CN113356456A CN202110688200.0A CN202110688200A CN113356456A CN 113356456 A CN113356456 A CN 113356456A CN 202110688200 A CN202110688200 A CN 202110688200A CN 113356456 A CN113356456 A CN 113356456A
Authority
CN
China
Prior art keywords
ceiling
plate
ceiling decorative
main
decorative plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110688200.0A
Other languages
Chinese (zh)
Inventor
赵永生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing New Building Material Group Co Ltd
Original Assignee
Beijing New Building Material Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing New Building Material Group Co Ltd filed Critical Beijing New Building Material Group Co Ltd
Priority to CN202110688200.0A priority Critical patent/CN113356456A/en
Publication of CN113356456A publication Critical patent/CN113356456A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/22Connection of slabs, panels, sheets or the like to the supporting construction
    • E04B9/225Connection of slabs, panels, sheets or the like to the supporting construction with the slabs, panels, sheets or the like hanging at a distance below the supporting construction
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The invention discloses a ceiling decorative plate assembly component, a ceiling structure and a ceiling assembly method, relates to the field of buildings, and aims to solve the problems of exposure of the conventional assembly component and low construction efficiency. The ceiling trim panel assembly includes a keel and at least one clip structure. The keel comprises a top plate, two side plates and two first clamping parts, wherein the two side plates are respectively connected with two opposite ends of the top plate; two first joint portions are respectively connected with the edges of the two side plates far away from the top plate, and the two first joint portions extend towards the same direction. One end of the clamping and hanging structure is provided with a second clamping portion, and the other end of the clamping and hanging structure is provided with a first connecting portion. The ceiling decorative plate assembly component and the ceiling decorative plate assembly provided by the invention have the advantages that the assembly components are not exposed when the ceiling decorative plate is installed, and the construction efficiency is high.

Description

Ceiling decorative plate assembling assembly, ceiling structure and ceiling assembling method
Technical Field
The invention relates to the field of buildings, in particular to a ceiling decorative plate assembling assembly, a ceiling structure and a ceiling assembling method.
Background
The home decoration suspended ceiling is a common link in home decoration, and in the related technology, suspended ceiling boards with fire-resistant and sound-absorbing functions mostly adopt gypsum boards, calcium silicate boards, ceramic boards, mineral wool sound-absorbing boards and the like. One way of suspended ceiling is to directly lap the ceiling board on the decorative keel; according to the method, two adjacent ceiling tiles are lapped on two sides of the same keel, so that mutual influence in construction can be caused, and the ceiling tiles are easy to fall off when the lapping quantity of the two ceiling tiles is adjusted; also, this method may leave a portion of the keel exposed below the ceiling tile.
Another mode of suspended ceiling adopts the fluting of furred ceiling board side intermediate position, makes fossil fragments partial structure insert the notch to guarantee that the assembly subassembly does not expose. Because the ceiling board material among the correlation technique is crisp, be difficult to guarantee intensity behind the side fluting, and the side fluting is high to the technological precision requirement, takes time and labours, and the efficiency of construction is lower, and simultaneously, the dust that the fluting produced also does not benefit to the environmental protection.
Disclosure of Invention
The invention aims to provide a ceiling decorative plate assembling component, a ceiling structure and a ceiling assembling method, which can prevent the ceiling decorative plate assembling component from being exposed without damaging the structure of a ceiling plate when the ceiling plate is installed, and can avoid a large amount of time for processing the ceiling decorative plate when the ceiling decorative plate is installed, thereby improving the construction efficiency.
In order to achieve the purpose, the invention provides the following technical scheme:
in a first aspect, some embodiments of the invention provide a ceiling trim panel assembly comprising: a keel, the keel comprising: a top plate; the two side plates are respectively connected with the two opposite ends of the top plate and are positioned on the same side of the top plate; two first joint portions, respectively with two the curb plate is kept away from the edge of roof links to each other, two first joint portion extends to same direction to be located the first side of the curb plate of connecting separately respectively. At least one card structure of hanging, the one end of card structure of hanging have be used for with the second joint portion of first joint portion joint, the other end has the first connecting portion that is used for being connected with the furred ceiling decorative board.
In some embodiments, the first clip portion includes: the one end of first overlap joint portion links to each other with one the curb plate is kept away from the edge of roof, the other end of first overlap joint portion extends to the first side of this curb plate. One end of the first limiting part is connected with the other end of the first lapping part, and the other end of the first limiting part extends to one side of the first lapping part, which is close to the plane where the top plate is located.
In some embodiments, the first connection portion comprises a first connection plate for connecting the ceiling trim panel; a first portion of the edge of the first connecting plate extends in a direction perpendicular to the first connecting plate to form a support plate; one end, far away from the first connecting plate, of the supporting plate is connected with the second clamping portion.
In some embodiments, a second portion of the edge of the first connecting plate extends in a direction parallel to the first connecting plate to form a positioning plate; the second partial edge and the first partial edge are located at the same end of the first connection plate.
In some embodiments, the catch structure comprises: the card pendant comprises a plugboard; one edge of the plugboard extends along a direction perpendicular to the plugboard to form a support plate; the end part of the supporting plate far away from the inserting plate is connected with the second clamping part. The surface of one side of the flat seam clamping piece is provided with a groove for accommodating the plug board, and at least one side surface of the groove is in an opening shape; the area around the groove in the flush joint clamping piece is the first connecting part.
In some embodiments, the bottom wall of the groove has a seam extending to one side of the groove that is open, the seam having a width greater than or equal to the thickness of the support plate.
In some embodiments, the groove is a rectangular groove having a rectangular cross section, and the connecting portion has a plate shape.
In some embodiments, the length of the card slot is less than or equal to half the length of the groove.
In some embodiments, the ceiling trim panel assembly further comprises a corner fastener comprising two second connecting plates connected at their ends, the two second connecting plates being perpendicular to each other.
In some embodiments, the ceiling trim panel assembly further comprises: one end of the suspender is used for being connected with a roof, and the other end of the suspender is connected with the top plate of the keel.
In a second aspect, some embodiments of the invention also provide a ceiling structure comprising: the first suspended ceiling decorative plate component comprises a first main suspended ceiling decorative plate and a first auxiliary suspended ceiling decorative plate, the end part of the first auxiliary suspended ceiling decorative plate is connected with the end part of the first main suspended ceiling decorative plate, and the first auxiliary suspended ceiling decorative plate is located on one side of the first main suspended ceiling decorative plate. The second ceiling decorative panel assembly comprises a second main ceiling decorative panel and a second auxiliary ceiling decorative panel, the end part of the second auxiliary ceiling decorative panel is connected with the end part of the second main ceiling decorative panel, and the second auxiliary ceiling decorative panel is located on one side of the second main ceiling decorative panel. The ceiling decorative panel assembly of any one of the above embodiments is characterized in that the first main ceiling decorative panel and the second main ceiling decorative panel are respectively connected to hoist the first ceiling decorative panel assembly and the second ceiling decorative panel assembly, and the first main ceiling decorative panel, the first auxiliary ceiling decorative panel, the second main ceiling decorative panel and the second auxiliary ceiling decorative panel form a light groove therebetween. The size of the first auxiliary ceiling decorative board in the direction perpendicular to the first main ceiling decorative board is larger than the size of the second auxiliary ceiling decorative board in the direction perpendicular to the first main ceiling decorative board.
In some embodiments, the first primary ceiling tile and the first secondary ceiling tile are connected by corner fasteners, and the second primary ceiling tile and the second secondary ceiling tile are connected by corner fasteners.
In a third aspect, some embodiments of the invention also provide a ceiling mounting method using the ceiling structure of any of the above embodiments, the method comprising: mounting the clamping structure on the first main ceiling decorative plate and the second main ceiling decorative plate; connecting the auxiliary ceiling decorative plate with the corresponding main ceiling decorative plate; hanging the keel on the roof; and hanging a first main ceiling decorative plate and a second main ceiling decorative plate which are provided with the hanging structures on the keel to form the light trough type ceiling.
The ceiling decorative plate assembling component, the ceiling structure and the ceiling assembling method provided by the invention have the following beneficial effects:
when the ceiling decorative plate assembly component provided by the invention is used for mounting a ceiling decorative plate, the keel can be hung and fixed on a roof, the clamping and hanging structure is mounted on the back surface of the ceiling decorative plate through the first connecting part, then the ceiling decorative plate is close to the keel, and the ceiling decorative plate is clamped and mounted on the keel through the second clamping and hanging part of the clamping and hanging structure, so that the ceiling decorative plate is hung and fixed on the roof. The assembly mode does not need to open grooves on the side edges of the ceiling decorative plate, so that the strength of the ceiling decorative plate made of crisp materials is ensured, a large amount of time consumed for processing the ceiling decorative plate is saved, and the construction efficiency is improved; after the installation, the splicing part where two adjacent ceiling decorative boards contact, the ceiling decorative board assembly component is not exposed.
When the furred ceiling decorative board is dismantled to needs, can demolish the joint between card string structure and the fossil fragments, can realize dismantling alone arbitrary furred ceiling decorative board and not influence adjacent furred ceiling decorative board, be convenient for change furred ceiling decorative board and overhaul other structures or equipment between furred ceiling decorative board and the roof.
When the ceiling decoration board assembly provided by the invention is used for assembling a ceiling, the ceiling decoration board assembly used by the ceiling decoration board assembly is the ceiling decoration board assembly in any embodiment, so that the same technical effect can be produced, and the same technical problem can be solved; besides, the beautiful ceiling with the lamp groove can be quickly and conveniently assembled.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is an assembled perspective view of a ceiling trim panel mounting assembly and a ceiling trim panel according to some embodiments of the invention;
FIG. 2 is an assembled front view of a ceiling trim panel mounting assembly and a ceiling trim panel according to some embodiments of the invention;
FIG. 3 is an enlarged view of the structure at A in FIG. 2;
FIG. 4 is a schematic diagram of a structure of a snap structure according to some embodiments of the invention;
FIG. 5 is a schematic view of a clip structure coupled to a ceiling trim panel according to some embodiments of the present invention;
FIG. 6 is a schematic diagram of another structure of a latch structure according to some embodiments of the invention;
FIG. 7 is a schematic structural view of a ceiling trim panel assembly according to some embodiments of the present invention;
fig. 8 is a schematic structural view of an assembled suspended ceiling according to some embodiments of the invention.
Reference numerals: 100. ceiling decorative panel assembly subassembly, 1, fossil fragments, 11, the roof, 12, the curb plate, 121, first side, 13, first joint portion, 131, first overlap joint portion, 132, first spacing portion, 2, the structure is hung to the card, 2a, the card pendant, 22a, the plugboard, 2b, the parallel joint fastener, 22b, the recess, 221b, the joint, 21, second joint portion, 22, first connecting portion, 221, first connecting plate, 23, the backup pad, 24, the locating plate, 3, the corner firmware, 31, the second connecting plate, 4, the jib, 200, the ceiling decorative panel, 300, the ceiling decorative panel subassembly, 301, first ceiling decorative panel subassembly, 3011, first main ceiling decorative panel, 3012, first pair of ceiling decorative panel, 302, second ceiling decorative panel subassembly, 3021, second main ceiling decorative panel, 3022, second pair of ceiling decorative panel, 303, the light trough.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and thus, are not to be construed as limiting the present invention.
The terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; the specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-3, some embodiments of the present invention provide a ceiling trim panel assembly 100 including a runner 1 and at least one catch structure 2.
Referring to fig. 3, the keel 1 includes a top plate 11, two side plates 12, and two first clamping portions 13. The two side plates 12 are respectively connected to opposite ends of the top plate 11 and are located on the same side of the top plate 11. The two first clamping portions 13 are respectively connected with the edges of the two side plates 12 far away from the top plate 11, and the two first clamping portions 13 extend towards the same direction to be respectively located on the first sides 121 of the side plates 12 connected with each other.
Illustratively, the keel 1 is a long-strip-shaped section, and the top plate 11 and the two side plates 12 can be of an integrated structure and are bent and formed; or the top plate 11 and the two side plates 12 may be connected together by welding or bolting.
Exemplarily, the included angle between roof 11 and two curb plates 12 is 90, both convenient to use the mould processing fossil fragments 1, structural stability when guaranteeing fossil fragments 1 atress again betterly.
It should be noted that the included angle between the top plate 11 and the side plates 12 may be other angles, and the two first side plates 12 may be symmetrically disposed about the middle vertical plane of the top plate 11 in the width direction of the keel 1, may also be asymmetrically disposed, and may all be applied.
Referring to fig. 1 and 3, one end of the hooking structure 2 has a second hooking portion 21 for hooking with the first hooking portion 13, and the other end has a first connecting portion 22 for connecting with the ceiling decorative panel 200.
Illustratively, the number of the clamping structures 2 can be two, and the clamping structures are distributed at intervals along the direction parallel to the edge of the ceiling decorative plate 200; alternatively, two or more of the hooking structures 2 may be used.
When the ceiling decorative panel assembly 100 provided by the invention is used for mounting the ceiling decorative panel 200, the keel 1 can be hung and fixed on a roof, the clamping structure 2 is mounted on the back surface of the ceiling decorative panel 200 through the first connecting part 22, then the ceiling decorative panel 200 is close to the keel 1, and the ceiling decorative panel 200 is clamped and mounted on the keel 1 through the second clamping part 21 of the clamping structure 2, so that the ceiling decorative panel 200 is hung and fixed on the roof. The assembly mode does not need to open grooves on the side edges of the ceiling decorative plate 200, so that the strength of the ceiling decorative plate made of crisp materials is ensured, a large amount of time consumed for processing the ceiling decorative plate 200 is saved, and the construction efficiency is improved; after installation, the ceiling tile assembly 100 is not exposed at the splicing position where two adjacent ceiling tiles 200 contact.
Because fossil fragments 1 has two first joint portions 13, hang structure 2 with two of a set of card in hanging structure 2 and install respectively at the tip of two furred ceiling decorative panels 200 of splicing mutually, hang structure 2 with two cards simultaneously respectively and hang the dress on two first joint portions 13 of a fossil fragments 1, can realize two adjacent furred ceiling decorative panels 200 and splice fast, it is convenient to be under construction.
It should be noted that the hanging structure 2 may also be installed at other positions of the ceiling decorative panel 200, as long as it can ensure that the ceiling decorative panel 200 is hung and fixed on the roof.
When the furred ceiling decorative board 200 is dismantled to needs, can demolish the joint between structure 2 and the fossil fragments 1 is hung to the card, can realize dismantling alone arbitrary furred ceiling decorative board 200 and not influence adjacent furred ceiling decorative board 200, be convenient for change furred ceiling decorative board 200 and overhaul other structures or equipment between furred ceiling decorative board 200 and the roof.
Referring to fig. 3, in some embodiments, the first clamping portion 13 includes a first bridging portion 131 and a first position-limiting portion 132, one end of the first bridging portion 131 is connected to an edge of one side plate 12 away from the top plate 11, and the other end of the first bridging portion 131 extends to the first side 121 of the side plate 12; one end of the first limiting portion 132 is connected to the other end of the first bridging portion 131, and the other end of the first limiting portion 132 extends to one side of the first bridging portion 131 close to the plane of the top plate 11.
For example, the first bridging portion 131 and the first limiting portion 132 are both flat plates, and the first clamping portion 13 and the side plate 12 may be an integral structure and are formed by bending; or the first clamping portion 13 and the side plate 12 may be connected together by welding or bolts.
Exemplarily, the included angle between the first overlapping portion 131 and the first limiting portion 132 is 90 °, the included angle between the first overlapping portion 131 and the side plate 12 is 90 °, which facilitates the use of a mold for processing the keel 1, and can better ensure the structural stability of the keel 1 when being stressed.
First joint portion 13 that first overlap joint portion 131 and first spacing portion 132 constitute is the joint groove the same with fossil fragments 1 length direction, and the second joint portion 21 on the structure 2 is hung in the card can be along 1 length direction adjusting position of fossil fragments, and then furred ceiling decorative board 200 can be along 1 length direction adjusting position of fossil fragments.
Referring to fig. 4, in some embodiments, the first connection portion 22 includes a first connection plate 221 for connecting a ceiling trim panel; a first partial edge of the first connection plate 221 extends in a direction perpendicular to the first connection plate 221 to form the support plate 23; one end of the supporting plate 23 away from the first connecting plate 221 is connected with the second clamping portion 21.
The first connecting plate 221 is perpendicular to the supporting plate 23, which facilitates the mold processing and improves the accuracy and convenience of mounting the ceiling decorative panel 200.
Illustratively, the first connecting plate 221 and the supporting plate 23 are both flat plates, which facilitates the material processing of the card hanging structure 2.
Illustratively, the second clamping portion 21 is a clamping hook formed by bending and extending an edge of one end of the support plate 23 away from the first connecting plate 221.
For example, the second clamping portion 21 and the first connecting plate 221 may be located on the same side of the supporting plate 23; or the second catching portion 21 and the first connecting plate 221 may be positioned at both sides of the supporting plate 23.
As another example, the first connecting plate 221, the supporting plate 23 and the second clamping portion 21 may be an integral structure, and are formed by bending; or the first connection plate 221 and the support plate 23 may be connected together by welding or bolts.
Further illustratively, the height of the support plate 23 in the direction perpendicular to the first connection plate 221 is greater than the height of the first click portion 13 in the direction perpendicular to the top plate 11. By the design, enough installation space can be reserved, and installation is facilitated.
Referring to fig. 4, in some embodiments, a second portion of the edge of the first connection plate 221 extends in a direction parallel to the first connection plate 221 to form the positioning plate 24; the second partial edge and the first partial edge are located at the same end of the first connection plate 221.
When two adjacent furred ceiling decorative panels 200 of installation, can make in the structure 2 of hanging of first card the edge that the locating plate 24 kept away from backup pad 23 and the coplane of a side of first furred ceiling decorative panel 200, and make in the structure 2 of hanging of second card the edge that the locating plate 24 kept away from backup pad 23 and the coplane of a side of second furred ceiling decorative panel 200, two second joint portions 21 of two structures 2 of hanging are towards the same one side of backup pad 23, when the length of locating plate 24 in the direction of perpendicular to backup pad 23 can guarantee that two structures 2 of hanging are simultaneously with fossil fragments 1 joint, two furred ceiling decorative panels 200 can seamless concatenation can. So design, during installation furred ceiling decorative board 200, need not to carry out the adjustment repeatedly of mutual position to adjacent furred ceiling decorative board 200, also need not to measure repeatedly the mounted position of card hanging structure 2 on furred ceiling decorative board 200, greatly improved the efficiency of construction, also avoided furred ceiling decorative board 200 to drop the unnecessary loss that causes.
Referring to fig. 5 and 6, in some embodiments, the hanging structure 2 includes a hanging member 2a and a flush clip member 2b, the hanging member 2a including a plugboard 22 a; one edge of the socket plate 22a extends in a direction perpendicular to the socket plate 22a to form a support plate 23; the end of the support plate 23 away from the insertion plate 22a is connected with the second clamping part 21. One side surface of the flat seam clamping piece 2b is provided with a groove 22b for accommodating the plugboard, and at least one side surface of the groove 22b is in an opening shape; the area of the flat seam fastener 2b around the recess 22b is the first connecting portion 22.
Illustratively, the flush joint fastener 2b is a flat plate, and a partial region of the flush joint fastener 2b is recessed to form a groove 22b, i.e. the flush joint fastener 2b is an integral structure, which is convenient for processing and is convenient for the insertion of the insertion plate 22 a. The first connecting portion 22 of the parallel seam cramp 2b is bolted to the ceiling decorative panel 200.
Because the flush joint fastener 2b is connected with the ceiling decorative board 200 in the clamping structure 2, the clamping fastener 2a forms a detachable split type inserting structure through the flush joint fastener 2b to realize the connection with the ceiling decorative board 200, the ceiling decorative board 200 only provided with the flush joint fastener 2b is flattened and has small volume, the connection of the flush joint fastener 2b and the ceiling decorative board 200 can be produced in batches in a factory, and the connected flush joint fastener 2b and the ceiling decorative board 200 can be stacked and transported in batches, the installation time of a construction site is saved, and the construction efficiency is improved.
When two adjacent furred ceiling decorative panels 200 of installation, can make in the first card hang structure 2 the parallel joint fastener 2 b's in the edge of first connecting portion 22 and a side coplane of first furred ceiling decorative panel 200, and make in the second card hang structure 2 the parallel joint fastener 2 b's in the edge of first connecting portion 22 and a side coplane of second furred ceiling decorative panel 200, two second joint portions 21 of two card structures 2 are towards the same one side of backup pad 23, when two card structures 2 were simultaneously with fossil fragments 1 joint, two furred ceiling decorative panels 200 can seamless concatenation. So design, during installation furred ceiling decorative board 200, need not to carry out the adjustment repeatedly of mutual position to adjacent furred ceiling decorative board 200, also need not to measure repeatedly the mounted position of card hanging structure 2 on furred ceiling decorative board 200, greatly improved the efficiency of construction, also avoided furred ceiling decorative board 200 to drop the unnecessary loss that causes.
Referring to fig. 8, in some embodiments, the first connecting portion 22 has a plurality of mounting holes. Thus, the first connection portion 22 may be bolted to the ceiling trim panel 200 through the mounting hole, facilitating disassembly.
Referring to fig. 4 and 6, in some embodiments, the bottom wall of the groove 22b has a catching slit 221b, the catching slit 221b extends to one side of the groove 22b in an open shape, and the width of the catching slit 221b is greater than or equal to the thickness of the support plate 23. By the design, when the clamping piece 2a is inserted into the flat seam clamping piece 2b, the insertion plate 22a of the clamping piece 2a is inserted into the groove 22b from the side face of the opening of the groove 22b and is matched with the groove 22b, and the supporting plate 23 of the clamping piece 2a is matched and connected with the clamping seam 221b, so that the clamping piece 2a and the flat seam clamping piece 2b are ensured to form an insertion structure convenient to assemble and disassemble, the movement of the clamping piece 2a is effectively limited, and the reliability of the whole ceiling decorative plate assembly 100 is ensured.
Referring to fig. 6, in some embodiments, the groove 22b is a rectangular groove having a rectangular cross section, and the first connection portion 22 has a plate shape.
Illustratively, the flat seam fastener 2b is a rectangular flat plate, a middle area of a part of the flat seam fastener 2b along the width direction is recessed to form a groove 22b with a rectangular cross section, the length direction of the groove 22b is the same as that of the flat seam fastener 2b, and the length of the groove 22b is smaller than or equal to that of the flat seam fastener 2 b; the plate portion area around the groove 22b on the parallel seam fastener 2b is the first connecting portion 22. Namely, the flush joint clamping piece 2b is of an integral structure, and the groove 22b is a rectangular groove, so that the processing by using a die is convenient, and the plugging plate 22a of the clamping and hanging piece 21 is convenient to plug.
Referring to fig. 6, in some embodiments, the length of the slot 221b is less than or equal to half the length of the groove 22 b. So design, the length overlength of having avoided card seam 221b leads to the joint strength between recess 22b and the first connecting portion 22 to hang lowly, and then when leading to hanging dress furred ceiling decorative panel 200, the power that furred ceiling decorative panel 200 applyed on recess 22b diapire makes the fracture of being connected between recess 22b and the first connecting portion 22.
Referring to fig. 7, in some embodiments, the ceiling trim panel assembly 100 further includes a corner fastener 3, the corner fastener 3 including two second connecting plates 31 connected at two ends, the two second connecting plates 31 being perpendicular to each other.
For example, the two second connecting plates 31 may be an integral structure, and are formed by bending; or the two second connecting plates 31 may be connected together by welding or bolting. So designed, the vertical connection of two ceiling trim panels 200 can be achieved by the corner fasteners 3.
Referring to fig. 1 and 3, in some embodiments, the ceiling trim panel assembly 100 further includes a hanger bar 4, one end of the hanger bar 4 being used for attachment to a roof, and the other end of the hanger bar 4 being connected to the top panel 11 of the runner 1.
Exemplarily, the quantity of jib 4 is two at least, and it has the hole with jib 4 matched with to open on the roof 11, and jib 4 hangs fossil fragments 1 on the roof through bolted connection with roof 11, and then hangs furred ceiling decorative board assembly subassembly 100 and furred ceiling decorative board 200 on the roof, connects simple and convenient reliably.
In some embodiments, the keel 1, the hooking member 2a and the fixing member 2b may be made of metal, plastic or wood-plastic material.
Referring to fig. 7, some embodiments of the present invention provide a ceiling structure 300 comprising a first ceiling trim panel assembly 301, a second ceiling trim panel assembly 302, and a plurality of the ceiling trim panel assembly assemblies 100 provided in any of the above embodiments. The first ceiling trim panel assembly 301 includes a first main ceiling trim panel 3011 and a first secondary ceiling trim panel 3012, the end of the first secondary ceiling trim panel 3012 is connected to the end of the first main ceiling trim panel 3011, and the first secondary ceiling trim panel 3012 is located on one side of the first main ceiling trim panel 3011. The second ceiling trim panel assembly 302 includes a second main ceiling trim panel 3021 and a second auxiliary ceiling trim panel 3022, an end portion of the second auxiliary ceiling trim panel 3022 is connected to an end portion of the second main ceiling trim panel 3021, and the second auxiliary ceiling trim panel 3022 is located on one side of the second main ceiling trim panel 3021. A plurality of the ceiling trim panel assembly assemblies 100 according to any of the above embodiments are connected to the first main ceiling trim panel 3011 and the second main ceiling trim panel 3021, respectively, to hoist the first ceiling trim panel assembly 301 and the second ceiling trim panel assembly 302, and to form the light groove 303 between the first main ceiling trim panel 3011, the first sub-ceiling trim panel 3012, the second main ceiling trim panel 3021, and the second sub-ceiling trim panel 3022. The first auxiliary ceiling decorative panel 3012 is larger than the second auxiliary ceiling decorative panel 3022 in a direction perpendicular to the first main ceiling decorative panel 3011.
When the ceiling structure 300 provided by the invention is used for assembling a ceiling, the ceiling decorative plate assembling component 100 used by the ceiling structure is the ceiling decorative plate assembling component 100 in any embodiment, so that the same technical effect can be produced, and the same technical problem can be solved; besides, the beautiful ceiling with the lamp groove can be quickly and conveniently assembled.
Referring to fig. 7, in some embodiments, a first main ceiling trim panel 3011 and a first secondary ceiling trim panel 3012 are connected by corner fasteners 3, and a second main ceiling trim panel 3021 and a second secondary ceiling trim panel 3022 are connected by corner fasteners 3.
Illustratively, the two second connecting plates 31 of the corner fixing members 3 are connected to the ends of the first main ceiling trim panel 3011 and the first sub-ceiling trim panel 3012, and the two second connecting plates 31 of the corner fixing members 3 are connected to the ends of the second main ceiling trim panel 3021 and the second sub-ceiling trim panel 3022, respectively. So design, first main furred ceiling decorative board 3011 and first pair furred ceiling decorative board 3012 mutually perpendicular, the second main furred ceiling decorative board 3021 and the vice furred ceiling decorative board 3022 mutually perpendicular of second, even if be convenient for processing the installation, again can make light trough 303 brief pleasing to the eye.
Referring to fig. 1-3, 7 and 8, some embodiments of the present invention provide a ceiling mounting method comprising the steps of:
s1: the clip structure 2 is installed on the first and second main ceiling trim panels 3011 and 3022.
For example, some of the hooking structures 2 are first installed on the back surface of the first main ceiling decorative panel 3011 through the first connecting portion 22, for example, two hooking structures 2 are respectively installed on two opposite end portions of each first main ceiling decorative panel 3011, and the two hooking structures 2 on the same end portion are spaced apart along the extending direction of the edge of the end portion.
Meanwhile, other hooking structures 2 are installed on the back surface of the second main ceiling decorative panel 3021 through the first connecting portion 22, for example, two hooking structures 2 are installed at one end portion of each second main ceiling decorative panel 3021, and the two hooking structures 2 at the same end portion are spaced apart along the extending direction of the end portion edge. On the basis, in some examples, two clamping and hanging structures 2 can be further installed in a direction parallel to a connecting line of the two clamping and hanging structures 2 at the same end, and the two clamping and hanging structures 2 which are further installed are distributed at intervals in a direction parallel to the connecting line of the two clamping and hanging structures 2.
Illustratively, the step S1 is repeated, and the hooking structure 2 is installed on each of the first main ceiling decorative panels 3011 on the back surface facing the roof.
S2: and connecting the auxiliary ceiling decorative plate with the corresponding main ceiling decorative plate.
Illustratively, two second connecting plates 31 of the corner fixing member 3 are connected to end portions of the first main ceiling trim panel 3011 and the first sub-ceiling trim panel 3012, respectively; two second connection plates 31 of the corner fixing member 3 are connected to end portions of a second main ceiling decorative panel 3021 and a second sub-ceiling decorative panel 3022, respectively.
Illustratively, step S2 is repeated to connect all the secondary ceiling trim panels with the corresponding primary ceiling trim panel.
It should be noted that the order of the above steps S1 and S2 may be reversed, for example, the installation order may be selected according to the actual installation scenario.
S3: the keel 1 is hung on the roof.
Illustratively, the assembly 100 further comprises hanger rods 4, the top plate 11 of the keel 1 is provided with holes matched with the hanger rods 4, one end of at least two hanger rods 4 is connected with the top plate 11 through bolts, and the other end is connected with the roof.
Illustratively, the step S3 is repeated until all the keels 1 are hung on the roof, when the keels 1 are hung, the top plate 11 and the two side plates 12 of the keel 1 are enclosed to form a groove opening facing the ground, and all the keels 1 are adjusted to be parallel to each other, all the keels 1 used for hoisting the first main ceiling decorative panel 3011 are in the same horizontal plane, all the keels 1 used for hoisting the second main ceiling decorative panel 3012 are in the same horizontal plane, and the height difference between the keel 1 used for hoisting the first main ceiling decorative panel 3011 and the keel 1 used for hoisting the second main ceiling decorative panel 3012 is greater than or equal to the height of the first auxiliary ceiling decorative panel 3012 in the direction perpendicular to the first main ceiling decorative panel 3011.
S4: and a first main ceiling decorative plate 3011 and a second main ceiling decorative plate 3021 which are provided with the clamping structure 2 are clamped on the keel 1 to form the light trough type ceiling.
Illustratively, the step S4 is repeated, all the first main ceiling decorative panels 3011 are hung on the corresponding keels 1, and when the main ceiling decorative panels are hung, the first main ceiling decorative panels 3011 provided with the first auxiliary ceiling decorative panels 3012 are spliced one by one, and all the first auxiliary ceiling decorative panels 3012 are spliced one by one.
All the second main ceiling decorative boards 3021 are hung on the corresponding keels 1, and when the main ceiling decorative boards are hung, the end parts, far away from the second auxiliary ceiling decorative boards 3022, of the second main ceiling decorative boards 3011 with the second auxiliary ceiling decorative boards 3022 are abutted to the wall, and all the second auxiliary ceiling decorative boards 3022 are spliced one by one.
After all the first main ceiling decorative panels 3011 and all the second main ceiling decorative panels 3021 are hung on the keel 1, the light groove 303 is formed.
It should be noted that, when a plurality of ceiling structures 300 are installed to complete the assembly of the whole ceiling, the step S1, the step S2, or the step S4 may be repeated separately to complete the installation of all the individual components in the corresponding step, or the steps S1 to S3 may be repeated to sequentially assemble each group of ceiling structures 300 to complete the assembly of the whole ceiling.
The above description is only for the specific embodiments of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art can easily conceive of the changes or substitutions within the technical scope of the present invention, and the changes or substitutions should be covered within the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (13)

1. A ceiling tile mounting assembly, comprising:
a keel, the keel comprising:
a top plate;
the two side plates are respectively connected with the two opposite ends of the top plate and are positioned on the same side of the top plate;
the two first clamping parts are respectively connected with the edges of the two side plates, which are far away from the top plate, and extend towards the same direction so as to be respectively positioned on the first sides of the side plates connected with each other;
at least one card structure of hanging, the one end of card structure of hanging have be used for with the second joint portion of first joint portion joint, the other end has the first connecting portion that is used for being connected with the furred ceiling decorative board.
2. The ceiling trim panel assembly of claim 1, wherein the first snap-fit portion comprises:
one end of the first lap joint part is connected with the edge of one side plate far away from the top plate, and the other end of the first lap joint part extends to the first side of the side plate;
one end of the first limiting part is connected with the other end of the first lapping part, and the other end of the first limiting part extends to one side of the first lapping part, which is close to the plane where the top plate is located.
3. The ceiling trim panel assembly of claim 1,
the first connecting part comprises a first connecting plate used for connecting the ceiling decorative plate;
a first portion of the edge of the first connecting plate extends in a direction perpendicular to the first connecting plate to form a support plate;
one end, far away from the first connecting plate, of the supporting plate is connected with the second clamping portion.
4. The ceiling trim panel assembly of claim 3, wherein the second portion of the edge of the first connector plate extends in a direction parallel to the first connector plate to form a positioning plate; the second partial edge and the first partial edge are located at the same end of the first connection plate.
5. The ceiling trim panel assembly of claim 1, wherein the catch structure comprises:
the card pendant comprises a plugboard; one edge of the plugboard extends along a direction perpendicular to the plugboard to form a support plate; the end part of the supporting plate far away from the plugboard is connected with the second clamping part;
the surface of one side of the flat seam clamping piece is provided with a groove for accommodating the plug board, and at least one side surface of the groove is in an opening shape; the area around the groove in the flush joint clamping piece is the first connecting part.
6. The ceiling trim panel assembly of claim 5, wherein the recess bottom wall has a card slot extending to one side of the opening in the recess, the card slot having a width greater than or equal to a thickness of the support plate.
7. The ceiling trim panel assembly of claim 6, wherein the recess is a rectangular channel having a rectangular cross-section and the first connecting portion is plate-shaped.
8. The ceiling trim panel assembly of claim 6, wherein the length of the snap seam is less than or equal to half the length of the groove.
9. A ceiling tile trim assembly according to any one of claims 1 to 8, further comprising a corner fastener comprising two second connecting plates joined at their ends, the two second connecting plates being perpendicular to each other.
10. A ceiling tile mounting assembly according to any one of claims 1 to 8, further comprising:
one end of the suspender is used for being connected with a roof, and the other end of the suspender is connected with the top plate of the keel.
11. A suspended ceiling structure comprising:
the first ceiling decorative plate assembly comprises a first main ceiling decorative plate and a first auxiliary ceiling decorative plate, the end part of the first auxiliary ceiling decorative plate is connected with the end part of the first main ceiling decorative plate, and the first auxiliary ceiling decorative plate is positioned on one side of the first main ceiling decorative plate;
the second ceiling decorative plate component comprises a second main ceiling decorative plate and a second auxiliary ceiling decorative plate, the end part of the second auxiliary ceiling decorative plate is connected with the end part of the second main ceiling decorative plate, and the second auxiliary ceiling decorative plate is positioned on one side of the second main ceiling decorative plate;
a plurality of ceiling decorative panel assembly assemblies according to any one of claims 1 to 10, wherein the first main ceiling decorative panel and the second main ceiling decorative panel are respectively connected to hoist the first ceiling decorative panel assembly and the second ceiling decorative panel assembly, and a light groove is formed among the first main ceiling decorative panel, the first auxiliary ceiling decorative panel, the second main ceiling decorative panel and the second auxiliary ceiling decorative panel;
the size of the first auxiliary ceiling decorative board in the direction perpendicular to the first main ceiling decorative board is larger than the size of the second auxiliary ceiling decorative board in the direction perpendicular to the first main ceiling decorative board.
12. Suspended ceiling structure according to claim 11,
the first main ceiling decorative plate is connected with the first auxiliary ceiling decorative plate through corner fixing pieces, and the second main ceiling decorative plate is connected with the second auxiliary ceiling decorative plate through corner fixing pieces.
13. A method of assembling a suspended ceiling, using the suspended ceiling structure of claim 11 or 12, the method comprising:
mounting the clamping structure on the first main ceiling decorative plate and the second main ceiling decorative plate;
connecting the auxiliary ceiling decorative plate with the corresponding main ceiling decorative plate;
hanging the keel on the roof;
and hanging a first main ceiling decorative plate and a second main ceiling decorative plate which are provided with the hanging structures on the keel to form the light trough type ceiling.
CN202110688200.0A 2021-06-21 2021-06-21 Ceiling decorative plate assembling assembly, ceiling structure and ceiling assembling method Pending CN113356456A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110688200.0A CN113356456A (en) 2021-06-21 2021-06-21 Ceiling decorative plate assembling assembly, ceiling structure and ceiling assembling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110688200.0A CN113356456A (en) 2021-06-21 2021-06-21 Ceiling decorative plate assembling assembly, ceiling structure and ceiling assembling method

Publications (1)

Publication Number Publication Date
CN113356456A true CN113356456A (en) 2021-09-07

Family

ID=77535534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110688200.0A Pending CN113356456A (en) 2021-06-21 2021-06-21 Ceiling decorative plate assembling assembly, ceiling structure and ceiling assembling method

Country Status (1)

Country Link
CN (1) CN113356456A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672547A (en) * 2016-02-04 2016-06-15 浙江亚厦装饰股份有限公司 Ceiling lamp trough device and mounting method
CN206888324U (en) * 2017-07-07 2018-01-16 广州科莱思诚铝业有限公司 Hide section bar keel smallpox
CN208586800U (en) * 2018-06-25 2019-03-08 广州康纳天花有限公司 A kind of removable adjustable ceiling system
CN110424617A (en) * 2019-07-30 2019-11-08 北新集团建材股份有限公司 A kind of assembled ceiling structure and its installation method
CN110424616A (en) * 2019-07-30 2019-11-08 北新集团建材股份有限公司 A kind of vertical mounting assembly of suspended ceiling decorative plate and its installation method
CN210597834U (en) * 2019-07-30 2020-05-22 北新集团建材股份有限公司 Assembled furred ceiling structure
CN210597835U (en) * 2019-07-30 2020-05-22 北新集团建材股份有限公司 Vertical installation component of furred ceiling decorative board

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672547A (en) * 2016-02-04 2016-06-15 浙江亚厦装饰股份有限公司 Ceiling lamp trough device and mounting method
CN206888324U (en) * 2017-07-07 2018-01-16 广州科莱思诚铝业有限公司 Hide section bar keel smallpox
CN208586800U (en) * 2018-06-25 2019-03-08 广州康纳天花有限公司 A kind of removable adjustable ceiling system
CN110424617A (en) * 2019-07-30 2019-11-08 北新集团建材股份有限公司 A kind of assembled ceiling structure and its installation method
CN110424616A (en) * 2019-07-30 2019-11-08 北新集团建材股份有限公司 A kind of vertical mounting assembly of suspended ceiling decorative plate and its installation method
CN210597834U (en) * 2019-07-30 2020-05-22 北新集团建材股份有限公司 Assembled furred ceiling structure
CN210597835U (en) * 2019-07-30 2020-05-22 北新集团建材股份有限公司 Vertical installation component of furred ceiling decorative board

Similar Documents

Publication Publication Date Title
CN112049310B (en) Suspended ceiling connecting component and installation method
CN110761479A (en) Mounting structure and mounting method of assembly type ceiling
CN215670474U (en) Assembled furred ceiling with adjustable piece
CN113356456A (en) Ceiling decorative plate assembling assembly, ceiling structure and ceiling assembling method
CN113431250A (en) Independent dismounting ceiling assembly, ceiling structure and mounting method thereof
CN215106504U (en) Suspended ceiling board hanging assembly
CN113356458B (en) Suspended ceiling member and method for mounting suspended ceiling plate
CN215889137U (en) Keel assembly, quick-assembly frame and quick-building system
CN113356493B (en) But fast assembly's shape fast-assembling ceramic tile shingle nail of preapring for an unfavorable turn of events
CN210597833U (en) Assembled furred ceiling structure
CN212427740U (en) Suspended ceiling connecting component
CN210049468U (en) Fast-assembling wall body smallpox binding off component and furred ceiling structure
CN215330864U (en) Ceiling board clamping assembly and leveling member
CN113356500A (en) Decorative plate mounting assembly and mounting method
CN113431247A (en) Keel, hanging structure, ceiling board hanging component and ceiling assembling method
CN215926332U (en) Detachable wallboard connecting assembly and connecting system
CN219118629U (en) Prefabricated assembled decorative steel plate
CN113431251B (en) Machining method of suspended ceiling assembly and clamping groove component
CN113431288B (en) Splicing structure of decorative plates and mounting method thereof
CN219138217U (en) Assembled fitment wallboard structure
CN218149174U (en) Suspended ceiling system
CN213806113U (en) Integrated furred ceiling structure of pin-connected panel that furred ceiling board was buckled and is closely pieced together
CN216810767U (en) Fast-assembling single face attaches wall light steel skeleton system
CN219671687U (en) Edge collecting piece for lapping independent frame type bathroom suspended ceiling
CN113818621B (en) Movable inner buckle flat joint keel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210907

RJ01 Rejection of invention patent application after publication