CN113393083A - Environment-friendly monitor deployment method and system - Google Patents

Environment-friendly monitor deployment method and system Download PDF

Info

Publication number
CN113393083A
CN113393083A CN202110517911.1A CN202110517911A CN113393083A CN 113393083 A CN113393083 A CN 113393083A CN 202110517911 A CN202110517911 A CN 202110517911A CN 113393083 A CN113393083 A CN 113393083A
Authority
CN
China
Prior art keywords
equipment
information
industry
target enterprise
enterprise
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110517911.1A
Other languages
Chinese (zh)
Other versions
CN113393083B (en
Inventor
倪西涛
郑益公
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Sanxi Technology Co ltd
Shandong Sanxi Environmental Protection Technology Co ltd
Original Assignee
Jiangsu Sanxi Technology Co ltd
Shandong Sanxi Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Sanxi Technology Co ltd, Shandong Sanxi Environmental Protection Technology Co ltd filed Critical Jiangsu Sanxi Technology Co ltd
Priority to CN202110517911.1A priority Critical patent/CN113393083B/en
Publication of CN113393083A publication Critical patent/CN113393083A/en
Application granted granted Critical
Publication of CN113393083B publication Critical patent/CN113393083B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/50Information retrieval; Database structures therefor; File system structures therefor of still image data
    • G06F16/53Querying
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/30Authentication, i.e. establishing the identity or authorisation of security principals
    • G06F21/31User authentication
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/067Enterprise or organisation modelling
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Tourism & Hospitality (AREA)
  • Game Theory and Decision Science (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • General Engineering & Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Computer Security & Cryptography (AREA)
  • Databases & Information Systems (AREA)
  • Data Mining & Analysis (AREA)
  • Computer Hardware Design (AREA)
  • Software Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a method and a system for deploying an environmental protection monitor, which comprise the following steps: storing data models of various industries to a pre-constructed basic database, wherein the data models comprise important equipment node information; acquiring the industry information of a target enterprise; searching a corresponding data model from the basic database according to the industry information, and locking a target equipment node of a target enterprise according to important equipment node information in the corresponding data model; and deploying the environmental protection monitor on a target equipment node of the target enterprise. The invention can quickly generate the deployment scheme of the environmental protection monitor according to the industry information of enterprises, does not need manual participation, ensures the quality of the deployment scheme and saves time and human resources.

Description

Environment-friendly monitor deployment method and system
Technical Field
The invention relates to the technical field of enterprise environment protection monitoring, in particular to an environment protection monitor deployment method and system.
Background
Based on the environmental protection requirement, an environmental protection monitor needs to be installed on the production equipment and pollution control equipment of enterprises. And important nodes need to be selected from production equipment and pollution treatment equipment as monitoring nodes when the environmental protection monitor is installed, so that the purposes of saving the environmental protection monitor and effectively monitoring the production pollution treatment data of enterprises are achieved.
At present, the deployment method of the environmental protection monitor is generally that an installer conducts on-site investigation on an enterprise, and then analyzes a investigation report to obtain a deployment scheme.
The manual investigation and deployment have too high a dependence on the experience of people, resulting in uneven quality of deployment schemes. Meanwhile, the efficiency of preparing the deployment scheme is too slow, and time and labor are wasted.
Disclosure of Invention
In view of the above-mentioned deficiencies of the prior art, the present invention provides a method and a system for deploying an environmental protection monitor, so as to solve the above-mentioned technical problems.
In a first aspect, the present invention provides a deployment method of an environmental protection monitor, including:
storing data models of various industries to a pre-constructed basic database, wherein the data models comprise important equipment node information;
acquiring the industry information of a target enterprise;
searching a corresponding data model from the basic database according to the industry information, and locking a target equipment node of a target enterprise according to important equipment node information in the corresponding data model;
and deploying the environmental protection monitor on a target equipment node of the target enterprise.
Further, the method further comprises:
creating a distributed storage database on a cloud platform;
and setting a plurality of users, and granting the plurality of users the right to access the distributed storage database.
Further, the data model includes:
the equipment comprises equipment model parameters, equipment connection topological structure and process information, wherein the equipment comprises production line equipment and pollution control line equipment;
important equipment nodes are calibrated in the equipment connection topological structure, and type parameters, installation positions and operation parameter thresholds of the important equipment nodes are calibrated.
Further, the acquiring of the industry information of the target enterprise includes:
acquiring input enterprise information and workshop equipment images of a target enterprise;
connecting an industrial and commercial management database, and searching the registered industrial information of the target enterprise from the industrial and commercial management database according to the enterprise information;
pre-storing workshop equipment images of various industries in a local database;
searching a matching workshop equipment image of the target enterprise from a local database;
if the matched workshop equipment image is found, outputting the industry corresponding to the matched workshop equipment image as verification industry information, and verifying the registered industry information according to the verification industry information;
and if the matched industrial workshop equipment image is not found, outputting a prompt without a search result.
Further, the method further comprises:
and importing the operating parameter threshold value in the data model corresponding to the target enterprise into a corresponding environment-friendly monitor deployed by the target enterprise.
Further, the method further comprises:
if the corresponding data model does not exist in the basic database, acquiring a field investigation result input by a manual operation terminal;
and extracting a data model of the industry information from the field investigation result.
In a second aspect, the present invention provides an environmental protection monitor deployment system, including:
the data preparation unit is configured to store data models of various industries to a pre-constructed basic database, wherein the data models comprise important equipment node information;
the industry acquisition unit is configured for acquiring industry information of a target enterprise;
the data matching unit is configured to search a corresponding data model from the basic database according to the industry information and lock a target device node of a target enterprise according to important device node information in the corresponding data model;
and the deployment execution unit is configured to deploy the environmental protection monitor on a target equipment node of the target enterprise.
Further, the data model includes:
the equipment comprises equipment model parameters, equipment connection topological structure and process information, wherein the equipment comprises production line equipment and pollution control line equipment;
important equipment nodes are calibrated in the equipment connection topological structure, and type parameters, installation positions and operation parameter thresholds of the important equipment nodes are calibrated.
Further, the industry acquisition unit includes:
the information acquisition module is configured for acquiring the input enterprise information of the target enterprise and the workshop equipment image;
the registration query module is configured to be used for butting a business administration database and searching the registered industry information of the target enterprise from the business administration database according to the enterprise information;
the image pre-storage module is configured for pre-storing workshop equipment images of various industries in a local database;
the image matching module is used for searching a matching workshop equipment image of the target enterprise from a local database;
the industry checking module is configured to output the industry corresponding to the matched workshop equipment image as checking industry information if the matched workshop equipment image is found, and check the registered industry information according to the checking industry information;
and the prompt output module is configured for outputting a no-search-result prompt if the matched industry workshop equipment image is not searched.
Further, the system further comprises:
the investigation acquisition unit is configured to acquire a field investigation result input by the manual operation terminal if the corresponding data model does not exist in the basic database;
and the investigation and analysis unit is used for extracting a data model of the industry information from the field investigation result.
The beneficial effect of the invention is that,
according to the method and the system for deploying the environmental protection monitor, the basic database capable of storing the data models of all industries is constructed in advance, then the industry information of the target enterprise is obtained, the corresponding data model can be inquired from the basic database according to the industry information, and the equipment node for deploying the environmental protection monitor is found according to the guidance of the data model. The invention can quickly generate the deployment scheme of the environmental protection monitor according to the industry information of enterprises, does not need manual participation, ensures the quality of the deployment scheme and saves time and human resources.
In addition, the invention has reliable design principle, simple structure and very wide application prospect.
Drawings
In order to more clearly illustrate the embodiments or technical solutions in the prior art of the present invention, the drawings used in the description of the embodiments or prior art will be briefly described below, and it is obvious for those skilled in the art that other drawings can be obtained based on these drawings without creative efforts.
FIG. 1 is a schematic flow diagram of a method of one embodiment of the invention.
FIG. 2 is a schematic block diagram of a system of one embodiment of the present invention.
Detailed Description
In order to make those skilled in the art better understand the technical solution of the present invention, the technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the drawings in the embodiment of the present invention, and it is obvious that the described embodiment is only a part of the embodiment of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
FIG. 1 is a schematic flow diagram of a method of one embodiment of the invention. The execution subject in fig. 1 may be an environmental monitor deployment system.
As shown in fig. 1, the method includes:
step 110, storing data models of various industries to a pre-constructed basic database, wherein the data models comprise important equipment node information;
step 120, acquiring industry information of a target enterprise;
step 130, searching a corresponding data model from the basic database according to the industry information, and locking a target equipment node of a target enterprise according to important equipment node information in the corresponding data model;
step 140, an environmental protection monitor is deployed on a target device node of the target enterprise.
In order to facilitate understanding of the present invention, the environmental protection monitor deployment method provided by the present invention is further described below with reference to embodiments according to the principles of the environmental protection monitor deployment method of the present invention.
Specifically, the deployment method of the environmental protection monitor comprises the following steps:
and S1, storing the data models of all industries to a pre-constructed basic database, wherein the data models comprise important equipment node information.
The basic database of the embodiment adopts a distributed storage database of a cloud platform, so that the data storage safety and the quick transmission of the interactive information are ensured. And creating a plurality of users, and granting the users the right to access the basic database, wherein the users are owned by the party who installs the environmental protection monitor.
The data model comprises process information, production equipment information (production equipment model parameters and connection topological structures), pollution control equipment information (pollution control equipment model parameters and connection topological structures), corresponding relations between the process information and the production equipment, relations between production operation parameters and pollution control operation parameters set according to environmental protection requirements, and threshold values of the operation parameters. And the equipment connection topological structure is calibrated with important equipment nodes, and type parameters, installation positions and operation parameter thresholds of the important equipment nodes are calibrated.
And S2, acquiring the industry information of the target enterprise.
(1) And inputting enterprise information (such as enterprise name, legal person, address and the like) and workshop equipment images of the target enterprise.
(2) And (4) the business management database is connected (enterprise inquiry tools such as enterprise inquiry and heaven-eye communication can be called), and the registered industry information of the target enterprise is searched from the business management database according to the enterprise information.
(3) The method comprises the steps of pre-storing workshop equipment images of all industries in a local database, namely pre-storing standard workshop equipment images of all industries, searching matched workshop equipment images of the workshop equipment images of a target enterprise from the local database, adopting image similarity calculation to screen out the workshop equipment images with the similarity reaching 90% as the matched workshop equipment images, and modifying the similarity threshold according to actual needs.
(4) And if the matched workshop equipment image is found, outputting the industry corresponding to the matched workshop equipment image as verification industry information, judging whether the verification industry information is consistent with the registered industry information, if so, directly outputting the registered industry information as actual industry information of the target enterprise, and if not, manually inputting the industry information.
(5) And if the matched industrial workshop equipment image is not found, outputting a prompt without a search result.
And S3, searching a corresponding data model from the basic database according to the industry information, and generating a deployment scheme.
Searching a data model of the industry information from the basic database according to the industry information of the target enterprise acquired in the step S2, and extracting the important device node calibrated in the device connection topology structure and the type parameter, the installation position and the operation parameter threshold of the important device node from the data model. And positioning the important equipment nodes according to the type parameters and the installation positions of the important equipment nodes, and importing the operating parameter threshold values of the important equipment nodes into the environment-friendly monitor installed at the nodes.
Thereby completing the deployment and parameter setting of the environmental protection monitor.
As shown in fig. 2, the system 200 includes:
the data preparation unit 210 is configured to store data models of various industries into a pre-constructed basic database, where the data models include important device node information;
an industry obtaining unit 220 configured to obtain industry information of a target enterprise;
the data matching unit 230 is configured to search a corresponding data model from the basic database according to the industry information, and lock a target device node of a target enterprise according to important device node information in the corresponding data model;
and the deployment execution unit 240 is configured to deploy the environmental protection monitor on a target device node of the target enterprise.
Optionally, as an embodiment of the present invention, the data model includes:
the equipment comprises equipment model parameters, equipment connection topological structure and process information, wherein the equipment comprises production line equipment and pollution control line equipment;
important equipment nodes are calibrated in the equipment connection topological structure, and type parameters, installation positions and operation parameter thresholds of the important equipment nodes are calibrated.
Optionally, as an embodiment of the present invention, the industry acquiring unit includes:
the information acquisition module is configured for acquiring the input enterprise information of the target enterprise and the workshop equipment image;
the registration query module is configured to be used for butting a business administration database and searching the registered industry information of the target enterprise from the business administration database according to the enterprise information;
the image pre-storage module is configured for pre-storing workshop equipment images of various industries in a local database;
the image matching module is used for searching a matching workshop equipment image of the target enterprise from a local database;
the industry checking module is configured to output the industry corresponding to the matched workshop equipment image as checking industry information if the matched workshop equipment image is found, and check the registered industry information according to the checking industry information;
and the prompt output module is configured for outputting a no-search-result prompt if the matched industry workshop equipment image is not searched.
Optionally, as an embodiment of the present invention, the system further includes:
the investigation acquisition unit is configured to acquire a field investigation result input by the manual operation terminal if the corresponding data model does not exist in the basic database;
and the investigation and analysis unit is used for extracting a data model of the industry information from the field investigation result.
Although the present invention has been described in detail by referring to the drawings in connection with the preferred embodiments, the present invention is not limited thereto. Various equivalent modifications or substitutions can be made on the embodiments of the present invention by those skilled in the art without departing from the spirit and scope of the present invention, and these modifications or substitutions are within the scope of the present invention/any person skilled in the art can easily conceive of the changes or substitutions within the technical scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (10)

1. An environmental protection monitor deployment method, comprising:
storing data models of various industries to a pre-constructed basic database, wherein the data models comprise important equipment node information;
acquiring the industry information of a target enterprise;
searching a corresponding data model from the basic database according to the industry information, and locking a target equipment node of a target enterprise according to important equipment node information in the corresponding data model;
and deploying the environmental protection monitor on a target equipment node of the target enterprise.
2. The method of claim 1, further comprising:
creating a distributed storage database on a cloud platform;
and setting a plurality of users, and granting the plurality of users the right to access the distributed storage database.
3. The method of claim 1, wherein the data model comprises:
the equipment comprises equipment model parameters, equipment connection topological structure and process information, wherein the equipment comprises production line equipment and pollution control line equipment;
important equipment nodes are calibrated in the equipment connection topological structure, and type parameters, installation positions and operation parameter thresholds of the important equipment nodes are calibrated.
4. The method of claim 1, wherein the obtaining industry information of the target enterprise comprises:
acquiring input enterprise information and workshop equipment images of a target enterprise;
connecting an industrial and commercial management database, and searching the registered industrial information of the target enterprise from the industrial and commercial management database according to the enterprise information;
pre-storing workshop equipment images of various industries in a local database;
searching a matching workshop equipment image of the target enterprise from a local database;
if the matched workshop equipment image is found, outputting the industry corresponding to the matched workshop equipment image as verification industry information, and verifying the registered industry information according to the verification industry information;
and if the matched industrial workshop equipment image is not found, outputting a prompt without a search result.
5. The method of claim 3, further comprising:
and importing the operating parameter threshold value in the data model corresponding to the target enterprise into a corresponding environment-friendly monitor deployed by the target enterprise.
6. The method of claim 1, further comprising:
if the corresponding data model does not exist in the basic database, acquiring a field investigation result input by a manual operation terminal;
and extracting a data model of the industry information from the field investigation result.
7. An environmental monitor deployment system, comprising:
the data preparation unit is configured to store data models of various industries to a pre-constructed basic database, wherein the data models comprise important equipment node information;
the industry acquisition unit is configured for acquiring industry information of a target enterprise;
the data matching unit is configured to search a corresponding data model from the basic database according to the industry information and lock a target device node of a target enterprise according to important device node information in the corresponding data model;
and the deployment execution unit is configured to deploy the environmental protection monitor on a target equipment node of the target enterprise.
8. The system of claim 7, wherein the data model comprises:
the equipment comprises equipment model parameters, equipment connection topological structure and process information, wherein the equipment comprises production line equipment and pollution control line equipment;
important equipment nodes are calibrated in the equipment connection topological structure, and type parameters, installation positions and operation parameter thresholds of the important equipment nodes are calibrated.
9. The system of claim 7, wherein the industry acquisition unit comprises:
the information acquisition module is configured for acquiring the input enterprise information of the target enterprise and the workshop equipment image;
the registration query module is configured to be used for butting a business administration database and searching the registered industry information of the target enterprise from the business administration database according to the enterprise information;
the image pre-storage module is configured for pre-storing workshop equipment images of various industries in a local database;
the image matching module is used for searching a matching workshop equipment image of the target enterprise from a local database;
the industry checking module is configured to output the industry corresponding to the matched workshop equipment image as checking industry information if the matched workshop equipment image is found, and check the registered industry information according to the checking industry information;
and the prompt output module is configured for outputting a no-search-result prompt if the matched industry workshop equipment image is not searched.
10. The system of claim 7, further comprising:
the investigation acquisition unit is configured to acquire a field investigation result input by the manual operation terminal if the corresponding data model does not exist in the basic database;
and the investigation and analysis unit is used for extracting a data model of the industry information from the field investigation result.
CN202110517911.1A 2021-05-12 2021-05-12 Environment-friendly monitor deployment method and system Active CN113393083B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110517911.1A CN113393083B (en) 2021-05-12 2021-05-12 Environment-friendly monitor deployment method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110517911.1A CN113393083B (en) 2021-05-12 2021-05-12 Environment-friendly monitor deployment method and system

Publications (2)

Publication Number Publication Date
CN113393083A true CN113393083A (en) 2021-09-14
CN113393083B CN113393083B (en) 2023-01-31

Family

ID=77617018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110517911.1A Active CN113393083B (en) 2021-05-12 2021-05-12 Environment-friendly monitor deployment method and system

Country Status (1)

Country Link
CN (1) CN113393083B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130035972A1 (en) * 2011-08-05 2013-02-07 Bank Of America Corporation Monitoring Object System and Method of Operation
CN104486435A (en) * 2014-12-22 2015-04-01 厦门大学 Sensor-network-based low-energy-consumption ecological environment monitoring node deploying method
CN106231609A (en) * 2016-09-22 2016-12-14 北京工商大学 A kind of underwater sensor network Optimization deployment method based on highest priority region
CN107402532A (en) * 2017-06-23 2017-11-28 深圳市盛路物联通讯技术有限公司 One kind is based on Internet of Things workshop condition monitoring method and system
CN108062689A (en) * 2017-12-22 2018-05-22 深圳市英威腾电气股份有限公司 A kind of method, apparatus, equipment and the readable storage medium storing program for executing of monitoring trade information
CN109640332A (en) * 2018-11-28 2019-04-16 青海师范大学 A kind of Internet of Things 3 D stereo monitoring topological structure and reliability quantitative analysis method
CN110134759A (en) * 2019-05-13 2019-08-16 极智(上海)企业管理咨询有限公司 A method of obtaining the trade information of enterprise
CN110928254A (en) * 2019-11-13 2020-03-27 江苏三希科技股份有限公司 Environment-friendly monitoring method and system for operation of pollution control equipment produced by pollution discharge enterprise
CN112200631A (en) * 2020-10-12 2021-01-08 支付宝(杭州)信息技术有限公司 Industry classification model training method and device
CN112764764A (en) * 2020-12-31 2021-05-07 成都佳华物链云科技有限公司 Scene model deployment method, device, equipment and storage medium

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130035972A1 (en) * 2011-08-05 2013-02-07 Bank Of America Corporation Monitoring Object System and Method of Operation
CN104486435A (en) * 2014-12-22 2015-04-01 厦门大学 Sensor-network-based low-energy-consumption ecological environment monitoring node deploying method
CN106231609A (en) * 2016-09-22 2016-12-14 北京工商大学 A kind of underwater sensor network Optimization deployment method based on highest priority region
CN107402532A (en) * 2017-06-23 2017-11-28 深圳市盛路物联通讯技术有限公司 One kind is based on Internet of Things workshop condition monitoring method and system
CN108062689A (en) * 2017-12-22 2018-05-22 深圳市英威腾电气股份有限公司 A kind of method, apparatus, equipment and the readable storage medium storing program for executing of monitoring trade information
CN109640332A (en) * 2018-11-28 2019-04-16 青海师范大学 A kind of Internet of Things 3 D stereo monitoring topological structure and reliability quantitative analysis method
CN110134759A (en) * 2019-05-13 2019-08-16 极智(上海)企业管理咨询有限公司 A method of obtaining the trade information of enterprise
CN110928254A (en) * 2019-11-13 2020-03-27 江苏三希科技股份有限公司 Environment-friendly monitoring method and system for operation of pollution control equipment produced by pollution discharge enterprise
CN112200631A (en) * 2020-10-12 2021-01-08 支付宝(杭州)信息技术有限公司 Industry classification model training method and device
CN112764764A (en) * 2020-12-31 2021-05-07 成都佳华物链云科技有限公司 Scene model deployment method, device, equipment and storage medium

Also Published As

Publication number Publication date
CN113393083B (en) 2023-01-31

Similar Documents

Publication Publication Date Title
CN107832428B (en) Webpage method for monitoring state based on Website page and system
CN109684047B (en) Event processing method, device, equipment and computer storage medium
US10915508B2 (en) Data linking
WO2018059402A1 (en) Method and apparatus for determining fault type
CN111835582B (en) Configuration method and device of Internet of things inspection equipment and computer equipment
CN111835585B (en) Inspection method and device for Internet of things equipment, computer equipment and storage medium
CN109739867B (en) Industrial metadata management method and system
CN104363107B (en) A kind of security baseline check method and equipment
CN108134692A (en) A kind of fault handling method and system based on mark figure
CN111614696A (en) Network security emergency response method and system based on knowledge graph
US20160004794A1 (en) System and method using generative model to supplement incomplete industrial plant information
CN111934899A (en) Configuration method and device of user information of Internet of things and computer equipment
CN111598700A (en) Financial wind control system and method
CN109446791A (en) New equipment recognition methods, device, server and computer readable storage medium
CN113852476A (en) Method, device and system for determining abnormal event associated object
CN113393083B (en) Environment-friendly monitor deployment method and system
CN104539449B (en) A kind of failure information processing method and relevant apparatus
CN114124837A (en) Asset information discovery system and method based on passive flow
CN111897898B (en) Configuration method and device for equipment position of Internet of things and computer equipment
CN110427648B (en) Component attribute acquisition method and related product
CN104486337A (en) Data validity verification method and device
CN110995489B (en) Large data platform server management method, device, server and storage medium
CN116561337A (en) Network attack knowledge graph generation method and device, electronic equipment and storage medium
CN108427744B (en) Intelligent data association relation determining method based on information operation and maintenance
CN105279230A (en) Method and system for constructing internet application feature identification database with active learning method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant