CN113250224A - Foundation structure of mountainside building and construction method - Google Patents

Foundation structure of mountainside building and construction method Download PDF

Info

Publication number
CN113250224A
CN113250224A CN202110668594.3A CN202110668594A CN113250224A CN 113250224 A CN113250224 A CN 113250224A CN 202110668594 A CN202110668594 A CN 202110668594A CN 113250224 A CN113250224 A CN 113250224A
Authority
CN
China
Prior art keywords
concrete layer
layer
mountain
foundation
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110668594.3A
Other languages
Chinese (zh)
Other versions
CN113250224B (en
Inventor
王晖
唐洪希
唐洪丹
岳添雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huazhong Weiye Construction Group Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202110668594.3A priority Critical patent/CN113250224B/en
Publication of CN113250224A publication Critical patent/CN113250224A/en
Application granted granted Critical
Publication of CN113250224B publication Critical patent/CN113250224B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers
    • E03F3/046Open sewage channels
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Health & Medical Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Building Environments (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Foundations (AREA)

Abstract

The invention relates to the technical field of constructional engineering, in particular to a mountainside building foundation; the technical scheme is as follows: a foundation structure of a mountainside building comprises a foundation plain concrete layer and a mountain supporting concrete layer which is obliquely arranged; the foundation plain concrete layer is used for covering the upper surface of a foundation, a foundation waterproof layer, a waterproof concrete layer and a gravel layer are sequentially laid on the foundation plain concrete layer, the cross section of the waterproof concrete layer is in an inwards concave arch shape, and the middle part of the waterproof concrete layer is longitudinally inclined; the mountain supporting concrete layer is used for covering an excavated mountain opposite to a mountain building, the mountain supporting concrete layer is provided with a plurality of drain holes, the drain holes penetrate through the mountain supporting concrete layer, and the lower side of the mountain supporting concrete layer is connected with the outer edge of the waterproof concrete layer. The invention can reduce the earth volume excavated by the mountain during the construction of the mountainside building foundation, thereby reducing the construction cost of the mountainside building foundation and shortening the construction period.

Description

Foundation structure of mountainside building and construction method
Technical Field
The invention relates to the technical field of building engineering, in particular to a mountainside building foundation structure and a construction method.
Background
The foundation structure of the building is a foundation mechanism for bearing all loads of the building, and for the mountainside buildings built in mountainous areas, the foundation structure needs to have enough bearing capacity and good drainage capacity so as to deal with the condition of torrential flood in rainy seasons, prevent rainwater from scouring the building foundation and ensure the safety of the building. In the existing mountainous buildings, drainage ditches and a sink basin are usually dug around a foundation structure, and in the case of a large flow of rainwater in a mountainous area, the depth and/or width of the drainage ditches are/is generally increased to improve the drainage capacity of the drainage ditches. However, increasing the depth of the drainage ditch not only increases the amount of earth excavated by the mountain, but also increases the instability of the mountain, and increases the engineering amount and difficulty of mountain protection; widening the drainage ditch greatly increases the earthwork amount of mountain excavation, increases the construction cost of building construction and prolongs the construction period.
Disclosure of Invention
Aiming at the technical problems of large earth volume of mountain excavation, high construction cost and long construction period when the drainage ditch of the mountain building foundation is constructed; the invention provides a mountainside building foundation which can reduce the earth volume of mountain excavation during the construction of the mountainside building foundation so as to reduce the construction cost of the mountainside building and shorten the construction period.
The invention is realized by the following technical scheme:
in a first aspect, the invention provides a foundation structure of a mountainside building, which comprises a basic plain concrete layer and a mountain supporting concrete layer which is obliquely arranged; the foundation plain concrete layer is used for covering the upper surface of a foundation, a foundation waterproof layer, a waterproof concrete layer and a gravel layer are sequentially laid on the foundation plain concrete layer, the cross section of the waterproof concrete layer is in an inwards concave arch shape, and the middle part of the waterproof concrete layer is longitudinally inclined; the mountain supporting concrete layer is used for covering an excavated mountain opposite to a mountain building, the mountain supporting concrete layer is provided with a plurality of drain holes, the drain holes penetrate through the mountain supporting concrete layer, and the lower side of the mountain supporting concrete layer is connected with the outer edge of the waterproof concrete layer.
When the mountain-side building foundation structure provided by the invention is built, a mountain is excavated according to the occupied area of the mountain-side building to be built, then a basic plain concrete layer, a basic waterproof layer, a waterproof concrete layer and a gravel layer are sequentially laid on a leveled foundation, and a mountain supporting concrete layer is laid on the side of the shaped excavated mountain, so that the lower side of the mountain supporting concrete layer is connected with the outer edge of the waterproof concrete layer. Because the slope of massif supporting concrete sets up and has seted up the wash port, the bow-shaped, the rubble layer of laying on the waterproof concrete layer that waterproof concrete layer cross section is the indent has the clearance for rivers that flow along massif supporting concrete layer, the rivers that flow from the wash port flow equally to the middle part on waterproof concrete layer. The waterproof concrete layer is longitudinally inclined, and the lower end of the waterproof concrete layer extends into the drainage channel of the mountain body, so that water flow is guided into the drainage channel of the mountain body, and drainage of the foundation of the mountain-side building is achieved.
The mountain supporting concrete layer is obliquely arranged, the building is usually vertically arranged, and a corresponding structure body is arranged between the building bottom plate and the building foundation mechanism, so that a larger gap exists between the building side wall and the mountain supporting concrete layer, and water flow left along the mountain supporting concrete layer cannot impact the side wall of the building; meanwhile, the building foundation has a large area, so that the gravel layer on the waterproof concrete layer also has a large enough area, and therefore, the gravel layer can be ensured to have enough drainage capacity, and the drainage requirement of the mountainside building foundation is met.
In conclusion, when the mountain-side building foundation structure provided by the invention is built, drainage ditches do not need to be dug independently, the drainage ditches do not need to be widened or deepened, and the mountain excavation amount is small; the invention only lays a gravel layer on the waterproof concrete layer and changes the shape of the waterproof concrete layer. Therefore, the mountainside building foundation structure provided by the invention can reduce the earth volume excavated by the mountains during the construction of the mountainside building foundation, thereby reducing the construction cost of the mountainside building foundation and shortening the construction period.
In an optional embodiment, the gravel layer comprises a first graded layer, a second graded layer and a third graded layer which are sequentially laid, and the crushed stone particle sizes of the first graded layer, the third graded layer and the second graded layer are sequentially increased. The broken stone with small particle size is paved on the waterproof concrete, so that the surface of the waterproof concrete layer is prevented from being damaged by the broken stone, and normal drainage can be performed; the middle part on rubble layer is the big rubble of particle diameter, can ensure that the rubble layer has sufficient drainage ability, lays the medium rubble of particle diameter at rubble layer top, can ensure the entering rubble layer that rivers can be normal, is convenient for lay the concrete again on the rubble layer simultaneously.
In an optional embodiment, a plain concrete layer is laid on the gravel layer to ensure the flatness of the top of the gravel layer, so that a waterproof layer can be laid on the gravel layer.
In an optional embodiment, the mountain support concrete gravel layer is provided with a plurality of Bingge net cages, the Bingge net cages are arranged around the periphery of the gravel layer, and the Bingge net cages which are opposite to the mountain support concrete layer and the mountain support concrete layer enclose a drainage ditch so as to surround the gravel layer through the Bingge net cages and prevent the gravel in the gravel layer from being displaced under the washing of water flow.
In an alternative embodiment, a top waterproof layer is laid on the plain roof concrete layer and the binge cage to prevent water in the building foundation mechanism from permeating to the building bottom plate.
In an optional embodiment, the mountain supporting concrete layer is provided with a plurality of drainage grooves, and the lower ends of the drainage grooves extend into the drainage ditches, so that when the water flow is large, the flowing water flowing along the mountain is guided into the drainage ditches, and the wall body of the mountain building is further prevented from being washed by rainwater.
In an alternative embodiment, the bottom of the drainage ditch is inclined longitudinally, and the shorter end of the drainage ditch and the shorter end of the waterproof concrete layer are positioned on the same side, so that water remained in the drainage ditch can be led out.
In an optional embodiment, a first smooth concrete layer is laid on the bottom surface of the drainage ditch, a second smooth concrete layer is arranged on the side wall of the drainage ditch far away from the mountain supporting concrete layer, the lower side of the second smooth concrete layer is connected with the first smooth concrete layer, and the height of the second smooth concrete layer is lower than that of the Bingge cage.
Set up the plain concrete bottom the escape canal, can avoid mingling with debris such as silt, branch in the rivers and remain in the escape canal. The lateral wall of keeping away from massif at the escape canal and strutting concrete layer sets up the plain concrete, can prevent to press from both sides debris such as branch in rivers and still remain in the binge box with a net outside after the drainage is accomplished. Simultaneously, strutting the concrete layer downside at first plain noodles concrete layer, second plain noodles concrete layer and massif and enclose into more shallow ditch, directly through the escape canal drainage when discharge is less, only through the metalling drainage when rivers are big, and when rivers are big, the rivers are fast, the scouring capacity is strong, can avoid being mingled with the silt in the rivers and deposit two drainage capacities that reduce the metalling in the rubble in a large number.
In an optional embodiment, the height of the second smooth concrete layer is less than half of the height of the Bingge net cage, so that the foundation structure of the mountainous-side building can discharge water flow when the water flow is too large, and the water flow is prevented from overflowing to the building bottom plate.
In an optional embodiment, the system further comprises a plurality of vertically arranged foundation piles, the lower ends of the foundation piles penetrate through the foundation plain concrete layer, and the upper ends of the foundation piles protrude out of the top waterproof layer, so that the adequate bearing capacity of the mountainside building foundation is ensured.
In a second aspect, the present invention further provides a method for constructing a foundation of a mountainside building, which is used for constructing the foundation structure of the mountainside building, and comprises the following steps:
excavating a mountain body according to the floor area of a mountainside building to be constructed, leveling a foundation and shaping the excavated side of the mountain body, so that the excavated side surface of the mountain body forms a groove;
pouring a mountain supporting concrete layer on the mountain excavation side, forming a drainage groove after the groove is attached to the concrete layer, and drilling a drainage hole on the mountain supporting concrete layer;
building foundation piles on the foundation;
after foundation piles are built, sequentially paving a basic plain concrete layer, a basic waterproof layer, a waterproof concrete layer, a gravel layer and a top plain concrete layer on the foundation;
building a Bingge net cage at the periphery of the gravel layer, so that a drainage ditch is formed by the Bingge net cage which is right opposite to the mountain supporting concrete layer and the mountain supporting mixed soil layer;
paving a first smooth concrete layer at the bottom of the drainage ditch, and paving a second smooth concrete layer on the side wall of the drainage ditch far away from the mountain supporting concrete layer;
and paving a top waterproof layer on the Bingge net cage and the top plain concrete layer to finish the construction of the foundation structure of the mountainside building.
The invention has the beneficial effects that:
according to the mountain-side building foundation structure provided by the invention, the mountain supporting concrete is obliquely arranged and provided with the drain holes, the cross section of the waterproof concrete layer is concave and arched, and the gravel layer laid on the waterproof concrete layer has gaps, so that water flow flowing along the mountain supporting concrete layer and water flow flowing out from the drain holes flow uniformly to the middle part of the waterproof concrete layer, the waterproof concrete layer is longitudinally inclined, the lower end of the waterproof concrete layer extends into the drainage channel of the mountain, so that the water flow is guided into the drainage channel of the mountain, a drainage ditch does not need to be dug independently, the drainage ditch does not need to be widened or deepened, and the excavated volume of the mountain is small. Therefore, the mountainside building foundation structure provided by the invention can reduce the earth volume excavated by the mountains during the construction of the mountainside building foundation, thereby reducing the construction cost of the mountainside building foundation and shortening the construction period.
Drawings
The accompanying drawings, which are included to provide a further understanding of the embodiments of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the principles of the invention. In the drawings:
FIG. 1 is a schematic cross-sectional view of a mountainside building foundation according to an embodiment of the present invention;
fig. 2 is an enlarged schematic view of a portion a of fig. 1.
Reference numbers and corresponding part names in the drawings:
1-basic plain concrete layer, 2-mountain supporting concrete layer, 21-drain hole, 22-drain groove, 4-basic waterproof layer, 5-waterproof concrete layer, 6-gravel layer, 61-first-stage matching layer, 62-second-stage matching layer, 63-third-stage matching layer, 7-top plain concrete layer, 8-binge net cage, 9-drain ditch, 91-first smooth concrete layer, 92-second smooth concrete layer, 10-top waterproof layer and 11-foundation pile.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail below with reference to examples and accompanying drawings, and the exemplary embodiments and descriptions thereof are only used for explaining the present invention and are not meant to limit the present invention.
Example 1
With reference to fig. 1 and 2, the present embodiment provides a foundation structure of a mountainside building, which includes a foundation plain concrete layer 1 and an obliquely arranged mountain supporting concrete layer 2; the foundation plain concrete layer 1 is used for covering the upper surface of a foundation, a foundation waterproof layer 4, a waterproof concrete layer 5 and a gravel layer 6 are sequentially laid on the foundation plain concrete layer 1, the cross section of the waterproof concrete layer 5 is in an inwards concave arch shape, and the middle part of the waterproof concrete layer 5 is longitudinally inclined; the mountain supporting concrete layer 2 is used for covering an excavated mountain opposite to a mountain building, the mountain supporting concrete layer 2 is provided with a plurality of drain holes 21, the drain holes 21 penetrate through the mountain supporting concrete layer 2, and the lower side of the mountain supporting concrete layer 2 is connected with the outer edge of the waterproof concrete layer 5.
Specifically, the crushed stone layer 6 comprises a first graded layer 61, a second graded layer 62 and a third graded layer 63 which are sequentially laid, and the crushed stone particle sizes of the first graded layer 61, the third graded layer 63 and the second graded layer 62 are sequentially increased. The gravel with small particle size is laid on the waterproof concrete, so that the surface of the waterproof concrete layer 5 is prevented from being damaged by the gravel, and normal drainage can be performed; the middle part of rubble layer 6 is the big rubble of particle diameter, can ensure that rubble layer 6 has sufficient drainage ability, lays the medium rubble of particle diameter at 6 tops in rubble layer, can ensure that rivers can be normal get into rubble layer 6, is convenient for lay the concrete again on rubble layer 6 simultaneously.
Further, a plain concrete layer 7 is laid on the gravel layer 6 to ensure the flatness of the top of the gravel layer 6, so that a waterproof layer is laid on the gravel layer 6.
Further, still include a plurality of binge check box with a net 8, it is a plurality of binge check box with a net 8 winds gravel layer 6 periphery sets up, and just right the concrete layer 2 is strutted to the massif binge check box with the massif is strutted the muddy soil layer and is enclosed into escape canal 9 to surround gravel layer 6 through binge check box with a net 8, avoid the rubble in gravel layer 6 to produce the displacement under the erodeing of rivers.
Further, a top waterproof layer 10 is laid on the top plain concrete layer 7 and the Bingge net cage 8 to prevent water in the building foundation mechanism from permeating to a building bottom plate.
Preferably, the mountain supporting concrete layer 2 is provided with a plurality of drainage grooves 22, and the lower ends of the drainage grooves 22 extend into the drainage ditches 9, so that when the water flow is large, the flowing water flowing along the mountain is guided into the drainage ditches 9, and the wall body of the mountain building is further prevented from being washed by rainwater.
It can be understood that the bottom of the drainage ditch 9 is longitudinally inclined, and the shorter end of the drainage ditch 9 and the shorter end of the waterproof concrete layer 5 are positioned on the same side, so that water remained in the drainage ditch 9 is led out.
Further, 9 bottom surfaces in escape canal are laid first plain noodles concrete layer 91, escape canal 9 is kept away from the lateral wall that concrete layer 2 was strutted to the massif is provided with second plain noodles concrete layer 92, second plain noodles concrete layer 92 downside with first plain noodles concrete layer 91 links to each other, just second plain noodles concrete layer 92 highly is less than the height of guest grid box 8.
Set up the plain concrete in 9 bottoms in escape canal, can avoid mingling with debris such as silt, branch in the rivers and remain in escape canal 9. The lateral wall of the drainage ditch 9 far away from the mountain supporting concrete layer 2 is provided with the smooth concrete, so that sundries such as branches clamped in water flow can be prevented from remaining outside the Bingge net cage 8 after drainage is completed. Simultaneously, 2 downside at first plain noodles concrete layer 91, second plain noodles concrete layer 92 and massif support concrete layer enclose into less ditch, directly pass through 9 drainage ditches of escape canal when discharge is less, only through the drainage of metalling 6 when rivers are big, and when rivers are big, rivers are fast, the scouring ability is strong, can avoid being mingled with the silt in the rivers and deposit in a large number and reduce the drainage ability of metalling 6 in the rubble.
Preferably, the height of the second smooth concrete layer 92 is less than half of the height of the binge box 8, so as to ensure that the foundation structure of the mountainous buildings can discharge water flow when the water flow is too large, and prevent the water flow from overflowing to the building bottom plate.
It should be understood that the foundation pile comprises a plurality of vertically arranged foundation piles 11, the lower ends of the foundation piles 11 penetrate through the foundation plain concrete layer 1, and the upper ends of the foundation piles 11 protrude out of the top waterproof layer 10, so that the adequate bearing capacity of the foundation of the mountainside building is ensured.
When the foundation structure of the mountain-side building provided by the embodiment is built, a mountain body is excavated according to the occupied area of the mountain-side building to be built, then a basic plain concrete layer 1, a basic waterproof layer 4, a waterproof concrete layer 5 and a gravel layer 6 are sequentially laid on a leveled foundation, and a mountain body supporting concrete layer 2 is laid on the side of the excavated mountain body after being shaped, so that the lower side of the mountain body supporting concrete layer 2 is connected with the outer edge of the waterproof concrete layer 5. Because the mountain supporting concrete is obliquely arranged and provided with the drain hole 21, the cross section of the waterproof concrete layer 5 is concave-inward arched, and the gravel layer 6 laid on the waterproof concrete layer 5 has a gap, the water flow flowing along the mountain supporting concrete layer 2 and the water flow flowing out of the drain hole 21 flow uniformly to the middle part of the waterproof concrete layer 5. The waterproof concrete layer 5 is longitudinally inclined, and the lower end of the waterproof concrete layer 5 extends into the drainage channel of the mountain body, so that water flow is guided into the drainage channel of the mountain body, and drainage of the foundation of the mountainous building is achieved.
The mountain supporting concrete layer 2 is obliquely arranged, the building is usually vertically arranged, and a corresponding structure body is arranged between the building bottom plate and the building foundation mechanism, so that a larger gap exists between the building side wall and the mountain supporting concrete layer 2, and water flow left along the mountain supporting concrete layer 2 cannot impact the side wall of the building; meanwhile, the building foundation has a large area, so that the gravel layer 6 on the waterproof concrete layer 5 also has a large enough area, and therefore, the gravel layer 6 can be ensured to have enough water drainage capacity, and the water drainage requirement of the mountainside building foundation is met.
In conclusion, when the foundation structure of the mountain-side building provided by the embodiment is built, the drainage ditch 9 does not need to be dug independently, the drainage ditch 9 does not need to be widened or deepened, and the excavated volume of the mountain is small; the foundation of the building foundation is paved with plain concrete, a foundation waterproof layer 4 and a waterproof concrete layer 5, and the mountain supporting concrete layer 2 is paved on the excavated side of the mountain, which are basic structures required by the mountainside buildings. Therefore, the mountainside building foundation structure provided by the embodiment can reduce the earth volume excavated by the mountains during the construction of the mountainside building foundation, thereby reducing the construction cost of the mountainside building foundation and shortening the construction period.
Example 2
The embodiment provides a method for constructing a foundation of a mountainside building, which is used for constructing the foundation structure of the mountainside building and comprises the following steps:
excavating a mountain body according to the floor area of a mountainside building to be constructed, leveling a foundation and shaping the excavated side of the mountain body, so that the excavated side surface of the mountain body forms a groove;
pouring a mountain supporting concrete layer 2 on the mountain excavation side, forming a drainage groove 22 after the groove is attached with the concrete layer, and drilling a drainage hole 21 on the mountain supporting concrete layer 2;
building foundation piles 11 on the foundation;
after foundation piles 11 are built, sequentially paving a basic plain concrete layer 1, a basic waterproof layer 4, a waterproof concrete layer 5, a gravel layer 6 and a top plain concrete layer 7 on the foundation;
building a Bingge net cage 8 at the periphery of the gravel layer 6, so that a drainage ditch 9 is formed by the Bingge net cage 8 which is opposite to the mountain supporting concrete layer 2 and the mountain supporting mixed soil layer;
paving a first smooth concrete layer 91 at the bottom of the drainage ditch 9, and paving a second smooth concrete layer 92 on the side wall of the drainage ditch 9 far away from the mountain supporting concrete layer 2;
and paving a top waterproof layer 10 on the Bingge net cage 8 and the top plain concrete layer 7 to finish building of the foundation structure of the mountainside building.
The above-mentioned embodiments are intended to illustrate the objects, technical solutions and advantages of the present invention in further detail, and it should be understood that the above-mentioned embodiments are merely exemplary embodiments of the present invention, and are not intended to limit the scope of the present invention, and any modifications, equivalent substitutions, improvements and the like made within the spirit and principle of the present invention should be included in the scope of the present invention.

Claims (10)

1. A foundation structure of a mountainside building is characterized by comprising a foundation plain concrete layer (1) and a mountain supporting concrete layer (2) which is obliquely arranged;
the foundation plain concrete layer (1) is used for covering the upper surface of a foundation, a foundation waterproof layer (4), a waterproof concrete layer (5) and a gravel layer (6) are sequentially laid on the foundation plain concrete layer (1), the cross section of the waterproof concrete layer (5) is in an inwards concave arch shape, and the middle part of the waterproof concrete layer (5) is longitudinally inclined;
the mountain supporting concrete layer (2) is used for covering a mountain just opposite to a mountain excavated by a mountain building, the mountain supporting concrete layer (2) is provided with a plurality of drain holes (21), the drain holes (21) penetrate through the mountain supporting concrete layer (2), and the lower side of the mountain supporting concrete layer (2) is connected with the outer edge of the waterproof concrete layer (5).
2. A mountaineering building foundation structure according to claim 1, wherein the gravel layer (6) comprises a first graded layer (61), a second graded layer (62) and a third graded layer (63) which are laid in sequence, and the gravel particle size of the first graded layer (61), the third graded layer (63) and the second graded layer (62) is increased in sequence.
3. A mountaineering building foundation structure according to claim 1 or 2, characterized in that a layer of plain concrete (7) is laid on the gravel layer (6).
4. A mountainside architecture foundation structure as claimed in claim 3, further comprising a plurality of Bingge net cages (8), wherein the plurality of Bingge net cages (8) are arranged around the periphery of the gravel layer (6), and the Bingge net cages (8) facing the mountain supporting concrete layer (2) and the mountain supporting concrete layer enclose drainage ditches (9).
5. A mountaineering building foundation structure according to claim 4, wherein a roof waterproof layer (10) is laid on the plain roof concrete layer (7) and the Bingge cage (8).
6. A mountaineering building foundation structure according to claim 4, wherein the mountain supporting concrete layer (2) is provided with a plurality of drainage grooves (22), and the lower ends of the drainage grooves (22) extend into the drainage ditch (9).
7. A mountaineering building foundation structure according to claim 4, wherein a first smooth concrete layer (91) is laid on the bottom surface of the drainage ditch (9), a second smooth concrete layer (92) is arranged on the side wall of the drainage ditch (9) far away from the mountain supporting concrete layer (2), the lower side of the second smooth concrete layer (92) is connected with the first smooth concrete layer (91), and the height of the second smooth concrete layer (92) is lower than that of the Bingge cage (8).
8. A mountaineering building infrastructure according to claim 7, characterized in that the height of the second plain concrete layer (92) is less than half the height of the binge grid box (8).
9. A mountaineering building foundation structure according to claim 8, further comprising a plurality of vertically arranged foundation piles (11), wherein the lower ends of the foundation piles (11) penetrate through the foundation plain concrete layer (1), and the upper ends of the foundation piles (11) protrude out of the top waterproof layer (10).
10. A method of constructing a foundation of a mountainside building for constructing a foundation structure of the mountainside building according to any one of claims 1 to 9, comprising the steps of:
excavating a mountain body according to the occupied area of a mountainside building to be constructed, leveling a foundation and shaping the excavated side of the mountain body, so that the excavated side surface of the mountain body forms a groove;
a mountain supporting concrete layer (2) is poured on the mountain excavation side, a drainage groove (22) is formed after the concrete layer is attached to the groove, and a drainage hole (21) is drilled in the mountain supporting concrete layer (2);
building foundation piles (11) on the foundation;
after foundation piles (11) are built, sequentially paving a basic plain concrete layer (1), a basic waterproof layer (4), a waterproof concrete layer (5), a gravel layer (6) and a top plain concrete layer (7) on the foundation;
building a Bingge net cage (8) at the periphery of the gravel layer (6) so as to enclose a drainage ditch (9) between the Bingge net cage (8) which is right opposite to the mountain supporting concrete layer (2) and the mountain supporting concrete layer;
paving a first smooth concrete layer (91) at the bottom of the drainage ditch (9), and paving a second smooth concrete layer (92) on the side wall of the drainage ditch (9) far away from the mountain supporting concrete layer (2);
and paving a top waterproof layer (10) on the binge grid box (8) and the top plain concrete layer (7) to finish the construction of the foundation structure of the mountainside building.
CN202110668594.3A 2021-06-16 2021-06-16 Foundation structure of mountaineering building and construction method Active CN113250224B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110668594.3A CN113250224B (en) 2021-06-16 2021-06-16 Foundation structure of mountaineering building and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110668594.3A CN113250224B (en) 2021-06-16 2021-06-16 Foundation structure of mountaineering building and construction method

Publications (2)

Publication Number Publication Date
CN113250224A true CN113250224A (en) 2021-08-13
CN113250224B CN113250224B (en) 2023-02-07

Family

ID=77188196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110668594.3A Active CN113250224B (en) 2021-06-16 2021-06-16 Foundation structure of mountaineering building and construction method

Country Status (1)

Country Link
CN (1) CN113250224B (en)

Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5245113A (en) * 1975-10-06 1977-04-09 Mitsubishi Oil Co Method of building foundation for tank
KR20020043506A (en) * 2001-10-30 2002-06-10 이재경 Process for constructing retaining wall safely by natural stones
JP2006274657A (en) * 2005-03-29 2006-10-12 Kunio Okada Construction method of building foundation structure
CN101775817A (en) * 2010-02-04 2010-07-14 魏勇 Structure for preventing cold penetration and dewing of basement base plate of costal building and construction method thereof
CN101914918A (en) * 2010-07-12 2010-12-15 无锡市政设计研究院有限公司 High-steep side slope and intensely weathered bed rock solid waste landfill site seepage prevention structure and treatment method thereof
CN103061352A (en) * 2011-10-21 2013-04-24 中铁二十一局集团有限公司 Salt lake region bridge foundation concrete anticorrosion structure and construction method
CN103526770A (en) * 2013-10-16 2014-01-22 鸿鑫建设集团有限公司 High-impermeable anti-floating pile raft structure and construction method
WO2017000918A1 (en) * 2015-07-02 2017-01-05 厦门市宜景环境工程有限公司 Intermittent pressure flow drainage system
CN108914959A (en) * 2018-07-12 2018-11-30 湖北工业大学 A kind of foundation structure and its construction method built suitable for mountain area room
CN108930263A (en) * 2018-09-04 2018-12-04 商丘工学院 A kind of basement process structure based on level of ground water
CN109797769A (en) * 2019-03-14 2019-05-24 兰州理工大学 A kind of Collapsible Loess District underground pipe gallery foundation structure and its construction method
CN109898533A (en) * 2019-03-27 2019-06-18 中建一局集团第二建筑有限公司 The built-in Precipitation Structure of raft plate, the shut-in well structure of dewatering well and shut-in well method
CN110439014A (en) * 2019-07-26 2019-11-12 中国核工业华兴建设有限公司 A kind of underground stratiform discharge structure and its construction method
CN111042310A (en) * 2019-12-14 2020-04-21 中冶天工集团有限公司 Basement bottom plate structure and construction method thereof
CN210395463U (en) * 2019-07-29 2020-04-24 刘季琳 Anti structure of floating of stake bottom plate of underground construction
JP6695562B1 (en) * 2020-01-27 2020-05-20 株式会社フジコーポレーション Impermeable side wall structure, bottom slab / side wall structure and impermeable side wall construction method
CN210712874U (en) * 2019-08-15 2020-06-09 辽宁建筑职业学院 Slope protection structure for civil engineering
CN111373100A (en) * 2017-08-18 2020-07-03 查尔斯·莫耶尔 Shaping, drainage and ventilation system for agriculture, irrigation and sports fields
CN111576487A (en) * 2020-06-01 2020-08-25 许庆仁 Underground engineering foundation bottom plate structure and construction method thereof
CN213115347U (en) * 2021-02-22 2021-05-04 中铁九局集团第四工程有限公司 Dampproof ground
CN213233502U (en) * 2020-07-23 2021-05-18 河北人地生态工程有限公司 Highway subgrade landslide prevention device
CN214530813U (en) * 2021-03-18 2021-10-29 王晖 Anti foundation structure that floats of building
CN114525819A (en) * 2022-02-24 2022-05-24 北京建工四建工程建设有限公司 Vibration isolation structure of tower crane foundation and construction method thereof

Patent Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5245113A (en) * 1975-10-06 1977-04-09 Mitsubishi Oil Co Method of building foundation for tank
KR20020043506A (en) * 2001-10-30 2002-06-10 이재경 Process for constructing retaining wall safely by natural stones
JP2006274657A (en) * 2005-03-29 2006-10-12 Kunio Okada Construction method of building foundation structure
CN101775817A (en) * 2010-02-04 2010-07-14 魏勇 Structure for preventing cold penetration and dewing of basement base plate of costal building and construction method thereof
CN101914918A (en) * 2010-07-12 2010-12-15 无锡市政设计研究院有限公司 High-steep side slope and intensely weathered bed rock solid waste landfill site seepage prevention structure and treatment method thereof
CN103061352A (en) * 2011-10-21 2013-04-24 中铁二十一局集团有限公司 Salt lake region bridge foundation concrete anticorrosion structure and construction method
CN103526770A (en) * 2013-10-16 2014-01-22 鸿鑫建设集团有限公司 High-impermeable anti-floating pile raft structure and construction method
WO2017000918A1 (en) * 2015-07-02 2017-01-05 厦门市宜景环境工程有限公司 Intermittent pressure flow drainage system
CN111373100A (en) * 2017-08-18 2020-07-03 查尔斯·莫耶尔 Shaping, drainage and ventilation system for agriculture, irrigation and sports fields
CN108914959A (en) * 2018-07-12 2018-11-30 湖北工业大学 A kind of foundation structure and its construction method built suitable for mountain area room
CN108930263A (en) * 2018-09-04 2018-12-04 商丘工学院 A kind of basement process structure based on level of ground water
CN109797769A (en) * 2019-03-14 2019-05-24 兰州理工大学 A kind of Collapsible Loess District underground pipe gallery foundation structure and its construction method
CN109898533A (en) * 2019-03-27 2019-06-18 中建一局集团第二建筑有限公司 The built-in Precipitation Structure of raft plate, the shut-in well structure of dewatering well and shut-in well method
CN110439014A (en) * 2019-07-26 2019-11-12 中国核工业华兴建设有限公司 A kind of underground stratiform discharge structure and its construction method
CN210395463U (en) * 2019-07-29 2020-04-24 刘季琳 Anti structure of floating of stake bottom plate of underground construction
CN210712874U (en) * 2019-08-15 2020-06-09 辽宁建筑职业学院 Slope protection structure for civil engineering
CN111042310A (en) * 2019-12-14 2020-04-21 中冶天工集团有限公司 Basement bottom plate structure and construction method thereof
JP6695562B1 (en) * 2020-01-27 2020-05-20 株式会社フジコーポレーション Impermeable side wall structure, bottom slab / side wall structure and impermeable side wall construction method
CN111576487A (en) * 2020-06-01 2020-08-25 许庆仁 Underground engineering foundation bottom plate structure and construction method thereof
CN213233502U (en) * 2020-07-23 2021-05-18 河北人地生态工程有限公司 Highway subgrade landslide prevention device
CN213115347U (en) * 2021-02-22 2021-05-04 中铁九局集团第四工程有限公司 Dampproof ground
CN214530813U (en) * 2021-03-18 2021-10-29 王晖 Anti foundation structure that floats of building
CN114525819A (en) * 2022-02-24 2022-05-24 北京建工四建工程建设有限公司 Vibration isolation structure of tower crane foundation and construction method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
焦忠华: "雍景台大厦基坑支护工程设计与施工", 《施工技术》 *

Also Published As

Publication number Publication date
CN113250224B (en) 2023-02-07

Similar Documents

Publication Publication Date Title
CN112392127B (en) Dendritic embedded type flexible ecological slope drainage ditch and construction method
CN113235626A (en) Medium-strong expansive rock soil slope protection structure and construction method
CN102383408B (en) Greening method for high water level impermeable saline and alkaline lands and greening system
CN102425175B (en) Reinforcement protective structure of large spoil disposal area in mountainous area
CN112832288A (en) Anti-floating structure of sloping field building basement and construction method thereof
CN109235469A (en) A kind of Cut Slopes of Expansive Soil structure and its construction method
CN210177294U (en) Mountain area highway subgrade
CN210596858U (en) Plateau permafrost region roadbed structure
CN104818734B (en) Control completely decomposed granite side slope damage by water waterproof and water drainage system and construction method thereof
CN112726638A (en) Expansive soil cutting slope protection structure and construction method
CN209412838U (en) A kind of Cut Slopes of Expansive Soil structure
CN108914959B (en) Foundation structure suitable for mountain house building and construction method thereof
CN204225069U (en) Bank protection work unfavorable geology shallow underground drainage system
CN113250224B (en) Foundation structure of mountaineering building and construction method
CN206768838U (en) A kind of Protection of Expansive Soil structure
CN110080234A (en) A method of it is excavated in the secondary central island of deep foundation pit of soft soil foundation
CN214363925U (en) Cut water seepage ditch system
CN214831569U (en) Roadbed drainage structure of road and bridge engineering
CN210946533U (en) A closed channel structure for open cut construction
CN212316950U (en) Slope structure
CN106149736A (en) The construction method stable based on cutting draining holding hillside fields bury excavation slope
CN207297090U (en) A kind of sewer structure for expansive stratum Tunnel Base draining
CN209194456U (en) Antiseepage landslide-proofing bank protection structure
CN216787153U (en) Basement drain gallery structure of backfilling in advance
CN216006460U (en) Semi-filling and semi-excavating ecological roadbed structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20230113

Address after: 442000 ohmlin Industrial Park, Changling Economic Development Zone, Yun County, Shiyan City, Hubei Province

Applicant after: Hubei Yuncheng Construction Group Co.,Ltd.

Address before: 610000 room 2101, 21 / F, unit 1, building 51, No. 555, Fengxi Avenue South section, Liucheng, Wenjiang District, Chengdu, Sichuan

Applicant before: Wang Hui

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 442512 omlin Industrial Park, Changling Economic Development Zone, Yun County, Shiyan City, Hubei Province

Patentee after: Huazhong Weiye Construction Group Co.,Ltd.

Address before: 442000 ohmlin Industrial Park, Changling Economic Development Zone, Yun County, Shiyan City, Hubei Province

Patentee before: Hubei Yuncheng Construction Group Co.,Ltd.

CP03 Change of name, title or address