CN113089717A - A green ecological barricade of assembled for cutting side slope protection - Google Patents

A green ecological barricade of assembled for cutting side slope protection Download PDF

Info

Publication number
CN113089717A
CN113089717A CN202110381011.9A CN202110381011A CN113089717A CN 113089717 A CN113089717 A CN 113089717A CN 202110381011 A CN202110381011 A CN 202110381011A CN 113089717 A CN113089717 A CN 113089717A
Authority
CN
China
Prior art keywords
planting
retaining wall
wallboard
fixing rod
green ecological
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110381011.9A
Other languages
Chinese (zh)
Other versions
CN113089717B (en
Inventor
孙余好
吴亚华
邢鹏飞
周煌
刘江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nuclear Industry Jingxiang Construction Group Co Ltd
Original Assignee
Nuclear Industry Jingxiang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nuclear Industry Jingxiang Construction Group Co Ltd filed Critical Nuclear Industry Jingxiang Construction Group Co Ltd
Priority to CN202110381011.9A priority Critical patent/CN113089717B/en
Publication of CN113089717A publication Critical patent/CN113089717A/en
Application granted granted Critical
Publication of CN113089717B publication Critical patent/CN113089717B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0266Retaining or protecting walls characterised by constructional features made up of preformed elements
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G27/00Self-acting watering devices, e.g. for flower-pots
    • A01G27/005Reservoirs connected to flower-pots through conduits
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G27/00Self-acting watering devices, e.g. for flower-pots
    • A01G27/04Self-acting watering devices, e.g. for flower-pots using wicks or the like
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • A01G9/022Pots for vertical horticulture
    • A01G9/023Multi-tiered planters
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • A01G9/022Pots for vertical horticulture
    • A01G9/025Containers and elements for greening walls

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The invention provides an assembled green ecological retaining wall for cutting slope protection, which relates to the technical field of road administration protection and comprises a retaining wall component and a planting component, wherein the retaining wall component covers a slope foundation, the planting component is installed on the retaining wall component, the retaining wall component consists of a plurality of groups of wallboards, the wallboards are in a ladder shape, the planting component comprises planting units, and the planting units are provided with a plurality of groups; according to the invention, the retaining wall assembly is formed by the plurality of groups of wallboards, the wallboards can be spliced in the length direction by matching the splicing blocks with the splicing grooves, plants can be planted in the planting grooves in the planting units, the planting units and the wallboards can be fixed by inserting the fixing rods into the side slope foundation, and the water guide pipes are inserted into the side slope foundation, so that the retaining wall assembly can be matched with the water absorption line to absorb water from the soil layer to supply the water to the plants and can further fix the planting units and the wallboards, therefore, the retaining wall assembly is more convenient to install, the wallboards can be spliced infinitely.

Description

A green ecological barricade of assembled for cutting side slope protection
Technical Field
The invention relates to the technical field of road administration protection, in particular to an assembled green ecological retaining wall for protecting a cutting side slope.
Background
The cutting is a roadbed made by excavating natural ground, and mainly has the main functions of easing a longitudinal slope of a road or enabling a cross ridge line to pass through a ridge opening to control elevation, and a stratum through which the cutting passes generally has a complex geological structure in the long-term generation and evolution process, the cutting side slope is positioned on the surface layer of a crust, and after the cutting is exposed, the cutting side slope is easy to deform and damage under the action of various conditions and natural factors, and the cutting side slope is treated carefully, and a retaining wall is generally required to be constructed to maintain stability, so that bad geological sections which can generate landslides and landslides can be protected;
in the prior art, the retaining wall is generally formed by pouring cement, trees are planted on the cement retaining wall for greening, the pouring of the cement retaining wall needs to carry out working procedures such as reinforcement processing and binding, formwork supporting, concrete pouring, maintenance, formwork removal and the like on a construction site, and the construction procedures are complex and high in cost, so that the invention provides the assembly type green ecological retaining wall for protecting the cutting side slope to solve the problems in the prior art.
Disclosure of Invention
In order to solve the problems, the invention provides an assembled green ecological retaining wall for cutting slope protection, which comprises a retaining wall assembly formed by a plurality of groups of wallboards, the wallboards can be spliced in the length direction by matching splicing blocks with splicing grooves, plants can be planted in planting grooves in planting units, the planting units and the wallboards can be fixed by inserting fixing rods into a slope foundation, and the water pipes are inserted into the slope foundation, so that a water absorption line can be matched to absorb water from a soil layer to supply the plants, and the planting units and the wallboards can be further fixed.
In order to realize the purpose of the invention, the invention is realized by the following technical scheme: an assembly type green ecological retaining wall for cutting slope protection comprises a retaining wall component and planting components, wherein the retaining wall component covers a slope foundation, the planting components are mounted on the retaining wall component, the retaining wall component is composed of a plurality of groups of wall boards, the wall boards are in a step shape, the planting components comprise planting units, the planting units are provided with a plurality of groups, and the planting units are respectively mounted on each layer of step on the wall boards;
the inner sides of the planting units are provided with planting grooves, the two sides of the bottoms of the planting units are provided with fixing rods, the fixing rods penetrate through the wall plate and are inserted into the side slope foundation, the two sides of one end of each planting unit are provided with water guide pipes, one ends of the water guide pipes penetrate through the wall plate and are inserted into the side slope foundation, the other ends of the water guide pipes are communicated with the planting grooves, water suction lines are arranged in the water guide pipes and are connected with the side slope foundation and the planting grooves, and the front ends of the bottoms of the planting units are provided with blocking assemblies;
the left side of wallboard is equipped with the splice, and the splice is equipped with the multiunit, the one end of splice both sides all is equipped with glues the piece, the right side of wallboard is equipped with the splice groove with splice looks adaptation, and is equipped with the constant head tank with splice looks adaptation in the splice groove.
The further improvement lies in that: the front side of the planting unit is provided with at least two groups of water guide holes, and the water guide holes are communicated with the planting grooves.
The further improvement lies in that: the ground grabbing tooth ring is locked into the slope foundation and is installed at the lower end of the fixing rod, a thread groove is formed in the ground grabbing tooth ring, and installation threads matched with the thread groove are arranged below the outer side of the fixing rod.
The further improvement lies in that: the wallboard fixing device is characterized in that a first external thread is arranged above the outer side of the fixing rod, a first nut is installed on the fixing rod through the first external thread, and the first nut is located below the wallboard and locks the penetrating position of the fixing rod and the wallboard.
The further improvement lies in that: one end outside the water guide pipe is provided with a second external thread, a second nut is installed outside the water guide pipe through the second external thread, and the second nut is located on the outer side of the wallboard and locks the penetrating position of the water guide pipe and the wallboard.
The further improvement lies in that: the blocking assembly comprises a first inserted bar and a hook, the first inserted bar is installed on two sides of the front end of the top of the planting unit, the hook is arranged on the first inserted bar, and the first inserted bar is connected with a blocking net through the hook.
The further improvement lies in that: stop the subassembly and include second inserted bar and make a mute the worn-out fur, the second inserted bar is installed in the both sides of planting unit top front end, and the front side of second inserted bar installs make a mute the worn-out fur, make a mute the worn-out fur to pass through the bolt and fix with the second inserted bar.
The further improvement lies in that: the bottom of the inside of the fixed rod is provided with a spring, the spring is provided with an elastic sheet, the two sides of the elastic sheet are provided with ground clamping teeth, the lower parts of the two sides of the fixed rod are provided with through holes, and the ground clamping teeth extend out of the fixed rod through the through holes.
The further improvement lies in that: the inner side of the fixed rod is provided with an internal thread, the inner side of the fixed rod is provided with a screw rod through the internal thread, and the screw rod is used for pushing the elastic sheet.
The invention has the beneficial effects that:
1. according to the invention, the retaining wall assembly is formed by the plurality of groups of wallboards, the wallboards can be spliced in the length direction by matching the splicing blocks with the splicing grooves, plants can be planted in the planting grooves in the planting units, the planting units and the wallboards can be fixed by inserting the fixing rods into the side slope foundation, and the water guide pipes are inserted into the side slope foundation, so that the retaining wall assembly can be matched with the water absorption line to absorb water from the soil layer to supply the water to the plants and can further fix the planting units and the wallboards, therefore, the retaining wall assembly is more convenient to install, the wallboards can be spliced infinitely.
2. According to the invention, the blocking net on the first inserted rod can block plants from the slope direction, so that the plants are limited, and the plants are prevented from falling off along the slope direction due to factors such as external wind, water flow and the like;
3. the plants are limited by the matte plate on the second inserted bar, so that the plants are prevented from falling off, the matte plate can not reflect light, a driver in a road is prevented from being interfered by the reflected light on the side slope, and the safety is improved;
4. according to the invention, the elastic sheet is pushed to move by rotating the screw rod, so that the ground clamping teeth are extruded out of the through holes of the fixed rod, and when the fixed rod is inserted into the side slope foundation, the ground clamping teeth extend out to be matched with the ground grabbing gear ring, so that the fixation firmness is further improved.
Drawings
FIG. 1 is a front view of the present invention;
FIG. 2 is a schematic view of a wall panel, planting unit of the present invention;
FIG. 3 is a schematic view of a wall panel of the present invention;
FIG. 4 is a schematic view of a blocking assembly according to an embodiment of the present invention;
FIG. 5 is a schematic view of a second barrier assembly according to an embodiment of the present invention;
fig. 6 is an internal schematic view of a triple fixation rod according to an embodiment of the present invention.
Wherein: 1. a wallboard; 2. a planting unit; 3. planting grooves; 4. fixing the rod; 5. a water conduit; 6. a water suction line; 7. splicing blocks; 8. gluing blocks; 9. a water guide hole; 10. a ground gripping gear ring; 11. a first nut; 12. a second nut; 13. a first plunger; 14. hooking; 15. a barrier net; 16. a second plunger; 17. a matte board; 18. a spring; 19. a spring plate; 20. a ground clamping tooth; 21. a screw.
Detailed Description
In order to further understand the present invention, the following detailed description will be made with reference to the following examples, which are only used for explaining the present invention and are not to be construed as limiting the scope of the present invention.
Example one
According to the drawings of fig. 1, 2, 3 and 4, the embodiment provides an assembled green ecological retaining wall for cutting slope protection, which comprises retaining wall components and planting components, wherein the retaining wall components cover a slope foundation, the planting components are installed on the retaining wall components, the retaining wall components are composed of a plurality of groups of wall plates 1, the wall plates 1 are in a ladder shape, the planting components comprise planting units 2, the planting units 2 are provided with a plurality of groups, and the planting units 2 are respectively installed on each layer of ladder on the wall plates 1;
the inner side of each planting unit 2 is provided with a planting groove 3, two sides of the bottom of each planting unit 2 are provided with fixing rods 4, each fixing rod 4 penetrates through the wall plate 1 and is inserted into a side slope foundation, two sides of one end of each planting unit 2 are provided with water guide pipes 5, one ends of the water guide pipes 5 penetrate through the wall plate 1 and are inserted into the side slope foundation, the other ends of the water guide pipes 5 are communicated with the planting grooves 3, water suction lines 6 are arranged in the water guide pipes 5, the water suction lines 6 are connected with the side slope foundation and the planting grooves 3, and the front ends of the bottoms of the planting units 2 are provided with blocking assemblies;
the left side of wallboard 1 is equipped with splice 7, and splice 7 is equipped with the multiunit, the one end of splice 7 both sides all is equipped with glues piece 8, the right side of wallboard 1 be equipped with the splice groove of splice 7 looks adaptation, and be equipped with in the splice groove with the constant head tank of gluing 8 looks adaptations. During the use, constitute the barricade subassembly through multiunit wallboard 1, accomplish the length direction concatenation through splice 7 cooperation splice groove between the multiunit wallboard 1, plant the plant through planting groove 3 in planting unit 2, insert side slope foundation through dead lever 4 and fix planting unit 2 and wallboard 1, insert the side slope foundation through aqueduct 5, cooperate water absorption line 6 to absorb moisture from the soil layer and supply with the plant.
The front side of the planting unit 2 is provided with two groups of water guide holes 9, and the water guide holes 9 are communicated with the planting grooves 3. For discharging excess water in the planting tank 3.
The lower end of the fixed rod 4 is provided with a ground grabbing gear ring 10 locked into a slope foundation, the ground grabbing gear ring 10 is provided with a thread groove, and a mounting thread matched with the thread groove is arranged below the outer side of the fixed rod 4. Insert side slope ground through dead lever 4 and fix planting unit 2 and wallboard 1, improve fixed steadiness through grabbing ground ring gear 10.
The top in the 4 outsides of dead lever is equipped with first external screw thread, and installs first nut 11 through first external screw thread on the dead lever 4, first nut 11 is located wallboard 1's below and locks the department that runs through of dead lever 4 and wallboard 1. Fixing planting unit 2 and wall plate 1.
One end in the aqueduct 5 outside is equipped with the second external screw thread, and the aqueduct 5 is installed the second nut 12 through the second external screw thread outward, the second nut 12 is located the outside of wallboard 1 and locks the run-through department of aqueduct 5 and wallboard 1. Fixing planting unit 2 and wall plate 1.
The blocking assembly comprises a first inserted bar 13 and a hook 14, the first inserted bar 13 is installed on two sides of the front end of the top of the planting unit 2, the hook 14 is arranged on the first inserted bar 13, and the first inserted bar 13 is connected with a blocking net 15 through the hook 14. The plant can be blocked from the slope inclination direction through the blocking net 15 on the first inserted bar 13, the plant is limited, and the plant is prevented from falling along the slope direction due to factors such as external wind, water flow and the like.
Example two
According to the drawings of fig. 1, 2, 3 and 5, the embodiment provides an assembled green ecological retaining wall for cutting slope protection, which comprises retaining wall components and planting components, wherein the retaining wall components cover a slope foundation, the planting components are installed on the retaining wall components, the retaining wall components are composed of a plurality of groups of wall plates 1, the wall plates 1 are in a ladder shape, the planting components comprise planting units 2, the planting units 2 are provided with a plurality of groups, and the planting units 2 are respectively installed on each layer of ladder on the wall plates 1;
the inner side of each planting unit 2 is provided with a planting groove 3, two sides of the bottom of each planting unit 2 are provided with fixing rods 4, each fixing rod 4 penetrates through the wall plate 1 and is inserted into a side slope foundation, two sides of one end of each planting unit 2 are provided with water guide pipes 5, one ends of the water guide pipes 5 penetrate through the wall plate 1 and are inserted into the side slope foundation, the other ends of the water guide pipes 5 are communicated with the planting grooves 3, water suction lines 6 are arranged in the water guide pipes 5, the water suction lines 6 are connected with the side slope foundation and the planting grooves 3, and the front ends of the bottoms of the planting units 2 are provided with blocking assemblies;
the left side of wallboard 1 is equipped with splice 7, and splice 7 is equipped with the multiunit, the one end of splice 7 both sides all is equipped with glues piece 8, the right side of wallboard 1 be equipped with the splice groove of splice 7 looks adaptation, and be equipped with in the splice groove with the constant head tank of gluing 8 looks adaptations. During the use, constitute the barricade subassembly through multiunit wallboard 1, accomplish the length direction concatenation through splice 7 cooperation splice groove between the multiunit wallboard 1, plant the plant through planting groove 3 in planting unit 2, insert side slope foundation through dead lever 4 and fix planting unit 2 and wallboard 1, insert the side slope foundation through aqueduct 5, cooperate water absorption line 6 to absorb moisture from the soil layer and supply with the plant.
The front side of the planting unit 2 is provided with two groups of water guide holes 9, and the water guide holes 9 are communicated with the planting grooves 3. For discharging excess water in the planting tank 3.
The lower end of the fixed rod 4 is provided with a ground grabbing gear ring 10 locked into a slope foundation, the ground grabbing gear ring 10 is provided with a thread groove, and a mounting thread matched with the thread groove is arranged below the outer side of the fixed rod 4. Insert side slope ground through dead lever 4 and fix planting unit 2 and wallboard 1, improve fixed steadiness through grabbing ground ring gear 10.
The top in the 4 outsides of dead lever is equipped with first external screw thread, and installs first nut 11 through first external screw thread on the dead lever 4, first nut 11 is located wallboard 1's below and locks the department that runs through of dead lever 4 and wallboard 1. Fixing planting unit 2 and wall plate 1.
One end in the aqueduct 5 outside is equipped with the second external screw thread, and the aqueduct 5 is installed the second nut 12 through the second external screw thread outward, the second nut 12 is located the outside of wallboard 1 and locks the run-through department of aqueduct 5 and wallboard 1. Fixing planting unit 2 and wall plate 1.
The blocking assembly comprises a second inserted bar 16 and a matte plate 17, the second inserted bar 16 is installed on two sides of the front end of the top of the planting unit 2, the matte plate 17 is installed on the front side of the second inserted bar 16, and the matte plate 17 is fixed with the second inserted bar 16 through bolts. It is spacing to the plant through the dull and stereotyped 17 on the second inserted bar 16, prevents that the plant from dropping, and dull and stereotyped 17 still can not reflect light, avoids driving driver in the road to be disturbed the sight by the reflection of light on the side slope, improves the security.
EXAMPLE III
According to the drawings of fig. 1, 2, 3 and 6, the embodiment provides an assembly type green ecological retaining wall for cutting slope protection, which comprises retaining wall components and planting components, wherein the retaining wall components cover a slope foundation, the planting components are installed on the retaining wall components, the retaining wall components are composed of a plurality of groups of wall plates 1, the wall plates 1 are in a step shape, the planting components comprise planting units 2, the planting units 2 are provided with a plurality of groups, and the planting units 2 are respectively installed on each layer of step on the wall plates 1;
the inner side of each planting unit 2 is provided with a planting groove 3, two sides of the bottom of each planting unit 2 are provided with fixing rods 4, each fixing rod 4 penetrates through the wall plate 1 and is inserted into a side slope foundation, two sides of one end of each planting unit 2 are provided with water guide pipes 5, one ends of the water guide pipes 5 penetrate through the wall plate 1 and are inserted into the side slope foundation, the other ends of the water guide pipes 5 are communicated with the planting grooves 3, water suction lines 6 are arranged in the water guide pipes 5, the water suction lines 6 are connected with the side slope foundation and the planting grooves 3, and the front ends of the bottoms of the planting units 2 are provided with blocking assemblies;
the left side of wallboard 1 is equipped with splice 7, and splice 7 is equipped with the multiunit, the one end of splice 7 both sides all is equipped with glues piece 8, the right side of wallboard 1 be equipped with the splice groove of splice 7 looks adaptation, and be equipped with in the splice groove with the constant head tank of gluing 8 looks adaptations. During the use, constitute the barricade subassembly through multiunit wallboard 1, accomplish the length direction concatenation through splice 7 cooperation splice groove between the multiunit wallboard 1, plant the plant through planting groove 3 in planting unit 2, insert side slope foundation through dead lever 4 and fix planting unit 2 and wallboard 1, insert the side slope foundation through aqueduct 5, cooperate water absorption line 6 to absorb moisture from the soil layer and supply with the plant.
The front side of the planting unit 2 is provided with two groups of water guide holes 9, and the water guide holes 9 are communicated with the planting grooves 3. For discharging excess water in the planting tank 3.
The lower end of the fixed rod 4 is provided with a ground grabbing gear ring 10 locked into a slope foundation, the ground grabbing gear ring 10 is provided with a thread groove, and a mounting thread matched with the thread groove is arranged below the outer side of the fixed rod 4. Insert side slope ground through dead lever 4 and fix planting unit 2 and wallboard 1, improve fixed steadiness through grabbing ground ring gear 10.
The top in the 4 outsides of dead lever is equipped with first external screw thread, and installs first nut 11 through first external screw thread on the dead lever 4, first nut 11 is located wallboard 1's below and locks the department that runs through of dead lever 4 and wallboard 1. Fixing planting unit 2 and wall plate 1.
One end in the aqueduct 5 outside is equipped with the second external screw thread, and the aqueduct 5 is installed the second nut 12 through the second external screw thread outward, the second nut 12 is located the outside of wallboard 1 and locks the run-through department of aqueduct 5 and wallboard 1. Fixing planting unit 2 and wall plate 1.
The bottom of the inside of the fixed rod 4 is provided with a spring 18, the spring 18 is provided with an elastic sheet 19, two sides of the elastic sheet 19 are provided with ground clamping teeth 20, the lower parts of two sides of the fixed rod 4 are provided with through holes, and the ground clamping teeth 20 extend out of the fixed rod 4 through the through holes.
The inner side of the fixing rod 4 is provided with an internal thread, the inner side of the fixing rod 4 is provided with a screw 21 through the internal thread, and the screw 21 is used for pushing the elastic sheet 19. The elastic sheet 19 is pushed to move by rotating the screw 21, so that the ground clamping teeth 20 are extruded out of the through holes of the fixing rod 4, and when the fixing rod 4 is inserted into the slope foundation, the ground clamping teeth 20 extend out of the matched ground grabbing toothed ring 10 to further improve the fixing firmness.
The assembled green ecological retaining wall for the cut slope protection comprises a retaining wall assembly which is formed by a plurality of groups of wall boards 1, the length direction splicing can be completed by matching splicing blocks 7 with splicing grooves among the groups of wall boards 1, plants can be planted through planting grooves 3 in planting units 2, the planting units 2 and the wall boards 1 can be fixed by inserting fixing rods 4 into slope foundations, and water guide pipes 5 are inserted into the slope foundations, so that the assembled green ecological retaining wall can be matched with a water absorption line 6 to absorb water from soil layers to supply the plants, and can further fix the planting units 2 and the wall boards 1, therefore, the assembly is more convenient, the wall boards 1 can be infinitely spliced, the process is simple, the cost is low, the plants can be blocked from the slope direction by the blocking nets 15 on the first inserting rods 13, the plants are limited, the plants are prevented from falling along the slope direction by factors such as external wind and water flow, and the like, meanwhile, the plants are limited by the, prevent that the plant from dropping, mute light board 17 still can not reflect light, avoids driving driver in the road to be disturbed the sight by the reflection of light on the side slope, improves the security, in addition, promotes shell fragment 19 through rotatory screw rod 21 and removes for card ground tooth 20 is extruded the perforation of dead lever 4, inserts the side slope ground at dead lever 4, and card ground tooth 20 stretches out the cooperation and grabs ground ring gear 10 and further improves fixed fastness.
The foregoing illustrates and describes the principles, general features, and advantages of the present invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (9)

1. The utility model provides a green ecological barricade of assembled for cutting side slope protection, includes barricade subassembly and planting subassembly, its characterized in that: the retaining wall assembly covers a side slope foundation, the planting assembly is installed on the retaining wall assembly, the retaining wall assembly is composed of a plurality of groups of wall plates (1), the wall plates (1) are in a step shape, the planting assembly comprises planting units (2), the planting units (2) are provided with a plurality of groups, and the planting units (2) are installed on each layer of step on the wall plates (1) respectively;
the inner side of each planting unit (2) is provided with a planting groove (3), fixing rods (4) are arranged on two sides of the bottom of each planting unit (2), each fixing rod (4) penetrates through the corresponding wall plate (1) and is inserted into a side slope foundation, water guide pipes (5) are arranged on two sides of one end of each planting unit (2), one ends of the water guide pipes (5) penetrate through the corresponding wall plate (1) and are inserted into the side slope foundation, the other ends of the water guide pipes (5) are communicated with the corresponding planting grooves (3), water suction lines (6) are arranged in the water guide pipes (5), the water suction lines (6) are connected with the side slope foundations and the planting grooves (3), and blocking assemblies are arranged at the front ends of the bottoms of the planting units (2);
the left side of wallboard (1) is equipped with splice (7), and splice (7) is equipped with the multiunit, the one end of splice (7) both sides all is equipped with glues piece (8), the right side of wallboard (1) is equipped with the splice groove with splice (7) looks adaptation, and is equipped with the constant head tank with glue piece (8) looks adaptation in the splice groove.
2. The assembled green ecological retaining wall for cutting slope protection according to claim 1, characterized in that: the front side of the planting unit (2) is provided with water guide holes (9), at least two groups of water guide holes (9) are arranged, and the water guide holes (9) are communicated with the planting groove (3).
3. The assembled green ecological retaining wall for cutting slope protection according to claim 2, characterized in that: the ground grabbing device is characterized in that a ground grabbing gear ring (10) locked into a slope foundation is installed at the lower end of the fixing rod (4), a thread groove is formed in the ground grabbing gear ring (10), and mounting threads matched with the thread groove are arranged below the outer side of the fixing rod (4).
4. The assembled green ecological retaining wall for cutting slope protection according to claim 3, characterized in that: the wallboard fixing device is characterized in that a first external thread is arranged above the outer side of the fixing rod (4), a first nut (11) is installed on the fixing rod (4) through the first external thread, and the first nut (11) is located below the wallboard (1) and locks the penetrating position of the fixing rod (4) and the wallboard (1).
5. The assembled green ecological retaining wall for cutting slope protection according to claim 4, characterized in that: one end in aqueduct (5) outside is equipped with the second external screw thread, and installs second nut (12) through the second external screw thread outside aqueduct (5), second nut (12) are located the outside of wallboard (1) and lock the department that runs through of aqueduct (5) and wallboard (1).
6. The assembled green ecological retaining wall for cutting slope protection according to claim 5, characterized in that: the blocking assembly comprises a first inserting rod (13) and a hook (14), the first inserting rod (13) is installed on the two sides of the front end of the top of the planting unit (2), the hook (14) is arranged on the first inserting rod (13), and the first inserting rod (13) is connected with a blocking net (15) through the hook (14).
7. The assembled green ecological retaining wall for cutting slope protection according to claim 5, characterized in that: the blocking assembly comprises a second inserted bar (16) and a matte plate (17), the second inserted bar (16) is installed on two sides of the front end of the top of the planting unit (2), the matte plate (17) is installed on the front side of the second inserted bar (16), and the matte plate (17) is fixed with the second inserted bar (16) through bolts.
8. The assembled green ecological retaining wall for cutting slope protection according to any one of claims 2 to 7, wherein: the fixing rod is characterized in that a spring (18) is arranged at the bottom inside the fixing rod (4), an elastic sheet (19) is arranged on the spring (18), ground clamping teeth (20) are arranged on two sides of the elastic sheet (19), through holes are formed in the lower portions of two sides of the fixing rod (4), and the ground clamping teeth (20) extend out of the fixing rod (4) through the through holes.
9. The assembled green ecological retaining wall for cutting slope protection according to claim 8, characterized in that: the inner side of the fixing rod (4) is provided with an internal thread, a screw rod (21) is installed on the inner side of the fixing rod (4) through the internal thread, and the screw rod (21) is used for pushing the elastic sheet (19).
CN202110381011.9A 2021-04-09 2021-04-09 A green ecological barricade of assembled for cutting side slope protection Active CN113089717B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110381011.9A CN113089717B (en) 2021-04-09 2021-04-09 A green ecological barricade of assembled for cutting side slope protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110381011.9A CN113089717B (en) 2021-04-09 2021-04-09 A green ecological barricade of assembled for cutting side slope protection

Publications (2)

Publication Number Publication Date
CN113089717A true CN113089717A (en) 2021-07-09
CN113089717B CN113089717B (en) 2022-10-11

Family

ID=76675552

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110381011.9A Active CN113089717B (en) 2021-04-09 2021-04-09 A green ecological barricade of assembled for cutting side slope protection

Country Status (1)

Country Link
CN (1) CN113089717B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113882405A (en) * 2021-11-01 2022-01-04 中实建设集团有限公司 Foundation engineering construction is with central island formula side slope support device
CN115217067A (en) * 2022-08-25 2022-10-21 广东城华工程咨询有限公司 Green plant ecological retaining wall combined green road and design and construction method thereof

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204690779U (en) * 2015-04-02 2015-10-07 成都科特柯本科技有限公司 A kind of retaining wall
CN106368171A (en) * 2016-11-11 2017-02-01 天津绿茵景观生态建设股份有限公司 River way side slope stabilizing feature wall
CN207794107U (en) * 2018-01-16 2018-08-31 王玉敬 Side slope protection device for construction
CN208441049U (en) * 2018-06-25 2019-01-29 中国电建集团中南勘测设计研究院有限公司 A kind of ecological brick and its ecological slope protection system
CN109778780A (en) * 2019-02-22 2019-05-21 西安景兴祥环境科技有限公司 A kind of set plays building block
CN209368850U (en) * 2018-11-10 2019-09-10 陕西交通公路设计研究院有限公司 A kind of protection contractility soil cut slope
CN110438991A (en) * 2019-07-17 2019-11-12 长安大学 A kind of freeze proof Ecological Slope barricade of the dark and damp Han Qu pin-connected panel of weather and assembly method
CN210395431U (en) * 2019-06-03 2020-04-24 武汉市武昌市政建设(集团)有限公司 Assembled retaining wall
CN212506334U (en) * 2020-06-22 2021-02-09 肖洪 Highway bank protection of block structure
CN112482405A (en) * 2020-11-26 2021-03-12 湖北沛函建设有限公司 Prefabricated slope protection device and construction method thereof

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204690779U (en) * 2015-04-02 2015-10-07 成都科特柯本科技有限公司 A kind of retaining wall
CN106368171A (en) * 2016-11-11 2017-02-01 天津绿茵景观生态建设股份有限公司 River way side slope stabilizing feature wall
CN207794107U (en) * 2018-01-16 2018-08-31 王玉敬 Side slope protection device for construction
CN208441049U (en) * 2018-06-25 2019-01-29 中国电建集团中南勘测设计研究院有限公司 A kind of ecological brick and its ecological slope protection system
CN209368850U (en) * 2018-11-10 2019-09-10 陕西交通公路设计研究院有限公司 A kind of protection contractility soil cut slope
CN109778780A (en) * 2019-02-22 2019-05-21 西安景兴祥环境科技有限公司 A kind of set plays building block
CN210395431U (en) * 2019-06-03 2020-04-24 武汉市武昌市政建设(集团)有限公司 Assembled retaining wall
CN110438991A (en) * 2019-07-17 2019-11-12 长安大学 A kind of freeze proof Ecological Slope barricade of the dark and damp Han Qu pin-connected panel of weather and assembly method
CN212506334U (en) * 2020-06-22 2021-02-09 肖洪 Highway bank protection of block structure
CN112482405A (en) * 2020-11-26 2021-03-12 湖北沛函建设有限公司 Prefabricated slope protection device and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113882405A (en) * 2021-11-01 2022-01-04 中实建设集团有限公司 Foundation engineering construction is with central island formula side slope support device
CN115217067A (en) * 2022-08-25 2022-10-21 广东城华工程咨询有限公司 Green plant ecological retaining wall combined green road and design and construction method thereof

Also Published As

Publication number Publication date
CN113089717B (en) 2022-10-11

Similar Documents

Publication Publication Date Title
CN113089717B (en) A green ecological barricade of assembled for cutting side slope protection
DE2456915A1 (en) Screens against industrial traffic and similar noise - deflect sound on to sound- absorbing material or into open space
CN113668461B (en) Ecological slope protection structure for hydraulic engineering
CN212000895U (en) River bank slope surface protection device
CN219315638U (en) Ecological bank protection of river course
CN108867668B (en) Ecological retaining plate structure
CN215165251U (en) Side slope protection device for riverway renovation and nursing
CN106988324B (en) Root system combines the method that bar strip reinforces expansive soil slope
CN214089911U (en) Side slope protection device
CN213173774U (en) Side slope protection structure
CN205776286U (en) Retaining wall pumping equipment
CN212270825U (en) Plant-growing concrete revetment structure
CN212001166U (en) Highway side slope protector
CN216515398U (en) Hydraulic engineering is with slope protection that prevents soil erosion and water loss
CN219099939U (en) Ecological restoration slope protection of channel
CN214832383U (en) Slope protection device in lake
CN217203877U (en) Forest and grass planting system for preventing and treating reservoir water and soil loss
CN217896545U (en) Ecological grid for protecting soil slope
CN219124872U (en) Facility is planted to highway afforestation plant
CN220202711U (en) Cutting side slope collapse prevention structure
CN217266677U (en) Concatenation formula high strength road bed protection prefabricated component
CN216040980U (en) Civil engineering is with bank protection protector of convenient regulation
CN115305929B (en) Slope treatment and greening auxiliary mechanism for urban external traffic development
CN214573057U (en) Steel grating convenient to maintain
CN210369033U (en) Ecological retaining plate structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant