CN113202264A - A building rubbish is cleared and is transported device for in high-rise building construction floor - Google Patents

A building rubbish is cleared and is transported device for in high-rise building construction floor Download PDF

Info

Publication number
CN113202264A
CN113202264A CN202110528648.6A CN202110528648A CN113202264A CN 113202264 A CN113202264 A CN 113202264A CN 202110528648 A CN202110528648 A CN 202110528648A CN 113202264 A CN113202264 A CN 113202264A
Authority
CN
China
Prior art keywords
pipeline
mounting
plate
vertical
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110528648.6A
Other languages
Chinese (zh)
Inventor
幸迅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202110528648.6A priority Critical patent/CN113202264A/en
Publication of CN113202264A publication Critical patent/CN113202264A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage
    • E04F17/10Arrangements in buildings for the disposal of refuse
    • E04F17/12Chutes

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sink And Installation For Waste Water (AREA)

Abstract

The invention discloses a building garbage clearing device used in a high-rise building construction floor, which comprises a plurality of fixing pieces, a plurality of vertical pipelines and a bent pipeline, wherein the vertical pipelines are arranged between two vertically adjacent fixing pieces, the bent pipeline is fixedly connected to the lower end of the fixing piece at the lowest part, two mounting frames are fixedly mounted on one side of each fixing piece close to the construction floor, a feeding bent pipe is fixedly connected to the lower part of one side of each vertical pipeline close to the construction floor, a horn-shaped collecting pipe is fixedly connected to one end, far away from the vertical pipeline, of each feeding bent pipe, an overhaul plate is fixedly mounted on one side of the bent part of each bent pipeline through bolts, and a buffer member is arranged in each vertical pipeline. The building garbage clearing device used in the high-rise building construction floor is simple and rapid to install, can reduce kinetic energy generated by falling of garbage, plays a good role in buffering, has a long service life, and is suitable for popularization.

Description

A building rubbish is cleared and is transported device for in high-rise building construction floor
Technical Field
The invention relates to the field of building engineering, in particular to a building rubbish clearing device used in a high-rise building construction floor.
Background
In the process of construction of high-rise buildings, a large amount of construction waste can be generated, particularly in the electromechanical and decoration construction stages in the later period, the problems of large construction waste yield and long production period exist in each floor, the construction waste needs to be transported to the ground in time for transfer treatment, otherwise, a large amount of construction sites can be occupied, and normal construction is hindered.
At present, the transportation modes of construction waste of high-rise building construction sites are generally several: firstly, the integrated hopper is collected and transported to the ground by a construction elevator or a tower crane without erecting auxiliary facilities, but the transportation mode has low efficiency, occupies vertical transportation devices such as the construction elevator and the tower crane, increases the pressure of vertical transportation and has high transportation cost; secondly, a suspended garbage channel is erected along the vertical wall, and a curtain type garbage throwing-in opening is arranged at the position of the reserved hole of the corresponding door and window, so that the use is convenient, but the assembly is inconvenient, the construction cost is high, and the process is complex; thirdly, adopt the brickwork to build closed passageway in stair side, each floor is seted up the activity and is collected the mouth in order to collect rubbish, and this kind of mode construction cost is high, for fixed knot structure, can't have enough to meet the need the use.
In addition, in the second and third methods, due to the lack of the buffer device, the garbage can fall down from the pipeline quickly, which brings great potential safety hazard, so that a building garbage clearing device in a high-rise building construction floor, which has the advantages of good buffer effect, convenient use, simple installation procedure, low construction cost and convenient recycling, is needed to solve the problems.
Disclosure of Invention
The invention mainly aims to provide a building rubbish clearing device used in a high-rise building construction floor, which can effectively solve the problems in the background technology.
In order to achieve the purpose, the invention adopts the technical scheme that:
the utility model provides a be used for intraformational building rubbish clearance device of high-rise building construction building, it includes a plurality of mounting and the vertical pipeline of a plurality of and a pipeline of buckling, affiliated vertical pipeline sets up between two upper and lower adjacent mountings, buckle pipeline fixed link in the mounting lower extreme of below, one side fixed mounting that the mounting is close to the construction building has two mounting brackets, vertical pipeline is close to one side lower part fixedly connected with feeding return bend of construction building, and the one end fixedly connected with loudspeaker form collecting pipe that vertical pipeline was kept away from to the feeding return bend, there is the access panel kink one side of the pipeline of buckling through bolt fixed mounting, and the access panel is provided with the sealing rubber packing ring in the junction of the pipeline of buckling, be provided with the buffer component in the vertical pipeline.
Preferably, the vertical pipeline comprises an upper pipeline, a connecting pipeline and a lower pipeline, the feeding bent pipe is fixedly connected with the lower pipeline, the collecting pipe is communicated with the interior of the lower pipeline through the feeding bent pipe, and the buffering component is arranged in the middle of the upper pipeline.
Preferably, the buffering component includes first install bin and second install bin, first install bin and second install bin all are integrated into one piece structure and lie in upper pipeline left and right sides with upper pipeline, first install bin is located second install bin below and the size of first install bin is greater than the size of second install bin, the equal fixed mounting in tank wall upper portion has the stationary blade around first install bin, two rotate jointly between the stationary blade and be connected with down the flitch, a lateral wall fixed mounting that upper pipeline was kept away from to first install bin inner chamber has two at least bolster, and the even flitch swing joint is in the same place under the bolster.
Preferably, the buffer part comprises a sliding rod and a buffer spring, the buffer spring and the sliding rod are both fixedly arranged on one side wall of the inner cavity of the first installation box far away from the upper layer pipeline, the buffer spring is sleeved on the outer surface of the sliding rod, the middle part of the outer surface of the sliding rod is inserted with a sliding block in a sliding way, the sliding block is fixedly connected with the other end of the buffer spring, two first fixing plates are fixedly arranged at the upper end of the sliding block, a first connecting shaft is fixedly connected between the two first fixing plates, the part of the outer surface of the first connecting shaft, which is positioned between the two first fixing plates, is rotatably connected with a supporting rod through a bearing, one side of the support rod, which is far away from the first connecting shaft, is rotatably connected with a second connecting shaft which is parallel to the first connecting shaft through a bearing, the outer surface of the second connecting shaft is located on the two sides of the supporting rod, and the two second fixing plates are fixedly connected to the lower end face of the blanking plate.
Preferably, the mounting bracket includes horizontal plate and hang plate, the hang plate fixed connection is in horizontal plate lower extreme middle part, common fixedly connected with vertical board between horizontal plate and the hang plate, and vertical board and horizontal plate and hang plate be the integrated into one piece structure, the equal fixed mounting in one side that horizontal plate and hang plate are close to the mounting has the mounting panel, horizontal plate lower extreme middle part still fixed mounting has the backup pad, and backup pad and hang plate each other contactless, one side that the mounting was kept away from to the horizontal plate has a plurality of mounting grooves.
Preferably, the mounting includes spacing frame, spacing frame inner chamber middle part fixedly connected with annular installing frame, the rectangular channel has all been seted up to annular installing frame up end both sides, and the first mounting hole of break-over about all having seted up in the rectangular channel, the second mounting hole has all been seted up to upper pipeline body upper end, and the position one-to-one of second mounting hole and first mounting hole.
Preferably, the connecting pipeline is close to the first limiting plates of the upper portion and the lower portion of the inner side wall, the second limiting plate is fixedly mounted on the lower portion of the outer surface of the upper pipeline, the third limiting plate is fixedly mounted on the outer surface of the lower pipeline, the second limiting plate and the third limiting plate are both located between the first limiting plates, the inner pipe and the sleeve are fixedly mounted at one end, close to each other, of the second limiting plate and the third limiting plate respectively, and the inner cavity of the sleeve is located through the inner pipe sleeve.
Preferably, the sum of the maximum heights of the inner tube and the sleeve is not greater than the height between the lower end face of the second limiting plate and the upper end face of the third limiting plate, and one side of the sleeve, which is close to the inner cavity of the upper-layer pipeline, is located on the same vertical plane as the inner wall of the upper-layer pipeline.
Preferably, the bending angle of the bent pipeline is a right angle, the inner wall vertical portion and the horizontal portion of the bent pipeline are provided with sliding grooves close to the bending portions, two elastic metal plates are connected in the sliding grooves in a sliding mode, the upper end face of each elastic metal plate is provided with an electroplating wear-resistant layer, a buffer cavity is formed between each elastic metal plate and the corresponding bending portion of the bent pipeline, a plurality of spiral springs are fixedly mounted on the bottom wall of the buffer cavity, and the other ends of the spiral springs are tightly attached to the elastic metal plates.
Compared with the prior art, the invention has the following beneficial effects:
1. according to the invention, through the arrangement of the buffer component, in the actual working engineering, when the construction waste falls, a certain impact force is generated on the blanking plates, and at the moment, the blanking plates generate a certain pressure on the sliding block through the supporting rod, so that the buffer spring is contracted, therefore, the two blanking plates rotate downwards, a certain gap is generated between the two blanking plates, the waste falls smoothly, and part of impact force generated by the falling of the waste can be blocked, the kinetic energy generated by the falling of the waste is reduced, and a good buffer effect is achieved; in addition, the access panel covers the kink of whole pipeline of buckling completely, through dismantling the access panel promptly, when elastic metal plate wearing and tearing are serious, can change it, in addition, through being provided with cushion chamber and coil spring, can further reduce the impact force that building rubbish produced when the whereabouts to play certain guard action to the pipeline of buckling, prolong its life.
2. In the invention, the upper layer pipeline is fixed with the first mounting hole and the annular mounting frame through the second mounting hole, the lower layer pipeline is directly placed on the upper end surface of the annular mounting frame and is limited and fixed through the limiting frame, wherein the limiting frame and the annular mounting frame are of an integrally formed structure, the mounting step is simplified while the mounting and connection are firm, the mounting and dismounting working efficiency is improved, and the practicability is obviously improved; through the total height sum that changes upper pipeline, connecting tube and lower floor's pipeline, reach the purpose that is applicable to the floor installation of different floor height, in addition, through inner tube and sleeve pipe, when playing limiting displacement, can also avoid rubbish to get into and be detained in the connecting tube.
Drawings
FIG. 1 is a schematic view showing the overall structure of a construction waste removal device for use in a high-rise building construction floor according to the present invention;
FIG. 2 is a schematic structural view of a buffering member of the construction waste removal device for high-rise building construction floors according to the present invention;
FIG. 3 is a schematic view showing the overall structure of a buffer member of the construction waste removal device for high-rise building construction floors according to the present invention;
fig. 4 is a schematic view showing the overall construction of a mounting bracket and a fixing member of the construction waste removal device for use in a high-rise building construction floor according to the present invention;
FIG. 5 is a schematic view showing the connection between the upper pipe and the fixing member of the construction waste removing device for the high-rise building construction floor according to the present invention;
FIG. 6 is a schematic connection diagram of an upper layer pipeline and a lower layer pipeline of the building rubbish clearing device used in a high-rise building construction floor and a connecting pipeline;
fig. 7 is a sectional view of a bent pipe of the construction waste removing device for high-rise building construction floors according to the present invention.
In the figure: 1. a vertical pipe; 11. an upper layer of piping; 12. connecting a pipeline; 13. a lower layer pipeline; 14. a second limiting plate; 15. a third limiting plate; 16. a first limit plate; 17. a sleeve; 18. an inner tube; 2. a fixing member; 21. a limiting frame; 22. an annular mounting frame; 23. a rectangular groove; 24. a first mounting hole; 25. a second mounting hole; 3. a cushioning member; 31. a first installation box; 32. a second installation box; 33. a fixing sheet; 34. a blanking plate; 35. a buffer member; 351. a slide bar; 352. a buffer spring; 353. a slider; 354. a first fixing plate; 355. a support bar; 356. a second fixing plate; 357. a first connecting shaft; 358. a second connecting shaft; 4. bending the pipeline; 41. an elastic metal plate; 42. a buffer chamber; 43. a coil spring; 44. a chute; 5. an access panel; 6. a feeding bent pipe; 7. a mounting frame; 71. a horizontal plate; 72. an inclined plate; 73. a vertical plate; 74. mounting a plate; 75. a support plate; 76. mounting grooves; 8. and collecting the tubes.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the invention easy to understand, the invention is further described with the specific embodiments.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front", "rear", "both ends", "one end", "the other end", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, such as "connected," which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1-7, a construction waste clearing device for use in a high-rise building construction floor comprises a plurality of fixing pieces 2, a plurality of vertical pipelines 1 and a bent pipeline 4, wherein the vertical pipeline 1 is arranged between two vertically adjacent fixing pieces 2, the bent pipeline 4 is fixedly connected to the lower end of the fixing piece 2 at the lowest part, two mounting frames 7 are fixedly mounted on one side of the fixing piece 2 close to the construction floor, a feeding bent pipe 6 is fixedly connected to the lower part of one side of the vertical pipeline 1 close to the construction floor, a trumpet-shaped collecting pipe 8 is fixedly connected to one end of the feeding bent pipe 6 far away from the vertical pipeline 1, an access panel 5 is fixedly mounted on one side of the bent part of the bent pipeline 4 through bolts, a sealing rubber gasket is arranged at the joint of the access panel 5 and the bent pipeline 4, and a buffer member 3 is arranged in the vertical pipeline 1; through feeding return bend 6 and collecting pipe 8, be convenient for put into rubbish and concentrate the transportation.
The vertical pipeline 1 is composed of an upper layer pipeline 11, a connecting pipeline 12 and a lower layer pipeline 13, a feeding bent pipe 6 is fixedly connected with the lower layer pipeline 13, a collecting pipe 8 is communicated with the interior of the lower layer pipeline 13 through the feeding bent pipe 6, and a buffering component 3 is arranged in the middle of the upper layer pipeline 11.
Specifically, referring to fig. 2, the buffering member 3 of the present invention includes a first installation box 31 and a second installation box 32, the first installation box 31 and the second installation box 32 are both integrated with the upper pipe 11 and are located on the left and right sides of the upper pipe 11, the first installation box 31 is located below the second installation box 32, the size of the first installation box 31 is larger than that of the second installation box 32, fixing plates 33 are fixedly installed on the upper portions of the front and rear box walls of the first installation box 31, a blanking plate 34 is rotatably connected between the two fixing plates 33, at least two buffering members 35 are fixedly installed on a side wall of the inner cavity of the first installation box 31 far away from the upper pipe 11, and the buffering members 35 are movably connected together by the blanking plates 34.
It can be seen that, by arranging the fixing plates 33 in the second mounting box 32 and rotatably mounting the blanking plates 34 between the two fixing plates 33, the two blanking plates 34 can freely rotate in the upper layer pipeline 11, and meanwhile, it should be noted that, in the present invention, in order to ensure that the construction waste can be smoothly discharged, the mounting heights of the blanking plates 34 at both sides should be consistent.
As shown in fig. 3, the buffer 35 includes a sliding rod 351 and a buffer spring 352, the buffer spring 352 and the sliding rod 351 are both fixedly mounted on a side wall of the inner cavity of the first mounting box 31 far away from the upper pipe 11, the buffer spring 352 is sleeved on the outer surface of the sliding rod 351, a sliding block 353 is inserted into the middle of the outer surface of the sliding rod 351 and slidably mounted, the sliding block 353 is fixedly connected to the other end of the buffer spring 352, two first fixing plates 354 are fixedly mounted on the upper end of the sliding block 353, a first connecting shaft 357 is fixedly connected between the two first fixing plates 354, a supporting rod 355 is rotatably connected to a portion of the outer surface of the first connecting shaft 357 between the two first fixing plates 354 through a bearing, a second connecting shaft 358 parallel to the first connecting shaft 357 is rotatably connected to a side of the supporting rod 355 through a bearing, and second fixing plates 356 are fixedly connected to portions of the outer surface of the second connecting shaft 358 on both sides of the supporting rod 355, and the two second fixing plates 356 are both fixedly connected to the lower end surface of the blanking plate 34.
It can be seen that the slide block 353 can freely slide on the slide rod 351 to extrude the buffer spring 352, in the actual working engineering, when the construction waste falls, a certain impact force is generated on the blanking plate 34, at the moment, the blanking plate 34 generates a certain pressure on the slide block 353 through the support rod 355, so that the buffer spring 352 is contracted, therefore, the two blanking plates 34 rotate downwards, a certain gap is generated between the two blanking plates 34, the waste smoothly falls, and a part of impact force generated by the falling of the waste can be blocked, the kinetic energy generated by the falling of the waste is reduced, and a good buffering effect is achieved.
As shown in fig. 4, the mounting bracket 7 includes a horizontal plate 71 and an inclined plate 72, the inclined plate 72 is fixedly connected to the middle of the lower end of the horizontal plate 71, a vertical plate 73 is fixedly connected between the horizontal plate 71 and the inclined plate 72, the vertical plate 73, the horizontal plate 71 and the inclined plate 72 are integrally formed, a mounting plate 74 is fixedly mounted on both sides of the horizontal plate 71 and the inclined plate 72 close to the fixing member 2, a support plate 75 is also fixedly mounted on the middle of the lower end of the horizontal plate 71, the support plate 75 is not in contact with the inclined plate 72, and a plurality of mounting grooves 76 are formed on one side of the horizontal plate 71 away from the fixing member 2.
Note that, when actually installing, the fixing member 2 needs to be installed outside the floor slab, and the actual operation position: fixing whole mounting bracket 7 and mounting 2 through fixing bolt and mounting panel 74 earlier, then supporting plate 75 supports the floor outside for horizontal plate 71 hugs closely floor ground, then adopts the bolt to fix through mounting groove 76, and then accomplishes mounting bracket 7 and mounting 2's installation work, and hang plate 72 and vertical plate 73 play good support reinforcing effect in whole mounting bracket 7, improve whole mounting bracket 7's anti ability of buckling.
Referring to fig. 4 and 5, the fixing member 2 includes a limiting frame 21, an annular mounting frame 22 is fixedly connected to the middle portion of an inner cavity of the limiting frame 21, rectangular grooves 23 are respectively formed in two sides of an upper end surface of the annular mounting frame 22, first mounting holes 24 penetrating through the rectangular grooves 23 from top to bottom are respectively formed in the rectangular grooves 23, second mounting holes 25 are respectively formed in upper ends of pipe bodies of the upper-layer pipeline 11, and the second mounting holes 25 are in one-to-one correspondence with the first mounting holes 24.
It can be seen that, in the present invention, the upper layer pipeline 11 is fixed with the first mounting hole 24 and the annular mounting frame 22 through the second mounting hole 25, and the lower layer pipeline 13 is directly placed on the upper end surface of the annular mounting frame 22 and is then fixed in a limiting manner through the limiting frame 21, wherein the limiting frame 21 and the annular mounting frame 22 are of an integrally formed structure, so that the installation and connection can be ensured to be firm, the installation steps are simplified, the work efficiency of installation and disassembly is improved, and the practicability is significantly improved.
As shown in fig. 6, the connecting pipe 12 is close to the upper portion and the lower portion of the inner side wall and is fixedly connected with the first limiting plate 16, the lower portion of the outer surface of the upper layer pipe 11 is fixedly provided with the second limiting plate 14, the outer surface of the lower layer pipe 13 is fixedly provided with the third limiting plate 15, the second limiting plate 14 and the third limiting plate 15 are both located between the two first limiting plates 16, one end of the second limiting plate 14, which is close to the third limiting plate 15, is fixedly provided with the inner pipe 18 and the sleeve 17, and the inner cavity of the sleeve 17 is sleeved with the inner pipe 18.
It should be noted that in the present invention, the sum of the maximum heights of the inner tube 18 and the sleeve 17 is not greater than the height between the lower end face of the second limiting plate 14 and the upper end face of the third limiting plate 15, and the side of the sleeve 17 close to the inner cavity of the upper-layer pipeline 11 is located on the same vertical plane as the inner wall of the upper-layer pipeline 11; that is, the present invention can achieve the purpose of being suitable for installation on floors with different floor heights by changing the sum of the total heights of the upper layer pipeline 11, the connecting pipeline 12 and the lower layer pipeline 13, and can prevent garbage from entering and staying in the connecting pipeline 12 while playing a limiting role through the inner pipe 18 and the sleeve 17.
Referring to fig. 7, the bending angle of the bent pipe 4 is a right angle, the vertical portion and the horizontal portion of the inner wall of the bent pipe 4 are both provided with sliding grooves 44 near the bending portion, the two sliding grooves 44 are connected with an elastic metal plate 41 in a sliding manner, the upper end surface of the elastic metal plate 41 is provided with an electroplating wear-resistant layer, a buffer cavity 42 is formed between the elastic metal plate 41 and the bending portion of the bent pipe 4, the bottom wall of the buffer cavity 42 is fixedly provided with a plurality of coil springs 43, and the other ends of the coil springs 43 are tightly attached to the elastic metal plate 41.
The access panel 5 completely covers the bent portion of the entire bent pipe 4, that is, the access panel 5 is removed, so that the elastic metal plate 41 can be replaced when worn seriously, and in addition, the buffer chamber 42 and the coil spring 43 are arranged, so that the impact force generated when the construction waste falls can be further reduced, the bent pipe 4 is protected to a certain extent, and the service life of the bent pipe is prolonged.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (9)

1. A device for clearing and transporting construction waste in a high-rise building construction floor is characterized by comprising a plurality of fixing pieces (2), a plurality of vertical pipelines (1) and a bent pipeline (4), wherein the vertical pipelines (1) are arranged between two vertically adjacent fixing pieces (2), the bent pipeline (4) is fixedly connected with the lower end of the lowest fixing piece (2), two mounting frames (7) are fixedly mounted on one side of each fixing piece (2) close to the construction floor, a feeding bent pipe (6) is fixedly connected to the lower part of one side of each vertical pipeline (1) close to the construction floor, a horn-shaped collecting pipe (8) is fixedly connected to one end, far away from the vertical pipeline (1), of each feeding bent pipe (6), an access panel (5) is fixedly mounted on one side of the bent part of each bent pipeline (4) through bolts, and a sealing rubber gasket is arranged at the joint of the access panel (5) and the bent pipeline (4), a buffer component (3) is arranged in the vertical pipeline (1).
2. The building waste cleaning device for the high-rise building construction floor as claimed in claim 1, wherein: vertical pipeline (1) comprises upper pipeline (11), connecting tube (12) and lower floor's pipeline (13), feeding return bend (6) are fixed with lower floor's pipeline (13) fixed connection, collecting pipe (8) communicate with each other through feeding return bend (6) and lower floor's pipeline (13) are inside, buffer member (3) set up in upper pipeline (11) middle part.
3. The building waste cleaning device for the high-rise building construction floor as claimed in claim 2, wherein: buffering component (3) include first install bin (31) and second install bin (32), first install bin (31) and second install bin (32) all are the integrated into one piece structure with upper pipeline (11) and are located upper pipeline (11) left and right sides, first install bin (31) are located second install bin (32) below and the size of first install bin (31) is greater than the size of second install bin (32), the equal fixed mounting in tank wall upper portion has stationary blade (33), two around first install bin (31) rotate jointly between stationary blade (33) and be connected with down flitch (34), a lateral wall fixed mounting that upper pipeline (11) were kept away from to first install bin (31) inner chamber has two at least cushions (35), and cushion (35) even down flitch (34) swing joint together.
4. The building waste cleaning device for the high-rise building construction floor as claimed in claim 3, wherein: bolster (35) include slide bar (351) and buffer spring (352), buffer spring (352) and slide bar (351) equal fixed mounting in first install bin (31) inner chamber keep away from a lateral wall of upper pipeline (11), and buffer spring (352) cover is located slide bar (351) surface, there is slider (353) in slider (351) surface middle part interlude slidable mounting, and slider (353) in buffer spring (352) other end fixed connection, slider (353) upper end fixed mounting has two first fixed plates (354), two common fixedly connected with first connecting axle (357) between first fixed plate (354), the part that first connecting axle (357) surface is located between two first fixed plates (354) is connected with bracing piece (355) through the bearing rotation, one side that first connecting axle (357) was kept away from to bracing piece (355) is connected with second connecting axle (358) that is parallel to each other through the bearing rotation with first connecting axle (357) ) The outer surface of the second connecting shaft (358) is located on the two sides of the supporting rod (355) and is fixedly connected with a second fixing plate (356), and the two second fixing plates (356) are fixedly connected to the lower end face of the lower material plate (34).
5. The building waste cleaning device for the high-rise building construction floor as claimed in claim 1, wherein: mounting bracket (7) are including horizontal plate (71) and hang plate (72), hang plate (72) fixed connection is in horizontal plate (71) lower extreme middle part, common fixedly connected with vertical board (73) between horizontal plate (71) and hang plate (72), and vertical board (73) and horizontal plate (71) and hang plate (72) be the integrated into one piece structure, the equal fixed mounting in one side that horizontal plate (71) and hang plate (72) are close to mounting (2) has mounting panel (74), horizontal plate (71) lower extreme middle part still fixed mounting has backup pad (75), and backup pad (75) and hang plate (72) each other not contact, one side that mounting (2) were kept away from in horizontal plate (71) begins to have a plurality of mounting grooves (76).
6. The building waste cleaning device for the high-rise building construction floor as claimed in claim 2, wherein: mounting (2) are including spacing frame (21), spacing frame (21) inner chamber middle part fixedly connected with annular installing frame (22), rectangular channel (23) have all been seted up to annular installing frame (22) up end both sides, and first mounting hole (24) of break-over about all having seted up in rectangular channel (23), second mounting hole (25) have all been seted up to upper pipeline (11) body upper end, and the position one-to-one of second mounting hole (25) and first mounting hole (24).
7. The building waste cleaning device for the high-rise building construction floor as claimed in claim 2, wherein: connecting tube (12) are close to the first limiting plate of inside wall upper portion and the equal fixedly connected with in lower part (16), upper pipeline (11) surface lower part fixed mounting has second limiting plate (14), the equal fixed mounting of lower floor's pipeline (13) surface has third limiting plate (15), second limiting plate (14) and third limiting plate (15) all are located two between first limiting plate (16), the one end that second limiting plate (14) and third limiting plate (15) are close to each other is fixed mounting inner tube (18) and sleeve pipe (17) respectively, and sleeve pipe (17) inner chamber is located to inner tube (18) cover.
8. The building waste cleaning device for the high-rise building construction floor as claimed in claim 7, wherein: the sum of the maximum heights of the inner tube (18) and the sleeve (17) is not more than the height between the lower end face of the second limiting plate (14) and the upper end face of the third limiting plate (15), and one side of the sleeve (17) close to the inner cavity of the upper-layer pipeline (11) is located on the same vertical plane with the inner wall of the upper-layer pipeline (11).
9. The building waste cleaning device for the high-rise building construction floor as claimed in claim 1, wherein: the utility model discloses a pipeline bending device, including pipeline bending machine, be characterized in that the angle of buckling of pipeline bending machine (4) is the right angle, just spout (44), two have all been seted up near kink department to the inner wall vertical part and the horizontal part of pipeline bending machine (4) common sliding connection elastic metal board (41) in spout (44), elastic metal board (41) up end is provided with electroplates the wearing layer, elastic metal board (41) with form cushion chamber (42) between the kink of pipeline bending machine (4), cushion chamber (42) diapire fixed mounting has a plurality of coil spring (43), elastic metal board (41) are hugged closely to the other end of coil spring (43).
CN202110528648.6A 2021-05-14 2021-05-14 A building rubbish is cleared and is transported device for in high-rise building construction floor Pending CN113202264A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110528648.6A CN113202264A (en) 2021-05-14 2021-05-14 A building rubbish is cleared and is transported device for in high-rise building construction floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110528648.6A CN113202264A (en) 2021-05-14 2021-05-14 A building rubbish is cleared and is transported device for in high-rise building construction floor

Publications (1)

Publication Number Publication Date
CN113202264A true CN113202264A (en) 2021-08-03

Family

ID=77031327

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110528648.6A Pending CN113202264A (en) 2021-05-14 2021-05-14 A building rubbish is cleared and is transported device for in high-rise building construction floor

Country Status (1)

Country Link
CN (1) CN113202264A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113914579A (en) * 2021-09-26 2022-01-11 青岛一建集团有限公司 Building construction site is with turnover assembled rubbish clearance passageway
CN114476732A (en) * 2022-01-08 2022-05-13 深圳市博华装饰有限公司 Building rubbish transfer device for building site

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113914579A (en) * 2021-09-26 2022-01-11 青岛一建集团有限公司 Building construction site is with turnover assembled rubbish clearance passageway
CN113914579B (en) * 2021-09-26 2023-04-14 青岛一建集团有限公司 Building construction site is with turnover assembled rubbish clearance passageway
CN114476732A (en) * 2022-01-08 2022-05-13 深圳市博华装饰有限公司 Building rubbish transfer device for building site

Similar Documents

Publication Publication Date Title
CN113202264A (en) A building rubbish is cleared and is transported device for in high-rise building construction floor
CN210316383U (en) Device is cleared to rubbish in high-rise building construction floor
CN213293647U (en) Super high-rise construction garbage disposal device
CN213683064U (en) Vertical transport passageway of building rubbish in elevator shaft
CN112169889B (en) Recovery unit is smashed to building rubbish
CN201245372Y (en) Dust collecting all sealed guide chute
CN101987325A (en) Comprehensive sorting and pretreating integrated equipment of kitchen garbage
CN111891780B (en) Totally-enclosed coal conveying system for thermal power plant
CN211006284U (en) Milling machine
CN210395887U (en) Building roof drainage structures
CN210563209U (en) Channel device for recycling construction floor construction waste
CN207509048U (en) A kind of environment-friendly type strength recycles sand blasting system
CN201815531U (en) Comprehensive sorting and pretreatment integrated device for restaurant-kitchen garbage
CN209939947U (en) Dustless car loader of buggy
CN216827076U (en) A rubbish recovery plant for municipal garden
CN220909006U (en) Garbage pipeline buffer structure
CN213833106U (en) Building rubbish discharging equipment in construction
CN219241198U (en) Building rubbish channel with buffering effect
CN218522137U (en) Interim perpendicular transport corridor of hidden building rubbish
CN211395443U (en) Warning device for construction site and construction vehicle
CN212475020U (en) Spiral blanking device
CN219992986U (en) Can have enough to meet need assembled floor rubbish passageway and wash pump waste fitting discharging concurrently
CN220226070U (en) Timely cleaning pipeline device for building rubbish on floor plate in high-rise building construction
CN213853609U (en) Wall-hanging building public latrine deodorization equipment
CN213133354U (en) Steel garbage collection device is built in room

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20210803