CN212556720U - Auxiliary device is set up to boats and ships scaffold - Google Patents

Auxiliary device is set up to boats and ships scaffold Download PDF

Info

Publication number
CN212556720U
CN212556720U CN202021043988.7U CN202021043988U CN212556720U CN 212556720 U CN212556720 U CN 212556720U CN 202021043988 U CN202021043988 U CN 202021043988U CN 212556720 U CN212556720 U CN 212556720U
Authority
CN
China
Prior art keywords
plate
scaffold
ship
loading
loading plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021043988.7U
Other languages
Chinese (zh)
Inventor
王雷
王健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Cosco KHI Ship Engineering Co Ltd
Original Assignee
Dalian Cosco KHI Ship Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Cosco KHI Ship Engineering Co Ltd filed Critical Dalian Cosco KHI Ship Engineering Co Ltd
Priority to CN202021043988.7U priority Critical patent/CN212556720U/en
Application granted granted Critical
Publication of CN212556720U publication Critical patent/CN212556720U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The embodiment of the utility model provides a boats and ships scaffold puts up auxiliary device, boats and ships scaffold puts up auxiliary device and includes: the cell type main part, the one end of cell type main part sets up the locking unit, the locking unit with cell type main part swing joint, the other end of cell type main part is fixed and is provided with the scaffold frame fixed plate, be provided with the fixed orifices on the scaffold frame fixed plate. When ship high-place operation is carried out, the edge vertical plate corresponding to the ship high-place operation position of the groove-shaped main body is screwed, and then the groove-shaped main body is locked and fixed on the edge vertical plate through the locking unit, so that a scaffold can be freely erected at a high place through the scaffold fixing plate. And furthermore, when the ship works at high altitude, a special plate for the scaffold does not need to be welded on the ship body, so that the structure of the ship body and paint smearing are protected from being damaged.

Description

Auxiliary device is set up to boats and ships scaffold
Technical Field
The utility model relates to a marine tool technical field especially relates to a boats and ships scaffold puts up auxiliary device.
Background
At present, with the development of large-scale ship type specifications and large-scale ship building sections, high-altitude operation is increased in the building process, and therefore scaffold platforms need to be erected at a plurality of construction positions. For example, in the construction stage of ship water outfitting, the repair work such as fire work and coating on the outer wall of a chimney, and the welding and coating work of a wharf deck freeboard.
In order to realize high-altitude operation in ship construction in the prior art, the high-altitude operation needs to be erected layer by layer from the ground, so that a large number of scaffolds need to be consumed, and the erection difficulty is high. In order to avoid the problem of building up scaffolds from the ground layer upon layer, the suspension type scaffold directly at the corresponding ship boarding protruding position is erected according to the requirement of high-altitude operation in the prior art, such as: the outer wall of the deck gunwale is erected with a hanging scaffold, and the scaffold is hung on the edge of the platform in the cabin.
However, the suspended scaffold needs to weld a board special for the scaffold on the hull, and further damages and damages the hull structure and the paint coating.
SUMMERY OF THE UTILITY MODEL
The utility model provides a ship scaffold sets up auxiliary device to solve traditional suspension type scaffold and film the problem that causes destruction to hull structure and paint.
An embodiment of the utility model provides a boats and ships scaffold puts up auxiliary device, include: the cell type main part, the one end of cell type main part sets up the locking unit, the locking unit with cell type main part swing joint, the other end of cell type main part is fixed and is provided with the scaffold frame fixed plate, be provided with the fixed orifices on the scaffold frame fixed plate.
Preferably, the groove-shaped main body comprises a first bearing plate, a second bearing plate and a third bearing plate, the second bearing plate and the third bearing plate are respectively and fixedly arranged at two ends of the first bearing plate, and the second bearing plate and the third bearing plate are both perpendicular to the fixing surface of the first linking plate.
Preferably, a through hole is formed in the third bearing plate, and the locking unit is movably connected with the third bearing plate through the through hole.
Preferably, the groove-shaped main body outer side corresponds the through-hole is fixed and is provided with the nut, the nut is provided with the internal thread, the locking unit be provided with internal thread assorted external screw thread.
Preferably, the scaffold fixing plate comprises a right-angle trapezoidal plate and a rectangular plate, the rectangular plate and the right-angle trapezoidal plate are integrally formed, the upper bottom edge of the right-angle trapezoidal plate is fixedly connected with the second bearing plate, and the plane of the right-angle trapezoidal plate is perpendicular to the fixing surface of the second bearing plate.
Preferably, the length of the upper bottom edge of the right-angle trapezoidal plate is the same as that of the second bearing plate, the length of the lower bottom edge of the right-angle trapezoidal plate is the same as that of the long edge of the rectangular plate, and two ends of the oblique waist edge of the right-angle trapezoidal plate are respectively connected with the ends of the rectangular plate and the second bearing plate.
Preferably, the fixing holes are arranged in a plurality, and the fixing holes are uniformly and vertically distributed on the rectangular plate.
Preferably, the second bearing plate and the third bearing plate are connected with two ends of the first bearing plate in a welding mode.
Preferably, the upper bottom edge of the right-angle trapezoidal plate is connected with the fixing surface of the second bearing plate in a welding mode.
The embodiment of the utility model provides a still provide a boats and ships scaffold puts up auxiliary device application method, adopt above-mentioned arbitrary boats and ships scaffold set up auxiliary device, the method includes: determining a ship high-altitude operation position, and reversely buckling the groove-shaped main body on an edge vertical plate corresponding to the ship high-altitude operation position; the groove-shaped main body and the edge vertical plate are locked and fixed by the screwing and locking unit; and erecting a scaffold on the scaffold fixing plate through the fixing holes.
The embodiment of the utility model provides a technical scheme can include following beneficial effect:
adopt the embodiment of the utility model provides a ship scaffold sets up auxiliary device, when carrying out boats and ships eminence operation, on the marginal riser that corresponds the boats and ships eminence operation position of cell type main part, then screw the locking unit and fix cell type main part locking on marginal riser, just so can freely set up the scaffold frame at the eminence through the scaffold frame fixed plate. And furthermore, when the ship works at high altitude, a special plate for the scaffold does not need to be welded on the ship body, so that the structure of the ship body and paint smearing are protected from being damaged.
It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the invention as claimed.
Drawings
In order to more clearly illustrate the technical solution of the present invention, the drawings needed to be used in the embodiments will be briefly described below, and it is obvious to those skilled in the art that other drawings can be obtained according to these drawings without any creative effort.
Fig. 1 is a perspective view of an auxiliary device for building a scaffold of a ship according to an embodiment of the present invention;
fig. 2 is a top view of a ship scaffold erection aid provided by an embodiment of the present invention;
fig. 3 is a side view of a ship scaffold erection aid provided by an embodiment of the present invention;
fig. 4 is a schematic flow chart of a using method of the ship scaffold erection aid provided by the embodiment of the present invention;
the symbols represent:
1-groove-shaped main body, 2-first bearing plate, 3-second bearing plate, 4-third bearing plate, 5-through hole, 6-locking unit, 7-nut, 8-scaffold fixing plate, 9-fixing hole, 10-right-angle trapezoidal plate and 11-rectangular plate.
Detailed Description
The embodiments of the present invention will be explained with reference to the drawings and the detailed description.
Referring to fig. 1-3, the utility model provides a ship scaffold sets up auxiliary device includes cell type main part 1, and cell type main part 1 includes first loading board 2, second loading board 3 and third loading board 4, and second loading board 3 and third loading board 4 are fixed respectively and are set up at the both ends of first loading board 2, and second loading board 3 and third loading board 4 all are perpendicular with the stationary plane of first chain link board. Specifically, the second carrier plate 3 and the third carrier plate 4 in this embodiment are respectively welded to two ends of the first carrier plate 2. The three bearing plates are connected in a welding mode, so that the stability of the groove-shaped main body 1 is guaranteed, and the bearing capacity is improved.
The third loading plate 4 is provided with a through hole 5, and a locking unit 6 is provided corresponding to the third loading plate 4. The locking unit 6 is movably connected with the third bearing plate 4 through the through hole 5. Further, the groove-shaped main body 1 is fixedly provided with a nut 7 corresponding to the through hole 5, the nut 7 is provided with an internal thread, the locking unit 6 is a bolt, and the bolt is provided with an external thread matched with the internal thread. The distance between one end of the bolt extending into the groove-shaped main body 1 and the second bearing plate 3 is reduced when the bolt is rotated, and when the groove-shaped main body 1 is reversely buckled on the edge vertical plate of the ship, the edge vertical plate can be held by the bolt and the second bearing plate 3 to realize that the groove-shaped main body 1 is only fixed on the edge vertical plate.
The other end of cell type main part 1 is fixed and is provided with scaffold frame fixed plate 8, is provided with fixed orifices 9 on scaffold frame fixed plate 8. Scaffold frame fixed plate 8 in this embodiment includes right angle trapezoidal board and rectangular board 11, rectangular board 11 and right angle trapezoidal board 10 integrated into one piece, the last base and the 3 fixed connection of second loading board of right angle trapezoidal board, and the plane of right angle trapezoidal board is perpendicular to the fixed surface of second loading board 3. The last base of right angle trapezoidal board is the same with the length of second loading board 3, and the lower base of right angle trapezoidal board is the same with the long limit length of rectangular board 11, and the oblique waist limit both ends of right angle trapezoidal board are connected with the tip of rectangular board 11 and second loading board 3 respectively.
The fixed orifices 9 are provided with a plurality of, and a plurality of fixed orifices 9 are even vertical distribution on rectangular board 11. The upper bottom edge of the right-angle trapezoidal plate in the embodiment is welded to the fixing surface of the second bearing plate 3, and the scaffold fixing plate 8 is fixed on the groove-shaped main body 1.
As shown in fig. 4, the embodiment of the present invention further provides a method for using the above ship scaffold erection assisting device, which includes:
s101, determining a position for carrying out high-altitude operation on a ship, and reversely buckling the groove-shaped main body on an edge vertical plate corresponding to the position for high-altitude operation on the ship;
when placing the type main part, only laminate second loading board and marginal riser, help later stage cooperation to screw the unit and firmly hold with adding of marginal riser like this.
S102, tightening the locking unit to lock and fix the groove-shaped main body and the edge vertical plate;
after the groove-shaped main body is placed in the S101, a bolt (screwing unit) is rotated, so that the bolt extends into the movable end of the groove-shaped main body to contact with the edge vertical plate and is locked until the bolt cannot rotate continuously. It should be pointed out that, when the rotatory bolt contacted marginal riser, the rotatory bolt changed into the fine setting this moment, had so both guaranteed screwing of bolt, had avoided the rotatory bolt of transition again to cause the risk of bolt smooth silk.
And S103, erecting a scaffold on the scaffold fixing plate through the fixing hole.
After the groove-shaped main body is fixed through the S102, the scaffold can be erected through the fixing holes in the scaffold fixing plate. The scaffold is not limited to only one scaffold fixing plate when being erected, and a plurality of groove-shaped units can be fixed at S101 and S102, so that the scaffold can be erected through a plurality of scaffold fixing plates at a later stage.
According to the above embodiment, adopt the utility model provides a ship scaffold sets up auxiliary device, when carrying out boats and ships eminence operation, on the marginal riser that corresponds the boats and ships eminence operation position of cell type main part, then the locking unit of screwing fixes cell type main part locking on marginal riser, just so can freely set up the scaffold in the eminence through the scaffold fixing plate. And furthermore, when the ship works at high altitude, a special plate for the scaffold does not need to be welded on the ship body, so that the structure of the ship body and paint smearing are protected from being damaged.
Other embodiments of the invention will be apparent to those skilled in the art from consideration of the specification and practice of the disclosure of the invention disclosed herein. The present invention is intended to cover any variations, uses, or adaptations of the invention following, in general, the principles of the invention and including such departures from the present disclosure as come within known or customary practice within the art to which the invention pertains. It is intended that the specification and examples be considered as exemplary only, with a true scope and spirit of the invention being indicated by the following claims.
It is to be understood that relational terms such as "first" and "second," and the like, may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. The present invention is not limited to the precise arrangements described above and shown in the drawings, and various modifications and changes may be made without departing from the scope thereof. The scope of the present invention is limited only by the appended claims.

Claims (9)

1. An auxiliary device is set up to boats and ships scaffold frame which characterized in that includes: cell type main part (1), the one end of cell type main part (1) sets up locking unit (6), locking unit (6) with cell type main part (1) swing joint, the other end of cell type main part (1) is fixed and is provided with scaffold frame fixed plate (8), be provided with fixed orifices (9) on scaffold frame fixed plate (8).
2. The ship scaffold erection aid of claim 1, wherein the groove-shaped main body (1) comprises a first loading plate (2), a second loading plate (3) and a third loading plate (4), the second loading plate (3) and the third loading plate (4) are respectively and fixedly arranged at both ends of the first loading plate (2), and the second loading plate (3) and the third loading plate (4) are perpendicular to the fixing surface of the first linking plate.
3. The ship scaffold erection aid of claim 2, wherein a through hole (5) is provided on the third loading plate (4), and the locking unit (6) is movably connected with the third loading plate (4) through the through hole (5).
4. The ship scaffold erecting aid device according to claim 3, wherein a nut (7) is fixedly arranged on the outer side of the groove-shaped main body (1) corresponding to the through hole (5), the nut (7) is provided with an internal thread, and the locking unit (6) is provided with an external thread matched with the internal thread.
5. Marine scaffolding installation aid according to any of claims 2-4, characterised in that the scaffolding fixing plate (8) comprises a right angle trapezoidal plate (10) and a rectangular plate (11), the rectangular plate (11) is integrated with the right angle trapezoidal plate (10), the upper bottom edge of the right angle trapezoidal plate (10) is fixedly connected with the second loading plate (3), and the plane of the right angle trapezoidal plate (10) is perpendicular to the fixing surface of the second loading plate (3).
6. The ship scaffold erection aid of claim 5, wherein the upper bottom edge of the right-angle trapezoidal plate (10) has the same length as the second loading plate (3), the lower bottom edge of the right-angle trapezoidal plate (10) has the same length as the long edge of the rectangular plate (11), and the two ends of the oblique waist edge of the right-angle trapezoidal plate (10) are respectively connected with the ends of the rectangular plate (11) and the second loading plate (3).
7. Marine scaffolding auxiliary device according to claim 6, characterized in that the fixing holes (9) are provided in plurality, and the plurality of fixing holes (9) are evenly and vertically distributed on the rectangular plate (11).
8. Marine scaffolding auxiliary arrangement according to claim 2, characterized in that the second loading floor (3) and the third loading floor (4) are welded connection with both ends of the first loading floor (2).
9. Marine scaffolding auxiliary device according to claim 5, characterized in that the upper bottom edge of the right angle ladder bar (10) is welded to the fixing surface of the second loading plate (3).
CN202021043988.7U 2020-06-09 2020-06-09 Auxiliary device is set up to boats and ships scaffold Active CN212556720U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021043988.7U CN212556720U (en) 2020-06-09 2020-06-09 Auxiliary device is set up to boats and ships scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021043988.7U CN212556720U (en) 2020-06-09 2020-06-09 Auxiliary device is set up to boats and ships scaffold

Publications (1)

Publication Number Publication Date
CN212556720U true CN212556720U (en) 2021-02-19

Family

ID=74630241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021043988.7U Active CN212556720U (en) 2020-06-09 2020-06-09 Auxiliary device is set up to boats and ships scaffold

Country Status (1)

Country Link
CN (1) CN212556720U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111572728A (en) * 2020-06-09 2020-08-25 大连中远海运川崎船舶工程有限公司 Ship scaffold erecting auxiliary device and using method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111572728A (en) * 2020-06-09 2020-08-25 大连中远海运川崎船舶工程有限公司 Ship scaffold erecting auxiliary device and using method thereof

Similar Documents

Publication Publication Date Title
CN212556720U (en) Auxiliary device is set up to boats and ships scaffold
CN105539769A (en) Method for building scaffolds in closing stage of bottom side tank of bulk cargo ship cargo hold
CN110901851A (en) Ship large-scale equipment broadside installation device
CN111572728A (en) Ship scaffold erecting auxiliary device and using method thereof
CN218085970U (en) Ship side externally-hung platform
US2406786A (en) Adjustable staging
CN112208726B (en) Clamping type ship ground rack
KR20100039076A (en) Jig for transporting derrick structure using floatingcrane
CN211193649U (en) Be used for frock of top surface buckled plate installation on boats and ships
CN201573762U (en) Working platform rack
CN110371272A (en) A kind of scaffold building method for the cabin LNG
CN109911106A (en) A kind of apparatus for work and method for the installation of container ship positioning pin
CN215155507U (en) Multipurpose rigid water platform
CN212337125U (en) Combined type climbing tool for straight bulkhead of cargo hold
CN110386232B (en) Scaffold erecting method for container ship side cabin mouth surrounding area
CN114802642A (en) Construction method of container ship torsion box section and container ship
WO1999050137A1 (en) Scaffold support bracket
CN210049572U (en) Pile clamping supporting device and port engineering scaffold adopting same
CN205135387U (en) Portable ladder suitable for large -scale ore sand ship
CN202684363U (en) Welding platform system for steel structure column bodies
CN215851788U (en) Double-sided pedal
CN220537341U (en) Platform for stacking cargo hold cover plates and quay crane with same
CN111017150A (en) Assembling jig frame device and assembling method for hatch coaming of bulk cargo ship
CN217100376U (en) Chemical tanker cargo tank channel
CN219753657U (en) Suspended ceiling connecting component of steel structure house

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant