CN113404515A - Tunnel foamed aluminum plate and secondary lining concrete integral casting construction method - Google Patents

Tunnel foamed aluminum plate and secondary lining concrete integral casting construction method Download PDF

Info

Publication number
CN113404515A
CN113404515A CN202110678040.1A CN202110678040A CN113404515A CN 113404515 A CN113404515 A CN 113404515A CN 202110678040 A CN202110678040 A CN 202110678040A CN 113404515 A CN113404515 A CN 113404515A
Authority
CN
China
Prior art keywords
aluminum plate
foamed aluminum
tunnel
construction method
lining concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110678040.1A
Other languages
Chinese (zh)
Other versions
CN113404515B (en
Inventor
聂刚
万利
宫伟鹏
张长安
赵丹丹
林赞权
龚琛杰
雷明锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong High Speed High Tech Materials Technology Co Ltd
Central South University
Shandong Provincial Communications Planning and Design Institute Group Co Ltd
Original Assignee
Shandong High Speed High Tech Materials Technology Co Ltd
Central South University
Shandong Provincial Communications Planning and Design Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong High Speed High Tech Materials Technology Co Ltd, Central South University, Shandong Provincial Communications Planning and Design Institute Group Co Ltd filed Critical Shandong High Speed High Tech Materials Technology Co Ltd
Priority to CN202110678040.1A priority Critical patent/CN113404515B/en
Publication of CN113404515A publication Critical patent/CN113404515A/en
Application granted granted Critical
Publication of CN113404515B publication Critical patent/CN113404515B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/107Reinforcing elements therefor; Holders for the reinforcing elements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

The application discloses tunnel foamed aluminum plate and two lining concrete monolithic pouring construction method relates to and uses purpose-made connecting piece, and the connecting piece includes first component and second component, and first component is column structure and inside sets up the screw hole and outside sets up the external screw thread, and the second component is panel structure and is connected with the tip of first component is perpendicular, is equipped with first through-hole and the second through-hole that corresponds with the screw hole on the second component, and the method includes following step: s1: one surface of the foamed aluminum plate is attached to one surface, far away from the first member, of the second member, and the foamed aluminum plate is fixedly connected with the connecting piece through the matching of the screws and the first through holes; s2: attaching the other surface of the foamed aluminum plate to the trolley panel, and fixedly connecting the trolley panel, the foamed aluminum plate and the connecting piece through the matching of the bolt and the threaded hole in the first member; s3: positioning the trolley and constructing a second lining; s4: and (4) removing the bolts and performing surface treatment. This application has improved the operating efficiency when guaranteeing foamed aluminum plate installation intensity.

Description

Tunnel foamed aluminum plate and secondary lining concrete integral casting construction method
Technical Field
The invention relates to the technical field of tunnel engineering, in particular to a tunnel foamed aluminum plate and secondary lining concrete integral casting construction method.
Background
Once a fire disaster occurs in the tunnel, besides great damage to vehicles and personnel, the high temperature can also cause concrete burst and mechanical property deterioration, damage to the lining structure is generated to different degrees, and the bearing capacity and safety of the tunnel are greatly reduced. Therefore, a certain protection measure is required to keep the integrity and stability of the reinforced concrete structure in case of fire, so as to achieve the purpose of fire prevention of the tunnel structure. At present, the fireproof protection of the tunnel mainly adopts simple methods of spraying non-expansive fireproof paint on the tunnel lining, laying fireproof plates and the like, and the fireproof effect is poor.
Foamed aluminum is a novel material, and has the functions of fire prevention, heat insulation, sound absorption and noise reduction. Researches show that the closed-cell foamed aluminum has extremely low heat conductivity coefficient which is only 1/51-1/500 percent of pure aluminum, the equivalent heat conductivity coefficient of the foamed aluminum alloy with 80.2-99 percent of porosity at 25 ℃ is 3.19-1.63W/(m.K), the equivalent heat conductivity coefficient of the solid aluminum alloy at 25 ℃ is 98.4W/(m.K), and the performances of the closed-cell foamed aluminum alloy and the solid aluminum alloy on heat insulation effect are greatly different. Therefore, aluminum foam is an excellent fire-retardant material.
However, most of the current foamed aluminum materials are applied to electronic devices as electromagnetic shielding materials, or applied to road engineering as sound insulation materials, or applied to the aerospace field as heat exchange materials, and have not been applied to the field of tunnel fire protection, and therefore, further research on related construction methods is also lacking in the industry.
Disclosure of Invention
The application aims to provide a tunnel foamed aluminum plate and secondary lining concrete integral casting construction method, which gives an exact fine construction scheme while applying a foamed aluminum material to tunnel fireproof protection. The technical scheme of the application is as follows:
the utility model provides a tunnel foamed aluminum plate and two lining concrete monolithic construction methods of watering, which is characterized in that, including using purpose-made connecting piece cooperation construction, the connecting piece includes first component and second component, first component is the columnar structure, set up the screw hole and the surface sets up bellied line in the inside of first component, the second component is panel structure and is connected with the tip of first component is perpendicular, be equipped with first through-hole and the second through-hole that corresponds with the screw hole on the second component, construction methods includes following step:
step S1: one surface of the foamed aluminum plate is attached to one surface, far away from the first member, of the second member, and the foamed aluminum plate is fixedly connected with the connecting piece through the matching of the screws and the first through holes;
step S2: attaching the other surface of the foamed aluminum plate to the trolley panel, and fixedly connecting the trolley panel, the foamed aluminum plate and the connecting piece through the matching of the bolt and the threaded hole in the first member;
step S3: positioning the trolley and constructing a second lining;
step S4: and (4) removing the bolts and performing surface treatment.
In some specific embodiments, the outer surface of the first member is provided with external threads.
In some specific embodiments, between the step S2 and the step S3, a process of checking the flatness of the fit between the foamed aluminum plate and the trolley panel is further included.
In some specific embodiments, the surface treatment in step S4 includes filling the hole after the bolt is removed.
In some specific embodiments, the aluminum foam plate is provided with a preformed hole corresponding to the first through hole, and the length of the threaded portion on the screw does not exceed the total length of the first through hole plus the preformed hole.
In some specific embodiments, the connecting piece, the screw and the bolt are all made of a fire-resistant aluminum alloy material.
In some embodiments, the screw and bolt are used in conjunction with a washer.
In some embodiments, the foamed aluminum sheet is a flat sheet or a curved sheet designed according to the shape of a trolley panel and the contour of a tunnel.
In some embodiments, the number of the first through holes is two or more, and the first through holes are uniformly or symmetrically arranged on the second component at intervals.
In some specific embodiments, the foamed aluminum plate is provided with a abdicating hole corresponding to a working window of the lining trolley.
The technical scheme provided by the application has at least the following beneficial effects:
1. the foamed aluminum plate with the functions of sound absorption, noise reduction and fire resistance is applied to tunnel engineering, sound insulation and heat insulation protection of a tunnel are realized, structural change of a concrete supporting structure in the tunnel due to high temperature is avoided when a fire disaster occurs, the problems that cracking, mechanical property deterioration and the like are caused are avoided, accidents that a lining of a tunnel building drops and collapses in the fire disaster process are avoided, and the tunnel building can be continuously used after the fire disaster.
2. The concrete and feasible installation process of the foamed aluminum plate in the tunnel is provided, the construction operation is simple, the foamed aluminum plate is ensured to have enough installation strength by adopting a method of integrally pouring the foamed aluminum plate with the secondary lining concrete, the subsequent process of independently installing the foamed aluminum plate is saved, and the operation efficiency is improved.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings that are needed in the description of the embodiments or the prior art will be briefly described below, it being understood that the following drawings only illustrate some embodiments of the present application and therefore should not be considered as limiting the scope, and that other drawings may be derived from those drawings without inventive effort for a person skilled in the art.
FIG. 1 is a construction effect diagram of a tunnel foamed aluminum plate and secondary lining concrete integral casting construction method provided by an embodiment of the present application;
FIG. 2 is a schematic view of the connector of FIG. 1 disposed on an aluminum foam sheet;
FIG. 3 is a cross-sectional view of the connector of FIG. 1;
in the figure: 1 two linings, 2 foamed aluminum plate, 3 platform truck panels, 4 first components, 5 second components, 6 screw holes, 7 external screw threads, 8 first through holes, 9 second through holes, 10 hole of stepping down, 11 screws, 12 bolts.
Detailed Description
In order to facilitate understanding of the present application, the technical solutions in the present application will be described more fully and in detail with reference to the drawings and the preferred embodiments, but the scope of protection of the present application is not limited to the following specific embodiments, and all other embodiments obtained by a person of ordinary skill in the art based on the embodiments in the present application without creative efforts shall fall within the scope of protection of the present application.
It will be understood that when an element is referred to as being "coupled" or "connected" to another element, it can be directly coupled, connected or communicated with the other element or indirectly coupled, connected or communicated with the other element via other intervening elements.
Unless otherwise defined, all terms of art used hereinafter have the same meaning as commonly understood by one of ordinary skill in the art. The terminology used herein is for the purpose of describing particular embodiments only and is not intended to limit the scope of the present application.
Examples
Referring to fig. 1-3, a tunnel foamed aluminum plate and secondary lining concrete integral casting construction method relates to the matching use of a special connecting piece.
The connecting piece comprises a first component 4 and a second component 5, wherein the first component 4 is a cylinder, a threaded hole 6 is formed in the first component 4, raised grains are formed in the outer surface of the first component 4, the second component 5 is of a panel structure, the first component 4 is vertically arranged on the second component 5, and a first through hole 8 and a second through hole 9 corresponding to the threaded hole 6 are formed in the second component 5.
The construction method comprises the following steps:
step S1: attaching one surface of the foamed aluminum plate 2 to one surface of the second member 4 far away from the first member 5, and realizing the fixed connection of the foamed aluminum plate 2 and the connecting piece through the matching of the screw 11 and the first through hole 8;
step S2: attaching the other surface of the foamed aluminum plate 2 to the trolley panel 3, fixedly connecting the trolley panel 3, the foamed aluminum plate 2 and the connecting piece through the matching of a bolt 12 and a threaded hole 6 in the first member 4, wherein the bolt 12 penetrates out of the trolley, sequentially passes through the trolley panel 3, the foamed aluminum plate 2 and the connecting piece and then is connected with the threaded hole 6, and the installation direction of the bolt 12 is opposite to that of the bolt 11;
step S3: inspecting the joint flatness of the foamed aluminum plate 2 and the trolley panel 3, and when the gap between the foamed aluminum plate 2 and the trolley panel 3 is not more than 1mm, determining that the foamed aluminum plate and the trolley panel are tightly jointed;
step S4: the trolley is in place, the second lining is constructed, and after the concrete is solidified, the foamed aluminum plate 2 is fixedly connected to the second lining 1 through a connecting piece;
step S5: and (3) dismantling the bolts 12, removing the trolley, and performing surface treatment, wherein the surface treatment comprises filling holes left after the bolts 5 are dismantled, so that the surface is smooth and attractive.
In this embodiment, the foamed aluminum sheet 2 is provided with preformed holes corresponding to the first through hole 8 and the second through hole 9, so as to facilitate the subsequent installation of the screw 11 and the bolt 12, wherein the length of the threaded portion on the screw 11 does not exceed the total length of the first through hole 8 plus the preformed holes.
In this embodiment, a gasket is attached to a contact portion between the screw 11 and the connecting member, and a gasket is attached to a contact portion between the bolt 12 and the carriage panel 3, so that the connection strength and the sealing property can be ensured.
In this embodiment, the foamed aluminum plate 2 is a flat plate or a curved plate designed according to the shape and size of the trolley panel 3 and the contour of the tunnel.
In this embodiment, the connecting member, the screw 11 and the bolt 12 are made of a fire-resistant aluminum alloy material, which is directly available from the market, and the specific brand and model are not limited. Meanwhile, the strength of the aluminum alloy material is required to be capable of resisting the pouring pressure during the construction of the two-lining concrete. By using the aluminum alloy material, on one hand, the related connecting structure is ensured to have enough strength, on the other hand, the fireproof performance of the connecting structure is also enhanced, and the fireproof effect is further optimized.
In the present embodiment, the thread provided on the outer surface of the first member 4 is an external thread 7, and in other specific embodiments, the thread may take other structural forms. This application is through setting up the special connecting piece of structure, and the internal thread is connected with bolt 12 on the one hand, has ensured foamed aluminum plate 2 and platform truck panel 3 and has had sufficient intensity in the concrete is poured, and can realize platform truck panel 3 and foamed aluminum plate 2 quickly separating through unscrewing bolt 12 when form removal, and on the other hand external screw thread 7 can effectively compensate that the adhesion force between foamed aluminum plate 2 and two linings 1 is not enough, further improves the installation strength.
In this embodiment, the number of the first through holes 8 is two and the first through holes 8 are symmetrically disposed on two sides of the second through hole 9, and in other specific embodiments, the number of the first through holes 8 may be more and disposed around the second through hole 9.
In this embodiment be equipped with square hole 10 of stepping down on foamed aluminum plate 2, the size and the position of the hole 10 of stepping down need not can compensate the not enough of foamed aluminum plate 2 and the laminating of platform truck panel 3 through setting up hole 10 of stepping down according to the work window design of lining cutting platform truck.
By applying the construction method, the new application of the foamed aluminum plate in the tunnel fireproof and noise reduction effects is provided, the installation efficiency of the foamed aluminum plate is further improved, and the installation quality of the foamed aluminum plate is guaranteed.
The above description is only a few examples of the present application and does not limit the scope of the claims of the present application, and it will be apparent to those skilled in the art that various modifications and variations can be made in the present application. Any improvement or equivalent replacement directly or indirectly applicable to other related technical fields within the spirit and principle of the present application by using the contents of the specification and the drawings of the present application shall be included in the protection scope of the present application.

Claims (10)

1. The tunnel foamed aluminum plate and secondary lining concrete integral casting construction method is characterized by comprising the step of using a specially-made connecting piece for matching construction, wherein the connecting piece comprises a first member and a second member, the first member is of a columnar structure, a threaded hole is formed in the first member, convex grains are arranged on the outer surface of the first member, the second member is of a panel structure and is vertically connected with the end part of the first member, a first through hole and a second through hole corresponding to the threaded hole are formed in the second member, and the construction method comprises the following steps:
step S1: one surface of the foamed aluminum plate is attached to one surface, far away from the first member, of the second member, and the foamed aluminum plate is fixedly connected with the connecting piece through the matching of the screws and the first through holes;
step S2: attaching the other surface of the foamed aluminum plate to the trolley panel, and fixedly connecting the trolley panel, the foamed aluminum plate and the connecting piece through the matching of the bolt and the threaded hole in the first member;
step S3: positioning the trolley and constructing a second lining;
step S4: and (4) removing the bolts and performing surface treatment.
2. The tunnel foamed aluminum plate and secondary lining concrete integral casting construction method according to claim 1, wherein the outer surface of the first member is provided with external threads.
3. The tunnel foamed aluminum plate and secondary lining concrete block pouring construction method according to claim 2, further comprising a process of checking the flatness of the joint between the foamed aluminum plate and the trolley panel between the step S2 and the step S3.
4. The cast-in-place construction method for tunnel foamed aluminum plate and secondary lining concrete according to claim 3, wherein the surface treatment in the step S4 comprises filling holes after the bolts are removed.
5. The tunnel foamed aluminum plate and secondary lining concrete integral casting construction method according to claim 4, wherein the foamed aluminum plate is provided with a prefabricated hole corresponding to the first through hole, and the length of the thread part on the screw does not exceed the total length of the first through hole plus the prefabricated hole.
6. The tunnel foamed aluminum plate and secondary lining concrete integral casting construction method according to any one of claims 1 to 5, wherein the connecting pieces, the screws and the bolts are all made of a fire-resistant aluminum alloy material.
7. The tunnel foamed aluminum plate and secondary lining concrete integral casting construction method according to any one of claims 1 to 5, wherein the bolts and the bolts are matched with gaskets for use.
8. The tunnel foamed aluminum plate and secondary lining concrete integral casting construction method according to any one of claims 1 to 5, wherein the foamed aluminum plate is a plane plate or a curved plate designed according to the shape of a trolley panel and the contour of a tunnel.
9. The tunnel foamed aluminum plate and secondary lining concrete block pouring construction method according to any one of claims 1 to 5, wherein the number of the first through holes is two or more, and the first through holes are uniformly or symmetrically arranged at intervals on the second member.
10. The tunnel foamed aluminum plate and secondary lining concrete block casting construction method according to any one of claims 1 to 5, wherein the foamed aluminum plate is provided with abdicating holes corresponding to the lining trolley working window.
CN202110678040.1A 2021-06-18 2021-06-18 Tunnel foamed aluminum plate and secondary lining concrete integral casting construction method Active CN113404515B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110678040.1A CN113404515B (en) 2021-06-18 2021-06-18 Tunnel foamed aluminum plate and secondary lining concrete integral casting construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110678040.1A CN113404515B (en) 2021-06-18 2021-06-18 Tunnel foamed aluminum plate and secondary lining concrete integral casting construction method

Publications (2)

Publication Number Publication Date
CN113404515A true CN113404515A (en) 2021-09-17
CN113404515B CN113404515B (en) 2022-08-26

Family

ID=77681305

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110678040.1A Active CN113404515B (en) 2021-06-18 2021-06-18 Tunnel foamed aluminum plate and secondary lining concrete integral casting construction method

Country Status (1)

Country Link
CN (1) CN113404515B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1484386A1 (en) * 1963-03-27 1971-09-23 Henri Vidal Composite shoring
CN101265742A (en) * 2007-03-16 2008-09-17 李书通 Refractory compound foamed aluminum plate
CN202467866U (en) * 2012-03-16 2012-10-03 长沙理工大学 Fire-proof plate for tunnel
CN106251853A (en) * 2016-10-09 2016-12-21 四川中车复合材料结构有限公司 A kind of novel foam aluminum sound-absorbing composite board
CN108331596A (en) * 2018-01-19 2018-07-27 浙江交工路桥建设有限公司 A kind of construction method of highway in cold region tunnel foam glass insulating layer composite fire retardant coating
CN210706336U (en) * 2019-10-12 2020-06-09 天津安盛达防火材料有限公司 Fireproof partition plate for tunnel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1484386A1 (en) * 1963-03-27 1971-09-23 Henri Vidal Composite shoring
CN101265742A (en) * 2007-03-16 2008-09-17 李书通 Refractory compound foamed aluminum plate
CN202467866U (en) * 2012-03-16 2012-10-03 长沙理工大学 Fire-proof plate for tunnel
CN106251853A (en) * 2016-10-09 2016-12-21 四川中车复合材料结构有限公司 A kind of novel foam aluminum sound-absorbing composite board
CN108331596A (en) * 2018-01-19 2018-07-27 浙江交工路桥建设有限公司 A kind of construction method of highway in cold region tunnel foam glass insulating layer composite fire retardant coating
CN210706336U (en) * 2019-10-12 2020-06-09 天津安盛达防火材料有限公司 Fireproof partition plate for tunnel

Also Published As

Publication number Publication date
CN113404515B (en) 2022-08-26

Similar Documents

Publication Publication Date Title
CN113404515B (en) Tunnel foamed aluminum plate and secondary lining concrete integral casting construction method
CN204531108U (en) Precast floor slab connecting piece
CN218623303U (en) Concrete column pouring template reinforcing device
CN206346326U (en) From unit-built type thermal insulation plate
CN203347100U (en) Composite wallboard, hanging connection unit between composite wallboard and cross beam and connecting structure between composite wallboard and cross beam
CN214531191U (en) Environment-friendly heat-preservation noise-reduction color steel sandwich board
CN112160468A (en) Built-in heat-insulation cast-in-place concrete composite shear wall structure and construction method
CN209817402U (en) A template for cast in situ sandwich panel
CN107989224B (en) Connecting mechanism for wall corner of assembled house and construction process of connecting mechanism
CN112609982A (en) Method for manufacturing wall with heat-insulation plate by adopting energy-saving bolt
CN202299038U (en) Hidden-framing glass curtain wall with steel keel frame
CN203213586U (en) Switch connector for load-bearing bolts of climbing formwork
CN218437764U (en) Energy-saving prefab superimposed sheet mosaic structure
CN210421534U (en) Concrete placement of structure integration exempts from to tear open heated board connecting piece
CN217580823U (en) Assembled steel column combination fire prevention structure
CN218933428U (en) Fireproof heat-preservation safety steel structure
CN216706411U (en) Plug-in type steel structure beam column joint welding device that connects sparks
CN219793617U (en) Lifting type fireproof protection device for bottom of bridge span structure
CN219060449U (en) Building wall structure
CN208023737U (en) A kind of strength joint construction of building steel I-beam and wall
CN212453607U (en) T-shaped shear wall aluminum alloy template assembly
CN220521944U (en) Climbing frame auxiliary connecting device for hole-free mold-protecting integrated plate
CN218148937U (en) Embedded part fixing device
CN219952446U (en) Steel-UHPC composite beam
CN215911884U (en) Supporting device for explosion-proof structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination