the connecting surface of the flat section split piece of the tower barrel.
5. The wind power hybrid tower prefabricated tower barrel connected by the bolt U rings according to claim 4, is characterized in that: the bending section is solid U-shaped steel, and the straight section is a sleeve with internal threads.
6. The wind power hybrid tower prefabricated tower barrel connected by the bolt U rings according to claim 2, is characterized in that: the outer diameter of the low yield strength high plasticity sleeve is smaller than the inner diameter of the unthreaded sleeve, and the length of the low yield strength high plasticity sleeve is longer than the unthreaded sleeve.
7. The wind power hybrid tower prefabricated tower barrel connected by the bolt U rings according to claim 2, is characterized in that: the unthreaded sleeve is welded on the longitudinal steel bars of the tower barrel arc-shaped section segment.
8. The wind power hybrid tower prefabricated tower barrel connected by the bolt U rings according to claim 2, is characterized in that: the arc-shaped segment of the tower drum is internally provided with two unthreaded sleeves corresponding to the U-shaped sleeves, the axes of the unthreaded sleeves are perpendicular to the axes of the arc-shaped segment of the tower drum, and the two unthreaded sleeves are parallel.
9. The method for assembling the prefabricated tower barrel of the wind power hybrid tower connected by the U-shaped bolts according to any one of claims 1 to 8, wherein the method comprises the following steps: the assembling method comprises the following steps:
embedding a non-threaded sleeve in an arc section segment of a tower drum, embedding a U-shaped sleeve in a straight section segment of the tower drum, and enabling the straight section of the U-shaped sleeve to partially extend out of the surface of a connecting surface of the U-shaped sleeve;
hoisting the arc-shaped section fragments of the tower drum to a designed position, hoisting the straight section fragments of the tower drum to a corresponding position, aligning the extending part of the U-shaped sleeve and inserting the extending part into the unthreaded sleeve, so that the arc-shaped section fragments of the tower drum and the straight section fragments of the tower drum are aligned and form primary positioning;
inserting a low-yield-strength high-plasticity sleeve into the unthreaded sleeve, covering a base plate, screwing in a high-strength bolt to enable the low-yield-strength high-plasticity sleeve to be gradually pressed into the unthreaded sleeve, and applying pretightening force to the high-strength bolt after the low-yield-strength high-plasticity sleeve is completely pressed into the unthreaded sleeve to complete assembling connection.
10. The method for assembling the wind power hybrid tower prefabricated tower barrel connected by the bolt U rings according to the claim 9, is characterized in that: the unthreaded sleeve is welded with the steel bars of the arc-shaped section fragments of the tower barrel, and the U-shaped sleeve is welded with the steel bars of the straight section fragments of the tower barrel; and pouring the component after welding.
CN202110664937.9A 2021-06-15 2021-06-15 Wind power mixing tower prefabricated tower barrel connected by adopting bolt U-rings and construction method thereof Active CN113404645B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110664937.9A CN113404645B (en) 2021-06-15 2021-06-15 Wind power mixing tower prefabricated tower barrel connected by adopting bolt U-rings and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110664937.9A CN113404645B (en) 2021-06-15 2021-06-15 Wind power mixing tower prefabricated tower barrel connected by adopting bolt U-rings and construction method thereof

Publications (2)

Publication Number Publication Date
CN113404645A true CN113404645A (en) 2021-09-17
CN113404645B CN113404645B (en) 2024-04-02

Family

ID=77684242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110664937.9A Active CN113404645B (en) 2021-06-15 2021-06-15 Wind power mixing tower prefabricated tower barrel connected by adopting bolt U-rings and construction method thereof

Country Status (1)

Country Link
CN (1) CN113404645B (en)

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103573562A (en) * 2013-11-07 2014-02-12 国电联合动力技术有限公司 Hybrid fan tower
CN203569487U (en) * 2013-11-20 2014-04-30 中铁十局集团有限公司 Embedded part for installation of bridge pier hanging basket
EP2824257A1 (en) * 2013-07-04 2015-01-14 SIAG Industrie GmbH Method for preparation and erection of a tubular tower structure
CN104454866A (en) * 2014-12-15 2015-03-25 东南大学 Torsional shear type unilateral self-tightening bolt fastener
DE102013016604A1 (en) * 2013-10-07 2015-04-09 EcoEnterprises GmbH Steel tube tower of a wind turbine, as well as methods for manufacturing and assembling the tower components
KR20160027476A (en) * 2014-08-29 2016-03-10 주식회사 포스코 Precast segment unit and precast segment structure by using of it)
WO2017039049A1 (en) * 2015-08-28 2017-03-09 주식회사 포스코 Precast panel structure and method for constructing same
CN109322793A (en) * 2018-12-03 2019-02-12 重庆大学 A kind of full assembled concrete-filled double skin steel tube combination tower and node
CN209228539U (en) * 2018-10-16 2019-08-09 中国能源建设集团江苏省电力设计院有限公司 A kind of prefabricated assembled concrete wind power tower drum
CN110258963A (en) * 2019-07-14 2019-09-20 上海易拼利联建筑科技有限责任公司 A kind of serrated clips plate gear transmission deviation reinforcing bar connector
CN110863955A (en) * 2018-08-28 2020-03-06 中国船舶重工集团海装风电股份有限公司 Butt splicing structure and method of hybrid tower for wind power
CN111287537A (en) * 2018-12-06 2020-06-16 深圳京创重工特种工程有限公司 Arc-shaped tower piece for tower section and tower section
CN215256602U (en) * 2021-06-15 2021-12-21 中铁上海设计院集团有限公司 Wind power hybrid tower prefabricated tower cylinder connected by bolt U ring

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2824257A1 (en) * 2013-07-04 2015-01-14 SIAG Industrie GmbH Method for preparation and erection of a tubular tower structure
DE102013016604A1 (en) * 2013-10-07 2015-04-09 EcoEnterprises GmbH Steel tube tower of a wind turbine, as well as methods for manufacturing and assembling the tower components
CN103573562A (en) * 2013-11-07 2014-02-12 国电联合动力技术有限公司 Hybrid fan tower
CN203569487U (en) * 2013-11-20 2014-04-30 中铁十局集团有限公司 Embedded part for installation of bridge pier hanging basket
KR20160027476A (en) * 2014-08-29 2016-03-10 주식회사 포스코 Precast segment unit and precast segment structure by using of it)
CN104454866A (en) * 2014-12-15 2015-03-25 东南大学 Torsional shear type unilateral self-tightening bolt fastener
WO2017039049A1 (en) * 2015-08-28 2017-03-09 주식회사 포스코 Precast panel structure and method for constructing same
CN110863955A (en) * 2018-08-28 2020-03-06 中国船舶重工集团海装风电股份有限公司 Butt splicing structure and method of hybrid tower for wind power
CN209228539U (en) * 2018-10-16 2019-08-09 中国能源建设集团江苏省电力设计院有限公司 A kind of prefabricated assembled concrete wind power tower drum
CN109322793A (en) * 2018-12-03 2019-02-12 重庆大学 A kind of full assembled concrete-filled double skin steel tube combination tower and node
CN111287537A (en) * 2018-12-06 2020-06-16 深圳京创重工特种工程有限公司 Arc-shaped tower piece for tower section and tower section
CN110258963A (en) * 2019-07-14 2019-09-20 上海易拼利联建筑科技有限责任公司 A kind of serrated clips plate gear transmission deviation reinforcing bar connector
CN215256602U (en) * 2021-06-15 2021-12-21 中铁上海设计院集团有限公司 Wind power hybrid tower prefabricated tower cylinder connected by bolt U ring

Also Published As

Publication number Publication date
CN113404645B (en) 2024-04-02

Similar Documents

Publication Publication Date Title
CN215256602U (en) Wind power hybrid tower prefabricated tower cylinder connected by bolt U ring
CN111022072A (en) Combined joint for reinforcing secondary lining of tunnel constructed by mining method and mounting method
CN113404645A (en) Wind power hybrid tower prefabricated tower cylinder connected by bolt U rings and construction method thereof
CN210368609U (en) Self-resetting prefabricated assembled pier
CN112302001A (en) Rapid pile splicing device for steel reinforcement cage and using method of rapid pile splicing device
CN110616855A (en) Steel bar mechanical connection structure and connection method for prefabricated concrete structure
CN208088668U (en) A kind of full grout sleeve of bar connecting
CN209653232U (en) A kind of off-position of steel reinforcing bar connection structure
CN216787102U (en) High-shear prestressed concrete pile
CN204876349U (en) Steel bar anchoring device
CN101799095A (en) Method for connecting resin-based composite material tube and metal material
CN201343786Y (en) Reinforced concrete preformed unit connecting device
CN210013387U (en) Tensile and compressive steel bar connector
CN203559525U (en) Multipurpose connector and anchor head as well as composite member for FRP (Fiber Reinforced Polymer) reinforcement material connection
CN209891563U (en) Deviation rod piece double-spherical-hinge steering connector
CN109736513A (en) A kind of off-position of steel reinforcing bar connection structure and its processing and installation method
CN113339198B (en) Wind power hybrid tower prefabricated tower barrel connected by self-tightening high-strength bolts and construction method thereof
CN210177814U (en) Single-sleeve double-spherical-surface nut offset rod connector
CN113481815A (en) Multiple-protection concrete composite bridge and manufacturing method thereof
FI4004302T3 (en) Dry connection system of prefabricated elements
CN214836871U (en) Wind power hybrid tower prefabricated tower cylinder connected in pull-resisting mode through bolts and connecting piece
CN210178709U (en) Composite sleeve offset rod piece connector
CN209891569U (en) Expansion bolt off-set rod piece connector
CN209891570U (en) Sliding sleeve expansion bolt offset rod piece connector
CN217026649U (en) Steel pipe concrete arch foot hinge structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant