CN113120773A CN202110526974.3A CN202110526974A CN113120773A CN 113120773 A CN113120773 A CN 113120773A CN 202110526974 A CN202110526974 A CN 202110526974A CN 113120773 A CN113120773 A CN 113120773A
Authority
CN
China
Prior art keywords
longitudinal
main beam
main
lifting
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110526974.3A
Other languages
Chinese (zh)
Inventor
杨彪
程永志
巨高权
任忠生
聂记良
沈玉
王库
邢谦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC SHEC Third Highway Engineering Co Ltd
Original Assignee
CCCC SHEC Third Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHEC Third Highway Engineering Co Ltd filed Critical CCCC SHEC Third Highway Engineering Co Ltd
Priority to CN202110526974.3A priority Critical patent/CN113120773A/en
Publication of CN113120773A publication Critical patent/CN113120773A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/64Jibs
    • B66C23/70Jibs constructed of sections adapted to be assembled to form jibs or various lengths
    • B66C23/701Jibs constructed of sections adapted to be assembled to form jibs or various lengths telescopic
    • B66C23/705Jibs constructed of sections adapted to be assembled to form jibs or various lengths telescopic telescoped by hydraulic jacks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/84Slewing gear
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C9/00Travelling gear incorporated in or fitted to trolleys or cranes
    • B66C9/08Runners; Runner bearings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C9/00Travelling gear incorporated in or fitted to trolleys or cranes
    • B66C9/14Trolley or crane travel drives
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a spatial multidirectional alignment bridge deck crane structure of a cable-stayed bridge, which comprises two groups of main trusses, wherein the front ends of the main trusses are arranged in a suspended mode, the rear ends of the main trusses are arranged above an installed steel main beam, a traveling mechanism is arranged below each main truss, the main trusses are driven by the traveling mechanism to move longitudinally on the installed steel main beam, a lifting alignment system is arranged on each main truss and comprises a lifting mechanism, a longitudinal moving mechanism and a lifting appliance mechanism, each lifting mechanism comprises a winch, a steel wire rope and a steering wheel, the longitudinal moving mechanism is arranged on the top surface of each main truss, the longitudinal displacement of the steel main beam to be installed is adjusted through the longitudinal moving mechanism, one end of each steel wire rope is connected with the winch, the other end of each steel wire rope bypasses the steering wheel to be sequentially connected with the longitudinal moving mechanism and the lifting appliance mechanism, and the lifting. The steel girder positioning and positioning device improves the lifting efficiency of the steel girder, can quickly and accurately perform positioning, saves the construction time, and has great popularization value.

Description

Cable-stay bridge space multidirectional bridge floor loop wheel machine structure that counterpoints
Technical Field
The invention belongs to the technical field of bridge construction equipment, and particularly relates to a spatial multidirectional alignment bridge deck crane structure of a cable-stayed bridge.
Background
The steel truss girder cable-stayed bridge has wide application in modern bridge construction, and mainly has the advantages of large spanning capacity, light dead weight, convenient transportation and easy repair and replacement. However, in the construction of the steel truss girder cable-stayed bridge, the hoisting of the steel truss girder segment is troublesome, the requirement on the site is high, and the inconvenience is brought to the construction; the existing hoisting and assembling mode of the steel truss girder segment is mainly that a steel truss girder segment rod piece to be assembled is transported to an assembling position through the ground and is hoisted by a bridge deck crane for assembling; through this kind of mode, need in advance to repair a way so that transport between steel truss girder segment section and the position of assembling, repair the road surface and not only increase work load, but also can increase construction cost, moreover, the steel truss girder segment section of waiting to assemble of transportation makes a round trip, can increase the loading and the uninstallation process of steel truss girder segment section, and this can prolong the engineering time, reduces the efficiency of construction, influences the construction progress.
Disclosure of Invention
The invention provides a spatial multidirectional alignment bridge deck crane structure of a cable-stayed bridge, which can adjust the position of a steel girder section in a multidirectional alignment manner and realize rapid and accurate alignment assembly of a steel girder.
The technical scheme of the invention is as follows: a cable-stayed bridge deck crane structure with space multidirectional alignment comprises two groups of main trusses, wherein the front ends of the main trusses are arranged in the air, the rear ends of the main trusses are arranged above an installed steel main beam, a traveling mechanism is arranged below the main trusses, the main truss is driven by the traveling mechanism to move longitudinally on the installed steel main beam, a lifting alignment system is arranged on the main truss, the lifting alignment system comprises a lifting mechanism, a longitudinal moving mechanism and a lifting appliance mechanism, wherein the lifting mechanism comprises a winch, a steel wire rope and a steering wheel, the longitudinal moving mechanism is arranged on the top surface of the main truss, the longitudinal displacement of the steel girder to be installed is adjusted through the longitudinal moving mechanism, one end of the steel wire rope is connected with the winch, the other end of the steel wire rope bypasses the steering wheel and is sequentially connected with the longitudinal moving mechanism and the lifting appliance mechanism, the lifting appliance mechanism is fixedly connected with the steel main beam to be installed, and is used for lifting and realizing the vertical elevation and longitudinal linear adjustment of the end part of the steel main beam to be installed.
Preferably, the main truss includes sheer pole, back down tube, pole setting, entablature pole, preceding down tube, sheer pole, back down tube, entablature pole group become the rhombus structure, the vertical setting of pole setting is on the diagonal, the sheer pole sets up in running gear's top, the entablature pole surpasss the unsettled setting of installation steel girder terminal surface, indulge the top surface that moves the mechanism setting at the sheer pole, the hoist engine sets up in the main truss side, the directive wheel sets up the top surface one end at the sheer pole.
Preferably, the walking mechanism comprises walking wheels arranged at the bottom of one end of the lower cross bar, walking sliding shoes arranged at the bottom of the other end of the lower cross bar, walking tracks arranged above the installed steel main beams and parallel to the lower cross bar, a walking track anchoring mechanism for fixing the walking tracks, and a pushing jack for providing driving force, wherein a plurality of holes are formed in the side surfaces of the walking tracks, one end of the pushing jack is connected with the holes through a pin shaft, the other end of the pushing jack is connected with the walking sliding shoes through a pin shaft, the longitudinal walking of the main truss is realized through the jacking of the pushing jack, the walking track anchoring mechanism comprises anchoring ribs, anchoring main beams, anchoring rings and walking track anchoring parts, the walking track anchoring parts are arranged on the top surfaces of the installed steel main beams along the transverse bridge direction, the anchoring rings are firmly connected with the walking track anchoring parts through pin shafts, and the anchoring ribs penetrate through the anchoring main beams and, the bottom is locked by a nut.
Preferably, indulge and move mechanism including vertical flexible jack base, vertical flexible jack, pulley displacement box, pulley displacement groove, go up the bearing connecting band, go up the multislot pulley, vertical flexible jack base and pulley displacement groove set up the top surface at the last horizontal pole, vertical flexible jack one end and vertical flexible jack base pass through the round pin hub connection, and the other end passes through the round pin hub connection with pulley displacement box, pulley displacement box slides and sets up in pulley displacement inslot, the pulley sets up in pulley displacement box, go up the vertical both sides that set up at pulley displacement box of bearing connecting band, go up the multislot pulley setting in the bottom of last bearing connecting band.
Preferably, a ball is arranged on the contact surface of the pulley displacement box and the pulley displacement groove.
Preferably, the hoist mechanism includes lower bearing connecting band, lower multislot pulley, vertical girder, telescopic link, horizontal secondary beam, hoist suspender, hoist rings, hoist anchor assembly, horizontal secondary beam and vertical girder set up perpendicularly, lower bearing connecting band bottom is connected with vertical girder, and the top sets up multislot pulley down, the one end and the lower bearing connecting band of telescopic link are connected, and the other end and vertical girder are connected, the both ends below of vertical girder is equipped with the hoist suspender, the other end of hoist suspender passes through hoist rings, hoist anchor assembly and treats that the installation steel girder anchor is fixed.
Preferably, the transverse secondary beam penetrates through two ends of the longitudinal main beam and is welded to form a frame structure with the longitudinal main beam.
Preferably, the lower load-bearing connecting belt is arranged at the center of the top surface of the longitudinal main beam.
Preferably, the longitudinal main beam and the lower bearing connecting band, the telescopic rod and the lower bearing connecting band, and the telescopic rod and the longitudinal main beam are rotatably connected through pin shafts.
Preferably, a connecting rod is arranged between the two groups of main trusses to enhance the connection stability.
The invention has the beneficial effects that: realize the longitudinal displacement of whole device on the installed steel girder through running gear, can remove whole device to the steel girder needs the mounted position, rethread rolling machine, wire rope realizes lifting by crane and the vertical position adjustment of steel girder, through the flexible of vertical flexible jack, make pulley displacement box along pulley displacement groove longitudinal movement, adjust the vertical spatial position who waits to install the steel girder beam section, can realize the vertical rotation of vertical girder through the length change of the telescopic link of hoist mechanism simultaneously, with vertical elevation and the vertical linear adjustment of realization steel girder tip, and then realize waiting to install the position accurate adjustment of steel girder beam section, with the function of realizing quick accurate counterpoint assembly.
The invention greatly improves the hoisting efficiency of the steel girder, can comprehensively adjust the vertical and longitudinal displacement of the steel girder and the relative height difference with the installed steel girder, can quickly and accurately carry out alignment, solves the problems of difficult hoisting and transportation and inaccurate alignment of the cable-stayed bridge, saves the construction time and has great popularization value.
Drawings
FIG. 1 is a schematic view of an installation structure of a spatial multidirectional alignment bridge deck crane structure of a cable-stayed bridge according to the present invention;
FIG. 2 is a schematic structural view of a spatial multidirectional alignment bridge deck crane structure of a cable-stayed bridge according to the present invention;
FIG. 3 is a schematic structural view of a traveling track anchoring mechanism of a cable-stayed bridge spatial multi-directional alignment bridge deck crane structure according to the present invention;
FIG. 4 is a schematic structural view of a longitudinal movement mechanism of a cable-stayed bridge spatial multi-directional alignment bridge deck crane structure according to the present invention;
FIG. 5 is a structural plan view of a longitudinal movement mechanism of the cable-stayed bridge spatial multi-directional alignment bridge deck crane structure of the invention;
FIG. 6 is a front view of a spreader mechanism of the cable-stayed bridge spatial multi-directional alignment bridge deck crane structure of the present invention;
FIG. 7 is a top view of a spreader mechanism of the cable-stayed bridge spatial multi-directional alignment bridge deck crane structure of the present invention;
FIG. 8 is a side view of a spreader mechanism of the cable-stayed bridge spatial multi-directional alignment bridge deck crane structure of the present invention;
wherein: 1. a traveling mechanism, 101, traveling wheels, 102, a traveling track, 103, a jacking jack, 104, a traveling slipper, 2, a lifting mechanism, 21, a winch, 22, a steering wheel, 23, a steel wire rope, 3, a main truss, 31, a lower cross bar, 32, a rear inclined bar, 33, a vertical bar, 34, an upper cross bar, 35, a front inclined bar, 4, a longitudinal moving mechanism, 41, a longitudinal telescopic jack base, 42, a longitudinal telescopic jack, 43, a pulley displacement box, 44, a pulley, 45, a pulley displacement groove, 46, an upper bearing connecting belt, 47, an upper multi-groove pulley, 5, a hanger mechanism, 51, a lower bearing connecting belt, 52, a lower multi-groove pulley, 53, a longitudinal main beam, 54, a telescopic bar, 55, a transverse secondary beam, 56, a hanger, 57, a hanger, 58, a hanger anchor, 6, an installed steel main beam, 7, a steel main beam to be installed, 8, a traveling track anchor mechanism, 81. the main beam anchor comprises anchor ribs 82, anchor main beams 83, anchor lifting rings 84, a walking track anchor part 9, stay cables 10 and a main tower.
Detailed Description
The present invention will now be described more fully hereinafter with reference to the accompanying drawings, in which a person skilled in the art can, without any creative effort, fully implement the present invention.
The specific implementation mode of the invention is as follows: as shown in fig. 1-8, a cable-stayed bridge spatial multidirectional alignment bridge deck crane structure comprises two groups of main trusses 3, wherein the front ends of the main trusses 3 are arranged in a suspended manner, the rear ends of the main trusses 3 are arranged above an installed steel main beam 6, a bearing platform and a pile foundation are arranged below the installed steel main beam 6 as supports, the upper sides of the main trusses are stabilized by a main tower 10 and a stay cable 9, a traveling mechanism 1 is arranged below the main trusses 3, the main trusses 3 are driven by the traveling mechanism 1 to longitudinally move on the installed steel main beam 6, a lifting alignment system is arranged on the main trusses 3, the lifting alignment system comprises a lifting mechanism 2, a longitudinal movement mechanism 4 and a lifting appliance mechanism 5, the lifting mechanism 2 comprises a winch 21, a steel wire rope 23 and a steering wheel 22, the longitudinal movement mechanism 4 is arranged on the top surface of the main trusses 3, the longitudinal movement of the steel main beam 6 to be installed is adjusted by the longitudinal movement, the other end bypasses a steering wheel 22 to be sequentially connected with the longitudinal moving mechanism 4 and the lifting appliance mechanism 5, the lifting appliance mechanism 5 is fixedly connected with the steel main beam 7 to be installed, the vertical elevation and the longitudinal linear adjustment of the end part of the steel main beam 7 to be installed are lifted and realized, and the rapid and accurate alignment assembly of the steel main beam 7 to be installed is realized through the comprehensive action of the lifting mechanism 2, the longitudinal moving mechanism 4 and the lifting appliance mechanism 5.
Preferably, the main truss 3 includes a bottom rail 31, a rear diagonal bar 32, an upright bar 33, an upper rail 34 and a front diagonal bar 35, the bottom rail 31, the rear diagonal bar 32, the upper rail 34 and the front diagonal bar 35 form a diamond structure, the upright bar 33 is vertically arranged on a diagonal line, the bottom rail 31 is arranged above the traveling mechanism 1, the top rail 31 exceeds the end face of the installed steel girder 6 and is arranged in a suspended manner, the longitudinal movement mechanism 4 is arranged on the top face of the top rail 31, the winch 21 is arranged on the side face of the main truss 3, and the steering wheel 22 is arranged at one end of the top face of the top rail 31.
Preferably, the traveling mechanism 1 includes a traveling wheel 101 disposed at the bottom of one end of the bottom rail 31, a traveling skid shoe 104 disposed at the bottom of the other end of the bottom rail 31, a traveling rail 102 disposed above the installed steel girder 6 and parallel to the bottom rail 31, a traveling rail anchoring mechanism 8 for fixing the traveling rail 102, and a jack 103 for providing a driving force, wherein a plurality of channels are disposed on the side surface of the traveling rail 102, one end of the jack 103 is connected to the channels by a pin, the other end of the jack is connected to the traveling skid shoe 104 by a pin, and the longitudinal traveling of the main truss 3 is realized by jacking the jack 103, the traveling rail anchoring mechanism 8 includes an anchoring rib 81, an anchoring girder 82, an anchoring ring 83, and a traveling rail anchoring member 84, the traveling rail anchoring member 84 is disposed on the top surface of the installed steel girder 6 in the transverse direction, the anchoring ring 83 is firmly connected to the traveling rail anchoring member 84 by a pin, the anchoring ribs 81 penetrate through the anchoring main beam 82 and the anchoring hanging rings 83, and the bottoms of the anchoring ribs are locked through nuts.
Preferably, the longitudinal moving mechanism 4 comprises a longitudinal telescopic jack base 41, a longitudinal telescopic jack 42, a pulley displacement box 43, a pulley 44, a pulley displacement groove 45, an upper bearing connecting belt 46 and an upper multi-groove pulley 47, wherein the longitudinal telescopic jack base 41 and the pulley displacement groove 45 are arranged on the top surface of the upper cross rod 31, one end of the longitudinal telescopic jack 42 is connected with the longitudinal telescopic jack base 41 through a pin shaft, the other end of the longitudinal telescopic jack is connected with the pulley displacement box 43 through a pin shaft, the pulley displacement box 43 is arranged in the pulley displacement groove 45 in a sliding manner, the pulley 44 is arranged in the pulley displacement box 43, the upper connecting belt 46 is vertically arranged on two sides of the pulley displacement box 43, and the upper multi-groove pulley 47 is arranged at the bottom end of the upper bearing connecting belt 46.
Preferably, balls are provided on the contact surface of the pulley displacement case 43 and the pulley displacement groove 45.
Preferably, the lifting appliance mechanism 5 comprises a lower bearing connecting belt 51, a lower multi-groove pulley 52, a longitudinal main beam 53, an expansion link 54, a transverse secondary beam 55, a lifting appliance hanging strip 56, a lifting appliance hanging ring 57 and a lifting appliance anchoring part 58, wherein the transverse secondary beam 55 and the longitudinal main beam 53 are vertically arranged, the bottom end of the lower bearing connecting belt 51 is connected with the longitudinal main beam 53, the top end of the lower multi-groove pulley 52 is arranged, one end of the expansion link 54 is connected with the lower bearing connecting belt 51, the other end of the expansion link is connected with the longitudinal main beam 53, the lifting appliance hanging strip 56 is arranged below the two ends of the longitudinal main beam 53, the other end of the lifting appliance hanging strip 56 is anchored and fixed with the steel main beam 7 to be installed through the lifting appliance hanging ring 57 and the lifting appliance anchoring part 58, the steel wire rope 23 bypasses the steering wheel 22, the pulley 44 and the, thereby realizing the height difference adjustment of the steel main beam 7 to be installed and the installed steel main beam 6.
Preferably, the transverse secondary beam 55 penetrates through two ends of the longitudinal main beam 53 and is welded to form a frame structure with the longitudinal main beam 53.
Preferably, said lower load-bearing connecting belt 51 is arranged in a central position on the top surface of the longitudinal main beam 53.
Preferably, the longitudinal main beam 53 is rotatably connected with the lower bearing connecting band 51, the telescopic rod 54 is rotatably connected with the longitudinal main beam 53 through pin shafts, so that the longitudinal rotation of the longitudinal main beam 53 can be realized, and the vertical elevation and the longitudinal linear adjustment of the end part of the steel main beam 7 to be installed can be realized.
Preferably, a connecting rod is arranged between the two groups of main trusses 3 to enhance the connection stability.
While the preferred embodiments of the invention have been described, it is to be understood that the invention is not limited to the precise embodiments described, and that equipment and structures not described in detail are understood to be practiced as commonly known in the art; any simple modification, equivalent change and modification of the above embodiments according to the technical essence of the present invention by those skilled in the art can be made without departing from the technical scope of the present invention, and still fall within the protection scope of the technical solution of the present invention.

Claims (10)

1. A cable-stayed bridge space multidirectional alignment bridge deck crane structure is characterized by comprising two groups of main trusses, the front end of the main truss is arranged in a suspended manner, the rear end of the main truss is arranged above the installed steel main beam, a traveling mechanism is arranged below the main truss, the main truss is driven by the traveling mechanism to move longitudinally on the installed steel main beam, a lifting alignment system is arranged on the main truss, the lifting alignment system comprises a lifting mechanism, a longitudinal moving mechanism and a lifting appliance mechanism, wherein the lifting mechanism comprises a winch, a steel wire rope and a steering wheel, the longitudinal moving mechanism is arranged on the top surface of the main truss, the longitudinal displacement of the steel girder to be installed is adjusted through the longitudinal moving mechanism, one end of the steel wire rope is connected with the winch, the other end of the steel wire rope bypasses the steering wheel and is sequentially connected with the longitudinal moving mechanism and the lifting appliance mechanism, the lifting appliance mechanism is fixedly connected with the steel main beam to be installed, and is used for lifting and realizing the vertical elevation and longitudinal linear adjustment of the end part of the steel main beam to be installed.
2. The spatial multidirectional bridge floor crane structure of claim 1, wherein the main truss comprises a lower cross bar, a rear diagonal bar, a vertical bar, an upper cross bar and a front diagonal bar, the lower cross bar, the rear diagonal bar, the upper cross bar and the front diagonal bar form a diamond structure, the vertical bar is vertically arranged on a diagonal line, the lower cross bar is arranged above the traveling mechanism, the upper cross bar exceeds the end face of the installed steel main beam and is arranged in a suspended manner, the longitudinal moving mechanism is arranged on the top face of the upper cross bar, the winch is arranged on the side face of the main truss, and the steering wheel is arranged at one end of the top face of the upper cross bar.
3. The cable-stayed bridge space multidirectional alignment bridge floor crane structure as claimed in claim 2, wherein the traveling mechanism comprises traveling wheels arranged at the bottom of one end of the bottom cross bar, traveling shoes arranged at the bottom of the other end of the bottom cross bar, a traveling rail arranged above the installed steel main beam and parallel to the bottom cross bar, a traveling rail anchoring mechanism for fixing the traveling rail, and a pushing jack for providing driving force, wherein a plurality of pore channels are arranged on the side surface of the traveling rail, one end of the pushing jack is connected with the pore channels through a pin shaft, the other end of the pushing jack is connected with the traveling shoes through a pin shaft, the longitudinal traveling of the main truss is realized through the jacking of the pushing jack, the traveling rail anchoring mechanism comprises anchoring ribs, an anchored main beam, anchoring rings and a traveling rail anchoring member, the traveling rail anchoring member is arranged on the top surface of the installed steel main beam transverse bridge, the anchoring rings are firmly connected with the walking track anchoring parts through pin shafts, the anchoring ribs penetrate through the anchoring main beam and the anchoring rings, and the bottoms of the anchoring ribs are locked through nuts.
4. The cable-stayed bridge space multidirectional alignment bridge floor crane structure as claimed in claim 3, wherein the longitudinal moving mechanism comprises a longitudinal telescopic jack base, a longitudinal telescopic jack, a pulley displacement box, a pulley displacement groove, an upper bearing connecting belt and an upper multi-groove pulley, the longitudinal telescopic jack base and the pulley displacement groove are arranged on the top surface of the upper cross rod, one end of the longitudinal telescopic jack is connected with the longitudinal telescopic jack base through a pin shaft, the other end of the longitudinal telescopic jack is connected with the pulley displacement box through a pin shaft, the pulley displacement box is arranged in the pulley displacement groove in a sliding manner, the pulley is arranged in the pulley displacement box, the upper bearing connecting belt is vertically arranged on two sides of the pulley displacement box, and the upper multi-groove pulley is arranged at the bottom end of the upper bearing connecting belt.
5. The cable-stayed bridge space multidirectional alignment bridge deck crane structure as claimed in claim 4, wherein balls are arranged on the contact surface of the pulley displacement box and the pulley displacement groove.
6. The cable-stayed bridge space multidirectional alignment bridge floor crane structure according to claim 5, wherein the lifting device mechanism comprises a lower bearing connecting belt, a lower multi-groove pulley, a longitudinal main beam, a telescopic rod, a transverse secondary beam, a lifting device hanging strip, a lifting device hanging ring and a lifting device anchoring part, the transverse secondary beam and the longitudinal main beam are vertically arranged, the bottom end of the lower bearing connecting belt is connected with the longitudinal main beam, the top end of the lower bearing connecting belt is provided with the lower multi-groove pulley, one end of the telescopic rod is connected with the lower bearing connecting belt, the other end of the telescopic rod is connected with the longitudinal main beam, the lifting device hanging strip is arranged below two ends of the longitudinal main beam, and the other end of the lifting device hanging strip is anchored and fixed with the steel.
7. The cable-stayed bridge space multidirectional alignment bridge deck crane structure as claimed in claim 6, wherein the transverse secondary beam penetrates through two ends of the longitudinal main beam in a welding mode and forms a frame structure with the longitudinal main beam.
8. The spatial multidirectional cable-stayed bridge deck crane structure according to claim 7, wherein the lower load-bearing connecting band is arranged at the center of the top surface of the longitudinal main beam.
9. The spatial multidirectional cable-stayed bridge deck crane structure according to claim 8, wherein the longitudinal main beam and the lower bearing connecting band, the telescopic link and the lower bearing connecting band, and the telescopic link and the longitudinal main beam are rotatably connected through pin shafts.
10. The spatial multidirectional alignment bridge deck crane structure of claim 9, wherein a connecting rod is arranged between the two groups of main trusses to enhance the connection stability.
CN202110526974.3A 2021-05-14 2021-05-14 Cable-stay bridge space multidirectional bridge floor loop wheel machine structure that counterpoints Pending CN113120773A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110526974.3A CN113120773A (en) 2021-05-14 2021-05-14 Cable-stay bridge space multidirectional bridge floor loop wheel machine structure that counterpoints

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110526974.3A CN113120773A (en) 2021-05-14 2021-05-14 Cable-stay bridge space multidirectional bridge floor loop wheel machine structure that counterpoints

Publications (1)

Publication Number Publication Date
CN113120773A true CN113120773A (en) 2021-07-16

Family

ID=76781838

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110526974.3A Pending CN113120773A (en) 2021-05-14 2021-05-14 Cable-stay bridge space multidirectional bridge floor loop wheel machine structure that counterpoints

Country Status (1)

Country Link
CN (1) CN113120773A (en)

Similar Documents

Publication Publication Date Title
CN111945580B (en) Bridge deck erection method for large-radian curve type steel box girder
CN201232168Y (en) Walking bridging machine
CN109653105B (en) Main truss system of box girder bridge cantilever construction hanging basket and use method thereof
CN110397289B (en) All-dimensional beam erecting equipment standing on top of house column and having automatic walking function
CN210236912U (en) Movable cable carrying crane capable of carrying and walking track mechanism and walking system thereof
JP4264470B2 (en) Bridge girder member erection method and erection device
CN111691304B (en) Method and device for mounting prefabricated bridge deck between sections of steel-concrete composite beam
CN115417324A (en) Heavy-load transverse cable saddle system
CN210288140U (en) Simple and easy prefabricated decking hoist and mount platform truck
CN101481903A (en) Method for erecting main truss of suspension bridge in mountain area by reversely assembling cross-cable cranes
CN112695642A (en) Bridge floor crane
CN110042760B (en) But on-load removes cable carries loop wheel machine
CN215048206U (en) Cable-stay bridge space multidirectional bridge floor loop wheel machine structure that counterpoints
CN113120773A (en) Cable-stay bridge space multidirectional bridge floor loop wheel machine structure that counterpoints
CN208994999U (en) Mobile cable crane device
CN217350492U (en) Novel lifting device for bridge deck installation
CN108130864B (en) Integrally-assembled bridge whole-span beam transportation and erection equipment
CN106320190A (en) Platform of bridge maintenance, consolidation and suspension construction
CN214459672U (en) Bridge floor crane and front walking supporting mechanism thereof
CN210368664U (en) Wide-body bridge girder erection machine
CN110540142B (en) Automobile crane with bridge function, bridge plate and rail car
CN112695641A (en) Bridge floor crane and front walking supporting mechanism thereof
CN111827124A (en) T-beam transverse prestress tensioning auxiliary device, mounting method and using method
CN112709152A (en) Special plate erecting machine for bridge deck and construction process
CN111851301A (en) Bridge erecting machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination