CN113306679A - Double-sided pedal - Google Patents

Double-sided pedal Download PDF

Info

Publication number
CN113306679A
CN113306679A CN202110748049.5A CN202110748049A CN113306679A CN 113306679 A CN113306679 A CN 113306679A CN 202110748049 A CN202110748049 A CN 202110748049A CN 113306679 A CN113306679 A CN 113306679A
Authority
CN
China
Prior art keywords
panel
pedal
pedal body
upside
dual
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110748049.5A
Other languages
Chinese (zh)
Inventor
程宝臣
程工
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Huangrun Mechanical Products Co ltd
Original Assignee
Wuxi Huangrun Mechanical Products Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Huangrun Mechanical Products Co ltd filed Critical Wuxi Huangrun Mechanical Products Co ltd
Priority to CN202110748049.5A priority Critical patent/CN113306679A/en
Publication of CN113306679A publication Critical patent/CN113306679A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C5/00Equipment usable both on slipways and in dry docks
    • B63C5/02Stagings; Scaffolding; Shores or struts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/08Scaffold boards or planks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C5/00Equipment usable both on slipways and in dry docks
    • B63C5/02Stagings; Scaffolding; Shores or struts
    • B63C2005/025Stagings, or scaffolding, i.e. constructions providing temporary working platforms on slipways, in building or repair docks, or inside hulls

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Ocean & Marine Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Coating By Spraying Or Casting (AREA)

Abstract

The invention relates to the field of composition or accessories of scaffolds, and particularly discloses a double-sided pedal which comprises a pedal body, wherein the pedal body is of a closed box-shaped structure, and the upper surface and the lower surface of the pedal body are treading surfaces. In the invention, the upper surface and the lower surface of the pedal body of the closed box-packed structure can be treaded, and workers can walk and stand, so that the scaffold can be directly used after being turned over along with a ship module, and the scaffold does not need to be installed and fixed after being dismantled, thereby shortening the construction waiting time and greatly improving the construction efficiency; in addition, the process requirements and construction site restrictions of ship module manufacturing are fully considered, the steel shot subjected to sand blasting cannot fall inside the pedal, and if the steel shot falls inside the pedal, the steel shot can fall out and smash the paint surface in the paint spraying process to damage the paint surface, so that the problems are completely avoided. The present invention generally meets the need for efficient ship building.

Description

Double-sided pedal
Technical Field
The invention relates to the field of composition or accessories of scaffolds, in particular to a double-sided pedal.
Background
The scaffold is used as an auxiliary facility in the building construction process, and ensures that the construction process is smoothly carried out and the working platform is erected. The scaffold is also used for the construction of large ships in shipbuilding factories, but the difference is that the large ships are constructed in a modularized mode, and all modules forming the ships are independently constructed firstly and then are combined and spliced. The scaffold is erected by taking each module as a working object. In addition, the module is subjected to a plurality of processes such as welding, sand blasting, paint spraying and the like during the construction process, the process sites also include outdoor and indoor closed sites, and the module is required to be turned over during the construction process so as to perform operations on various parts.
The pedal is a part of the scaffold and is used for workers to walk and stand. In the prior art, the pedal is often a door-shaped structure formed by bending a plate, a plurality of small holes are formed in the top surface, one surface of the pedal is downward, only the top surface can be stepped, and one side of the pedal cannot be stepped by a person. During module construction, scaffold and module fixed connection, therefore scaffold will overturn along with the module upset, and footboard after the upset then can't supply to apply workman's walking, stand, and it is fixed to overturn after needing to demolish, and the work load of dismouting footboard is very big, and construction latency is very long, seriously influences the efficiency of construction of naval vessel.
Disclosure of Invention
In view of the defects of the background art, the invention provides a double-sided pedal, and solves the problem that in the prior art, the pedal in ship construction can only be used on one side, so that the ship construction efficiency is seriously influenced.
In order to solve the technical problems, the invention provides the following technical scheme:
the double-sided pedal comprises a pedal body, wherein the pedal body is of a closed box-shaped structure, and the upper surface and the lower surface of the pedal body are treading surfaces.
Preferably, the footboard body includes upside panel, lower side panel and end plate, upside panel and lower side panel dock from top to bottom, the end plate sets up in both ends, upside panel, lower side panel and end plate form closed box structure jointly.
Preferably, the cross section of the upper side panel and the lower side panel is of a door-shaped structure, the upper side panel and the lower side panel are butted in a mode that the openings are opposite, end side lines of the upper side panel and the lower side panel are both bent inwards to form curled edges, one curled edge of the upper side panel abuts against one folded corner of the lower side panel from the inside, the other curled edge of the upper side panel wraps the other folded corner of the lower side panel from the outside, and the lower side panel is symmetrically arranged in the same mode.
Preferably, the cross section of the folded angle and the curled edge is acute angle structure.
Preferably, the end plate is riveted to the upper or lower side panel.
Preferably, the pedal further comprises a pipe sleeve, wherein the pipe sleeve penetrates through the upper surface and the lower surface of the pedal body to tread the pedal face and is fixedly connected with the pedal body.
Preferably, the upper end port and the lower end port of the pipe sleeve are smooth.
Compared with the prior art, the invention has the beneficial effects that: the pedal body of the closed box-packed structure can be treaded on the upper surface and the lower surface, and can be used for workers to walk and stand, so that the scaffold can be directly used after being turned over along with the ship module, and the scaffold does not need to be installed and fixed after being dismantled, thereby shortening the construction waiting time and greatly improving the construction efficiency; in addition, the process requirements and construction site restrictions of ship module manufacturing are fully considered, the steel shot subjected to sand blasting cannot fall inside the pedal, and if the steel shot falls inside the pedal, the steel shot can fall out and smash the paint surface in the paint spraying process to damage the paint surface, so that the problems are completely avoided. The present invention generally meets the need for efficient ship building.
Drawings
The invention has the following drawings:
FIG. 1 is a perspective view of the present invention;
FIG. 2 is a top view of the present invention;
FIG. 3 is a schematic cross-sectional view A-A of FIG. 2;
description of reference numerals:
1. a pedal body; 2. treading the tread; 3. an upper side panel; 4. a lower side panel; 5. an end plate; 6. curling; 7. bending the corner; 8. and (4) pipe sleeves.
Detailed Description
The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic views illustrating only the basic structure of the present invention in a schematic manner, and thus show only the constitution related to the present invention.
As shown in fig. 1-3, a double-sided pedal comprises a pedal body 1, wherein the pedal body 1 is of a closed box-shaped structure, and the upper surface and the lower surface of the pedal body 1 are treading surfaces 2. Therefore, the pedal body 1 can be directly used after being turned over along with the scaffold, and does not need to be dismounted and then turned over for installation and fixation, so that the time waste caused by dismounting the pedal, turning over and installation and fixation is eliminated, and the module building efficiency is improved. In addition, because the pedal body 1 is of a closed box-packed structure, steel shots in the sand blasting process cannot be left in the pedal body 1, and residual water cannot be left in the pedal body 1 in open-air operation, so that the paint surface quality problem caused by the steel shots and the residual water is eliminated in the subsequent paint spraying process, and the paint surface quality is effectively ensured.
In this embodiment, the pedal body 1 includes an upper side panel 3, a lower side panel 4 and an end plate 5, the upper side panel 3 and the lower side panel 4 are butted up and down, the end plate 5 is disposed at both ends, and the upper side panel 3, the lower side panel 4 and the end plate 5 together form a closed box-like structure.
In the present embodiment, the cross section of the upper panel 3 and the lower panel 4 is a door-shaped structure, the upper panel 3 and the lower panel 4 are butted in a manner that the openings are opposite, the end edges of the upper panel 3 and the lower panel 4 are both bent inwards to form a turned edge 6, one turned edge 6 of the upper panel 3 abuts against one folded corner 7 of the lower panel 4 from the inside, the other turned edge 6 of the upper panel 3 wraps the other folded corner 7 of the lower panel 4 from the outside, and the lower panel 4 is symmetrically arranged in the same manner.
With such a structure, on the one hand, the structural strength of the pedal body 1 is improved due to the tension generated by the upper side panel 3 and the lower side panel 4 at the curled edges 6 and the folded corners 7, and even if the width of the pedal body 1 is relatively small, the middle part of the pedal body is not deformed; on the other hand, the joint of the upper side panel 3 and the lower side panel 4 has better sealing performance, and can effectively prevent water from flowing into the pedal body 1.
In the present embodiment, the cross-section of the folded angle 7 and the folded edge 6 are both acute angle structures. Thereby ensuring that the upper side panel 3 and the lower side panel 4 generate enough tension at the curled edges 6 and the folded corners 7, and ensuring that the pedal body 1 has enough structural strength; meanwhile, the cross sections of the folded angle 7 and the turned edge 6 are acute-angle structures, so that the sealing performance is stronger relative to a right-angle structure, and water is guaranteed not to flow into the pedal body 1.
In this embodiment, the end plate 5 is riveted with the upper side panel 3 or the lower side panel 4, the connection is reliable and firm, the use of screw connection is avoided, the time is long, the screw is easy to fall off, the screw falls off when spraying paint, the paint surface can be damaged, and therefore, the riveting fixation is used, and the quality of the paint surface is also ensured.
In this embodiment, the pedal device further comprises a pipe sleeve 8, and the pipe sleeve 8 penetrates through the upper and lower surfaces of the pedal body 1 and the treading surface 2 and is fixedly connected with the pedal body 1. The pipe sleeve 8 is used for penetrating through a rope for lifting the pedal body 1 to ascend and descend, the pipe sleeve 8 protects the lifting rope, the lifting rope is prevented from directly rubbing the pedal body 1 in the using process, and the lifting rope is easily abraded and cut off due to direct rubbing.
In this embodiment, the upper and lower end ports of the pipe sleeve 8 are smooth, further protecting the hoisting ropes.
In light of the foregoing, it is to be understood that various changes and modifications may be made by those skilled in the art without departing from the spirit and scope of the invention. The technical scope of the present invention is not limited to the content of the specification, and must be determined according to the scope of the claims.

Claims (7)

1. A double-sided pedal, characterized in that: the pedal is of a closed box-shaped structure, and the upper surface and the lower surface of the pedal body are treading surfaces.
2. The dual-sided step of claim 1, wherein: the footboard body includes upside panel, downside panel and end plate, upside panel and downside panel dock from top to bottom, the end plate sets up in both ends, upside panel, downside panel and end plate form closed box structure jointly.
3. The dual-sided step of claim 2, wherein: the cross section of upside panel and lower panel is door font structure, upside panel and lower panel dock with the mode that the opening is relative, the tip sideline of upside panel and lower panel all inwards bends and forms the turn-up, a turn-up of upside panel is followed inside and is supported a dog-ear of lower panel, and another turn-up of upside panel is followed another dog-ear of outside parcel lower panel, lower panel sets up with the mode symmetry the same.
4. The dual-sided step of claim 3, wherein: the cross sections of the folded angle and the turned edge are acute angle structures.
5. The dual-sided step of claim 2, wherein: the end plate is riveted with the upper side panel or the lower side panel.
6. The dual-sided step of claim 1, wherein: the pedal comprises a pedal body and is characterized by further comprising a pipe sleeve, wherein the pipe sleeve penetrates through the upper surface and the lower surface of the pedal body to tread the tread and is fixedly connected with the pedal body.
7. The dual-sided step of claim 6, wherein: the upper end port and the lower end port of the pipe sleeve are smooth.
CN202110748049.5A 2021-07-02 2021-07-02 Double-sided pedal Pending CN113306679A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110748049.5A CN113306679A (en) 2021-07-02 2021-07-02 Double-sided pedal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110748049.5A CN113306679A (en) 2021-07-02 2021-07-02 Double-sided pedal

Publications (1)

Publication Number Publication Date
CN113306679A true CN113306679A (en) 2021-08-27

Family

ID=77380836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110748049.5A Pending CN113306679A (en) 2021-07-02 2021-07-02 Double-sided pedal

Country Status (1)

Country Link
CN (1) CN113306679A (en)

Similar Documents

Publication Publication Date Title
CN110773845B (en) Assembling and welding method for ship superstructure subsection
CN205501837U (en) Steel case roof beam becomes bridge welding simple platform
CN108756441A (en) A kind of hydraulic lifting flipped device and its hanging method for reducing tower
CN108775081A (en) A kind of hydraulic lifting inverted structure and its application method
CN113401791A (en) Reinforcing method for hoisting large-opening total section
CN215851788U (en) Double-sided pedal
CN204124335U (en) A kind of cargo hold packaged type segmental hoisting frock
CN113306679A (en) Double-sided pedal
CN207191310U (en) One kind is used for ship plank construction portable unit
CN203715209U (en) Ship body section-by-section lifting welding device
CN106829757B (en) A kind of tower body structure and its welding method of marine worker crane
CN113401309A (en) Segmented construction method for bottom side cabin of bulk cargo ship
CN114802642B (en) Construction method of container ship torsion box section and container ship
CN201573762U (en) Working platform rack
CN212556720U (en) Auxiliary device is set up to boats and ships scaffold
CN109911106A (en) A kind of apparatus for work and method for the installation of container ship positioning pin
CN212921921U (en) Marine planking operation platform tool
CN212475766U (en) Plate hoisting equipment
KR20070053967A (en) Crane master apparatus for scaffolding
CN207000767U (en) It is easy to arrange the ship side extendable platform of underwater robot
CN208685808U (en) A kind of hydraulic lifting inverted structure
CN111017141A (en) Method for realizing installation of longitudinal wall suspension cage in container ship by using auxiliary tool
CN202684363U (en) Welding platform system for steel structure column bodies
CN205955195U (en) Shaped steel stair template and construction system
CN204552073U (en) Concreting titanium alloy metope template

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination