CN113356889A - Grouting device and box type reinforcing method for advanced drill pipe right above tunnel - Google Patents

Grouting device and box type reinforcing method for advanced drill pipe right above tunnel Download PDF

Info

Publication number
CN113356889A
CN113356889A CN202110797109.2A CN202110797109A CN113356889A CN 113356889 A CN113356889 A CN 113356889A CN 202110797109 A CN202110797109 A CN 202110797109A CN 113356889 A CN113356889 A CN 113356889A
Authority
CN
China
Prior art keywords
pipe
subway tunnel
grouting
threads
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110797109.2A
Other languages
Chinese (zh)
Other versions
CN113356889B (en
Inventor
唐亮
唐文冲
陈宏伟
凌贤长
孔祥勋
丛晟亦
胡心雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Institute of Technology
China Railway 17th Bureau Group Co Ltd
Chongqing Research Institute of Harbin Institute of Technology
Original Assignee
Harbin Institute of Technology
China Railway 17th Bureau Group Co Ltd
Chongqing Research Institute of Harbin Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Institute of Technology, China Railway 17th Bureau Group Co Ltd, Chongqing Research Institute of Harbin Institute of Technology filed Critical Harbin Institute of Technology
Priority to CN202110797109.2A priority Critical patent/CN113356889B/en
Publication of CN113356889A publication Critical patent/CN113356889A/en
Application granted granted Critical
Publication of CN113356889B publication Critical patent/CN113356889B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/107Reinforcing elements therefor; Holders for the reinforcing elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

A grouting device and a box type reinforcing method for an advance drill pipe right above a tunnel belong to the technical field of foundation pit excavation and reinforcement. In the grouting device, a drill pipe consists of a hollow drill bit and one or more connecting pipes; the hollow drill bit is composed of a conical head and a round steel pipe which are manufactured into a whole, inner threads and outer threads are arranged on the inner wall and the outer wall of the conical head, the outer threads are positive threads, the inner threads are reverse threads, the tail end of the inner wall of the round steel pipe is provided with a first inner connecting thread, one end of the inner wall of the connecting pipe is provided with a second inner connecting thread, and the other end of the outer wall of the connecting pipe is provided with an outer connecting thread; a plurality of first slurry outlet consolidation holes are formed in the cylinder and the connecting pipe; when the number of the connecting pipes is one, the hollow drill bit is in threaded connection with the connecting pipes; when the number of the connecting pipes is multiple, every two adjacent connecting pipes are connected through threads to form a splicing connecting pipe, and the splicing connecting pipes are connected with the hollow drill bits in a screwing mode; during grouting, the sleeve valve grouting pipe is arranged in the drill pipe and is in tight fit with the drill pipe. The method is used for reinforcing the right upper part of the existing subway tunnel.

Description

Grouting device and box type reinforcing method for advanced drill pipe right above tunnel
Technical Field
The invention belongs to the technical field of foundation pit excavation reinforcement, and particularly relates to a grouting device and a box type reinforcement method for an advance drill pipe right above a tunnel.
Background
The development of urban underground rail transit can effectively support and lead the expansion of urban spatial layout, and drive the development of the economy around the subway, so that various engineering activities carried out around the existing operation subway tunnel become increasingly frequent, and the accompanying subway is inevitably close to the engineering of a deep and large foundation pit. In order to ensure the safety of the subway tunnel, many countries and regions give control standards for the stress and deformation of the subway tunnel. The protection measures of the existing subway tunnel structure are lack of systematic research, and the existing subway tunnel structure is limited to reducing the deformation of a foundation pit so as to reduce the risk of overlarge tunnel deformation, such as research aiming at warehouse division excavation of the foundation pit and the like. Such methods often lack initiative, and once the subway tunnel is largely deformed in the construction process, it is difficult to remedy and control further deformation of the subway tunnel. Therefore, a new reinforcing method for excavation construction above the subway tunnel is needed to solve the problems.
In addition, current slip casting device slip casting effect is comparatively single, and need beat in advance to slip casting reinforcement region and establish the slip casting hole. The grouting effect is not ideal, and the leakage of the slurry is easy to occur or the grouting pressure can not reach the expected purpose. In addition, the form of the grouting concretion after grouting cannot be controlled, and even the grouting concretion is concentrated and agglomerated or slightly loose, so that the effect of uniform grouting cannot be achieved. For some special grouting reinforcement projects, directional grouting cannot be achieved, only circumferential grouting can be performed, slurry waste is easily caused, and construction cost is increased.
Disclosure of Invention
One of the objectives of the present invention is to solve the above problems in the prior art, and to provide a box-type reinforcement method for an advance drill pipe right above a tunnel, which can effectively achieve the purpose of protecting the subway tunnel.
The invention also aims to solve the problems of the existing grouting device and provide the grouting device for the advance drill pipe right above the tunnel so as to meet the advance grouting reinforcement effect of the advance box type reinforcement construction method.
In order to solve the technical problems, the invention adopts the following technical scheme:
a grouting device for an advance drill pipe right above a tunnel comprises a sleeve valve grouting pipe and a drill pipe; the drill pipe consists of a hollow drill bit and one or more connecting pipes; the hollow drill bit is composed of a conical head and a circular steel pipe which are manufactured into a whole, inner threads and outer threads are arranged on the inner wall and the outer wall of the conical head, the outer threads arranged on the outer wall of the conical head are positive-rotation threads, the inner threads arranged on the inner wall of the conical head are reverse-rotation threads, an inner connecting thread I is arranged at the tail end of the inner wall of the circular steel pipe, an inner connecting thread II is arranged at one end of the inner wall of the connecting pipe, and an outer connecting thread is arranged at the other end of the outer wall of the connecting pipe; a plurality of slurry outlet consolidation holes I are formed in the round steel pipe and the connecting pipe;
when the number of the connecting pipes is one, the internal connecting thread I of the hollow drill bit is screwed with the external connecting thread I of the connecting pipe; when the number of the connecting pipes is multiple, every two adjacent connecting pipes are connected in a screwing mode through the internal connecting threads II and the external connecting threads to form a splicing connecting pipe, and the external connecting threads of the connecting pipes at any end in the splicing connecting pipes are connected in a screwing mode with the internal connecting threads I of the hollow drill bit; during grouting, the sleeve valve grouting pipe is arranged in the drill pipe and is in tight fit with the drill pipe.
A box type reinforcing method for an advance drill pipe right above a tunnel by using a grouting device for the advance drill pipe right above the tunnel comprises the following steps:
the method comprises the following steps: firstly, according to a subway tunnel protection red line, constructing foundation pit two-side fender posts outside the subway tunnel protection red line, performing primary foundation pit excavation on two sides of the subway tunnel, and requiring that the lower ends of the foundation pit two-side fender posts are deep into the bottom of the subway tunnel;
step two: when a first-stage foundation pit except a subway tunnel protection red line is excavated, constructing isolation piles at two sides of the subway tunnel at the same time, wherein the minimum horizontal distance between each isolation pile and the outermost side of the subway tunnel is not less than 3m, arranging a plurality of rows of isolation piles, and effectively protecting the subway tunnel so as to reduce the lateral displacement of the subway tunnel caused by excavation of the foundation pits at two sides of the subway tunnel;
step three: after the first-stage foundation pits on two sides of the subway tunnel are excavated to the structural elevation and the bottom plate is poured, the drill pipe is used for lateral long-distance drilling construction, firstly, a hollow drill bit is used for drilling, the forward thread on the outer wall of the hollow drill bit is used for drilling the soil body, the reverse thread on the inner wall of the hollow drill bit is used for rotating the soil body out of the pipe body in the drilling process, the splicing connecting pipe continuously and continuously drills in along with the drilling of the hollow drill bit, and the end point is that the splicing connecting pipe drills to the isolation pile on the same side; then, cleaning soil in the drill pipe, tightly placing the sleeve valve grouting pipe into the drill pipe, simultaneously continuously infiltrating the slurry into the surrounding soil body through a slurry outlet consolidation hole II of the sleeve valve grouting pipe along with the proceeding of grouting of the sleeve valve grouting pipe to achieve the effect of grouting reinforcement, simultaneously connecting the slurry infiltrated into the soil body with the slurry in the connecting pipe to form a steel pipe concrete pile with tree branches, and establishing a corresponding waist beam when the drill pipe completes drilling in one row, so that the drill pipe and the fender posts on two sides of the foundation pit are connected into a whole, and the lateral displacement of the subway tunnel is effectively prevented;
step four: when the first-stage foundation pit bottom plates on two sides of the subway tunnel are poured and the lateral drill pipes are drilled, first-stage structural construction is carried out to form a stacking effect; then, reinforcing the soil body right above the subway tunnel, firstly carrying out jet grouting reinforcement pile construction right above the subway tunnel, then carrying out soil body excavation right above the subway tunnel, adopting layered and strip skip symmetrical excavation, firstly carrying out excavation of the soil body between the fender post and the isolation post at two sides of the foundation pit, carrying out slope placing and continuing downward excavation when an underground negative layer bottom plate elevation is excavated until the bottom elevation position of the jet grouting reinforcement pile is excavated, carrying out construction of an equipment parking temporary platform, starting drilling and managing operation, cleaning the soil in the drill pipe after top drilling to the specified position, and tightly placing a sleeve valve grouting pipe into the drill pipe for grouting; after the construction of the drill pipe is finished, slope releasing and soil backfilling are carried out, after the top of the jet grouting reinforcing pile is backfilled, equipment parking temporary platform operation is carried out, then the construction of the drill pipe at the top is carried out, and after the construction of the drill pipe at the top is finished, a box type reinforcing structure is formed above the subway tunnel; then, carrying out construction of an underground negative layer bottom plate, and connecting the underground negative layer bottom plate, the fender posts on two sides of the foundation pit and the tunnel isolation piles into a whole;
step five: after the pouring of the underground negative one-layer bottom plate is finished by local part-layer strip-by-strip skip symmetrical excavation, the construction of the upper negative one-layer structure top plate is carried out, including the construction of a temporary reinforcing rib wall; after the construction of the top plate with the negative layer of the structure is finished, the layered strip-by-strip cabin-jumping symmetrical excavation of other non-excavated parts is carried out, after the soil between the fender piles and the isolation piles at the two sides of the foundation pit is excavated and the structure construction is finished, all structural members are connected into a whole.
Compared with the prior art, the invention has the beneficial effects that:
the traditional excavation method right above the subway is basically a post-reinforcement measure, or the reinforcement construction cost is too high, or the prevention and control reinforcement effect is not ideal. The method is advanced reinforcement, namely, the reserved soil body above the tunnel is subjected to advanced prevention and control reinforcement before the excavation unloading of the soil body above the subway tunnel, so that the tunnel structure is already in a safety protection state when the formal excavation unloading is performed above the subway tunnel in the later period. And a new grouting device is adopted, the grouting device can not only perform advanced drilling reinforcement before soil body excavation right above the subway tunnel, but also perform directional grouting by combining sleeve valve pipes, and grouting slurry can directionally overflow from a drilling pipe slurry outlet consolidation hole to perform directional grouting reinforcement, so that the use of slurry is reduced, the construction cost can be reduced, and the reinforcement effect is greatly improved.
Drawings
FIG. 1 is an isometric view of a hollow drill bit;
FIG. 2 is an isometric view of a hollow drill bit;
FIG. 3 is an isometric view of a connecting tube;
FIG. 4 is an isometric view of the connecting tube two;
FIG. 5 is a schematic illustration of the drill pipe prior to assembly;
FIG. 6 is a schematic view of a box reinforcement structure;
FIG. 7 is a schematic diagram of a layered strip skip symmetrical excavation structure;
FIG. 8 is a schematic illustration of the operation of the drill pipe in the construction of the equipment parking temporary platform;
fig. 9 is a front cross-sectional view of a sleeve valve grouting tube. The arrows pointing downwards in the figure indicate the grouting direction.
The names and reference numbers of the components referred to in the above figures are as follows:
the grouting device comprises a reverse-rotation thread 1, a forward-rotation thread 2, a grout outlet consolidation hole I3, an internal connecting thread I4, an external connecting thread 5, an internal connecting thread II 6, a subway tunnel 7, a positioning ring 8, a jet grouting reinforcing pile 9, an underground negative layer bottom plate 10, an equipment parking temporary platform 11, an isolation pile 12, a fender pile 18, a temporary reinforcing rib wall 20, a slope 25, a drill pipe 26, a 6-minute steel pipe 27, a connecting piece I28, a grout stop ring I29, a steel pipe opening 30, a grout stop ring II 31, a pointed bottom 32, a connecting piece II 33, a grouting pipe opening 34 and a PVC grouting pipe 35.
Detailed Description
The first embodiment is as follows: as shown in fig. 1-5 and 9, the present embodiment discloses a grouting device for a pilot drill pipe right above a tunnel, which comprises a sleeve valve grouting pipe (prior art) and a drill pipe 26; the drill pipe 26 consists of a hollow drill bit and one or more connecting pipes; the hollow drill bit is composed of a conical head and a round steel pipe which are manufactured into a whole, inner threads and outer threads are arranged on the inner wall and the outer wall of the conical head, the outer threads arranged on the outer wall of the conical head are positive-rotation threads 2, the inner threads arranged on the inner wall of the conical head are negative-rotation threads 1, an inner connecting thread I4 is arranged at the tail end of the inner wall of the round steel pipe, an inner connecting thread II 6 is arranged at one end of the inner wall of the connecting pipe, and an outer connecting thread 5 is arranged at the other end of the outer wall of the connecting pipe; a plurality of slurry outlet consolidation holes I3 are formed in the round steel pipe and the connecting pipe;
when the number of the connecting pipes is one, the internal connecting thread I4 of the hollow drill bit is screwed with the external connecting thread 5 of the connecting pipe; when the number of the connecting pipes is multiple, every two adjacent connecting pipes are connected in a screwing mode through an inner connecting thread II 6 and an outer connecting thread 5 to form a splicing connecting pipe, the outer connecting thread 5 of the connecting pipe positioned at any end in the splicing connecting pipe is connected with an inner connecting thread I4 of the hollow drill bit in a screwing mode (a drilling pipe 26 is drilled by a mountain-opening KG420S crawler-type down-the-hole drill carriage); during grouting, the sleeve valve grouting pipe (which is the prior art) is arranged in the drill pipe 26 and is in tight fit with the drill pipe (the sleeve valve grouting pipe is in tight fit connection with the inner wall of the connecting pipe of the drill pipe 26 through the positioning ring 8 arranged on the outer wall of the grouting pipe of the sleeve valve grouting pipe).
Further, the hollow drill bit and the connecting pipe are both steel pipes.
Furthermore, the slurry outlet consolidation holes 3 are all round holes (the diameter of the round holes, the number of the open holes and the density can be changed according to actual needs).
The second embodiment is as follows: as shown in fig. 1 to 9, in this embodiment, a box-type reinforcing method for a lead drill pipe right above a tunnel is implemented by using a grouting device according to the first embodiment, where the reinforcing method includes the following steps:
the method comprises the following steps: firstly, protecting a red line according to a subway tunnel 7, driving guard piles 18 at two sides of a foundation pit outside the red line protected by the subway tunnel 7, excavating a first-stage foundation pit at two sides of the subway tunnel 7, and requiring that the lower ends of the guard piles 18 at two sides of the foundation pit penetrate into the bottom of the subway tunnel 7 (a plurality of waist beams can be properly arranged according to the excavation depth of the foundation pit);
step two: when excavation of a first-stage foundation pit except a red line protected by the subway tunnel 7 is carried out, isolation piles 12 on two sides of the subway tunnel 7 are simultaneously constructed, the minimum horizontal distance between each isolation pile 12 and the outermost side of the subway tunnel 7 is not less than 3m, a plurality of rows of isolation piles 12 (preferably four rows of isolation piles 12) are arranged in a driving mode, the subway tunnel 7 is effectively protected, and therefore the lateral displacement of the subway tunnel 7 caused by excavation of the foundation pits on two sides of the subway tunnel 7 is reduced;
step three: when the first-stage foundation pits on two sides of the subway tunnel 7 are excavated to the structural elevation and the pouring of a bottom plate (the bottom plate refers to the first-stage foundation pit bottom plates on two sides of the subway tunnel 7) is completed, the drill pipe 26 is utilized to carry out lateral long-distance (the lateral drilling distance can be kept to be about 20m-25 m) drilling construction (the diameter of the outer wall of a connecting pipe of the drill pipe 26 is slightly smaller than that of the outer wall of the fender post 18 on two sides of the foundation pit or is adjusted according to the construction structure requirement), firstly, a hollow drill bit is utilized to drill, a forward thread 2 on the outer wall of the hollow drill bit is used for drilling the soil body, a backward thread 1 on the inner wall of the hollow drill bit is used for rotating the soil body out of the pipe body in the drilling process, and the spliced connecting pipe is continuously drilled along with the drilling of the hollow drill bit until the fender post 12 on the same side is a terminal point; then, cleaning the soil in the drill pipe 26, tightly placing the sleeve valve grouting pipe into the drill pipe 26, and simultaneously controlling the grouting pressure of split grouting to be within 0.2-0.5MPa along with the grouting of the sleeve valve grouting pipe (the grouting pressure is different due to different soil qualities, for example, when grouting in sandy soil, the grouting pressure is controlled to be within 0.2-0.3MPa, if the grouting pressure is in cohesive soil, the grouting pressure is controlled to be within 25-75mm, if cement mortar is selected as the grout, the grouting pressure is 1-7MPa, if the slump is smaller, the grouting pressure can be an upper limit value, if cement-water-glass double-liquid quick setting grout is adopted, the grouting pressure is smaller than 1MPa), grout continuously permeates into the surrounding soil body through a grout outlet consolidation hole of the sleeve valve grouting pipe to achieve the grouting effect, and meanwhile, the grout permeating into the soil body and a branch of a steel pipe connected with a connecting pipe in the connecting pipe are tree-shaped concrete pipe, and the branch grout is penetrated into the soil body When the drilling pipes 26 finish drilling one row, corresponding waist beams are established, so that the drilling pipes 26 are connected with the fender posts 18 on the two sides of the foundation pit into a whole, and the lateral displacement of the subway tunnel is effectively prevented;
step four: when the first-stage foundation pit bottom plates on two sides of the subway tunnel 7 are poured and drilled, and the lateral drill pipes 26 are drilled, first-stage structure construction (the first-stage structure construction mainly comprises beams, columns, floor slabs, shear walls and the like of a main building structure) is carried out to form a stacking effect (so that the resilience hysteresis effect of a soil body caused by foundation pit unloading is relieved); after that, the soil body right above the subway tunnel 7 is reinforced, firstly, the construction of the rotary spraying reinforcing pile 9 is carried out right above the subway tunnel 7, then the excavation of the soil body right above the subway tunnel 7 is carried out, the symmetrical excavation of the layered strip skip cabin is adopted, firstly, the excavation of the soil body between the retaining piles 18 at the two sides of the foundation pit and the isolation pile 12 is carried out, when the underground negative layer bottom plate 10 is excavated to the elevation, the slope 25 is continuously excavated downwards until the bottom elevation position of the rotary spraying reinforcing pile 9 is excavated, the construction of the equipment parking temporary platform 11 is carried out, the operation of the drill pipe 26 is started (the diameter of the outer wall of the drill pipe 26 is 500mm, and the proper size adjustment can be carried out according to the self condition of the foundation pit project), after the top drill is positioned to the standard, the soil in the drill pipe 26 is cleaned, and the valve grouting pipe is fastened and placed in the drill pipe 26 for grouting (the soil quality is different, and the grouting pressure is also different); after the construction of the drill pipe 26 is finished, the slope 25 is set to back fill (the original soil can be replaced by the soil with better soil quality, or the original soil can be directly back filled), after the soil is back filled to the top of the jet grouting reinforcing pile 9, the temporary platform 11 operation of equipment parking is carried out, then the construction of the drill pipe 26 at the top is carried out, and after the construction of the drill pipe 26 at the top is finished, a box type reinforcing structure is formed above the subway tunnel 7; then, constructing an underground negative layer of bottom plate 10, and connecting the underground negative layer of bottom plate 10, the fender posts 18 on two sides of the foundation pit and the tunnel isolation posts 12 into a whole (so that a high-rigidity counter-pressure structure is formed);
step five: after the underground one-storey bottom plate 10 is poured by local part-storey strip-by-strip cabin-skipping symmetrical excavation, construction of the upper one-storey structure top plate is carried out, wherein the construction comprises the construction of a temporary reinforcing rib wall 20 (compared with the traditional reinforcing structure, the rigidity is higher, the self weight of the upper structure can be equivalent to effective stacking, and the subway tunnel 7 is effectively prevented from floating upwards due to excavation); after the construction of the top plate of the structure with the one-layer structure is finished, the layered strip-by-strip cabin-jumping symmetrical excavation of other non-excavated parts is carried out, after the soil between the retaining piles 18 and the isolation piles 12 at two sides of the foundation pit is excavated and the structure construction is finished, all structural members (including the retaining piles 18 at two sides of the foundation pit, the isolation piles 12 and the bottom plate 10 of the structure with the one-layer structure underground) are connected into a whole.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention, and the present invention is not limited thereto, and any person skilled in the art can substitute or change the technical solution of the present invention and its inventive concept within the technical scope of the present invention.

Claims (4)

1. A grouting device for an advance drill pipe right above a tunnel comprises a sleeve valve grouting pipe and a drill pipe (26); the drill pipe (26) consists of a hollow drill bit and one or more connecting pipes; the method is characterized in that: the hollow drill bit is composed of a conical head and a round steel pipe which are manufactured into a whole, inner threads and outer threads are arranged on the inner wall and the outer wall of the conical head, the outer threads arranged on the outer wall of the conical head are positive threads (2), the inner threads arranged on the inner wall of the conical head are negative threads (1), inner connecting threads I (4) are arranged at the tail end of the inner wall of the round steel pipe, inner connecting threads II (6) are arranged at one end of the inner wall of the connecting pipe, and outer connecting threads (5) are arranged at the other end of the outer wall of the connecting pipe; a plurality of slurry outlet consolidation holes I (3) are respectively arranged on the round steel pipe and the connecting pipe;
when the number of the connecting pipes is one, the internal connecting thread I (4) of the hollow drill bit is screwed with the external connecting thread (5) of the connecting pipe; when the number of the connecting pipes is multiple, every two adjacent connecting pipes are connected in a screwing mode through an inner connecting thread II (6) and an outer connecting thread (5) to form a splicing connecting pipe, and the outer connecting thread (5) of the connecting pipe positioned at any end in the splicing connecting pipe is connected with an inner connecting thread I (4) of the hollow drill bit in a screwing mode; during grouting, the sleeve valve grouting pipe is arranged in the drill pipe (26) and is in tight fit with the drill pipe.
2. The grouting device for the advance drill pipe right above the tunnel according to claim 1, characterized in that: the first slurry outlet consolidation holes (3) are all round holes.
3. A method for realizing box-type reinforcement of a forepoling pipe right above a tunnel by using the grouting device of claim 1 or 2, which is characterized by comprising the following steps: the reinforcing method comprises the following steps:
the method comprises the following steps: firstly, according to the protection red line of the subway tunnel (7), arranging fender posts (18) at two sides of a foundation pit outside the protection red line of the subway tunnel (7), excavating the foundation pit at one stage at two sides of the subway tunnel (7), and requiring the lower ends of the fender posts (18) at two sides of the foundation pit to be deep into the bottom of the subway tunnel (7);
step two: when excavation of a first-stage foundation pit except a red line protected by the subway tunnel (7), constructing isolation piles (12) on two sides of the subway tunnel (7) simultaneously, wherein the minimum horizontal distance between each isolation pile (12) and the outermost side of the subway tunnel (7) is not less than 3m, arranging a plurality of rows of isolation piles (12), and effectively protecting the subway tunnel (7) so as to reduce lateral displacement of the subway tunnel (7) caused by excavation of the foundation pits on two sides of the subway tunnel (7);
step three: after the first-stage foundation pits on two sides of the subway tunnel (7) are excavated to a structural elevation and the bottom plate is poured, the drill pipe (26) is utilized to carry out lateral long-distance drilling construction, firstly, a hollow drill bit is utilized to drill, the forward thread (2) on the outer wall of the hollow drill bit is used for drilling the soil body, the reverse thread (1) on the inner wall of the hollow drill bit is used for rotating the soil body out of the pipe body in the drilling process, the splicing connecting pipe continuously and continuously drills in along with the drilling of the hollow drill bit, and the end point of the splicing connecting pipe drills to the isolation pile (12) on the same side; then, cleaning soil in the drill pipe (26), tightly placing the sleeve valve grouting pipe into the drill pipe (26), simultaneously, continuously infiltrating grout into surrounding soil through a grout outlet consolidation hole II of the sleeve valve grouting pipe along with the proceeding of grouting of the sleeve valve grouting pipe to achieve the effect of grouting reinforcement, meanwhile, connecting the grout infiltrating into the soil and the grout in the connecting pipe into a steel pipe concrete pile with tree branches, and establishing a corresponding waist beam when the drill pipe (26) completes drilling of one row, so that the drill pipe (26) and the fender posts (18) at two sides of the foundation pit are connected into a whole, and the lateral displacement of the subway tunnel is effectively prevented;
step four: when the first-stage foundation pit bottom plates on two sides of the subway tunnel (7) are poured and the lateral drill pipes (26) are drilled, first-stage structural construction is carried out to form a stacking effect; then, reinforcing the soil body right above the subway tunnel (7), constructing a rotary spraying reinforcing pile (9) right above the subway tunnel (7), excavating the soil body right above the subway tunnel (7), adopting layered strip skip symmetrical excavation, firstly excavating the soil body between a retaining pile (18) at two sides of a foundation pit and an isolation pile (12), continuously excavating a slope (25) when the soil body is excavated to the elevation of a bottom plate (10) at the underground negative layer until the bottom elevation of the rotary spraying reinforcing pile (9) is excavated, constructing an equipment parking temporary platform (11), starting the operation of a drill pipe (26), cleaning the soil in the drill pipe (26) after top drilling to the preset position, and tightly arranging a sleeve valve grouting pipe into the drill pipe (26) for grouting; after the construction of the drill pipe (26), carrying out slope releasing (25) backfill, after backfilling to the top of the jet grouting reinforcing pile (9), carrying out equipment parking temporary platform (11) operation, then carrying out the construction of the drill pipe (26) at the top, and after the construction of the drill pipe (26) at the top is finished, forming a box-type reinforcing structure above the subway tunnel (7); then, constructing an underground negative layer bottom plate (10), and connecting the underground negative layer bottom plate (10), the fender posts (18) at two sides of the foundation pit and the tunnel isolation piles (12) into a whole;
step five: after the underground negative layer bottom plate (10) is poured by local partial-layer strip-by-strip skip symmetrical excavation, construction of the upper negative layer structure top plate is carried out, and the construction comprises the construction of a temporary reinforcing rib wall (20); after the construction of the top plate with the negative layer of structure is finished, the layered strip-by-strip cabin-jumping symmetrical excavation of other non-excavated parts is carried out, after the soil between the fender piles (18) at the two sides of the foundation pit and the isolation piles (12) is excavated and the structure construction is finished, all the structural members are connected into a whole.
4. The box type reinforcing method for the forepoling pipe right above the tunnel according to claim 3, characterized in that: in the fourth step, the mode of reinforcing the soil body right above the subway tunnel (7) before excavation is as follows: adopt the slip casting to consolidate or adopt deep mixing stake to consolidate, the reinforcement scope is for vertically consolidating along subway tunnel (7), consolidates the region that the width encloses for subway tunnel (7) both sides isolation pile (12).
CN202110797109.2A 2021-07-14 2021-07-14 Box type reinforcing method for advanced drill pipe right above tunnel Active CN113356889B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110797109.2A CN113356889B (en) 2021-07-14 2021-07-14 Box type reinforcing method for advanced drill pipe right above tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110797109.2A CN113356889B (en) 2021-07-14 2021-07-14 Box type reinforcing method for advanced drill pipe right above tunnel

Publications (2)

Publication Number Publication Date
CN113356889A true CN113356889A (en) 2021-09-07
CN113356889B CN113356889B (en) 2022-07-15

Family

ID=77539496

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110797109.2A Active CN113356889B (en) 2021-07-14 2021-07-14 Box type reinforcing method for advanced drill pipe right above tunnel

Country Status (1)

Country Link
CN (1) CN113356889B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112359980A (en) * 2020-12-03 2021-02-12 王光顺 Connecting method of building assembly structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669346A (en) * 2013-12-30 2014-03-26 湖南城市学院 Sleeve valve pipe and application to landslide control
US20140314503A1 (en) * 2013-04-11 2014-10-23 Henan Polytech Infrastructure Rehabilitation LTD. Grouting method for anchoring with polymer
CN105200978A (en) * 2015-10-12 2015-12-30 山东大学 Advancing type localized double-liquid grouting device and construction method
WO2017190397A1 (en) * 2016-05-03 2017-11-09 许国安 Segmented modular large deformation-resistant and impact-resistant combined anchor bolt and method for assembling same
CN110259386A (en) * 2019-07-18 2019-09-20 骆波清 A kind of high pressure jet grouting drill bit
CN112067347A (en) * 2020-09-07 2020-12-11 合肥巨步机械科技有限公司 A drilling equipment for soil layer soil sample

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140314503A1 (en) * 2013-04-11 2014-10-23 Henan Polytech Infrastructure Rehabilitation LTD. Grouting method for anchoring with polymer
CN103669346A (en) * 2013-12-30 2014-03-26 湖南城市学院 Sleeve valve pipe and application to landslide control
CN105200978A (en) * 2015-10-12 2015-12-30 山东大学 Advancing type localized double-liquid grouting device and construction method
WO2017190397A1 (en) * 2016-05-03 2017-11-09 许国安 Segmented modular large deformation-resistant and impact-resistant combined anchor bolt and method for assembling same
CN110259386A (en) * 2019-07-18 2019-09-20 骆波清 A kind of high pressure jet grouting drill bit
CN112067347A (en) * 2020-09-07 2020-12-11 合肥巨步机械科技有限公司 A drilling equipment for soil layer soil sample

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112359980A (en) * 2020-12-03 2021-02-12 王光顺 Connecting method of building assembly structure
CN112359980B (en) * 2020-12-03 2021-11-26 王光顺 Connecting method of building assembly structure

Also Published As

Publication number Publication date
CN113356889B (en) 2022-07-15

Similar Documents

Publication Publication Date Title
WO2021223573A1 (en) Construction structure for communication and connection between newly added mined channel and existing station hall layer
CN104818991B (en) A kind of construction method in Shallow-buried residual soil slope tunnel
CN102605792B (en) Multi-row mini-pile enclosing structure for blocking soil and construction process
CN205742213U (en) Foundation pit supporting construction
CN106930321B (en) The construction method of underground structure is built in a kind of stake of pipe-jacking with large diameter combination hole
CN211340827U (en) Structure for newly building bridge by passing through existing bridge piles in subway tunnel
CN106050243A (en) Super-shallow-buried small-spacing large-section multi-tunnel concurrent construction method
CN101748741A (en) Construction method of concrete supporting structure
CN110159298B (en) Subway underground excavation station primary support buckling arch construction method
CN112253162B (en) Water-rich sand layer large-diameter jacking pipe group entrance and exit reinforcing structure and construction method
CN111677520B (en) Construction method for excavating station structure by tunnel-first station-later station pipe curtain hole-pile method
WO2020248429A1 (en) Method for strengthening and lifting high-rise building having raft foundation
CN102660955A (en) Quick construction method for foundation pit slope support
CN110847207A (en) Structure and construction method for newly-built bridge with subway tunnel passing through existing bridge piles
CN112982431A (en) Construction method of foundation pit supporting structure
CN112761166A (en) Construction method for shallow foundation pit of combined support of piles and pre-grouting steel pipes based on SMW (soil mixing wall) construction method
CN107489106A (en) A kind of rocky bed subaqueous bearing platform construction method
CN113356889B (en) Box type reinforcing method for advanced drill pipe right above tunnel
CN101793027B (en) Core-grouted static pressure anchor rod pile
CN105386779A (en) Arch column method for building large-scale underground structure in shallow buried rock stratums
CN112726627A (en) Cast-in-situ bored pile structure in area with intense karst and construction method
CN112081158B (en) Construction method for forming reinforced composite pile foundation by advanced grouting of high-rise building
CN112145203A (en) Full-face advancing type sectional grouting construction method and overlapped tunnel construction method
CN201406687Y (en) Deep foundation pit supporting structure
CN116398165A (en) New tunnel penetrating through existing station at zero distance and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant