CN113205275A - Decoration order dispatching method, system, storage medium and equipment - Google Patents

Decoration order dispatching method, system, storage medium and equipment Download PDF

Info

Publication number
CN113205275A
CN113205275A CN202110570961.6A CN202110570961A CN113205275A CN 113205275 A CN113205275 A CN 113205275A CN 202110570961 A CN202110570961 A CN 202110570961A CN 113205275 A CN113205275 A CN 113205275A
Authority
CN
China
Prior art keywords
decoration
construction
construction team
idle
team
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110570961.6A
Other languages
Chinese (zh)
Inventor
胡斐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baianju Information Technology Shanghai Co ltd
Original Assignee
Baianju Information Technology Shanghai Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baianju Information Technology Shanghai Co ltd filed Critical Baianju Information Technology Shanghai Co ltd
Priority to CN202110570961.6A priority Critical patent/CN113205275A/en
Publication of CN113205275A publication Critical patent/CN113205275A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063114Status monitoring or status determination for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a decoration order dispatching method, a decoration order dispatching system, a storage medium and equipment. The method comprises the steps of obtaining decoration construction site information in a signing decoration order; acquiring all idle construction team information in a decoration construction time period required by an owner and all construction team information added into a decoration platform or a decoration company, wherein the idle construction team service radiation region covers a decoration construction site; calculating the distance between the idle construction team address and the decoration construction site address, and calculating a list dispatching weight value of the idle construction team according to the distance and other information of the construction team; and sequencing the order dispatching weight values of the construction teams and dispatching orders according to sequencing results. The invention can automatically match the signed decoration order to the construction team with high fitness with the decoration project of the signed owner, thereby solving the unfairness problem of manual order dispatching, reducing the cost, indirectly improving the decoration efficiency and the decoration quality of the decoration project and further improving the satisfaction of both the owner and the construction team.

Description

Decoration order dispatching method, system, storage medium and equipment
Technical Field
The invention relates to the field of decoration order dispatching, in particular to a decoration order dispatching method, a decoration order dispatching system, a storage medium and equipment.
Background
At present, after an owner signs a decoration contract with a home decoration platform or a decoration company, manual ordering is basically adopted when an assigned construction team enters a construction site for construction, if the number of the construction teams signed in cooperation with the home decoration platform or the decoration company is large and the construction teams are idle, the manual ordering mode has great unfairness, for example, the owner is located in a house to be decorated in an area A, the house decoration order is assigned to a construction team in an area B, and the work enthusiasm of other construction teams can be seriously influenced by the manual ordering mode. Moreover, the improper order dispatching method can also increase the construction cost, the labor cost and the cost of transportation materials.
Disclosure of Invention
In view of the above-mentioned shortcomings in the prior art, it is an object of the present invention to provide a decoration order dispatching method, system, storage medium and device, which solve the above problems in the prior art.
To achieve the above and other related objects, the present invention provides a decoration order dispatching method, system, storage medium and device, wherein the method comprises: obtaining decoration construction site information in a signed decoration order; acquiring all idle construction team information in a decoration construction time period required by an owner and all construction team information added into a decoration platform or a decoration company, wherein the idle construction team service radiation region covers a decoration construction site; calculating the distance between the idle construction team address and the decoration construction site address, and calculating a list dispatching weight value of the idle construction team according to the distance and other information of the construction team; and sorting the order dispatching weight values of the idle construction teams and dispatching orders according to sorting results.
In an embodiment of the present invention, the method further includes: and obtaining the longitude and latitude of a starting position and the longitude and latitude of an ending position through an api interface to calculate the distance between two places, wherein the starting position and the ending position are the decoration site address and the idle construction team address.
In an embodiment of the present invention, the decoration site information and the free construction team information in the decoration order and all construction team information added to the decoration platform or decoration company in the method include: the decoration construction site address, owner's demand fitment construction time section, the directory and the address of idle construction team, add the work score and the receptivity of all construction teams of fitment platform or fitment company.
In an embodiment of the present invention, the method includes the following steps: the sum of the weight of the distance between the idle construction team and the decoration construction site, the work scoring weight of the idle construction team and the bearing capacity weight of the idle construction team; the weight of the distance between the idle construction team and the decoration construction site is equal to 1/(the distance between the idle construction team and the decoration construction site +1) × weight proportion; the idle construction team work scoring weight is equal to the weight ratio of the idle construction team work scoring/the maximum value of the company construction team work scoring; the bearing capacity weight of the idle construction team is equal to the bearing force of the idle construction team/the maximum value of the bearing force of the company construction team; the weight proportion of the distance between the idle construction team and the decoration construction site, the weight proportion of the work scores of the idle construction team and the weight proportion of the bearing capacity of the idle construction team are preset values, and the sum of the weight proportions is 100%.
In an embodiment of the present invention, the method further includes: the construction team work score is preset with a basic score, and the decoration company patrol team patrols and examines after each order receiving construction of the construction team and increases or decreases the score according to the patrol result and the owner score according to the reward and penalty standard.
In an embodiment of the present invention, the method further includes: the construction team bearing capacity is preset with a foundation score, and the bearing capacity is increased or decreased according to the construction team order receiving times and rework times.
In an embodiment of the present invention, the method further includes: sorting the order weight values of the idle construction teams from high to low, and assigning the decoration order to the idle construction team with the highest order weight value; if the idle construction team refuses to receive the order, continuously assigning the decoration order to the idle construction team with the next weighted value according to the order weight value from high to low; and if all idle construction teams refuse to receive orders, performing manual coordination and dispatching orders.
To achieve the above and other related objects, the present invention provides a decoration order form dispatching system, comprising: the decoration building site and construction team information acquisition module is used for acquiring decoration building site information, idle construction team information and all construction team information added to a decoration platform or a decoration company in the decoration order; the information processing module is used for calculating the distance between the free construction team address and the decoration site address and the order weight value of the free construction team according to the obtained information; the sorting module is used for sorting the order weight values of the idle construction teams according to the height; and the order dispatching module is used for dispatching orders according to the order dispatching weight value sorting result of the idle construction team.
To achieve the above and other related objects, the present invention provides a computer-readable storage medium, wherein a computer program is stored, and when the computer program is loaded and executed by a processor, the decoration order dispatching method is implemented.
To achieve the above and other related objects, the present invention provides an electronic device, comprising: a processor, a memory; wherein the memory is for storing a computer program; the processor is used for loading and executing the computer program so as to enable the electronic equipment to execute the decoration order dispatching method.
As described above, the decoration order dispatching method, system, storage medium, and device provided by the present invention automatically match a signed order to an idle construction team with a high fitness with the decoration project of the signed owner. In the process of dispatching the order, an idle construction team with high matching degree is intelligently selected according to the house location (namely the building site location) required to be decorated by the owner, the service range, the carrying capacity and the work score of the construction team, so that the unfairness problem of manual dispatching is solved, the cost is reduced, the decoration efficiency and the decoration quality of a decoration project are indirectly improved, and the satisfaction degrees of both the owner and the idle construction team are further improved.
Drawings
Fig. 1 is a flow chart illustrating a decoration order dispatching method according to an embodiment of the invention.
Fig. 2 is a block diagram of a finishing order dispatching system according to an embodiment of the invention.
Fig. 3 is a schematic structural diagram of an electronic device according to an embodiment of the invention.
Detailed Description
The embodiments of the present invention are described below with reference to specific embodiments, and other advantages and effects of the present invention will be easily understood by those skilled in the art from the disclosure of the present specification. The invention is capable of other and different embodiments and of being practiced or of being carried out in various ways, and its several details are capable of modification in various respects, all without departing from the spirit and scope of the present invention. It is to be noted that the features in the following embodiments and examples may be combined with each other without conflict.
It should be noted that the drawings provided in the following embodiments are only for illustrating the basic idea of the present invention, and the components related to the present invention are only shown in the drawings rather than drawn according to the number, shape and size of the components in actual implementation, and the type, quantity and proportion of the components in actual implementation may be changed freely, and the layout of the components may be more complicated.
In order to solve the problems that other idle construction teams are not full of mind to influence the subsequent working enthusiasm, work efficiency is rewarded, construction quality is anxious and the like due to the fact that idle construction teams are manually distributed aiming at a signed decoration order in the prior art, and in order to distribute an idle construction team with high suitability in all aspects to a signed decoration project and reduce cost as much as possible, the invention provides a decoration order distributing method, a decoration order distributing system, a storage medium and a device.
As shown in fig. 1, the present embodiment provides a decoration order dispatching method, which includes the following steps:
s11: and obtaining decoration construction site information in the signing decoration order.
Specifically, after an owner signs a decoration order with a decoration platform or a decoration company, the decoration site information in the decoration order, including a decoration site address, a floor plan, a decoration design drawing, a decoration time period required by the owner and the like, is obtained and stored, so that after information processing, a free construction team is dispatched and a free construction team is accepted for the decoration order, and then a construction plan is generated according to the information.
Furthermore, the longitude and latitude of the decoration construction site address are obtained through the map api interface and stored.
S12: the method comprises the steps of obtaining all idle construction team information in a decoration construction time period required by an owner and all construction team information added into a decoration platform or a decoration company, wherein the idle construction team service radiation region covers a decoration construction site.
Specifically, according to the decoration time period required by an owner and the service radiation regional scope of a construction team, an idle construction team directory without work tasks in the time period, the addresses of all construction teams in the directory, and the current work scores and the current carrying capacity of all construction teams added into a decoration platform or a decoration company are obtained. The service radiation geographical range of the construction team in the directory is covered with the decoration site address in the signed order.
Further, the current work score of each construction team in the idle construction team directory is obtained, and the current work score and the construction condition after the past order receiving have a corresponding relation. When a construction team receives a decoration order for construction each time, a decoration platform or a decoration company inspection team inspects in the period, scores are increased or decreased according to inspection results and owner scores according to the reward and penalty standards, and basic scores are preset corresponding to the work scores of the construction team. Specifically, in the inspection process, the construction team finishes the inspection in advance according to the construction standard, and the working score is increased; the construction team does not finish the construction according to the construction standard in advance, and the work score is reduced; carrying out illegal operation by a construction team, and reducing the work score of the construction team; the construction is evaluated by the owner, and the working grade is increased. The working score is minimized to a predetermined minimum, preferably 0. For example, when a construction team joins a finishing platform or finishing company, its job score base score is set to 0. After receiving a decoration order, the construction team finishes the decoration in advance according to the construction standard and increases the work score by 1; the construction team does not finish the construction in advance according to the construction standard, and the work score is reduced by 1; carrying out illegal operation by a construction team, and reducing the working score by 2 points; the construction is scored well by the owner, and the working score is increased by 1 point. If the working score is reduced to a negative number, the score is directly 0.
Further, the current bearing capacity of each construction team in the idle construction team directory is obtained, the current bearing capacity is related to the order receiving times and the rework times of each construction team in the past, the bearing capacity is increased or decreased according to the order receiving times and the rework times, and the bearing capacity of the construction team is preset with a basic score. Specifically, the carrying capacity is increased when a construction team receives a decoration order each time; a reworking process exists in the construction process, so that the bearing capacity is reduced; and in the construction process, no reworking procedure is required and the bearing capacity is increased after the owner checks and accepts the construction. The minimum receiving capacity is reduced to a preset minimum value, and preferably, the preset minimum value is set to 0. For example, when a construction team joins a finishing platform or finishing company, its receptivity base score is set to 0. After receiving a decoration order, the construction team increases the carrying capacity by 1; the construction process has a rework process, and the bearing capacity of the construction process is reduced by 1; and in the construction process, no rework procedure is needed and the bearing capacity is increased by 1 after the owner checks and accepts the construction. If the carrying capacity is reduced to a negative number, the carrying capacity is directly reduced to 0.
Furthermore, the longitude and latitude of the construction team address are obtained through a map api interface.
S13: and calculating the distance between the idle construction team address and the decoration construction site address, and calculating a list dispatching weight value of the idle construction team according to the distance and other information of the construction team.
Specifically, the two-place distance is calculated according to the longitude and latitude of the decoration construction site and the longitude and latitude of the construction team address through a map api interface.
For example, the distance is calculated by the Gade map APIhttp:// restapi. amap. com/v 3/distancey ═ 6119e85defa6a97be090a0af41f0613c7 [ + startLonLat + "& destination [ + endLonLat [ ]/
key is key, startLonLat is start position longitude and latitude, and endLonLat end position longitude and latitude. The longitude and latitude of the decoration company address can be defined as the longitude and latitude of the starting position, and the longitude and latitude of the construction team address can be defined as the longitude and latitude of the ending position.
Further, the distances from the finishing site address to all the construction team addresses in the free construction team directory are calculated, for example, the free construction team directory is construction team A, B, C, D, E, F with addresses a, b, c, d, e, f, and the distances from the finishing site to a, b, c, d, e, f are calculated respectively.
Further, the order weight value of each idle construction team is the sum of the weight of the distance between the construction team and the decoration construction site, the construction team work scoring weight and the construction team bearing capacity weight.
Further, the weight of the distance between the construction team and the finishing site is equal to 1/(the distance between the construction team and the finishing site +1) × the weight ratio.
Furthermore, the construction team work score weight is equal to the maximum value of the construction team work score/company construction team work score-weight ratio, and the maximum value of the company construction team work score is obtained by comparing the current work scores of all construction teams added to the decoration platform or the company and taking the maximum value.
Furthermore, the bearing capacity weight of the construction team is equal to the bearing capacity of the construction team/the maximum value of the bearing capacity of the company construction team, namely the weight ratio, and the maximum value of the bearing capacity of the company construction team is obtained by comparing the current bearing capacities of all the construction teams added into the decoration platform or the company.
Further, the weight proportion of the distance between the construction team and the decoration site, the weight proportion of the work scores of the construction team and the weight proportion of the bearing capacity of the construction team are preset values, and the sum of the weight proportions is 100%. Preferably, the weight proportion of the distance between the construction team and the decoration site is preset to be 40%, the weight proportion of the work score of the construction team is preset to be 30%, and the weight proportion of the bearing capacity of the construction team is preset to be 30%.
In an embodiment of the present invention, the calculation method of the order weight value of each construction team is as follows:
the construction team dispatch single weight is 1/(the distance between the construction team and the decoration construction site +1) × 40% + construction team work score/company construction team work score maximum value × 30% + construction team bearing force/company construction team bearing force maximum value × 30%
S14: and sorting the order dispatching weight values of the idle construction teams and dispatching orders according to sorting results.
Specifically, all idle construction teams are ranked from high to low according to the calculated weight value of the order form of S13, and the order form is carried out according to the ranking result. Preferably, the decoration order is assigned to a construction team with the highest order weight value; if the construction team refuses to receive the order, the decoration order is continuously distributed to the construction team with the second highest order weight value according to the order weight value ranking; if the construction team with the second highest order weight value refuses to receive the order, the decoration order is continuously distributed to the construction team with the third highest order weight value according to the order weight value ranking; automatic dispatching is performed in sequence. And if all the construction teams refuse to receive orders, the manual work and the construction teams carry out communication coordination so as to send the orders manually.
Further, after the construction team receives the order, a construction plan is asynchronously generated, the time is confirmed by the owner, the construction team signs in, the construction team and the owner perform a construction starting instrument, and the construction stage is started.
All or part of the steps for implementing the above method embodiments may be performed by hardware associated with a computer program. Based upon such an understanding, the present invention also provides a computer program product comprising one or more computer instructions. The computer instructions may be stored in a computer readable storage medium. The computer-readable storage medium can be any available medium that a computer can store or a data storage device, such as a server, a data center, etc., that is integrated with one or more available media.
Referring to fig. 2, the present embodiment provides a decoration order assigning system 20, which is installed in an electronic device as a software to execute the decoration order assigning method according to the foregoing method embodiment during operation. Since the technical principle of the embodiment of the system is similar to that of the embodiment of the method, repeated description of the same technical details is omitted.
The decoration order form dispatching system 20 of the embodiment specifically includes: the system comprises a decoration building site and construction team information acquisition module 21, an information processing module 22, a sequencing module 23 and a scheduling module 24. The decoration site and construction team information acquisition module 21 is used for acquiring decoration site information, the idle construction team information and all construction team information added to a decoration platform or a decoration company in the decoration order; the information processing module 22 is used for calculating the distance between the free construction team address and the decoration site address and the order weight value of the free construction team according to the obtained information; the sorting module 23 is configured to sort the order weight values of the construction teams according to the high or low; and the order dispatching module 24 is used for dispatching orders according to the order dispatching weight value sorting result of the construction team.
Those skilled in the art should understand that the division of the modules in the embodiment of fig. 2 is only a logical division, and the actual implementation can be fully or partially integrated into one or more physical entities. And the modules can be realized in a form that all software is called by the processing element, or in a form that all the modules are realized in a form that all the modules are called by the processing element, or in a form that part of the modules are called by the hardware. For example, the information processing module 22 may be a separate processing element, or may be integrated in a chip, or may be stored in a memory in the form of program code, and a certain processing element calls and executes the function of the information processing module 22. Other modules are implemented similarly. The processing element described herein may be an integrated circuit having signal processing capabilities. In implementation, each step of the above method or each module above may be implemented by an integrated logic circuit of hardware in a processor element or an instruction in the form of software.
Referring to fig. 3, the embodiment provides an electronic device, which may be a portable computer, a smart phone, a tablet computer, or the like. In detail, the electronic device comprises at least, connected by a bus 31: a memory 32 and a processor 33, wherein the memory 32 is used for storing a computer program, and the processor 33 is used for executing the computer program stored in the memory 32 to execute all or part of the steps of the foregoing method embodiments.
The above-mentioned system bus may be a Peripheral Component Interconnect (PCI) bus, an Extended Industry Standard Architecture (EISA) bus, or the like. The system bus may be divided into an address bus, a data bus, a control bus, and the like. For ease of illustration, only one thick line is shown, but this does not mean that there is only one bus or one type of bus. The communication interface is used for realizing communication between the database access device and other equipment (such as a client, a read-write library and a read-only library). The Memory may include a Random Access Memory (RAM), and may further include a non-volatile Memory (non-volatile Memory), such as at least one disk Memory.
The Processor may be a general-purpose Processor, and includes a Central Processing Unit (CPU), a Network Processor (NP), and the like; the Integrated Circuit may also be a Digital Signal Processor (DSP), an Application Specific Integrated Circuit (ASIC), a Field Programmable Gate Array (FPGA) or other Programmable logic device, a discrete Gate or transistor logic device, or a discrete hardware component.
In summary, the decoration order dispatching method, the decoration order dispatching system, the storage medium and the equipment provided by the invention can automatically match the signing order to the construction team with high fitness with the decoration project of the signing owner, and simultaneously solve the unfairness problem of manual dispatching, thereby indirectly improving the decoration efficiency and the decoration quality of the decoration project and further improving the satisfaction of both the owner and the construction team. Therefore, the invention effectively overcomes various defects in the prior art and has high industrial utilization value.
The foregoing embodiments are merely illustrative of the principles and utilities of the present invention and are not intended to limit the invention. Any person skilled in the art can modify or change the above-mentioned embodiments without departing from the spirit and scope of the present invention. Accordingly, it is intended that all equivalent modifications or changes which can be made by those skilled in the art without departing from the spirit and technical spirit of the present invention be covered by the claims of the present invention.

Claims (10)

1. A decoration order dispatching method is characterized by comprising the following steps:
obtaining decoration construction site information in a signed decoration order;
acquiring all idle construction team information in a decoration construction time period required by an owner and all construction team information added into a decoration platform or a decoration company, wherein the idle construction team service radiation region covers a decoration construction site;
calculating the distance between the idle construction team address and the decoration construction site address, and calculating a list dispatching weight value of the idle construction team according to the distance and other information of the construction team;
and sorting the order dispatching weight values of the idle construction teams and dispatching orders according to sorting results.
2. The method of claim 1, further comprising:
and obtaining the longitude and latitude of a starting position and the longitude and latitude of an ending position through an api interface to calculate the distance between the two places, wherein the starting position and the ending position are the decoration site address and the idle construction team address.
3. The method of claim 1, wherein the finishing order includes finishing site information and the spare construction team information and all construction team information joining a finishing platform or finishing company:
the decoration construction site address, owner's demand fitment construction time section, the directory and the address of idle construction team, add the work score and the receptivity of all construction teams of fitment platform or fitment company.
4. The method of claim 1, wherein the weight of the pie is calculated by:
the sum of the weight of the distance between the idle construction team and the decoration construction site, the work scoring weight of the idle construction team and the bearing capacity weight of the idle construction team;
the weight of the distance between the idle construction team and the decoration construction site is equal to 1/(the distance between the idle construction team and the decoration construction site +1) × weight proportion;
the idle construction team work scoring weight is equal to the weight ratio of the idle construction team work scoring/the maximum value of the company construction team work scoring;
the bearing capacity weight of the idle construction team is equal to the bearing force of the idle construction team/the maximum value of the bearing force of the company construction team;
the weight proportion of the distance between the idle construction team and the decoration construction site, the weight proportion of the work scores of the idle construction team and the weight proportion of the bearing capacity of the idle construction team are preset values, and the sum of the weight proportions is 100%.
5. The method of claim 1, 3 or 4, wherein the construction team work score is preset with a basic score, and the finishing company inspection team inspects after each order receiving construction of the construction team and increases or decreases the score according to the inspection result and owner score according to the reward and penalty standard.
6. The method of claim 1, 3 or 4, wherein the construction team carrying capacity is preset with a base score, and is increased or decreased according to the number of orders received and reworking times of the construction team.
7. The method of claim 1, further comprising:
sorting the order weight values of the idle construction teams from high to low, and assigning the decoration order to the idle construction team with the highest order weight value;
if the idle construction team refuses to receive the order, continuously assigning the decoration order to the idle construction team with the next weighted value according to the order weight value from high to low;
and if all idle construction teams refuse to receive orders, performing manual coordination and dispatching orders.
8. A decoration order form dispatching system, said system comprising:
the decoration building site and construction team information acquisition module is used for acquiring decoration building site information, idle construction team information and all construction team information added to a decoration platform or a decoration company in the decoration order;
the information processing module is used for calculating the distance between the free construction team address and the decoration site address and the order weight value of the free construction team according to the obtained information;
the sorting module is used for sorting the order weight values of the idle construction teams according to the height;
and the order dispatching module is used for dispatching orders according to the order dispatching weight value sorting result of the idle construction team.
9. A computer-readable storage medium, in which a computer program is stored which, when loaded and executed by a processor, implements a fitment order issuance method according to any one of claims 1 to 7.
10. An electronic device, comprising: a processor, a memory; wherein the content of the first and second substances,
the memory is used for storing a computer program;
the processor is configured to load and execute the computer program to cause the electronic device to perform the decoration order dispatching method according to any one of claims 1 to 7.
CN202110570961.6A 2021-05-25 2021-05-25 Decoration order dispatching method, system, storage medium and equipment Pending CN113205275A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110570961.6A CN113205275A (en) 2021-05-25 2021-05-25 Decoration order dispatching method, system, storage medium and equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110570961.6A CN113205275A (en) 2021-05-25 2021-05-25 Decoration order dispatching method, system, storage medium and equipment

Publications (1)

Publication Number Publication Date
CN113205275A true CN113205275A (en) 2021-08-03

Family

ID=77023204

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110570961.6A Pending CN113205275A (en) 2021-05-25 2021-05-25 Decoration order dispatching method, system, storage medium and equipment

Country Status (1)

Country Link
CN (1) CN113205275A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113689145A (en) * 2021-09-14 2021-11-23 广州天天有活信息科技有限公司 Home decoration service team order receiving method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106355526A (en) * 2016-09-22 2017-01-25 成都快乐家网络技术有限公司 Order-sending processing device, system and method
CN108108951A (en) * 2017-08-28 2018-06-01 深圳市易装网络科技有限公司 Fit up data processing method, device, storage medium and computer equipment
CN109087160A (en) * 2018-06-15 2018-12-25 长沙市到家悠享家政服务有限公司 Order processing method, apparatus and electronic equipment
CN110197319A (en) * 2019-03-14 2019-09-03 杭州恋家网络科技有限公司 A kind of fitting-out work managing and control system based on big data model

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106355526A (en) * 2016-09-22 2017-01-25 成都快乐家网络技术有限公司 Order-sending processing device, system and method
CN108108951A (en) * 2017-08-28 2018-06-01 深圳市易装网络科技有限公司 Fit up data processing method, device, storage medium and computer equipment
CN109087160A (en) * 2018-06-15 2018-12-25 长沙市到家悠享家政服务有限公司 Order processing method, apparatus and electronic equipment
CN110197319A (en) * 2019-03-14 2019-09-03 杭州恋家网络科技有限公司 A kind of fitting-out work managing and control system based on big data model

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113689145A (en) * 2021-09-14 2021-11-23 广州天天有活信息科技有限公司 Home decoration service team order receiving method
CN113689145B (en) * 2021-09-14 2022-09-27 广州天天有活信息科技有限公司 Home decoration service team order receiving method

Similar Documents

Publication Publication Date Title
CN110766269A (en) Task allocation method and device, readable storage medium and terminal equipment
CN108399460A (en) Network about vehicle Order splitting processing method and server
CN107133096A (en) A kind of resource allocation methods and device
CN113205275A (en) Decoration order dispatching method, system, storage medium and equipment
Chen et al. Highway freight terminal facilities allocation based on flexsim
CN115511319A (en) Shared bicycle scheduling method and device, electronic equipment and storage medium
CN111311164A (en) Electronic order pushing method and system, server and storage medium
CN111832872A (en) Vehicle scheduling method and device, electronic equipment and storage medium
CN110765226B (en) Goods owner matching method, device, equipment and medium
CN112950248A (en) Logistics network point site selection method and device, computer equipment and readable storage medium
CN116562477A (en) Method, device, equipment and storage medium for selecting workgroup scheduling scheme
CN116029481A (en) Freight management method, device, equipment and storage medium
CN112837128B (en) Order assignment method, order assignment device, computer equipment and computer readable storage medium
CN108399524A (en) Information processing method and system
CN114037232A (en) Online distribution method and device for home maintenance orders and terminal equipment
CN110580312B (en) Data query method, device and computer readable storage medium
CN111813738A (en) Data conversion method, data downloading method and related device
CN116305372B (en) Method, device, equipment and storage medium for managing factory area
CN114048948A (en) Intelligent order dispatching method and device and electronic equipment
CN108805491A (en) Single share-car waybill generation method, device and server more than a kind of
CN115408976B (en) Virtual integrated circuit platform and control method and system thereof
CN111461833B (en) Information loading method, system, server, terminal and storage medium
CN116701003A (en) Online financial billing method and device, electronic equipment and storage medium
CN115470419A (en) Object recommendation method, device, equipment and medium
CN115439039A (en) Information processing method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination