CN113403091A - Method for online blocking blowby of vault masonry of primary coke dry quenching dust remover - Google Patents

Method for online blocking blowby of vault masonry of primary coke dry quenching dust remover Download PDF

Info

Publication number
CN113403091A
CN113403091A CN202110559902.9A CN202110559902A CN113403091A CN 113403091 A CN113403091 A CN 113403091A CN 202110559902 A CN202110559902 A CN 202110559902A CN 113403091 A CN113403091 A CN 113403091A
Authority
CN
China
Prior art keywords
dry quenching
vault
blowby
primary
dust remover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110559902.9A
Other languages
Chinese (zh)
Inventor
任社安
林森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN202110559902.9A priority Critical patent/CN113403091A/en
Publication of CN113403091A publication Critical patent/CN113403091A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B39/00Cooling or quenching coke
    • C10B39/02Dry cooling outside the oven
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B43/00Preventing or removing incrustations
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B57/00Other carbonising or coking processes; Features of destructive distillation processes in general

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

A method for online plugging blowby of vault masonry of a primary coke dry quenching dust remover is characterized by comprising the following steps: a. adjusting production condition of a dry quenching furnace, b, preparing maintenance construction equipment, c, equipping construction personnel with a portable O2Cutting a primary dust collector vault furnace shell steel plate, d, cleaning heat preservation particle fillers on the upper portion of a primary dust collector vault masonry, e, building heat insulation bricks, backfilling heat preservation particles, welding steel plates and completing online plugging of blowby of the primary dust collector vault masonry of the dry quenching coke after grouting is completed. The method for online plugging the blowby of the vault masonry of the coke dry quenching primary dust remover has the advantages of shortening the overhaul time, ensuring safe and reliable engineering quality, improving the production efficiency of the coke dry quenching furnace, reducing the maintenance cost and saving social refractory materials.

Description

Method for online blocking blowby of vault masonry of primary coke dry quenching dust remover
Technical Field
The invention relates to a method for plugging blowby of kiln masonry, in particular to a method for plugging blowby of vault masonry of a primary dry quenching dust remover on line.
Background
In recent years, with the development of society and higher requirements on environmental protection and energy, dry quenching devices are adopted by more and more steel mills in China. When the vault masonry of the primary coke dry quenching dust remover is newly built, the mortar joint is possibly too large and the mortar is not full; or the air flow scours excessively during the production process, so that the vault masonry has a through seam, the sealing is poor, and the local temperature of the vault shell of the dust remover is overhigh and reddish after a period of dry quenching production. Aiming at the phenomenon, a mode of covering a heat insulation castable material on a primary dust remover vault shell or a mode of bricking the primary dust remover vault masonry after a furnace is shut down and the primary dust remover vault masonry is dismantled is adopted. The first method described above causes the primary precipitator dome shell steel sheet to be burnt and deformed; the other method has the disadvantages of large dismantling workload, high maintenance cost, long construction period and serious influence on production.
The known methods of repairing the dome shell of a primary precipitator therefore suffer from the inconveniences and problems described above.
Disclosure of Invention
The invention aims to provide a safe and reliable method for online blocking blowby of vault masonry of a primary coke dry quenching dust remover.
In order to achieve the purpose, the technical solution of the invention is as follows:
a method for online plugging blowby of vault masonry of a primary coke dry quenching dust remover is characterized by comprising the following steps:
a. production condition adjustment of dry quenching furnace
Keeping the normal material level of the dry quenching furnace, filling nitrogen, and reducing combustible components H in a circulating gas system of the dry quenching furnace2Adjusting the CO content and the air volume of the circulating gas to be half of the normal air volume, and carrying out heat preservation and pressure maintaining treatment on the system; monitoring H in circulating gas at the moment of dry quenching main control chamber2The concentration of combustible CO components is ensured to be controlled within a range with minimum risk;
b. maintenance construction machine preparation
Portable O2An alarm, a portable CO alarm, and a low-pressure blower safety device; heat preservation particles, ceramic fiber blankets and mullite fire clay are used for plugging the blowby material; a cutting machine, an electric welding machine and corresponding welding line and welding rod construction tools;
c. portable O for constructors2An alarm and a portable CO alarm, wherein a low-pressure blower is arranged at a cutting hole at the upper part of the vault of the coke dry quenching primary dust remover for blowing air, so that H around a construction site is reduced2The concentration of combustible CO components;cutting a vault furnace shell steel plate of the dry quenching primary dust remover by using a cutting machine, wherein the hole opening part is positioned in the middle of the vault structure;
d. cleaning the heat preservation particle filler on the top of the primary dust remover, removing the heat insulation bricks on the top of the furnace, exposing the refractory bricks on the working layer of the furnace top, filling and compacting a larger gap at the arch top by adopting a ceramic fiber blanket, and then performing grouting treatment; directly adopting grouting treatment for small gaps at the arch crown;
e. and after grouting is finished, building the heat insulation brick, fully paving 1 layer of ceramic fiber blanket with the thickness of 50mm on the surface of the heat insulation brick, filling heat insulation particles, and finally welding a steel plate.
The method for online plugging the blow-by of the vault masonry of the coke dry quenching primary dust remover can be further realized by adopting the following technical measures.
The method as described above, wherein the minimum risk range is H2The content of CO is controlled below 3%, and the content of CO is controlled below 6%.
The method of the preceding, wherein the size of the opening is 800 x 1500 mm.
In the method, the grouting treatment is carried out in two times, the grouting refractory slurry is prepared by adding 10 percent of industrial phosphoric acid with the concentration of 85 percent of mullite fire clay and water, and the first time is the refractory slurry with the density of 1.3g/cm3(ii) a The density of the slurry adopted for the second time is 1.7g/cm3
After the technical scheme is adopted, the method for online plugging the blow-by of the vault masonry of the primary coke dry quenching dust remover has the following advantages:
1. the maintenance time is shortened;
2. the engineering quality is safe and reliable, and the production efficiency of the dry quenching furnace is improved;
3. the maintenance cost is reduced, and the manufacturing resources of the social refractory materials are saved.
Drawings
FIG. 1 is a schematic structural diagram of a primary dust collector in an embodiment of the present invention.
Detailed Description
The present invention will be further described with reference to the following examples and the accompanying drawings.
Example 1
The invention discloses a method for online plugging blowby of vault masonry of a primary coke dry quenching dust remover, which comprises the following process flows:
adjusting the production condition of a dry quenching furnace → preparing a maintenance construction machine → cutting a steel plate of a vault furnace shell of a dust remover → completely cleaning filler in the vault → dismantling partial heat insulation bricks → filling large seams at the vault → grouting treatment → building heat insulation bricks → filling heat preservation particles → welding the vault steel plate furnace shell → recovering the normal production condition.
FIG. 1 is a schematic structural diagram of a primary dust collector in an embodiment of the present invention. The method for online plugging the blow-by of the vault masonry of the primary coke dry quenching dust remover comprises the following steps:
1. production condition adjustment of dry quenching furnace
The dry quenching furnace is kept at a normal material level, and a method of filling nitrogen is adopted firstly to reduce combustible components H in a circulating gas system of the dry quenching furnace2And regulating the air quantity of the circulating gas to about half of the normal air quantity according to the CO content, and carrying out heat preservation and pressure maintaining treatment on the system. Monitoring H in circulating gas at the moment of dry quenching main control chamber2The concentration of combustible components such as CO is surely controlled within a predetermined minimum risk range, and generally H2The content of CO is controlled below 3%, and the content of CO is controlled below 6%.
2. Maintenance construction machine preparation
Portable O2Safety equipment such as an alarm, a portable CO alarm, a low-pressure blower and the like; plugging blowby materials such as heat-insulating particles, ceramic fiber blankets, mullite bricks 5, fire clay and the like; a cutting machine, an electric welding machine and corresponding construction materials such as a welding line, a welding rod and the like.
3. The specific construction measures of online plugging are as follows:
1) portable O for constructors2Alarm and be equipped with portable CO alarm. A low-pressure blower is arranged at the cutting hole for blowing air, so that H around the construction site is reduced2And the concentration of combustible components such as CO. The furnace shell steel plate 6 is cut by a cutting machine, the position of an opening 7 is mainly in the middle of the arch structure, and the size of the opening is 800 multiplied by 1500 mm.
2) Cleaning the heat preservation particles 3 at the top of the primary dust remover, removing the heat insulation bricks 4 at the furnace top part of the leakage point 2 of the vault masonry 1, exposing the refractory bricks at the working layer of the furnace top, filling and compacting a larger gap at the vault by adopting a ceramic fiber blanket, and then performing grouting treatment; and directly adopting grouting treatment for the small gap at the arch crown.
3) The grouting treatment is carried out twice. The fire-resistant slurry for grouting is prepared by adding 10 percent of industrial phosphoric acid (with the concentration of 85 percent) and water into mullite fire-resistant slurry, and the density of the fire-resistant slurry adopted for the first time is lower and is about 1.3g/cm3(ii) a The second time using a slurry density of about 1.7g/cm3
4) And after grouting is finished, building heat insulation bricks, paving 1 layer of ceramic fiber blanket with the thickness of 50mm on the surface of the heat insulation bricks, filling heat insulation particles, and finally welding steel plates.
The method for online plugging the blowby of the vault masonry of the primary coke dry quenching dust remover has the advantages that the basic parameters of the coke dry quenching production are properly adjusted under the condition that the coke dry quenching production is not influenced, the technical measures are adopted at the top of the primary coke dry quenching dust remover to plug the blowby point of the vault masonry, and the problems of high temperature and redness of the vault steel plate of the primary coke dry quenching dust remover are solved. The method shortens the maintenance time, improves the production efficiency of the dry quenching furnace, and has important significance in reducing the maintenance cost, saving the manufacturing resources of the social refractory materials and the like.
The method for online plugging blowby of vault masonry of the coke dry quenching primary dust remover disclosed by the invention is applied to maintenance engineering of a coke dry quenching furnace of a Pan steel coking company, has an obvious effect and is determined by relevant departments and units.
The above embodiments are provided only for illustrating the present invention and not for limiting the present invention, and those skilled in the art can make various changes or modifications without departing from the spirit and scope of the present invention. Accordingly, all equivalents are intended to fall within the scope of the invention, which is defined in the claims.

Claims (4)

1. A method for online plugging blowby of vault masonry of a primary coke dry quenching dust remover is characterized by comprising the following steps:
a. production condition adjustment of dry quenching furnace
Keeping the normal material level of the dry quenching furnace, filling nitrogen, and reducing combustible components H in a circulating gas system of the dry quenching furnace2Adjusting the CO content and the air volume of the circulating gas to be half of the normal air volume, and carrying out heat preservation and pressure maintaining treatment on the system; monitoring H in circulating gas at the moment of dry quenching main control chamber2The concentration of combustible CO components is ensured to be controlled within a range with minimum risk;
b. maintenance construction machine preparation
Portable O2An alarm, a portable CO alarm, and a low-pressure blower safety device; heat preservation particles, ceramic fiber blankets and mullite fire clay are used for plugging the blowby material; a cutting machine, an electric welding machine and corresponding welding line and welding rod construction tools;
c. portable O for constructors2An alarm and a portable CO alarm, wherein a low-pressure blower is arranged at a cutting hole at the upper part of the vault of the coke dry quenching primary dust remover for blowing air, so that H around a construction site is reduced2The concentration of combustible CO components; cutting a vault furnace shell steel plate of the dry quenching primary dust remover by using a cutting machine, wherein the hole opening part is positioned in the middle of the vault structure;
d. cleaning the heat preservation particle filler on the top of the primary dust remover, removing the heat insulation bricks on the top of the furnace, exposing the refractory bricks on the working layer of the furnace top, filling and compacting a larger gap at the arch top by adopting a ceramic fiber blanket, and then performing grouting treatment; directly adopting grouting treatment for small gaps at the arch crown;
e. and after grouting is finished, building the heat insulation brick, fully paving 1 layer of ceramic fiber blanket with the thickness of 50mm on the surface of the heat insulation brick, filling heat insulation particles, and finally welding a steel plate.
2. The method of online plugging blowby of dry quenching primary precipitator vault masonry of claim 1 wherein said minimum hazard range is H2The content of CO is controlled below 3%, and the content of CO is controlled below 6%.
3. The method of online plugging blowby of dry quenching primary precipitator vault masonry of claim 1 wherein the size of the openings is 800 x 1500 mm.
4. The method for online plugging blowby of vault masonry of a coke dry quenching primary dust collector of claim 1, wherein the grouting treatment is performed in two steps, the grouted refractory mortar is prepared by mullite mortar with the addition of industrial phosphoric acid with the concentration of 85% and water, the first time, the density of the grouted refractory mortar is 1.3g/cm3(ii) a The density of the slurry adopted for the second time is 1.7g/cm3
CN202110559902.9A 2021-05-21 2021-05-21 Method for online blocking blowby of vault masonry of primary coke dry quenching dust remover Pending CN113403091A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110559902.9A CN113403091A (en) 2021-05-21 2021-05-21 Method for online blocking blowby of vault masonry of primary coke dry quenching dust remover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110559902.9A CN113403091A (en) 2021-05-21 2021-05-21 Method for online blocking blowby of vault masonry of primary coke dry quenching dust remover

Publications (1)

Publication Number Publication Date
CN113403091A true CN113403091A (en) 2021-09-17

Family

ID=77679171

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110559902.9A Pending CN113403091A (en) 2021-05-21 2021-05-21 Method for online blocking blowby of vault masonry of primary coke dry quenching dust remover

Country Status (1)

Country Link
CN (1) CN113403091A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4014750A (en) * 1974-01-24 1977-03-29 Dr. C. Otto & Comp. G.M.B.H. Support apparatus for a battery of coke ovens
US4445977A (en) * 1983-02-28 1984-05-01 Furnco Construction Corporation Coke oven having an offset expansion joint and method of installation thereof
JPH07268343A (en) * 1994-03-31 1995-10-17 Nkk Corp Expansion joint for connecting primary dust removing device in coke dry quencher
CN102241995A (en) * 2010-05-11 2011-11-16 五冶集团上海有限公司 Dry quenching expansion joint firebrick structure construction technology
CN204224518U (en) * 2014-11-25 2015-03-25 重庆钢铁股份有限公司 Expansion joint is imported and exported in cork dry quenching disposable dedusting
CN104479697A (en) * 2014-12-09 2015-04-01 攀钢集团攀枝花钢钒有限公司 Treatment method for material jamming of rotating seal valve of dry quenching furnace
CN111569529A (en) * 2020-04-20 2020-08-25 包头钢铁(集团)有限责任公司 Method for rapidly processing faults of dry quenching discharge device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4014750A (en) * 1974-01-24 1977-03-29 Dr. C. Otto & Comp. G.M.B.H. Support apparatus for a battery of coke ovens
US4445977A (en) * 1983-02-28 1984-05-01 Furnco Construction Corporation Coke oven having an offset expansion joint and method of installation thereof
JPH07268343A (en) * 1994-03-31 1995-10-17 Nkk Corp Expansion joint for connecting primary dust removing device in coke dry quencher
CN102241995A (en) * 2010-05-11 2011-11-16 五冶集团上海有限公司 Dry quenching expansion joint firebrick structure construction technology
CN204224518U (en) * 2014-11-25 2015-03-25 重庆钢铁股份有限公司 Expansion joint is imported and exported in cork dry quenching disposable dedusting
CN104479697A (en) * 2014-12-09 2015-04-01 攀钢集团攀枝花钢钒有限公司 Treatment method for material jamming of rotating seal valve of dry quenching furnace
CN111569529A (en) * 2020-04-20 2020-08-25 包头钢铁(集团)有限责任公司 Method for rapidly processing faults of dry quenching discharge device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
谭春华等: "干熄焦伸缩节浇注料结构改为耐火砖结构的施工技术", 《工业建筑》 *

Similar Documents

Publication Publication Date Title
CN101225718B (en) Construction method of steel reinforced concrete chimney
CN102504837B (en) Synchronous cutting-off and unroofing repair method for coke side oven head of large-scale coke oven machine
CN110540842B (en) Furnace body repairing method for recycling coke oven after overall shutdown
CN110117494A (en) A kind of method for cleaning of 5.5 meters of tamping coke furnaces chute mouth tamper
CN205442638U (en) Adopt low -nitrogen combustion's sulfur waste acid cleavage stove
CN111187631B (en) Repair material for mouth structure of coke oven machine and use method thereof
CN113604619A (en) Remote control thermal state wet method jetting lining manufacturing method
CN113403091A (en) Method for online blocking blowby of vault masonry of primary coke dry quenching dust remover
CN104560065B (en) False corbel bracket and using method thereof during examining and repairing corbel bricks in dry quenching chute
CN102807350A (en) One-step formed high-strength fireproof flue and processing method thereof
CN111121464A (en) Method for repairing damaged partition wall of internal combustion type hot blast stove
CN210030566U (en) Quick repair structure of bolt in dry quenching furnace
CN204224518U (en) Expansion joint is imported and exported in cork dry quenching disposable dedusting
CN201458750U (en) Energy-saving cast stone heat treatment production equipment
CN204718409U (en) A kind of can the anode furnace of hot replacing redox mouth brick
CN218932042U (en) Coke oven furnace top area brickwork scurrying sealing tool
CN106969375B (en) A kind of boiler vortex burner aditus laryngis flame retardant coating building construction method
CN216513938U (en) Blast furnace tuyere large sleeve plugging device
CN110408735B (en) Method for repairing gooseneck part under blast furnace air supply system hot blast bustle pipe
CN113462403B (en) Sealing method for furnace head of combustion chamber of on-line production coke oven
CN115325830A (en) Method for reducing temperature of outer wall of furnace top of heating furnace
CN212658041U (en) A refractory composite brick structure for cement kiln hood cover
CN115536245B (en) Method for hot-state replacement of grid body of float glass melting furnace
CN116083100A (en) Coke oven top area masonry blowby sealing method and tool
CN209906701U (en) Structure for reducing heat dissipation capacity of head of combustion chamber of coke oven

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210917