CN113338502B - Building curtain wall - Google Patents

Building curtain wall Download PDF

Info

Publication number
CN113338502B
CN113338502B CN202110519596.6A CN202110519596A CN113338502B CN 113338502 B CN113338502 B CN 113338502B CN 202110519596 A CN202110519596 A CN 202110519596A CN 113338502 B CN113338502 B CN 113338502B
Authority
CN
China
Prior art keywords
fixedly connected
keel
motor
rack
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110519596.6A
Other languages
Chinese (zh)
Other versions
CN113338502A (en
Inventor
刘荣顺
张晓宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Zongheng Curtain Wall Technology Co ltd
Original Assignee
Shenzhen Zongheng Curtain Wall Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Zongheng Curtain Wall Technology Co ltd filed Critical Shenzhen Zongheng Curtain Wall Technology Co ltd
Priority to CN202110519596.6A priority Critical patent/CN113338502B/en
Publication of CN113338502A publication Critical patent/CN113338502A/en
Application granted granted Critical
Publication of CN113338502B publication Critical patent/CN113338502B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)
  • Curtains And Furnishings For Windows Or Doors (AREA)

Abstract

The invention relates to the technical field of building curtain walls, in particular to a building curtain wall which comprises an outer keel, wherein one side of the outer keel is fixedly connected with an inner keel, the back surface of the outer keel is provided with a groove, the inner bottom wall of the groove is fixedly connected with a damping mechanism, one side of the inner keel is fixedly connected with a mounting box, the inner bottom wall of the mounting box is fixedly connected with a motor, the output end of the motor is fixedly connected with a lifting mechanism, the back surface of the inner keel is provided with a through groove, and the inner wall of the inner keel is slidably connected with a rack; the lifting mechanism is arranged, so that the rack can be lifted to drive the curtain wall board to be lifted and put down; the motor is arranged, so that power can be provided for the lifting mechanism; through setting up mount and link, can the easy to assemble with dismantle curtain wallboard to make this building curtain have automatic lift up and put down the curtain, the buffering curtain is put down the time with fossil fragments collision's function.

Description

Building curtain wall
Technical Field
The invention relates to the technical field of building curtain walls, in particular to a building curtain wall.
Background
Building curtain walls refer to the non-load bearing exterior wall enclosures of a building, typically consisting of panels (glass, metal plates, slate, ceramic plates, etc.) and rear supporting structures (aluminum beam uprights, steel structures, glass ribs, etc.).
The glass curtain wall generally has certain displacement ability relative to the main structure, but most glass curtain walls in the current market have the function of lifting the glass curtain wall, but the glass curtain wall needs to be lifted manually and fixed by a supporting frame, when the supporting frame is loose, a user can be dropped down to the middle of the smashing of the curtain wall if beside the supporting frame is used, meanwhile, the glass curtain wall is closed, the user also needs to hold the curtain wall to slowly put down the curtain wall, the glass curtain wall is very troublesome, and the curtain wall and a keel can also collide to cause damage when the glass curtain wall is put down quickly. Accordingly, one skilled in the art would provide a building curtain wall that solves the problems set forth in the background above.
Disclosure of Invention
The invention aims to provide a building curtain wall, which solves the problems that most of glass curtain walls in the market proposed in the background art have the function of lifting the glass curtain wall, but the glass curtain wall needs to be manually lifted and fixed by a supporting frame, when the supporting frame is loose, a user can be possibly dropped down from the side of the glass curtain wall to hit the glass curtain wall, and meanwhile, when the glass curtain wall is closed, the user is required to hold the glass curtain wall to slowly put down the glass curtain wall, so that the glass curtain wall is very troublesome, and the glass curtain wall and a keel can be possibly collided to cause damage when the glass curtain wall is put down quickly.
In order to achieve the above purpose, the present invention provides the following technical solutions:
the utility model provides a building curtain, includes the outer fossil fragments, one side fixedly connected with inner joist of outer fossil fragments, the recess has been seted up to the back of outer fossil fragments, the interior bottom wall fixedly connected with damper of recess, one side fixedly connected with install bin one of inner joist, the interior bottom wall fixedly connected with motor of install bin one, the output fixedly connected with elevating system of motor, logical groove has been seted up to the back of inner fossil fragments, the inner wall sliding connection of inner fossil fragments has the rack, the top of rack rotates and is connected with the connecting rod, the back of outer fossil fragments is fixedly connected with fixed block and mount respectively, one side rotation of fixed block is connected with the link, the positive fixedly connected with connecting block of link, the front of connecting block is rotated with the one end of connecting rod and is connected.
As a further scheme of the invention: the screw holes are formed in the front face of the outer keel, the number of the screw holes is four, the four screw holes are arranged on the front face of the outer keel in a rectangular array mode, and the building curtain wall can be conveniently installed and detached through the screw holes.
As still further aspects of the invention: the damping mechanism comprises a fixed plate fixedly connected with the inner bottom wall of the groove, a cross rod is slidably connected with the inner wall of the fixed plate, a spring is sleeved on the surface of the cross rod, a slide block is fixedly connected with the back of the cross rod, one end of the spring is fixedly connected with the back of the fixed plate, the other end of the spring is fixedly connected with the front of the slide block, the slide block can be extruded forwards all the time through the fixed plate and the spring, and the slide block is decelerated when the slide block moves backwards.
As still further aspects of the invention: the inner walls of the fixing frame and the connecting frame are fixedly connected with curtain wall plates, the curtain wall plates are made of glass, and the curtain wall plates made of glass can be coordinated with the surrounding environment, so that a building and the natural building are integrated together by matching with illumination and the like, and the compression feeling of a high-rise building is reduced.
As still further aspects of the invention: the lifting mechanism comprises a connecting shaft fixedly connected with the output end of the first motor, a connecting gear is fixedly connected with the surface of the connecting shaft, and the rack can be lifted or lowered through the arrangement of the connecting shaft and the connecting gear.
As still further aspects of the invention: the inner wall of interior fossil fragments rotates and is connected with the pivot, the fixed surface of pivot is connected with the rotation gear, the rack respectively with connect gear and rotation gear engagement, through setting up rotation gear, take place the skew when can preventing that the rack from moving.
As still further aspects of the invention: one side fixedly connected with bracing piece of interior fossil fragments, the upper surface of bracing piece is in same horizontal plane with the upper surface of interior fossil fragments, through setting up the bracing piece, can stabilize the structure of this building curtain wall.
Compared with the prior art, the invention has the beneficial effects that:
1. according to the invention, the damping mechanism is arranged, so that collision between the curtain wall plate and the outer keel when the curtain wall plate is placed down can be buffered; the lifting mechanism is arranged, so that the rack can be lifted to drive the curtain wall board to be lifted and put down; the motor is arranged, so that power can be provided for the lifting mechanism; through setting up mount and link, can the easy to assemble with dismantle curtain wallboard to make this building curtain have automatic lift up and put down the curtain, the buffering curtain is put down the time with fossil fragments collision's function.
2. According to the invention, the building curtain wall can be conveniently installed and detached by arranging the threaded holes; through setting up fixed plate and spring, can extrude the slider forward always, give the slider speed reduction when the slider moves backward.
3. In the invention, the rack can be lifted or lowered by arranging the connecting shaft and the connecting gear; by arranging the rotary gear, the rack can be prevented from shifting when moving; through setting up the bracing piece, can stabilize the structure of this building curtain wall.
4. According to the invention, the solar panel is arranged, so that the power supply device can be powered, the whole building can be powered, and the energy is saved and the environment is protected.
5. According to the invention, by arranging the liquid preparation module, the surface of the solar cell panel can be cleaned by using the paste, objects such as dust and gravel in the air can be adsorbed when the solar cell panel meets the region with larger sand dust, and the problem that water stains on glass can be stuck with dust again can be solved by the paste.
Drawings
FIG. 1 is a schematic elevational view of the structure of the present invention;
FIG. 2 is a schematic side view of the structure of the present invention;
figure 3 is a schematic side cross-sectional view of the inner keel of the invention;
figure 4 is a schematic side cross-sectional view of the outer keel of the invention;
FIG. 5 is a schematic front cross-sectional view of the elevating mechanism according to the present invention;
FIG. 6 is a schematic front view of a building curtain wall of the present invention;
FIG. 7 is a schematic side cross-sectional view of a liquid making module according to the present invention;
fig. 8 is a schematic front cross-sectional view of a second lifting mechanism according to the present invention.
In the figure: 1. an outer keel; 2. an inner keel; 3. a damping mechanism; 301. a fixing plate; 302. a cross bar; 303. a spring; 304. a slide block; 4. the first mounting box is arranged; 5. a first motor; 6. a lifting mechanism; 601. a connecting shaft; 602. a connecting gear; 7. a through groove; 8. a rack; 9. a connecting rod; 10. a fixed block; 11. a fixing frame; 12. a connecting frame; 13. a threaded hole; 14. curtain wall plates; 15. rotating the gear; 16. a support rod; 17. a second motor; 19. a solar cell panel; 20. a cleaning block; 21. a cavity; 22. an infusion tube; 23. a pipe; 25. a storage groove; 26. a brush; 27. a mounting box; 28. an opening receiving groove; 29. a second lifting mechanism; 291. a second connecting shaft; 292. a second connecting gear; 30. a second rack; 31. a second connecting rod; 32. and a sliding groove.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1 to 8, in the embodiment of the invention, a building curtain wall comprises an outer keel 1, one side of the outer keel 1 is fixedly connected with an inner keel 2, the back surface of the outer keel 1 is provided with a groove, the inner bottom wall of the groove is fixedly connected with a damping mechanism 3, one side of the inner keel 2 is fixedly connected with a mounting box I4, the inner bottom wall of the mounting box I4 is fixedly connected with a first motor 5, the output end of the first motor 5 is fixedly connected with a lifting mechanism 6, the back surface of the inner keel 2 is provided with a through groove 7, the inner wall of the inner keel 2 is slidingly connected with a rack 8, the top end of the rack 8 is rotationally connected with a connecting rod 9, the back surface of the outer keel 1 is respectively fixedly connected with a fixed block 10 and a fixed frame 11, one side of the fixed block 10 is rotationally connected with a connecting frame 12, the front surface of the connecting frame 12 is fixedly connected with a connecting block, and one end of the connecting rod 9 is rotationally connected, and collision between the front surface of the connecting block and the outer keel 1 can be buffered when a curtain wall plate 14 is put down by arranging the damping mechanism 3; the lifting mechanism 6 is arranged, so that the rack 8 can be lifted to drive the curtain wall plate 14 to be lifted and put down; by providing the first motor 5, power can be provided to the lifting mechanism 6; through setting up mount 11 and link 12, can conveniently install and dismantle curtain wall board 14 to make this building curtain have automatic lift up and put down the curtain, the function of collision with fossil fragments when buffering curtain put down.
The front of outer fossil fragments 1 has been seted up screw hole 13, the quantity of screw hole 13 is four, and four screw holes 13 are rectangular array and set up in the front of outer fossil fragments 1, through setting up screw hole 13, can be convenient to mount and dismantle this building curtain, damper 3 includes fixed plate 301 with wall fixed connection in the recess, the inner wall sliding connection of fixed plate 301 has horizontal pole 302, the surface cover of horizontal pole 302 is equipped with spring 303, the back fixedly connected with slider 304 of horizontal pole 302, the one end and the back fixed connection of fixed plate 301 of spring 303, the other end and the front fixed connection of slider 304 of spring 303, through setting up fixed plate 301 and spring 303, can always extrude slider 304 forward, for slider 304 speed reduction when slider 304 backward movement, the equal fixedly connected with curtain board 14 of inner wall of mount 11 and link 12, the material of curtain board 14 is glass, through setting up curtain board 14 of glass material, can coordinate with surrounding environment, cooperation light etc. makes building and natural melting as an organic whole, let the high building reduce the oppression sense.
Wherein, elevating system 6 includes the connecting axle 601 with first motor 5 output fixed connection, connecting axle 601's fixed surface is connected with connecting gear 602, through setting up connecting axle 601 and connecting gear 602, can make rack 8 rise or reduce, the inner wall rotation of interior fossil fragments 2 is connected with the pivot, the fixed surface of pivot is connected with rotation gear 15, rack 8 respectively with connecting gear 602 and rotation gear 15 meshing, through setting up rotation gear 15, can prevent that rack 8 from taking place the skew when removing, one side fixedly connected with bracing piece 16 of interior fossil fragments 2, the upper surface of bracing piece 16 is in same horizontal plane with the upper surface of interior fossil fragments 2, through setting up bracing piece 16, can stabilize the structure of this building curtain wall.
The curtain wall plate 14 is attached to a layer of solar cell panel 19, the solar cell panel 19 is electrically connected with the first motor 5 and the second motor 17, an opening storage groove 28 is arranged at the bottom end of the solar cell panel 19, and the solar cell panel 19 is fully utilized to provide electric energy, so that the building curtain wall has the functions of energy conservation and environmental protection;
a cleaning block 20 is arranged between the left side and the right side of the connecting frame 12, a chute 32 is arranged on the left side of the connecting frame 12, a cavity 21 is formed in the cleaning block 20, a pipeline 23 is arranged in the cleaning block 20, the pipeline 23 is communicated with the cavity 21, a hairbrush 26 is arranged at the bottom end of the cleaning block 20, a mounting box 27 is fixedly connected to the other side of the inner keel 2, and a second motor 17 is fixedly connected to the inner bottom wall of the mounting box 27;
the output end of the second motor 17 is fixedly connected with a second lifting mechanism 29, the second lifting mechanism 29 comprises a second connecting shaft 291 fixedly connected with the output end of the second motor 17, the surface of the second connecting shaft 291 is fixedly connected with a second connecting gear 292, the upper end of the inner wall of the inner keel 2 is slidably connected with a second rack 30, the second rack 30 is meshed with the second connecting gear 292, the top end of the second rack 30 is rotatably connected with a second connecting rod 31, and the second connecting rod 31 is connected with the cleaning block 20;
the containing groove 24 is communicated with the cavity 21 in the cleaning block 20 through a transfusion tube 22, and the liquid making module 24 is fixedly connected to the rear side of the inner keel 2; the infusion tube 22 is connected with the left end and the containing groove 25, the containing groove 25 is of a rectangular structure, and a cylindrical through hole is formed in one side above the containing groove.
The working principle of the invention is as follows: when a user uses the building curtain wall, the user starts the first motor 5 (model is 3IK15 RGN-C), the first motor 5 drives the connecting shaft 601 to rotate, the connecting shaft 601 drives the connecting gear 602 to rotate so that the rack 8 moves upwards, the rack 8 pushes the connecting rod 9, the connecting rod 9 lifts the connecting frame 12 through the connecting block, so that the curtain wall plate 14 lifts up along with the connecting frame 12, when the building curtain wall needs to be closed, the first motor 5 rotates reversely so that the rack 8 moves downwards, the rack 8 pulls the connecting rod 9 to put down the connecting frame 12, when the connecting frame 12 contacts with the sliding block 304, the connecting frame 12 presses the sliding block 304 to move backwards, the spring 303 pushes the sliding block 304 forwards under pressure so that the putting down speed of the connecting frame 12 is reduced until the connecting frame 12 stops to prevent the outer keel 1 and the inner keel 2 from being impacted, and the building curtain wall has the functions of automatically lifting up and putting down the curtain wall and buffering the curtain wall from colliding with the keels when the curtain wall is put down.
When a user wants to clean the solar cell panel 19, the cleaning solution and the glue are poured into the through hole in the accommodating groove 25 indoors to enable the mixture in the cleaning solution to be thin glue, the thin glue is transferred into the infusion tube from the accommodating groove 25, then the thin glue is transferred into the cavity 21 in the cleaning block 20 through the infusion tube 22, then the thin glue is sprayed out to the surface of the solar cell panel 19 along the pipeline 23, the second motor 17 is started to drive the second connecting shaft 291 to rotate, the second connecting shaft 291 drives the second connecting gear 292 to rotate so as to enable the second rack 30 to move upwards, the second rack 30 pushes the second connecting rod 31, so that the cleaning block 20 is lifted along with the second connecting rod 31, the brush 26 at the bottom end of the cleaning block 20 contacts the screen, thin glue on the screen is uniformly smeared, the thin glue is 0.1-0.3 mm thick, and the bottom end of the solar cell panel 19 is provided with the opening accommodating groove 28 for collecting because of gravity effect on the solar cell panel 19 can be splashed downwards; when the building curtain wall needs to be closed, the second motor 17 rotates reversely to enable the second rack 30 to move downwards, the second rack 30 pulls the second connecting rod 31 to enable the cleaning block 20 to move upwards, the solar cell panel 19 supplies power for the first motor 5 and the second motor 17, the solar cell panel 19 is fully utilized to provide electric energy, and accordingly the building curtain wall has the energy-saving and environment-friendly functions.
The foregoing is only a preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art, who is within the scope of the present invention, should make equivalent substitutions or modifications according to the technical scheme of the present invention and the inventive concept thereof, and should be covered by the scope of the present invention.

Claims (7)

1. Building curtain, including outer fossil fragments (1), its characterized in that: one side fixedly connected with inner joist (2) of outer joist (1), the recess has been seted up at the back of outer joist (1), the interior bottom wall fixedly connected with damper (3) of recess, one side fixedly connected with install bin one (4) of inner joist (2), the interior bottom wall fixedly connected with first motor (5) of install bin one (4), the output fixedly connected with elevating system (6) of first motor (5), logical groove (7) have been seted up at the back of inner joist (2), the inner wall sliding connection of inner joist (2) has rack (8), the top rotation of rack (8) is connected with connecting rod (9), the back of outer joist (1) is fixedly connected with fixed block (10) and mount (11) respectively, one side rotation of fixed block (10) is connected with link (12), the front fixedly connected with connecting block of link (12), the front of connecting block and one end rotation of connecting rod (9) are connected.
The curtain wall plate (14) is attached with a layer of solar cell panel (19), the solar cell panel (19) is electrically connected with the first motor (5) and the second motor (17), and an opening containing groove (28) is arranged at the bottom end of the solar cell panel (19);
a cleaning block (20) is arranged between the left side and the right side of the connecting frame (12), a sliding groove (32) is formed in the left side of the connecting frame (12), a cavity (21) is formed in the cleaning block (20), a pipeline is arranged in the cleaning block (20), the pipeline (23) is communicated with the cavity (21), a hairbrush (26) is arranged at the bottom end of the cleaning block (20), an installation box (27) is fixedly connected to the other side of the inner keel (2), and a second motor (17) is fixedly connected to the inner bottom wall of the installation box (27);
the output end of the second motor (17) is fixedly connected with a second lifting mechanism (29), the second lifting mechanism (29) comprises a second connecting shaft (291) fixedly connected with the output end of the second motor (17), a second connecting gear (292) is fixedly connected to the surface of the second connecting shaft (291), a second rack (30) is slidably connected to the upper end of the inner wall of the inner keel (2), the second rack (30) is meshed with the second connecting gear (292), a second connecting rod (31) is rotatably connected to the top end of the second rack (30), and the second connecting rod (31) is connected with the cleaning block (20);
the containing groove (25) is communicated with the cavity (21) in the cleaning block (20) through a transfusion tube (22), and the liquid preparation module is fixedly connected to the rear side of the inner keel (2); the infusion tube (22) is connected with the left end and the containing groove (25), the right end of the infusion tube (22) is connected with the cavity (21), the containing groove (25) is of a rectangular structure, and a cylindrical through hole is formed in one side above the containing groove.
2. A building curtain as claimed in claim 1, wherein: screw holes (13) are formed in the front face of the outer keel (1), the number of the screw holes (13) is four, and the four screw holes (13) are arranged on the front face of the outer keel (1) in a rectangular array.
3. A building curtain as claimed in claim 1, wherein: the damping mechanism (3) comprises a fixed plate (301) fixedly connected with the inner bottom wall of the groove, a cross rod (302) is slidably connected with the inner wall of the fixed plate (301), a spring (303) is sleeved on the surface of the cross rod (302), a sliding block (304) is fixedly connected with the back of the cross rod (302), one end of the spring (303) is fixedly connected with the back of the fixed plate (301), and the other end of the spring (303) is fixedly connected with the front of the sliding block (304).
4. A building curtain as claimed in claim 1, wherein: the inner walls of the fixing frame (11) and the connecting frame (12) are fixedly connected with curtain wall plates (14), and the curtain wall plates (14) are made of glass.
5. A building curtain as claimed in claim 1, wherein: the lifting mechanism (6) comprises a connecting shaft (601) fixedly connected with the output end of the first motor (5), and a connecting gear (602) is fixedly connected to the surface of the connecting shaft (601).
6. A building curtain as claimed in claim 1, wherein: the inner wall of the inner keel (2) is rotationally connected with a rotating shaft, the surface of the rotating shaft is fixedly connected with a rotating gear (15), and the rack (8) is respectively meshed with the connecting gear (602) and the rotating gear (15).
7. A building curtain as claimed in claim 1, wherein: one side of the inner keel (2) is fixedly connected with a supporting rod (16), and the upper surface of the supporting rod (16) and the upper surface of the inner keel (2) are positioned on the same horizontal plane.
CN202110519596.6A 2021-05-13 2021-05-13 Building curtain wall Active CN113338502B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110519596.6A CN113338502B (en) 2021-05-13 2021-05-13 Building curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110519596.6A CN113338502B (en) 2021-05-13 2021-05-13 Building curtain wall

Publications (2)

Publication Number Publication Date
CN113338502A CN113338502A (en) 2021-09-03
CN113338502B true CN113338502B (en) 2023-11-14

Family

ID=77469477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110519596.6A Active CN113338502B (en) 2021-05-13 2021-05-13 Building curtain wall

Country Status (1)

Country Link
CN (1) CN113338502B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115262823B (en) * 2022-08-19 2023-06-30 深圳市瑞玮工程有限公司 Assembled double-layer energy-saving unit curtain wall system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN212225067U (en) * 2020-04-15 2020-12-25 福建雄辉幕墙门窗系统制造有限公司 Glass curtain wall for cleaning and protecting opening window

Also Published As

Publication number Publication date
CN113338502A (en) 2021-09-03

Similar Documents

Publication Publication Date Title
CN113338502B (en) Building curtain wall
CN212210912U (en) Solar photovoltaic panel sun facing adjusting mechanism
CN211257491U (en) Green energy-saving building curtain wall
CN213329907U (en) Thin plastering construction tool
CN209878849U (en) Outdoor low-voltage electricity generation ammeter case
CN112164341A (en) Rain-proof dirt-proof rotation type bill-board
CN216785607U (en) Material management device for building engineering
CN220553958U (en) Connecting device for solar panel installation
CN111306856A (en) Automatic ice-taking type snowflake refrigerator
CN212453766U (en) Strutting arrangement is used in prefabricated house construction
CN219516102U (en) Cleaning device and intelligent window thereof
CN220085581U (en) Electronic spring festival scroll
CN218603410U (en) Building integrated photovoltaic waterproof structure section bar
CN215934106U (en) High-frequency control cabinet with waterproof dustproof high sealing mechanism
CN214034413U (en) Sun-proof device of prefabricated house
CN213976816U (en) Lead screw guide rail floor elevating gear
CN215068986U (en) Warning subassembly is used in oil development
CN215888750U (en) Solar curtain wall structure based on solar energy utilization
CN219181481U (en) Energy storage power station with protective structure
CN218447160U (en) Information public display wallboard capable of being automatically cleaned
CN217710450U (en) Intelligence parking area is with automatic pole that takes off and land
CN217052051U (en) Glass duster with elevating system
CN220156473U (en) Antidetonation formula solar photovoltaic panel subassembly
CN218715329U (en) Novel surface structure of wall in green energy-saving building
CN215646695U (en) Photovoltaic electroplax for solar energy power generation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20231011

Address after: 518000, 17A, Block A, Jinfeng Building, No. 1001 and 1005 Shangbu South Road, Yutian Community, Nanyuan Street, Futian District, Shenzhen, Guangdong Province

Applicant after: Shenzhen Zongheng Curtain Wall Technology Co.,Ltd.

Address before: 221200 Room 501, unit 1, building 6, Tianhong Century City, No. 30, Tianhong Avenue, Suining County, Xuzhou City, Jiangsu Province

Applicant before: Liu Rongshun

GR01 Patent grant
GR01 Patent grant