CN113256266A - Building construction data archiving processing method and system based on data analysis and computer storage medium - Google Patents
Building construction data archiving processing method and system based on data analysis and computer storage medium Download PDFInfo
- Publication number
- CN113256266A CN113256266A CN202110647000.0A CN202110647000A CN113256266A CN 113256266 A CN113256266 A CN 113256266A CN 202110647000 A CN202110647000 A CN 202110647000A CN 113256266 A CN113256266 A CN 113256266A
- Authority
- CN
- China
- Prior art keywords
- construction
- building
- project
- information
- sub
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009435 building construction Methods 0.000 title claims abstract description 33
- 238000007405 data analysis Methods 0.000 title claims abstract description 21
- 238000003672 processing method Methods 0.000 title claims abstract description 21
- 238000010276 construction Methods 0.000 claims abstract description 580
- 238000012545 processing Methods 0.000 claims abstract description 34
- 239000004035 construction material Substances 0.000 claims description 96
- 238000004458 analytical method Methods 0.000 claims description 20
- 238000000034 method Methods 0.000 claims description 14
- 239000000463 material Substances 0.000 claims description 13
- 238000004364 calculation method Methods 0.000 claims description 11
- 238000004590 computer program Methods 0.000 claims description 9
- 239000000284 extract Substances 0.000 claims description 3
- 230000006835 compression Effects 0.000 description 6
- 238000007906 compression Methods 0.000 description 6
- 238000012937 correction Methods 0.000 description 6
- 238000004422 calculation algorithm Methods 0.000 description 3
- 230000010354 integration Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000007792 addition Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Primary Health Care (AREA)
Abstract
The invention discloses a building construction data archiving processing method and system based on data analysis and a computer storage medium. The building construction data archiving processing method based on data analysis comprises the following steps: counting the number of construction sub-items corresponding to the building; acquiring a construction period corresponding to each construction sub-project of the building; acquiring constructor information corresponding to each construction sub-project of the building; acquiring construction equipment information corresponding to each construction sub-project of the building; analyzing and processing construction information corresponding to each construction sub-project of the building; arranging construction information corresponding to each sub-construction project of the building; the problem that data archived and processed by the existing building construction data archiving and processing method is limited and cannot effectively reflect specific construction information of building engineering is solved, and meanwhile, the reference and the rationality of construction data of each construction sub-project of the building are greatly improved.
Description
Technical Field
The invention belongs to the technical field of data archiving processing, and relates to a building construction data archiving processing method and system based on data analysis and a computer storage medium.
Background
Along with the rapid development of economy, the building industry is rapidly developed, the archiving and the combing of the building construction data are one of indispensable projects for building construction, and meanwhile, the archiving and the processing of the building construction data have important reference values and reference meanings in the aspects of city construction and the like.
The existing building construction data archiving and processing method is mainly used for processing and archiving data of images and construction files acquired in a construction process, and obviously, the existing building construction data archiving and processing method has certain disadvantages.
Disclosure of Invention
In view of the above, in order to solve the problems in the background art, a method, a system and a computer storage medium for archiving and processing building construction data based on data analysis are provided, so as to implement accurate processing and archiving of the building construction data;
the purpose of the invention can be realized by the following technical scheme:
the invention provides a building construction data archiving processing method based on data analysis, which comprises the following steps:
s1, counting the quantity of construction sub-projects: counting the number of construction sub-projects corresponding to the building through a construction sub-project number counting module, numbering the counted construction sub-projects corresponding to the building according to a preset sequence, and sequentially marking the construction sub-projects as 1, 2,. i,. n;
s2, acquiring a construction period: acquiring a construction period corresponding to each construction sub-project of the building through a construction information acquisition module, and further constructing a construction period set Z (Z1, Z2,. multidot.Zi,. multidot.Zn) of each sub-project of the building, wherein Zi represents the construction period corresponding to the ith construction sub-project of the building;
s3, construction material information acquisition: acquiring material information corresponding to each construction sub-project of the building through a construction information acquisition module;
s4, acquiring manual information: the construction information acquisition module is used for acquiring the information of constructors corresponding to each construction sub-project of the building, further acquiring the quantity of the constructors corresponding to each construction sub-project of the building, numbering the constructors of each construction sub-project of the building according to a preset sequence, and sequentially marking the constructors as 1, 2,. x,. y;
s5, construction equipment information acquisition: construction equipment information corresponding to each construction sub-project of the building is obtained through a construction information obtaining module;
s6, information analysis and processing: analyzing and processing the construction period, construction material information, manual information and construction equipment information corresponding to each construction sub-project of the building through a data processing and analyzing module, and counting the comprehensive rationality of the building construction;
s7, construction information arrangement: and arranging the construction period, the construction material information, the manual information and the construction equipment information corresponding to each sub-construction project of the building through a construction information arrangement module, and further acquiring the arranged construction information corresponding to the building.
Further, the construction material information comprises construction material models, the number corresponding to each construction model material and the unit price corresponding to each type of construction material, the models of the construction materials of each construction sub-project of the building are numbered according to a preset sequence, and are sequentially marked as 1, 2,. j,. m, so that a construction material information set L of each model of each construction sub-project of the building is constructedw d(Lw d1,Lw d2,...Lw dj,...Lw dm),Lw dj represents the w-th information corresponding to the j-th model material of the d-th construction sub-project of the building, w represents the construction material information, and w is a1, a2, a1 and a2 respectively represent the number corresponding to each construction model material and the unit price corresponding to each model construction material.
Further, the manual information comprises construction time corresponding to each constructor and labor cost corresponding to each constructor, and then manual information sets R of each constructor of each construction sub-project of the building are constructede d(Re d1,Re d2,...Re dx,...Re dy),Re dx represents the e-th worker corresponding to the x-th constructor of the d-th construction sub-project of the buildingInformation, e represents labor information, and e-b 1, b2, b1, and b2 represent construction time and labor cost, respectively.
Furthermore, the construction equipment is machine equipment corresponding to construction, models corresponding to construction equipment of each construction sub-project of the building are obtained, the models corresponding to the construction equipment of each construction sub-project of the building are numbered according to a preset sequence, the models are marked as 1, 2, k, h, the number corresponding to the construction equipment of each model, the working time corresponding to the construction equipment of each model and the construction cost corresponding to the construction equipment of each model are obtained, and an information set J of the construction equipment of each model of each construction sub-project of the building is constructedz d(Jz d1,Jz d2,...Jz dk,...Jz dh),Jz dk represents the z-th information corresponding to each model of construction equipment of the kth construction sub-project of the building, z represents the construction equipment information, and z is c1, c2, c3, c1, c2 and c3 respectively represent the number corresponding to each model of construction equipment, the working time corresponding to each model of construction equipment and the construction cost corresponding to each model of construction equipment.
Further, the specific analysis processing procedure of the information analysis and processing comprises the following steps:
s61, according to the obtained construction period corresponding to each construction sub-project of the building, comparing each construction sub-project of the building with the standard construction period corresponding to each construction sub-project of the building, and further counting the rationality influence coefficient of the construction period of each construction sub-project of the building, wherein the calculation formula isαdExpressing the rationality influence coefficient T of the construction period corresponding to the d-th construction sub-project of the buildingdRepresents the construction period, T, corresponding to the d-th construction sub-project of the buildingd standardRepresenting the standard construction period corresponding to the d-th construction sub-project of the building;
s62, obtaining information set of each model of construction material of each construction sub-project of the building, further obtaining the quantity corresponding to each model of construction material of each construction sub-project of the building and the corresponding unit price of each model of construction material, further comparing the quantity corresponding to each model of construction material of each construction sub-project of the building with the standard quantity corresponding to each model of construction material of each construction sub-project, further counting the rationality influence coefficient of the quantity of construction material of each model of construction sub-project of the building, simultaneously comparing the unit price corresponding to each model of construction material of each construction sub-project of the building with the standard unit price corresponding to each model of construction material, further counting the rationality influence coefficient of the unit price of construction material of each model of construction sub-project of the building, according to the counted rationality influence coefficient of the quantity of construction material of each model of each construction sub-project of the building and the unit price rationality influence coefficient of construction material of each model of each construction sub-project of the building, further counting the rationality influence coefficient of the construction material of each construction sub-project of the building;
s63, acquiring the manual information set of each constructor of each construction sub-project of the building, further acquiring the construction time length and the manual cost corresponding to each constructor of each construction sub-project of the building, comparing the number of constructors corresponding to each construction sub-project of the building with the number of standard constructors corresponding to each construction sub-project of the building according to the number of constructors corresponding to each construction sub-project of the building, further counting the rationality influence coefficient of the number of constructors of each construction project of the building, comparing the construction time length and the manual cost corresponding to each constructor of each construction sub-project of the building with the standard construction time length and the standard manual cost corresponding to each constructor of the building, counting the rationality influence coefficient of each construction information of each constructor of each construction sub-project of the building, and counting the rationality influence coefficient of the number of constructors of each construction project of the building and the rationality influence coefficient of each construction information of each constructor of each construction sub-project of the building according to the statistics Further, counting the information rationality influence coefficient of the constructors of each construction sub-project of the building;
s64, acquiring information sets of construction equipment of each type of construction sub-project of the building, further acquiring the number of the construction equipment of each type corresponding to each construction sub-project of the building, the working time length corresponding to the construction equipment of each type and the construction cost corresponding to the construction equipment of each type, comparing the number of the construction equipment of each type corresponding to each construction sub-project of the building, the working time length corresponding to the construction equipment of each type and the construction cost corresponding to the construction equipment of each type with the standard number, the standard working time length and the standard construction cost corresponding to the construction equipment of each type of each construction sub-project, counting the rationality influence coefficients of the construction equipment information of each type of each construction sub-project of the building, and further counting the rationality influence coefficients of the construction equipment information of each construction sub-project of the building.
Further, the information analysis and processing further comprises comprehensively analyzing and processing the construction period, the construction material information, the manual information and the construction equipment information corresponding to each construction sub-project of the building, and further counting the comprehensive reasonable influence coefficient of the construction information according to the counted reasonable influence coefficient of the construction period of each construction sub-project of the building, the reasonable influence coefficient of the construction material of each construction sub-project of the building, the reasonable influence coefficient of the constructor information of each construction sub-project of the building and the reasonable influence coefficient of the construction equipment information of each construction sub-project of the building.
Further, the construction information arrangement user arranges the construction information corresponding to each construction sub-project of the building, further extracts the construction information arrangement template from the database, arranges the construction period, the construction material information, the manual information and the construction equipment information corresponding to each construction sub-project of the building according to the construction information arrangement template, adds a label to the arranged information, further integrates and compresses the construction information corresponding to the building after the label is added, and further obtains the arranged construction information corresponding to the building.
Further, the method also comprises the step of transmitting construction information, wherein the construction information comprehensive rationality influence coefficient and the construction information corresponding to the arranged building are transmitted to a construction supervisor corresponding to the building for analysis and archiving through an information transmitting terminal.
The invention provides a building construction data archiving processing system based on data analysis, wherein the data processing and analyzing module is respectively connected with a construction information acquisition module, a database and an information sending terminal, the construction information sorting module is respectively connected with the construction information acquisition module and the information sending terminal, and the construction information acquisition module is connected with a construction sub-project quantity counting module, wherein the construction information acquisition module comprises a construction sub-project construction period acquisition unit, a construction material information acquisition unit, a manual information acquisition unit and a construction equipment information acquisition unit.
A third aspect of the present invention provides a computer storage medium, in which a computer program is burned, and when the computer program runs in a memory of a server, the computer program implements the method according to any one of the above-mentioned embodiments.
The invention has the beneficial effects that:
(1) according to the building construction data archiving and processing method based on data analysis, the construction period, the construction material information, the manual information and the construction equipment information corresponding to each construction sub-project of the building are acquired, processed and archived, so that the problem that the archived and processed data of the existing building construction data archiving and processing method is limited and cannot effectively reflect the specific construction information of the building engineering is solved, the reference of the construction data of each construction sub-project of the building is greatly improved, and meanwhile, the rationality of the information of each construction sub-project of the building engineering is effectively analyzed.
(2) According to the construction information comprehensive rationality influence coefficient and the construction information corresponding to the building after arrangement are sent to the construction manager corresponding to the building for analysis and archiving, so that the efficiency of the construction manager for acquiring the construction information of each construction sub-project of the building is greatly improved, and the efficiency of the construction manager for acquiring the rationality of the construction information of each construction sub-project of the building is also greatly improved.
(3) In the construction information arrangement, the construction period, the construction material information, the manual information and the construction equipment information corresponding to each construction sub-project of the building are arranged according to the construction information arrangement template, and the arranged information is added with a label, so that the arrangement efficiency of the construction information of each construction sub-project of the building is greatly improved, and meanwhile, the arrangement definition of the construction information of each construction sub-project of the building and the acquisition efficiency of effective information by building managers are also greatly improved.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a flow chart of the steps of the method of the present invention;
FIG. 2 is a schematic diagram showing the connection of the modules of the system of the present invention;
fig. 3 is a schematic diagram of the connection of the construction information acquisition module according to the present invention.
Detailed Description
While the foregoing is directed to embodiments of the present invention, other and further embodiments of the invention may be devised without departing from the basic scope thereof, and the scope thereof is determined by the claims that follow.
Referring to fig. 1, a first aspect of the present invention provides a building construction data archiving processing method based on data analysis, including the following steps:
s1, counting the quantity of construction sub-projects: counting the number of construction sub-projects corresponding to the building through a construction sub-project number counting module, numbering the counted construction sub-projects corresponding to the building according to a preset sequence, and sequentially marking the construction sub-projects as 1, 2,. i,. n;
s2, acquiring a construction period: acquiring a construction period corresponding to each construction sub-project of the building through a construction information acquisition module, and further constructing a construction period set Z (Z1, Z2,. multidot.Zi,. multidot.Zn) of each sub-project of the building, wherein Zi represents the construction period corresponding to the ith construction sub-project of the building;
s3, construction material information acquisition: acquiring material information corresponding to each construction sub-project of the building through a construction information acquisition module;
specifically, the construction material information includes the type of construction material, the quantity corresponding to each construction type material and the unit price corresponding to each type of construction material, the types of the construction materials of each construction sub-project of the building are numbered according to a preset sequence, and are sequentially marked as 1, 2,. j,. m, and then a construction material information set L of each type of construction sub-project of the building is constructedw d(Lw d1,Lw d2,...Lw dj,...Lw dm),Lw dj represents the w-th information corresponding to the j-th model material of the d-th construction sub-project of the building, w represents the construction material information, and w is a1, a2, a1 and a2 respectively represent the number corresponding to each construction model material and the unit price corresponding to each model construction material.
According to the embodiment of the invention, the construction material information corresponding to each construction sub-project is obtained, so that a powerful data basis is provided for the subsequent rationality of the selection of the construction materials of each construction sub-project of the building and the rationality analysis of the price of the construction materials, and meanwhile, the selection and the calling of the construction materials directly influence the construction quality of the building.
S4, acquiring manual information: the construction information acquisition module is used for acquiring the information of constructors corresponding to each construction sub-project of the building, further acquiring the quantity of the constructors corresponding to each construction sub-project of the building, numbering the constructors of each construction sub-project of the building according to a preset sequence, and sequentially marking the constructors as 1, 2,. x,. y;
specifically, the manual information includes construction duration corresponding to each constructor and labor cost corresponding to each constructor, and then manual information sets R of each constructor of each construction sub-project of the building are constructede d(Re d1,Re d2,...Re dx,...Re dy),Re dx represents the d-th construction of the buildingThe e-th personal work information corresponding to the x-th constructor of the work sub-project, wherein e represents the manual information, e is b1, b2, b1 and b2 respectively represent the construction time length and the labor cost, d represents the number of the building construction sub-project, and d is 1, 2.
According to the embodiment of the invention, the actual working time and the actual cost corresponding to each constructor of each construction sub-project are effectively obtained by obtaining the constructor information corresponding to each construction sub-project of the building, the actual working time of the constructor directly influences the construction period of each sub-project of the building, and a bedding is provided for the subsequent rationality analysis of the constructor information corresponding to each sub-project of the building.
S5, construction equipment information acquisition: construction equipment information corresponding to each construction sub-project of the building is obtained through a construction information obtaining module;
specifically, the construction equipment is machine equipment corresponding to construction, models corresponding to construction equipment of each construction sub-project of the building are obtained, the models corresponding to the construction equipment of each construction sub-project of the building are numbered according to a preset sequence, the models are marked as 1, 2, k, h, the number corresponding to the construction equipment of each model, the working time corresponding to the construction equipment of each model and the construction cost corresponding to the construction equipment of each model are obtained, and an information set J of the construction equipment of each model of each construction sub-project of the building is constructedz d(Jz d1,Jz d2,...Jz dk,...Jz dh),Jz dk represents the z-th information corresponding to each model of construction equipment of the kth construction sub-project of the building, z represents the construction equipment information, and z is c1, c2, c3, c1, c2 and c3 respectively represent the number corresponding to each model of construction equipment, the working time corresponding to each model of construction equipment and the construction cost corresponding to each model of construction equipment.
According to the embodiment of the invention, the specific use information corresponding to the construction equipment of the building is effectively obtained by obtaining the information corresponding to the construction equipment of each construction sub-project of the building, and information basis and data reference are provided for the subsequent analysis of the construction equipment information.
S6, information analysis and processing: analyzing and processing the construction period, construction material information, manual information and construction equipment information corresponding to each construction sub-project of the building through a data processing and analyzing module, and counting the comprehensive rationality of the building construction;
specifically, the specific analysis processing procedure of the information analysis and processing includes the following steps:
s61, according to the obtained construction period corresponding to each construction sub-project of the building, comparing each construction sub-project of the building with the standard construction period corresponding to each construction sub-project of the building, and further counting the rationality influence coefficient of the construction period of each construction sub-project of the building, wherein the calculation formula isαdExpressing the rationality influence coefficient T of the construction period corresponding to the d-th construction sub-project of the buildingdRepresents the construction period, T, corresponding to the d-th construction sub-project of the buildingd standardRepresenting the standard construction period corresponding to the d-th construction sub-project of the building;
s62, obtaining information set of each model of construction material of each construction sub-project of the building, further obtaining the quantity corresponding to each model of construction material of each construction sub-project of the building and the corresponding unit price of each model of construction material, further comparing the quantity corresponding to each model of construction material of each construction sub-project of the building with the standard quantity corresponding to each model of construction material of each construction sub-project, further counting the rationality influence coefficient of the quantity of construction material of each model of construction sub-project of the building, simultaneously comparing the unit price corresponding to each model of construction material of each construction sub-project of the building with the standard unit price corresponding to each model of construction material, further counting the rationality influence coefficient of the unit price of construction material of each model of construction sub-project of the building, according to the counted rationality influence coefficient of the quantity of construction material of each model of each construction sub-project of the building and the unit price rationality influence coefficient of construction material of each model of each construction sub-project of the building, further counting the rationality influence coefficient of the construction material of each construction sub-project of the building;
whereinThe calculation formula of the reasonable influence coefficient of the quantity of the construction materials of each model of each construction sub-project of the building isβd rA1 representing the rationality influence coefficient corresponding to the r model construction material quantity of the d construction sub-project of the buildingd rA1 representing the quantity of the construction material corresponding to the r model of the d construction sub-projectd standard rAnd the standard quantity corresponding to the r model construction material of the d construction sub-project of the building is shown.
Wherein, the calculation formula of the unit price rationality influence coefficient of each type of construction material of each construction sub-project of the building isδd rA2 representing the rationality influence coefficient corresponding to the r model construction material quantity of the d construction sub-project of the buildingd rA2, which represents the unit price of the r model construction material of the d construction sub-projectr standardAnd the standard unit price corresponding to the construction material of the r-th model of the building is represented.
Wherein, the computing formula of the rationality influence coefficient of the construction material of each construction sub-project of the building isγdAnd the construction material rationality influence coefficient corresponding to the d-th construction sub-project of the building is represented, r represents the construction material model number, and r is 1, 2.
S63, acquiring the manual information set of each constructor of each construction sub-project of the building, further acquiring the construction time length and the manual cost corresponding to each constructor of each construction sub-project of the building, comparing the number of constructors corresponding to each construction sub-project of the building with the number of standard constructors corresponding to each construction sub-project of the building according to the number of constructors corresponding to each construction sub-project of the building, further counting the rationality influence coefficient of the number of constructors of each construction project of the building, comparing the construction time length and the manual cost corresponding to each constructor of each construction sub-project of the building with the standard construction time length and the standard manual cost corresponding to each constructor of the building, counting the rationality influence coefficient of each construction information of each constructor of each construction sub-project of the building, and counting the rationality influence coefficient of the number of constructors of each construction project of the building and the rationality influence coefficient of each construction information of each constructor of each construction sub-project of the building according to the statistics Further, counting the information rationality influence coefficient of the constructors of each construction sub-project of the building;
wherein, the calculation formula of the reasonable influence coefficient of the quantity of the constructors of each construction project of the building isεdExpressing the rationality influence coefficient, H, corresponding to the number of constructors of the d-th construction sub-project of the buildingdIndicates the number of constructors, H, corresponding to the d-th sub-project of the buildingd standardAnd the standard number of constructors corresponding to the d-th construction sub-project of the building is shown.
Wherein, the calculation formula of the rationality influence coefficient of each construction information of each constructor of each construction sub-project of the building isφe dtB1 showing the rationality influence coefficient corresponding to the e-th construction information of the t-th constructor of the d-th construction sub-project of the buildingd t,b2d tRespectively represents the construction time and labor cost corresponding to the t-th constructor of the d-th construction sub-project of the building, b1Standard of merit,b2Standard of meritRespectively showing the standard construction time and the standard labor cost corresponding to the construction constructor.
Wherein, the calculation formula of the information rationality influence coefficient of each construction sub-project constructor of the building is And the rationality influence coefficient corresponding to the information of the constructors of the ith construction sub-project of the building is represented, t represents the number of the constructors of each construction sub-project, and t is 1, 2, the.
S64, acquiring information sets of construction equipment of each type of construction sub-project of the building, further acquiring the number of the construction equipment of each type corresponding to each construction sub-project of the building, the working time length corresponding to the construction equipment of each type and the construction cost corresponding to the construction equipment of each type, comparing the number of the construction equipment of each type corresponding to each construction sub-project of the building, the working time length corresponding to the construction equipment of each type and the construction cost corresponding to the construction equipment of each type with the standard number, the standard working time length and the standard construction cost corresponding to the construction equipment of each type of each construction sub-project, counting the rationality influence coefficients of the construction equipment information of each type of each construction sub-project of the building, and further counting the rationality influence coefficients of the construction equipment information of each construction sub-project of the building.
Wherein, the calculation formula of the information rationality influence coefficient of each type of construction equipment of each construction sub-project of the building isμz dgC1 showing the rationality influence coefficient corresponding to the z-th information of the g-th model construction equipment of the d construction sub-projects of the buildingd g,c2d g,c3d gRespectively representing the quantity, the working time length and the construction cost corresponding to the g model construction equipment of the d construction sub-projects of the building, c1d standard g,c2d standard g,c3d standard gAnd respectively representing the standard quantity, the standard working time and the standard construction cost corresponding to the No. g construction equipment of the d construction sub-projects of the building.
Wherein, the calculation formula of the information rationality influence coefficient of each construction sub-project construction equipment of the building isηdAnd the rationality influence coefficient corresponding to the construction equipment information of the d construction sub-projects of the building is represented, g represents the model number of the construction equipment of each construction washing project, and g is 1, 2, k, h.
Specifically, the information analysis and processing further comprises comprehensively analyzing and processing construction periods, construction material information, artificial information and construction equipment information corresponding to each construction sub-project of the building, and further counting the comprehensive reasonable influence coefficient of the construction information according to the counted reasonable influence coefficient of the construction period of each construction sub-project of the building, the reasonable influence coefficient of the construction material of each construction sub-project of the building, the reasonable influence coefficient of the constructor information of each construction sub-project of the building and the reasonable influence coefficient of the construction equipment information of each construction sub-project of the building, wherein the calculation formula is thatXi represents the comprehensive rationality influence coefficient corresponding to the construction information, and n represents the number corresponding to the construction sub-project.
According to the embodiment of the invention, the construction period, the construction material information, the manual information and the construction equipment information corresponding to each construction sub-project of the building are analyzed and processed, so that the problem that the data archived and processed by the existing construction data archiving and processing method has limitation and cannot effectively reflect the specific construction information of the construction project is solved, the reference of the construction data of each construction sub-project of the building is greatly improved, and the rationality of the information of each construction sub-project of the building project is effectively analyzed.
S7, construction information arrangement: the construction period, the construction material information, the manual information and the construction equipment information corresponding to each sub-construction project of the building are arranged through a construction information arrangement module, and then the construction information corresponding to the arranged building is obtained;
specifically, the construction information arrangement user arranges the construction information corresponding to each construction sub-project of the building, further extracts the construction information arrangement template from the database, arranges the construction period, the construction material information, the manual information and the construction equipment information corresponding to each construction sub-project of the building according to the construction information arrangement template, adds a label to the arranged information, further integrates and compresses the construction information corresponding to the building after the label is added, and further obtains the arranged construction information corresponding to the building.
In a specific embodiment, the tag adding is used for performing tag adding on the construction information corresponding to the constructed building, wherein the tag corresponding to the construction information comprises a period tag, a material tag, an artificial tag and an equipment tag, and then each constructed tag is matched and added with the construction information corresponding to the building, so that the arrangement efficiency of the construction information of each construction sub-project of the building is greatly improved, and meanwhile, the arrangement definition of the construction information of each construction sub-project of the building and the obtaining efficiency of effective information by building supervisors are also greatly improved.
In one embodiment, the construction information integration and compression is used for integrating construction information into a document format, wherein the compression modes include compression into files, compression into barcodes and compression into two-dimensional code forms, the invention selects the compression into the two-dimensional code forms, and the specific operation process comprises the following steps:
a1, carrying out data analysis on the building construction information integration information, determining the data length, determining the format and version according to the data length, converting the input data into bit streams through data coding, and carrying out finite field conversion by adopting an error correction channel coding algorithm to generate error correction channel coding data code words;
a2, generating a corresponding key from the data code word, encrypting the key according to an encryption algorithm, and converting the encrypted key into an encrypted code word according to a preset encoding algorithm;
a3, acquiring the data code length and the error correction level of the data code word by encrypting the code word, and searching the number of error correction code word blocks in a preset error correction characteristic table entry;
a4, generating two-dimensional code information from the data code word and the encrypted code word according to the structural mode corresponding to the number of the error correction code word blocks.
The embodiment of the invention greatly saves the storage space corresponding to the construction information by compressing the construction integration information corresponding to the building into the form of the two-dimensional code, and greatly improves the convenience of sending and the convenience of obtaining information by building supervision personnel by the method of sending in the form of the two-dimensional code.
S8, construction information sending: and sending the comprehensive rationality influence coefficient of the construction information of the building and the arranged construction information corresponding to the building to a construction supervision person corresponding to the building for analysis and archiving through an information sending terminal.
According to the embodiment of the invention, the construction information comprehensive rationality influence coefficient and the construction information corresponding to the arranged building are sent to the construction manager corresponding to the building for analysis and archiving, so that the efficiency of the construction manager for acquiring the construction information of each construction sub-project of the building is greatly improved, and the efficiency of the construction manager for acquiring the rationality of the construction information of each construction sub-project of the building is also greatly improved.
Referring to fig. 2 to 3, a second aspect of the present invention provides a building construction data archiving processing system based on data analysis, in which the data processing and analyzing module is respectively connected to a construction information obtaining module, a database and an information sending terminal, the construction information collating module is respectively connected to a construction information obtaining module and an information sending terminal, and the construction information obtaining module is connected to a construction sub-project quantity counting module, wherein the construction information obtaining module includes a construction sub-project construction period obtaining unit, a construction material information obtaining unit, a manual information obtaining unit and a construction equipment information obtaining unit.
The database is used for storing the standard construction period corresponding to each construction sub-project of the building, the standard quantity corresponding to each model of construction material of each construction sub-project, the standard constructor quantity corresponding to each construction sub-project of the building, the standard construction time length corresponding to the constructor, the standard labor cost, the standard quantity corresponding to each model of construction equipment of each construction sub-project, the standard working time length and the standard construction cost.
A third aspect of the present invention provides a computer storage medium, in which a computer program is burned, and when the computer program runs in a memory of a server, the computer program implements the method according to any one of the above-mentioned embodiments.
The foregoing is merely exemplary and illustrative of the principles of the present invention and various modifications, additions and substitutions of the specific embodiments described herein may be made by those skilled in the art without departing from the principles of the present invention or exceeding the scope of the claims set forth herein.
Claims (10)
1. The building construction data archiving processing method based on data analysis is characterized by comprising the following steps: the method comprises the following steps:
s1, counting the quantity of construction sub-projects: counting the number of construction sub-projects corresponding to the building through a construction sub-project number counting module, numbering the counted construction sub-projects corresponding to the building according to a preset sequence, and sequentially marking the construction sub-projects as 1, 2,. i,. n;
s2, acquiring a construction period: acquiring a construction period corresponding to each construction sub-project of the building through a construction information acquisition module, and further constructing a construction period set Z (Z1, Z2,. multidot.Zi,. multidot.Zn) of each sub-project of the building, wherein Zi represents the construction period corresponding to the ith construction sub-project of the building;
s3, construction material information acquisition: acquiring material information corresponding to each construction sub-project of the building through a construction information acquisition module;
s4, acquiring manual information: the construction information acquisition module is used for acquiring the information of constructors corresponding to each construction sub-project of the building, further acquiring the quantity of the constructors corresponding to each construction sub-project of the building, numbering the constructors of each construction sub-project of the building according to a preset sequence, and sequentially marking the constructors as 1, 2,. x,. y;
s5, construction equipment information acquisition: construction equipment information corresponding to each construction sub-project of the building is obtained through a construction information obtaining module;
s6, information analysis and processing: analyzing and processing the construction period, construction material information, manual information and construction equipment information corresponding to each construction sub-project of the building through a data processing and analyzing module, and counting the comprehensive rationality of the building construction;
s7, construction information arrangement: and arranging the construction period, the construction material information, the manual information and the construction equipment information corresponding to each sub-construction project of the building through a construction information arrangement module, and further acquiring the arranged construction information corresponding to the building.
2. The building construction data archiving processing method based on data analysis according to claim 1, characterized in that: the construction material information comprises construction material models, the quantity corresponding to each construction model material and the unit price corresponding to each type of construction material, the models of the construction materials of each construction sub-project of the building are numbered according to a preset sequence, the numbers are marked as 1, 2, thew d(Lw d1,Lw d2,...Lw dj,...Lw dm),Lw dj represents the w-th information corresponding to the j-th model material of the d-th construction sub-project of the building, w represents the construction material information, and w is a1, a2, a1 and a2 respectively represent the number corresponding to each construction model material and the unit price corresponding to each model construction material.
3. The building construction data archiving processing method based on data analysis according to claim 1, characterized in that: the manual information comprises construction time corresponding to each constructor and labor cost corresponding to each constructor, and then manual information sets R of each constructor of each construction sub-project of the building are constructede d(Re d1,Re d2,...Re dx,...Re dy),Re dx representsThe e-th personal labor information corresponding to the x-th constructor of the d-th construction sub-project of the building, wherein e represents labor information, and e is b1, b2, b1 and b2 respectively represent construction time and labor cost.
4. The building construction data archiving processing method based on data analysis according to claim 1, characterized in that: the construction equipment is machine equipment corresponding to construction, models corresponding to construction equipment of each construction sub-project of the building are obtained, the models corresponding to the construction equipment of each construction sub-project of the building are numbered according to a preset sequence, the numbers are marked as 1, 2, k, h, the number corresponding to the construction equipment of each model, the working time corresponding to the construction equipment of each model and the construction cost corresponding to the construction equipment of each model are obtained, and an information set J of the construction equipment of each model of each construction sub-project of the building is constructedz d(Jz d1,Jz d2,...Jz dk,...Jz dh),Jz dk represents the z-th information corresponding to each model of construction equipment of the kth construction sub-project of the building, z represents the construction equipment information, and z is c1, c2, c3, c1, c2 and c3 respectively represent the number corresponding to each model of construction equipment, the working time corresponding to each model of construction equipment and the construction cost corresponding to each model of construction equipment.
5. The building construction data archiving processing method based on data analysis according to claim 1, characterized in that: the specific analysis processing process of the information analysis and processing comprises the following steps:
s61, according to the obtained construction period corresponding to each construction sub-project of the building, comparing each construction sub-project of the building with the standard construction period corresponding to each construction sub-project of the building, and further counting the rationality influence coefficient of the construction period of each construction sub-project of the building, wherein the calculation formula isαdIndicating correspondence of the d-th construction sub-item of the buildingCoefficient of influence of rationality of construction period, TdRepresents the construction period, T, corresponding to the d-th construction sub-project of the buildingd standardRepresenting the standard construction period corresponding to the d-th construction sub-project of the building;
s62, obtaining information set of each model of construction material of each construction sub-project of the building, further obtaining the quantity corresponding to each model of construction material of each construction sub-project of the building and the corresponding unit price of each model of construction material, further comparing the quantity corresponding to each model of construction material of each construction sub-project of the building with the standard quantity corresponding to each model of construction material of each construction sub-project, further counting the rationality influence coefficient of the quantity of construction material of each model of construction sub-project of the building, simultaneously comparing the unit price corresponding to each model of construction material of each construction sub-project of the building with the standard unit price corresponding to each model of construction material, further counting the rationality influence coefficient of the unit price of construction material of each model of construction sub-project of the building, according to the counted rationality influence coefficient of the quantity of construction material of each model of each construction sub-project of the building and the unit price rationality influence coefficient of construction material of each model of each construction sub-project of the building, further counting the rationality influence coefficient of the construction material of each construction sub-project of the building;
s63, acquiring the manual information set of each constructor of each construction sub-project of the building, further acquiring the construction time length and the manual cost corresponding to each constructor of each construction sub-project of the building, comparing the number of constructors corresponding to each construction sub-project of the building with the number of standard constructors corresponding to each construction sub-project of the building according to the number of constructors corresponding to each construction sub-project of the building, further counting the rationality influence coefficient of the number of constructors of each construction project of the building, comparing the construction time length and the manual cost corresponding to each constructor of each construction sub-project of the building with the standard construction time length and the standard manual cost corresponding to each constructor of the building, counting the rationality influence coefficient of each construction information of each constructor of each construction sub-project of the building, and counting the rationality influence coefficient of the number of constructors of each construction project of the building and the rationality influence coefficient of each construction information of each constructor of each construction sub-project of the building according to the statistics Further, counting the information rationality influence coefficient of the constructors of each construction sub-project of the building;
s64, acquiring information sets of construction equipment of each type of construction sub-project of the building, further acquiring the number of the construction equipment of each type corresponding to each construction sub-project of the building, the working time length corresponding to the construction equipment of each type and the construction cost corresponding to the construction equipment of each type, comparing the number of the construction equipment of each type corresponding to each construction sub-project of the building, the working time length corresponding to the construction equipment of each type and the construction cost corresponding to the construction equipment of each type with the standard number, the standard working time length and the standard construction cost corresponding to the construction equipment of each type of each construction sub-project, counting the rationality influence coefficients of the construction equipment information of each type of each construction sub-project of the building, and further counting the rationality influence coefficients of the construction equipment information of each construction sub-project of the building.
6. The building construction data archiving processing method based on data analysis according to claim 1, characterized in that: the information analysis and processing further comprises the step of comprehensively analyzing and processing the construction period, the construction material information, the manual information and the construction equipment information corresponding to each construction sub-project of the building, and further, according to the counted construction period rationality influence coefficient of each construction sub-project of the building, the construction material rationality influence coefficient of each construction sub-project of the building, the information rationality influence coefficient of each construction sub-project of the building and the information rationality influence coefficient of each construction sub-project of the building, the comprehensive rationality influence coefficient of the construction information of the building is counted.
7. The building construction data archiving processing method based on data analysis according to claim 1, characterized in that: the construction information arrangement user arranges the construction information corresponding to each construction sub-project of the building, then extracts the construction information arrangement template from the database, arranges the construction period, the construction material information, the artificial information and the construction equipment information corresponding to each construction sub-project of the building according to the construction information arrangement template, adds labels to the arranged information, integrates and compresses the construction information corresponding to the building after the labels are added, and then obtains the arranged construction information corresponding to the building.
8. The building construction data archiving processing method based on data analysis according to claim 1, characterized in that: the method also comprises the step of transmitting construction information, wherein the construction information comprehensive rationality influence coefficient and the construction information corresponding to the building after arrangement are transmitted to a construction supervisor corresponding to the building for analysis and archiving through an information transmitting terminal.
9. The utility model provides a building construction data archives processing system based on data analysis which characterized in that: the construction information management system comprises a data processing and analyzing module, a construction information acquiring module, a database and an information sending terminal, wherein the data processing and analyzing module is respectively connected with the construction information acquiring module, the database and the information sending terminal, the construction information sorting module is respectively connected with the construction information acquiring module and the information sending terminal, the construction information acquiring module is connected with a construction sub-project quantity counting module, and the construction information acquiring module comprises a construction sub-project construction period acquiring unit, a construction material information acquiring unit, a manual information acquiring unit and a construction equipment information acquiring unit.
10. A computer storage medium, wherein a computer program is burned into the computer storage medium, and when the computer program runs in a memory of a server, the computer program implements the method according to any one of claims 1 to 8.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110647000.0A CN113256266B (en) | 2021-06-10 | 2021-06-10 | Building construction data archiving processing method and system based on data analysis and computer storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110647000.0A CN113256266B (en) | 2021-06-10 | 2021-06-10 | Building construction data archiving processing method and system based on data analysis and computer storage medium |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113256266A true CN113256266A (en) | 2021-08-13 |
CN113256266B CN113256266B (en) | 2022-08-30 |
Family
ID=77187477
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110647000.0A Active CN113256266B (en) | 2021-06-10 | 2021-06-10 | Building construction data archiving processing method and system based on data analysis and computer storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113256266B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114611980A (en) * | 2022-03-23 | 2022-06-10 | 武汉有方设计有限公司 | Engineering project cost analysis method, equipment and computer storage medium |
CN116151775A (en) * | 2023-04-18 | 2023-05-23 | 苏州开普岩土工程有限公司 | Digital management method and system for construction process |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2017746A1 (en) * | 2007-04-24 | 2009-01-21 | Siemens Aktiengesellschaft | Method and device for planning and evaluation of industrial processes |
CN109670779A (en) * | 2018-11-29 | 2019-04-23 | 深圳华森建筑与工程设计顾问有限公司 | A kind of green building project statistical analysis platform and method |
CN109685558A (en) * | 2018-12-14 | 2019-04-26 | 国网辽宁省电力有限公司经济技术研究院 | A kind of Cost for Electric Power Engineering evaluation system based on BIM technology |
CN110570133A (en) * | 2019-09-18 | 2019-12-13 | 赖玲玲 | building engineering dynamic cost analysis and control system based on big data |
CN111738486A (en) * | 2020-05-09 | 2020-10-02 | 北京兴中海建工程造价咨询有限公司 | Comprehensive management method and system for construction project cost, bid inviting and consultation |
CN112348332A (en) * | 2020-10-26 | 2021-02-09 | 郑州铁路职业技术学院 | Engineering cost monitored control system based on cloud calculates |
US20210073694A1 (en) * | 2019-09-11 | 2021-03-11 | REQpay Inc. | Construction management method, system, computer readable medium, computer architecture, computer-implemented instructions, input-processing-output, graphical user interfaces, databases and file management |
-
2021
- 2021-06-10 CN CN202110647000.0A patent/CN113256266B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2017746A1 (en) * | 2007-04-24 | 2009-01-21 | Siemens Aktiengesellschaft | Method and device for planning and evaluation of industrial processes |
CN109670779A (en) * | 2018-11-29 | 2019-04-23 | 深圳华森建筑与工程设计顾问有限公司 | A kind of green building project statistical analysis platform and method |
CN109685558A (en) * | 2018-12-14 | 2019-04-26 | 国网辽宁省电力有限公司经济技术研究院 | A kind of Cost for Electric Power Engineering evaluation system based on BIM technology |
US20210073694A1 (en) * | 2019-09-11 | 2021-03-11 | REQpay Inc. | Construction management method, system, computer readable medium, computer architecture, computer-implemented instructions, input-processing-output, graphical user interfaces, databases and file management |
CN110570133A (en) * | 2019-09-18 | 2019-12-13 | 赖玲玲 | building engineering dynamic cost analysis and control system based on big data |
CN111738486A (en) * | 2020-05-09 | 2020-10-02 | 北京兴中海建工程造价咨询有限公司 | Comprehensive management method and system for construction project cost, bid inviting and consultation |
CN112348332A (en) * | 2020-10-26 | 2021-02-09 | 郑州铁路职业技术学院 | Engineering cost monitored control system based on cloud calculates |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114611980A (en) * | 2022-03-23 | 2022-06-10 | 武汉有方设计有限公司 | Engineering project cost analysis method, equipment and computer storage medium |
CN116151775A (en) * | 2023-04-18 | 2023-05-23 | 苏州开普岩土工程有限公司 | Digital management method and system for construction process |
Also Published As
Publication number | Publication date |
---|---|
CN113256266B (en) | 2022-08-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113256266B (en) | Building construction data archiving processing method and system based on data analysis and computer storage medium | |
CN111767247A (en) | File specification and synchronous forming control platform for real-time supervision of engineering data | |
CN109635006A (en) | Social security business association rule digging and recommendation apparatus and method based on Apriori | |
CN111859046A (en) | Water pollution tracing system and method based on pollution element source analysis | |
CN111311190A (en) | Experimental data management method convenient for data collection | |
CN111737549B (en) | Economic index intelligent analysis system | |
CN110096503A (en) | A kind of analysis method and system of three coordinate measuring point data of white body | |
CN113420902A (en) | Component prediction model training method, component prediction method and related equipment | |
CN116823188A (en) | Production management system and method based on big data analysis | |
CN113535818A (en) | Method and equipment for constructing audit comprehensive knowledge base | |
Shan et al. | A new model for predicting the total tree height for stems cut-to-length by harvesters in Pinus radiata plantations | |
CN115809795B (en) | Method and device for evaluating bearing capacity of production team based on digitalization | |
CN112200465A (en) | Electric power AI method and system based on multimedia information intelligent analysis | |
CN117151276A (en) | Intelligent management system of electricity selling platform | |
CN115063207A (en) | Building material purchasing intelligent price comparison analysis and processing system based on cloud computing | |
CN114782025A (en) | Laboratory data intelligent management system | |
CN111444191B (en) | Cosmic space data system, method, computer device and storage medium | |
CN113905289A (en) | Multi-standard energy data unified management method and system | |
CN110298585B (en) | Hierarchical automatic auditing method for monitoring information of substation equipment | |
CN111143452A (en) | Intelligent conversion system for engineering survey data | |
CN111126946A (en) | Modeling method and device for data tracing of information system | |
CN111177126A (en) | Information processing method, device and equipment | |
Lakshmi et al. | An Empirical Study On Industry 4.0 Future Practices In Indian Msmes | |
CN116028309B (en) | Quantitative monitoring system and method for system operation condition | |
CN117112116B (en) | User management system based on digital government affairs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20220812 Address after: Room 5-01, 5th Floor, Building 6, Headquarters Economic Park, No. 1309, Shangye Road, Fengxi New Town, Xixian New District, Xi'an City, Shaanxi Province 710000 Applicant after: SHAANXI HEYOU NETWORK TECHNOLOGY CO.,LTD. Address before: Putian Internet of things innovation and R & D base, No.18, jingangsi Road, Donghu New Technology Development Zone, Wuhan City, Hubei Province, 430074 Applicant before: Wuhan yuanmingsheng Network Technology Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |