CN113187212A CN202110481955.3A CN202110481955A CN113187212A CN 113187212 A CN113187212 A CN 113187212A CN 202110481955 A CN202110481955 A CN 202110481955A CN 113187212 A CN113187212 A CN 113187212A
Authority
CN
China
Prior art keywords
assembly
cabin
component
movable
cabin unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110481955.3A
Other languages
Chinese (zh)
Inventor
袁军
陈柚邃
林培沛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Shipyard International Co Ltd
Original Assignee
Guangzhou Shipyard International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Shipyard International Co Ltd filed Critical Guangzhou Shipyard International Co Ltd
Priority to CN202110481955.3A priority Critical patent/CN113187212A/en
Publication of CN113187212A publication Critical patent/CN113187212A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/28Scaffolds primarily resting on the ground designed to provide support only at a low height
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/02Scaffold feet, e.g. with arrangements for adjustment
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/10Steps or ladders specially adapted for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/16Struts or stiffening rods, e.g. diagonal rods
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Ladders (AREA)

Abstract

The invention provides a movable portal frame for improving the construction safety of the top of a cabin unit and a prefabricated cabin top construction method. The invention provides a movable portal frame which comprises a first assembly, a second assembly and a third assembly, wherein two ends of the third assembly are respectively connected with the upper parts of the first assembly and the second assembly, so that the first assembly, the second assembly and the third assembly form a working ladder, the first assembly and the second assembly are positioned on two sides of the working ladder, the first assembly and the second assembly respectively have different lengths extending downwards relative to the third assembly, sliding devices are arranged at the bottoms of the first assembly and the third assembly, and a prefabricated cabin placing area is arranged among the first assembly, the second assembly and the third assembly.

Description

Movable portal and prefabricated cabin top construction method
Technical Field
The invention belongs to the technical field of prefabricated cabins, and particularly relates to a movable portal and a prefabricated cabin top construction method.
Background
The preparation of self-contained cabin units brings great economic benefits to the shipbuilding plant, with the attendant safety risks of the cabin unit assembly process. Workers can only climb the vertical ladder to reach the top of the cabin unit and stand on the ceiling at the top of the cabin unit for construction operation, and potential safety hazards exist in the construction process of the workers. Without the support of corresponding tools, the following problems and defects exist in the construction process of the top of the cabin unit by workers:
(1) potential safety hazards caused by unstable placement of the ladder exist in the process of climbing the vertical ladder by workers;
(2) workers construct safety belts on the tops of the cabin units without stress points, and safety hooks can be hung everywhere;
(3) workers need to step on the ceiling reinforcing structure during construction at the top of the cabin unit, and the ceiling reinforcing structure and the ceiling may deform;
(4) the construction projects at the top of the cabin unit are more, and the construction efficiency of workers caused by the construction environment is low.
Although there are various improvements to the prior art, for example, CN201120365686 discloses a movable ladder, which comprises a bottom plate, handrails, ladder steps and the like, wherein the ladder is in a bilateral symmetry form, the bottom plate is arranged in the middle of the ladder, the bottom plate is supported by supporting legs, the supporting legs are stabilized by supports, the ladder steps and the bottom plate are connected by hinges, the dismountable handrails are respectively arranged on two side surfaces of the ladder steps and the bottom plate (1), and pulleys are arranged at one ends of the ladder steps and the supporting legs, which are in contact with the ground. The pulley under the ladder rung and the supporting leg in the proposal can ensure that the whole ladder can be moved to a required place at any time. The mounting of the base plate allows multiple persons to stand on the ladder at the same time. The handrails on the ladder rail and the bottom plate can be detached and folded at any time, so that the ladder is more convenient to use. However, the ladder of this solution is complicated in structure and presents a support structure, so that there is no place to accommodate the prefabricated cabin, which cannot be used for the construction of prefabricated cabin units.
In the construction and cable laying process of the cabin unit top framework piece, no corresponding tooling facilities are provided for better working conditions and safety guarantee for constructors.
Disclosure of Invention
Aiming at the defects of the prior art, the invention provides a movable portal frame for improving the construction safety of the top of a cabin unit and a prefabricated cabin top construction method.
The invention provides a movable portal frame which comprises a first assembly, a second assembly and a third assembly, wherein two ends of the third assembly are respectively connected with the upper parts of the first assembly and the second assembly, so that the first assembly, the second assembly and the third assembly form a working ladder, the first assembly and the second assembly are positioned on two sides of the working ladder, the first assembly and the second assembly respectively have different lengths extending downwards relative to the third assembly, sliding devices are arranged at the bottoms of the first assembly and the third assembly, and a prefabricated cabin placing area is arranged among the first assembly, the second assembly and the third assembly.
Preferably, the difference between the lengths of the first and second components extending downwards relative to the third component is: greater than 5cm, greater than 10cm, greater than 20cm, 5cm-50cm, 10cm-50cm or 20cm-40 cm.
Preferably, the height of the prefabricated cabin placing area is as follows: greater than 1.5m, greater than 2m, or 2m-3 m; the width of the prefabricated cabin placing area is as follows: greater than 1.5 meters, greater than 2 meters, or 2m-3 meters.
Preferably, the movable gantry further comprises an armrest supporting component, the armrest supporting component is fixedly arranged above the third component, the armrest supporting component comprises a circular tube armrest piece and a plurality of circular tube supporting pieces, two ends of the circular tube armrest piece are bent downwards and fixed with the third component, the circular tube supporting pieces are arranged between two ends of the circular tube armrest piece in a separated mode, one end of each circular tube supporting piece is connected with the third component, and the other end of each circular tube armrest piece is connected with the other end of each circular tube supporting piece.
Preferably, the movable gantry further comprises a first mounting part and a second mounting part, the first mounting part and the second mounting part are symmetrically arranged at two sides of the upper part of the prefabricated cabin placing area, one end of the first mounting part is connected with the first component, and the other end of the first mounting part is connected with the third component; and one end of the second mounting part is connected with the second assembly, and the other end of the second mounting part is connected with the third assembly.
Preferably, the movable gantry further comprises a first diagonal brace angle piece and a second diagonal brace angle piece, the third component extends outwards relative to the first component and is provided with a first extending part, one end of the first diagonal brace angle piece is fixed with the first extending part, and the other end of the first diagonal brace angle piece is fixed with the first component; the third component extends outwards relative to the second component and is provided with a second extending part, one end of the second diagonal brace corner piece is fixed with the second extending part, and the other end of the second diagonal brace corner piece is fixed with the second component.
Preferably, the width of first subassembly and second subassembly increases from top to bottom in proper order, the distance between first subassembly and the second subassembly increases from top to bottom in proper order.
The invention also provides a prefabricated cabin top construction method, which comprises the following steps:
a plurality of cabin units are placed on the cabin unit manufacturing platform;
matching the movable portal frame with a cabin unit manufacturing platform, so that a first component or a second component of the movable portal frame is placed on the cabin unit manufacturing platform, and the other component is placed outside the cabin unit manufacturing platform;
and placing a fastening device in the free positions at two sides of the movable portal frame and the cabin unit for construction.
Preferably, a plurality of cabin units are placed on the cabin unit production platform along the length direction, and the movable gantry can move along the cabin unit production platform along the length direction.
Preferably, the fastening device is a wooden box, and the wooden box is formed by splicing a plurality of wooden boards.
The movable portal and the construction method for the top of the prefabricated cabin can improve the construction safety of the top of the cabin unit.
Drawings
The foregoing and other objects, features and advantages of the invention will be apparent from the following more particular description of preferred embodiments of the invention, as illustrated in the accompanying drawings. Like reference numerals refer to like parts throughout the drawings, and the drawings are not intended to be drawn to scale in actual dimensions, emphasis instead being placed upon illustrating the principles of the invention.
Fig. 1 is a schematic structural diagram of a movable gantry provided in the present embodiment;
fig. 2 is a schematic structural view of the movable gantry provided by the embodiment cooperating with the cabin unit;
fig. 3 is a schematic structural diagram of a first assembly provided in this embodiment;
fig. 4 is a schematic structural diagram of a third assembly provided in this embodiment.
In the figure: 1-a first component; 11-square steel; 12-angle steel; 2-a second component; 3-a third component; 31-a first extension; 32-a second extension; 33 third square steel; 34-third angle steel; 4-universal wheels; 5 an armrest support assembly; 51-round tube armrest pieces; 52-a tubular support; 61-a first mount; 62-a second mounting member 62; 71-a first diagonal brace angle; 72-a second diagonal brace angle; 81-cabin unit; 82-wooden boxes; 83-cabin unit manufacturing platform;
Detailed Description
To facilitate an understanding of the invention, the invention will now be described more fully with reference to the accompanying drawings.
It will be understood that when an element is referred to as being "connected" to another element, it can be directly connected to the other element and be integral therewith, or intervening elements may also be present. The terms "mounted," "one end," "the other end," and the like are used herein for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
Referring to fig. 1 to 4, an embodiment of the present invention provides a movable gantry, which includes a first assembly 1, a second assembly 2, and a third assembly 3, wherein two ends of the third assembly 3 are respectively connected to upper portions of the first assembly 1 and the second assembly 2, so that the first assembly 1, the second assembly 2, and the third assembly 3 form a working ladder, the first assembly 1 and the second assembly 2 are located at two sides of the working ladder, the first assembly 1 and the second assembly 2 respectively extend downward different lengths relative to the third assembly 3, that is, bottoms of the first assembly 1 and the second assembly 2 are not in a same plane and have a certain height difference, sliding devices are arranged at bottoms of the first assembly 1 and the third assembly 3, and a prefabricated cabin placing area is arranged between the first assembly 1, the second assembly 2, and the third assembly 3.
The movable portal that this embodiment provided has following advantage:
(1) the safety problem of the construction project at the top of the cabin unit 81 is solved;
(2) the material loss caused by the deformation of the ceilings of departments in the construction process is solved;
(3) environmental influence factors caused by a plurality of construction projects on the top of the cabin unit 81 are solved, and therefore working efficiency is improved.
The district is placed to portable portal in this embodiment is provided with prefabricated cabin, makes it can cooperate cabin unit 81 for cabin unit 81 is located the work ladder, and the staff climbs to third subassembly 3 through the work ladder, conveniently is under construction cabin unit 81 top.
The movable gantry provided by the embodiment has the advantages that the first component 1 and the second component 2 respectively have different lengths extending downwards relative to the third component 3, the first component 1 or the second component 2 can be placed on the cabin unit manufacturing platform 83, the other component is placed outside the cabin unit manufacturing platform 83, the cabin unit 81 on the cabin unit manufacturing platform 83 can be better constructed, the width of the cabin unit manufacturing platform 83 does not need to be increased, and the operation area and the cost are saved.
The movable door frame provided by the embodiment can slide through the sliding devices arranged at the bottoms of the first component 1 and the third component 3, and the position and the direction of the movable door frame can be changed flexibly. In a further preferred embodiment the sliding means are universal wheels 4. In a further preferred embodiment, the universal wheel 4 is provided with a locking mechanism for locking the universal wheel 4 against slipping when the movable gantry does not need to be moved.
Referring to fig. 1-2, in a preferred embodiment, the difference between the downward extension lengths of the first module 1 and the second module 2, respectively, relative to the third module 3 is about the height of the cabin unit fabrication platform 83, specifically: the difference of the lengths of the first component 1 and the second component 2 extending downwards relative to the third component 3 is more than 5cm, the difference of the lengths of the first component 1 and the second component 2 extending downwards relative to the third component 3 is more than 10cm, the difference of the lengths of the first component 1 and the second component 2 extending downwards relative to the third component 3 is more than 20cm, the difference of the lengths of the first component 1 and the second component 2 extending downwards relative to the third component 3 is 5cm-50cm, the difference of the lengths of the first component 1 and the second component 2 extending downwards relative to the third component 3 is 10cm-50cm, or the difference of the lengths of the first component 1 and the second component 2 extending downwards relative to the third component 3 is 20cm-40 cm.
Referring to fig. 1-2, in a preferred embodiment, the prefabricated cabin placement area height is greater than 1.5m, the prefabricated cabin placement area height is greater than 2m or the prefabricated cabin placement area height is 2m-3 m; the width of the prefabricated cabin accommodation area (i.e. the width of the prefabricated cabin accommodation area formed between the first module 1 and the second module 2) is more than 1.5m, the width of the prefabricated cabin accommodation area is more than 2m or the width of the prefabricated cabin accommodation area is 2m-3 m. Can well accommodate the cabin unit 81 and realize the construction of the top of the cabin unit 81
Referring to fig. 1-2, in a preferred embodiment, the movable gantry further includes a handrail supporting assembly 5, the handrail supporting assembly 5 is fixedly disposed above the third assembly 3, the handrail supporting assembly 5 includes a circular pipe handrail member 51 and a plurality of circular pipe supporting members 52, two ends of the circular pipe handrail member 51 are bent downward and fixed with the third assembly 3, the plurality of circular pipe supporting members 52 are separately disposed between two ends of the circular pipe handrail member 51, one end of each circular pipe supporting member 52 is connected with the third assembly 3, and the other end of each circular pipe supporting member 52 is connected with the circular pipe handrail member 51. The structure capable of fixing the safety hook of the constructor can be arranged above the cabin unit 81, and the safety of the construction of workers on the top of the cabin unit 81 is further improved.
Referring to fig. 1-2, in a preferred embodiment, the movable gantry further comprises a first mounting member 61 and a second mounting member 62, the first mounting member 61 and the second mounting member 62 are symmetrically arranged at two sides of the upper part of the placing area of the prefabricated cabin, one end of the first mounting member 61 is connected with the first assembly 1, and the other end is connected with the third assembly 3; the second mounting element 62 is connected at one end to the second component 2 and at the other end to the third component 3. A triangular stable structure is formed between the first mounting piece 61 and the first component 1 and the third component 3 on one side in the prefabricated cabin placing area; the second mounting element 62 and the other side of the prefabricated cabin placing area between the second component 2 and the third component 3 are formed with triangular stabilizing structures. Through the setting of first installed part 61 and second installed part 62 in this embodiment, realize that movable portal has more firm structure, promote movable portal's security.
Referring to fig. 1-2, in a preferred embodiment, the movable mast further comprises a first diagonal brace corner piece 71 and a second diagonal brace corner piece 72, the third assembly 3 having a first extension 31 extending towards the outside with respect to the first assembly 1, the first diagonal brace corner piece 71 having one end fixed to the first extension 31 and the other end fixed to the first assembly 1; the third component 3 extends outward relative to the second component 2 and has a second extending portion 32, and one end of the second diagonal brace 72 is fixed to the second extending portion 32, and the other end is fixed to the second component 2. A triangular stable structure is formed between the first diagonal bracing angle piece 71 and the first component 1 and the third component 3 outside the prefabricated cabin placing area; a triangular stable structure is formed between the second diagonal bracing angle piece 72 and the second assembly 2 and the third assembly 3 on the other side outside the prefabricated cabin placing area, so that the movable door frame is further stable in structure, and the safety of the movable door frame is improved.
Referring to fig. 3, in the preferred embodiment, the widths of the first member 1 and the second member 2 are increased from top to bottom, and the distance between the first member 1 and the second member 2 is increased from top to bottom. The structure that portable portal is more firm is realized.
Referring to fig. 3, in the preferred embodiment, the first assembly 1 comprises a ladder formed by welding a first square steel 11 and a plurality of first angle steels 12 into a first assembly, wherein the angle steels 12 are arranged at intervals, and the universal wheels 4 are welded and fixed at the lower ends.
Referring to fig. 3, in a preferred embodiment, the second module 2 comprises a ladder formed by welding square steel and a plurality of angle steel, which are spaced apart from each other, according to the structure of the first module. The lower end is welded and fixed with a universal wheel 4. In this embodiment, the number of the plurality of angle steels used by the second assembly 2 is greater than the number of the plurality of angle steels used by the first assembly 1.
Referring to fig. 4, in a preferred embodiment, the third assembly 3 comprises a third square steel on two sides and a plurality of third angle steels welded together to form the third assembly, and two ends of the plurality of third angle steels are respectively connected with the third square steels on two sides.
Referring to fig. 4, an embodiment of the present invention further provides a prefabricated cabin roof construction method, including the following steps:
a plurality of cabin units 81 are placed on the cabin unit manufacturing platform 83;
the movable gantry provided in any of the embodiments described above is mated with the cabin unit fabrication platform 83 such that the first or second components 1, 2 of the movable gantry are placed on the cabin unit fabrication platform 83 and the other component is placed outside the cabin unit fabrication platform 83. For example, the caster 4 of the first module 1 having a shorter length is placed on the cabin unit creation platform 83, and the caster 4 of the second module 2 having a longer length is placed outside the cabin unit creation platform 83. So that the first module 1 and the second module 2 are not both placed on the cabin unit creation platform 83, so that the movable gantry height is not too high during operation and the width of the cabin unit creation platform 83 does not need to be additionally increased.
The fastening device is placed at the free positions on the two sides of the movable door frame and the cabin unit 81, the stability of the movable door frame is guaranteed, meanwhile, the universal wheels 4 can be locked, the sliding of the movable door frame is avoided, after the stability is guaranteed, a constructor can climb on a construction platform along the straight ladders on the two sides and hang the safety hook on the protective fence, and after the operation of a construction area is finished, the constructor unlocks the safety hook and descends to the ground along the straight ladders.
In the preferred embodiment, a plurality of cabin units 81 are positioned lengthwise along the cabin unit creation platform 83, and a movable gantry is movable lengthwise along the cabin unit creation platform 83. After the top of one of the cabin units 81 is constructed using the movable gantry, the wooden fastening box 82 is removed, the movable gantry is moved along the cabin unit fabrication platform 83 in the length direction to be matched with the next cabin unit 81, the wooden fastening box 82 is fixed again, and the next cabin unit 81 is constructed.
In the preferred embodiment, the fastening device is a wooden box 82, and the wooden box 82 is made of a plurality of wooden boards by splicing. The fastening wooden boxes 82 are formed by splicing 10mm-16mm wooden boards.
In this application, unless expressly stated or limited otherwise, the first feature "on" or "under" the second feature may be directly contacting the first and second features or indirectly contacting the first and second features through intervening media. Also, a first feature "on," "over," and "above" a second feature may be directly or diagonally above the second feature, or may simply indicate that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature may be directly under or obliquely under the first feature, or may simply mean that the first feature is at a lesser elevation than the second feature.
In the description herein, reference to the description of the terms "preferred embodiment," "yet another embodiment," "other embodiments," or "specific examples," etc., means that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the application. In this specification, the schematic representations of the terms used above are not necessarily intended to refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples. Furthermore, various embodiments or examples and features of different embodiments or examples described in this specification can be combined and combined by one skilled in the art without contradiction.
Although embodiments of the present application have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting the present application, and that variations, modifications, substitutions and alterations may be made to the above embodiments by those of ordinary skill in the art within the scope of the present application.

Claims (10)

1. The movable portal frame is characterized by comprising a first assembly, a second assembly and a third assembly, wherein two ends of the third assembly are respectively connected with the upper parts of the first assembly and the second assembly, so that the first assembly, the second assembly and the third assembly form a working ladder, the first assembly and the second assembly are positioned on two sides of the working ladder, the first assembly and the second assembly respectively have different lengths extending downwards relative to the third assembly, sliding devices are arranged at the bottoms of the first assembly and the third assembly, and a prefabricated cabin placing area is arranged among the first assembly, the second assembly and the third assembly.
2. The movable mast of claim 1, wherein the difference in the downward extension lengths of the first and second assemblies, respectively, relative to the third assembly is: greater than 5cm, greater than 10cm, greater than 20cm, 5cm-50cm, 10cm-50cm or 20cm-40 cm.
3. The movable mast according to claim 1, characterized in that the prefabricated cabin accommodation area has a height of: greater than 1.5m, greater than 2m, or 2m-3 m; the width of the prefabricated cabin placing area is as follows: greater than 1.5 meters, greater than 2 meters, or 2m-3 meters.
4. The movable mast structure as claimed in claim 1, further comprising a handrail support assembly fixedly disposed above the third assembly, the handrail support assembly comprising a tubular handrail member and a plurality of tubular support members, wherein two ends of the tubular handrail member are bent downward and fixed to the third assembly, the plurality of tubular support members are spaced apart and disposed between two ends of the tubular handrail member, and one end of each tubular support member is connected to the third assembly and the other end of each tubular support member is connected to the tubular handrail member.
5. The movable mast according to claim 1, further comprising a first mounting member and a second mounting member, said first mounting member and said second mounting member being symmetrically disposed on both sides of an upper portion of said prefabricated cabin placement area, said first mounting member being connected at one end to said first module and at the other end to said third module; and one end of the second mounting part is connected with the second assembly, and the other end of the second mounting part is connected with the third assembly.
6. The movable mast as claimed in claim 1, wherein the movable mast further comprises a first diagonal brace angle and a second diagonal brace angle, the third assembly having a first extension extending laterally outwardly relative to the first assembly, the first diagonal brace angle having one end secured to the first extension and another end secured to the first assembly; the third component extends outwards relative to the second component and is provided with a second extending part, one end of the second diagonal brace corner piece is fixed with the second extending part, and the other end of the second diagonal brace corner piece is fixed with the second component.
7. The movable mast of claim 1, wherein the widths of the first and second assemblies increase from top to bottom and the distance between the first and second assemblies increases from top to bottom.
8. A prefabricated cabin top construction method is characterized by comprising the following steps:
a plurality of cabin units are placed on the cabin unit manufacturing platform;
mating the moveable gantry of any of claims 1-7 with a cabin unit fabrication platform such that the moveable gantry first component or second component is placed on the cabin unit fabrication platform and the other component is placed outside the cabin unit fabrication platform;
and placing a fastening device in the free positions at two sides of the movable portal frame and the cabin unit for construction.
9. The prefabricated cabin roof construction method of claim 8, wherein a plurality of cabin units are placed in the cabin unit fabrication platform along the length direction, and the movable gantry is movable along the cabin unit fabrication platform along the length direction.
10. The prefabricated cabin roof construction method of claim 8, wherein the fastening means is a wooden box, and the wooden box is formed by splicing a plurality of wooden boards.
CN202110481955.3A 2021-04-30 2021-04-30 Movable portal and prefabricated cabin top construction method Pending CN113187212A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110481955.3A CN113187212A (en) 2021-04-30 2021-04-30 Movable portal and prefabricated cabin top construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110481955.3A CN113187212A (en) 2021-04-30 2021-04-30 Movable portal and prefabricated cabin top construction method

Publications (1)

Publication Number Publication Date
CN113187212A true CN113187212A (en) 2021-07-30

Family

ID=76983111

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110481955.3A Pending CN113187212A (en) 2021-04-30 2021-04-30 Movable portal and prefabricated cabin top construction method

Country Status (1)

Country Link
CN (1) CN113187212A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120092264A (en) * 2011-02-11 2012-08-21 에스티엑스조선해양 주식회사 Cracking machine of adjusting woods
CN205256606U (en) * 2015-11-02 2016-05-25 珠海太平洋粤新海洋工程有限公司 Modular marine auxiliary platform
CN209021534U (en) * 2018-10-28 2019-06-25 安徽亿力电力设备有限公司 Support platform is used in a kind of welding of prefabricated cabin
CN110371272A (en) * 2019-06-20 2019-10-25 沪东中华造船(集团)有限公司 A kind of scaffold building method for the cabin LNG

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120092264A (en) * 2011-02-11 2012-08-21 에스티엑스조선해양 주식회사 Cracking machine of adjusting woods
CN205256606U (en) * 2015-11-02 2016-05-25 珠海太平洋粤新海洋工程有限公司 Modular marine auxiliary platform
CN209021534U (en) * 2018-10-28 2019-06-25 安徽亿力电力设备有限公司 Support platform is used in a kind of welding of prefabricated cabin
CN110371272A (en) * 2019-06-20 2019-10-25 沪东中华造船(集团)有限公司 A kind of scaffold building method for the cabin LNG

Similar Documents

Publication Publication Date Title
US5588500A (en) Elevatable work facility
US20060219478A1 (en) Construction
US11274450B2 (en) System and method of assembling and installing commercial roofing
CA2567141A1 (en) Modular multilevel access platform and method for erecting the same
KR20200030196A (en) Outside workbench for offshore structures
JP6167025B2 (en) Stair lifting device and method for lifting heavy objects
CN113187212A (en) Movable portal and prefabricated cabin top construction method
CN114856144B (en) Scaffold for building construction and use method
KR200378217Y1 (en) Scaffolding for the high ground working
JP2010037769A (en) Connected-type ascending/descending mobile scaffold
JP2729017B2 (en) Elevator car gantry
JPH08100517A (en) Vertically movable scaffold
CN220539168U (en) Movable operation platform for installing arc-shaped roof of subway station
EP0682734B1 (en) An apparatus for escalading
CN220224960U (en) Construction platform
KR102609173B1 (en) High place operation tower and high place operation tower assembly having the same
JP3709507B2 (en) Scaffold assembly method and scaffold assembly table
CN215761458U (en) Telescopic ladder for ascending height
KR100458096B1 (en) A simple lifting device of a traveling model
CN218522164U (en) Scaffold for building engineering
CN113356550A (en) Quick detachable scaffold frame
JP7214545B2 (en) Elevating workbench and assembly method using the elevating workbench
CN210798237U (en) Carrying frame is built in room
KR20170127689A (en) Multi-type lifting scaffold
JP2003118999A (en) Unloading device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210730