CN113065800A - Tunnel constructor management method, system, intelligent equipment and storage medium - Google Patents

Tunnel constructor management method, system, intelligent equipment and storage medium Download PDF

Info

Publication number
CN113065800A
CN113065800A CN202110450506.2A CN202110450506A CN113065800A CN 113065800 A CN113065800 A CN 113065800A CN 202110450506 A CN202110450506 A CN 202110450506A CN 113065800 A CN113065800 A CN 113065800A
Authority
CN
China
Prior art keywords
information
worker
tunnel
construction
outputting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110450506.2A
Other languages
Chinese (zh)
Inventor
田文树
王泽乾
孙志刚
杜鹏
徐修恩
王宏昭
郑少华
刘辉
何磊
单岩
晋志建
胡小桢
郑永刚
郑彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Guohua Safety Technology Engineering Co ltd
Shijiazhuang Sikai Power Construction Co ltd
Shijiazhuang Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
Hebei Guohua Safety Technology Engineering Co ltd
Shijiazhuang Sikai Power Construction Co ltd
Shijiazhuang Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Guohua Safety Technology Engineering Co ltd, Shijiazhuang Sikai Power Construction Co ltd, Shijiazhuang Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical Hebei Guohua Safety Technology Engineering Co ltd
Priority to CN202110450506.2A priority Critical patent/CN113065800A/en
Publication of CN113065800A publication Critical patent/CN113065800A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The application relates to a method and a system for managing tunnel constructors, intelligent equipment and a storage medium, which relate to the technical field of tunnel construction management, wherein the method comprises the following steps: collecting personal information of workers; if the personal information is successfully matched with the pre-input personal information, outputting a control signal to enable the currently detected worker to enter the construction tunnel; calculating the working time of a first worker, and outputting first prompt information to inform the first worker to move out of the construction tunnel after a preset time period is reached; the first worker is a worker in the construction tunnel; outputting second prompt information to remind a second worker to enter the construction tunnel; the second worker refers to a worker outside the construction tunnel. The method and the device have the effects of improving the information management degree of tunnel construction and improving the management efficiency.

Description

Tunnel constructor management method, system, intelligent equipment and storage medium
Technical Field
The present disclosure relates to the field of tunnel construction management technologies, and in particular, to a method and a system for managing tunnel constructors, an intelligent device, and a storage medium.
Background
With the vigorous development of infrastructure construction in China, the engineering quantity of traffic roads per year is in a rapid growth trend, and the construction workload of tunnel engineering correspondingly increases. Due to the danger and specificity of tunnel construction, statistics needs to be carried out on workers in tunnel construction and other engineering information.
The method is not suitable for the tunnel engineering construction and the informatization, and the tunnel construction management and the traditional mode are laggard in terms of both engineering management and informatization management of data statistics.
Disclosure of Invention
In order to improve the information management degree of tunnel construction and improve the management efficiency, the application provides a tunnel constructor management method, a system, intelligent equipment and a storage medium.
In a first aspect, the tunnel constructor management method provided by the application adopts the following technical scheme:
the tunnel constructor management method comprises the following steps:
collecting personal information of workers;
if the personal information is successfully matched with the pre-input personal information, outputting a control signal to enable the currently detected worker to enter the construction tunnel;
calculating the working time of a first worker, and outputting first prompt information to inform the first worker to move out of the construction tunnel after a preset time period is reached; the first worker is a worker in the construction tunnel;
outputting second prompt information to remind a second worker to enter the construction tunnel; the second worker refers to a worker outside the construction tunnel.
By adopting the technical scheme, whether the current constructor is a spare and miscellaneous person or not is judged by collecting the personal information of the constructor in the construction process; because the environment in the tunnel utilizes the light to provide luminance, there is not great impression to the length of time of work, make statistics of constructor's length of time after constructor gets into the tunnel, and send first prompt message and second prompt message after arriving operating time, change by shift with the second operating information of reminding the first staff that is in operating condition and being in rest condition, make the incessant continuation of excavation work in the tunnel go on, reduce the notice management work load to the staff simultaneously, improve the degree of automation of management efficiency and management.
In a possible implementation manner, before the collecting the personal information of the constructor, the method further includes:
detecting environmental information in the tunnel, wherein the environmental information comprises air environmental information and temperature information,
judging whether the environmental information in the tunnel meets the construction requirements or not, and if so, acquiring personal information of workers; if not, outputting warning information.
By adopting the technical scheme, before the working personnel enter the construction tunnel, the environmental information in the tunnel is detected in advance, whether danger exists in the environmental information in the tunnel is judged, and when the working personnel are forbidden to enter in case of danger, the warning information is sent out, so that the personal safety of the working personnel is further improved.
In a possible implementation manner, after the outputting the second prompt message to notify the second worker to enter the construction tunnel, the method further includes:
counting the number information of the first staff;
collecting and recording the position information of each first worker in real time;
and displaying the position information of each first worker on a preset construction tunnel model.
By adopting the technical scheme, the number information of the first staff is detected, so that the number of the construction staff can be counted, and the related responsible person can conveniently master the construction progress according to the number information of the working staff; the position information of the first worker is collected, and the construction progress of each day or each week can be checked; the quantity of the trapped first workers can be counted after danger occurs, and rescue work can be performed according to the position information of the first workers.
In a possible implementation manner, after the outputting the second prompt message to notify the second worker to enter the construction tunnel, the method further includes:
acquiring physical condition information of a first worker in real time;
and when the physical condition of the first worker cannot meet the working requirement, outputting third prompt information to remind the first worker to exit the working state.
By adopting the technical scheme, when the physical condition of the first working personnel in the working state goes wrong, the third prompt message can be sent out in time to inform the first working personnel to quit the working state, and meanwhile, the relevant responsible personnel are informed, so that the working instruction can be made according to the condition of personnel shortage.
In a second aspect, the present application provides a tunnel constructor management system, which adopts the following technical scheme:
a tunnel builder management system comprising:
the information acquisition unit is used for acquiring personal information of workers;
the data processing unit is used for successfully matching the personal information with the pre-input personal information and outputting a control signal to enable the currently detected staff to enter the construction tunnel;
the timing unit is used for timing the working time of the first worker in the working state;
the information output unit is used for outputting first prompt information and second prompt information after the working time of the first worker reaches a preset time period, wherein the first prompt information is used for informing the first worker to move out of the construction tunnel; and the second prompt message is used for informing a second worker of entering the construction tunnel.
By adopting the technical scheme, in the construction process, the personal information of the constructors is acquired through the information acquisition unit, and whether the current constructors are idle or not is judged through the data processing unit; because the environment in the tunnel utilizes the light to provide luminance, there is not great impression to the length of time of work, make statistics of constructor's length of time through the timing unit after constructor gets into the tunnel, and send first prompt message and second prompt message through information output unit after arriving operating time, change by shift with reminding the second operating information who is in operating condition and is in rest condition first staff, make the excavation work in the tunnel can incessant continuation going on, reduce the notice management work load to the staff simultaneously, improve the degree of automation of management efficiency and management.
In one possible implementation manner, the method further includes:
the environment monitoring unit is used for detecting environment information in the tunnel, and the environment information comprises air environment information and temperature information;
the environment judgment unit is used for judging whether the environment information in the tunnel meets the construction requirement or not, and if so, acquiring personal information of workers; if not, outputting warning information.
Through adopting above-mentioned technical scheme, before the staff enters into the construction tunnel, through the environmental monitoring unit environmental information in the preliminary detection tunnel to judge whether there is danger in the environmental information in the tunnel through the environment judgement unit, when having dangerous condition forbid the staff and get into, send warning information, further improve staff's personal safety.
In one possible implementation manner, the method further includes:
the quantity counting unit is used for counting quantity information of the first staff;
and the position detection unit is used for detecting and displaying the position information of each first worker.
By adopting the technical scheme, the quantity information of the first staff is detected through the quantity counting unit, so that the related responsible person can conveniently master the construction progress according to the information of the number of the working staff; the position detection unit is used for collecting the position information of the first worker, so that the construction progress of each day or each week can be checked; the quantity of the trapped first workers can be counted after danger occurs, and rescue work can be performed according to the position information of the first workers.
In one possible implementation manner, the method further includes:
the body detection unit is used for acquiring the body condition information of the first worker in real time;
and the physical condition judging unit is used for judging whether the first worker can continue working according to the physical condition information, and outputting third prompt information to remind the first worker to quit the working state if the first worker cannot continue working.
By adopting the technical scheme, in the construction process, when the physical condition of the first working personnel in the working state goes wrong, the third prompt message can be sent out in time to inform the first working personnel to exit the working state, and meanwhile, relevant responsible persons are informed, so that the working instruction is made according to the condition of personnel shortage.
In a third aspect, the present application provides an intelligent device, which adopts the following technical solution:
a smart device comprising a memory and a processor, the memory having stored thereon a computer program that can be loaded by the processor and that executes the method according to any of the first aspects.
In a fourth aspect, the present application provides a computer-readable storage medium, which adopts the following technical solutions:
a computer readable storage medium storing a computer program capable of being loaded by a processor and performing a method as in any one of the first aspects.
In summary, the present application includes at least one of the following beneficial technical effects:
because the environment in the tunnel utilizes the light to provide luminance, there is not great impression to the length of time of work, make statistics of constructor's length of time after constructor gets into the tunnel, and send first prompt message and second prompt message after arriving operating time, change by shift with the second operating information of reminding the first staff that is in operating condition and being in rest condition, make the incessant continuation of excavation work in the tunnel go on, reduce the notice management work load to the staff simultaneously, improve the degree of automation of management efficiency and management.
Drawings
Fig. 1 is a flow chart of a method provided in an embodiment of the present application.
Fig. 2 is a flow chart of another method provided by an embodiment of the present application.
Detailed Description
The present application is described in further detail below with reference to the attached drawings.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications of the present embodiment without inventive contribution as needed after reading the present specification, but all of them are protected by patent law within the scope of the claims of the present invention.
The embodiment of the invention provides a tunnel constructor management method, which comprises the following steps: collecting personal information of workers; if the personal information is successfully matched with the pre-input personal information, outputting a control signal to enable the currently detected worker to enter the construction tunnel; calculating the working time of a first worker, and outputting first prompt information to inform the first worker to move out of the construction tunnel after a preset time period is reached; the first worker is a worker in the construction tunnel; after the first prompt message is output, outputting a second prompt message to remind a second worker to enter the construction tunnel; the second worker refers to a worker outside the construction tunnel.
In the embodiment of the invention, the illumination lamp is used for providing brightness no matter day and night in the tunnel, the working time of the constructors is not greatly felt, the working time of the constructors is counted after the constructors enter the tunnel, and the first prompt message and the second prompt message are sent out after the working time is reached so as to remind the first working personnel in the working state and the second working information in the rest state to carry out duty-on alternation, so that the excavation work in the tunnel can be continuously carried out, the notification management workload of the working personnel is reduced, and the management efficiency and the management automation degree are improved.
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The embodiments of the present invention will be described in further detail with reference to the drawings attached hereto.
The tunnel constructor management method provided by the embodiment of the invention has the main flow description as follows.
As shown in fig. 1:
step S100: personal information of the second worker is collected.
The second worker is a worker outside the construction tunnel and in a non-working state; the personal information of the second staff member includes facial information, fingerprint information or a virtual identification capable of representing the identity thereof. The virtual identifier may be a device that the second staff member writes with him and has information that can be read, for example, the virtual identifier may be a magnetic card, a card with a staff information identification code, or the like.
Before the second staff enters the tunnel construction, the personal information of the second staff is collected in advance, so that the situation that the idle staff is dangerous when entering the construction tunnel can be prevented, and meanwhile, the statistics and the management of the staff are facilitated.
Step S200: matching the personal information of the second worker with pre-recorded reference personal information, and judging whether the matching is successful;
step S210: if so, outputting a control signal to enable a second worker to be detected to enter the construction tunnel;
step S220: if not, jumping to step S100.
Before construction, personal information of all workers needs to be input in advance, the personal information is used for matching when second worker information is detected during construction, and control signals output after matching are used for controlling opening of access equipment, such as a gate, a revolving door and the like. If the matching fails, no control signal is output, then the access equipment is kept in a closed state, and workers who fail to match are forbidden to enter the construction tunnel, so that the phenomenon that non-workers enter the construction tunnel is further reduced.
Step S300: and calculating the working time of the first worker, and outputting first prompt information to inform the first worker to move out of the construction tunnel after a preset time period is reached.
The first worker is a worker in a working state in the construction tunnel; and when the personal information of the second worker is collected, the second worker is the first worker in the working state. The mode of outputting the first prompt message comprises the steps of making a sound or voice notification by using a loudspeaker, sending a text prompt message to the wearable device carried by the first worker, and the like.
When the personal information of the second staff is successfully matched with the pre-recorded reference personal information, timing is started for recording the working time length information of the first staff, light in the tunnel is provided through the illuminating lamp, the light and shade conditions outside the tunnel cannot be seen, and when the working time length of the first staff reaches or exceeds the preset working time, prompt information is sent for reminding the first staff of reaching the working time length, the workload of notification management of the staff responsible for the staff is reduced, and the management efficiency is improved.
Step S400: and outputting second prompt information to remind a second worker to enter the construction tunnel.
Wherein outputting the second prompt message may be performed simultaneously with outputting the first prompt message. The second prompting message mode comprises the steps of making a sound or voice notification by using a loudspeaker, making a character and vibration prompting message to the wearable device carried by the first worker, and the like.
Because tunnel construction's particularity, it is 24 hours continuous construction usually, light in the tunnel is provided by the light, and the staff can't see the light and shade condition outside the tunnel in the tunnel, and the time length of the difficult work of feeling promptly changes, through sending first prompt message and second prompt message in order to remind the first staff who is in operating condition and the second work information that is in the rest condition to take over shift and change to make the incessant continuation of excavation work in the tunnel go on. In order to improve the safety of workers in the construction tunnel, the method also comprises the following steps.
Referring to fig. 2:
step S110: detecting environmental information in a tunnel in real time, wherein the environmental information comprises air environmental information and temperature information;
step S120: and if the environmental information in the tunnel does not meet the construction requirements, outputting warning information.
The air environment information comprises concentration information of harmful gases, concentration information of combustible gases and oxygen content information.
First staff in the work progress in the tunnel, because the environment in the tunnel is comparatively sealed, produce the phenomenon of gas gathering easily, air circumstance information and temperature information in the accessible corresponding sensor detection tunnel to whether the environmental information in the judgement tunnel exists danger, when having dangerous condition forbid the entering of second staff, and send warning information to the first staff who is in the construction tunnel, further improve staff's personal safety.
In order to further improve the management work for the first worker, the following steps are further included after step S400.
Step 410: counting the number information of the first staff;
step 420: collecting and recording the position information of each first worker in real time;
step 430: and displaying the position information of each first worker on a preset construction tunnel model.
The mode of collecting the position information of the first worker can be realized through a Bluetooth technology, the Bluetooth communication is a short-distance low-power-consumption wireless transmission technology, after a proper Bluetooth local area network access point is installed in a construction tunnel, the network is configured into a multi-user-based basic network connection mode, and the Bluetooth local area network access point is guaranteed to be a main device of the micro network all the time. Thus, the position information of the user can be obtained by detecting the signal intensity.
The mode of collecting the position information of the first worker can be realized through an RFID technology, namely, a plurality of readers with fixed positions are arranged in a construction tunnel, the first worker writes a tag with radio frequency communication with the readers, the tag receives a radio frequency signal sent by the readers after entering the readers, or the tag actively sends a signal with a certain frequency, and the radio frequency mode is utilized for carrying out non-contact two-way communication to exchange data, so that the purposes of identifying and positioning the mobile equipment are realized.
The number information of the first working personnel is detected, the number of the constructed people can be counted, and the related responsible people can conveniently grasp the construction progress according to the number information of the working people. Before construction, a three-dimensional model of the tunnel can be designed in advance, the three-dimensional model can be a BIM (building information modeling) three-dimensional model, the position information of a first worker is displayed in the BIM model in a wireless transmission mode, and the construction progress of every day or every week can be checked; the quantity of the trapped first workers can be counted after danger occurs, and rescue work can be performed according to the position information of the first workers.
In order to guarantee that the working personnel have good physical conditions during working and further improve the personal safety of the working personnel, after the second prompt message is output to inform the second working personnel to enter the construction tunnel, the method further comprises the following steps:
step 440: acquiring physical condition information of a first worker in real time;
step 450: and when the physical condition of the first worker cannot meet the working requirement, outputting third prompt information to remind the first worker to exit the working state.
Wherein, gather first staff's health information and include first staff's rhythm of the heart information and body temperature information, the wearing equipment that the mode accessible first staff of the first staff's health information of collection worn realizes, or realize the function that the body temperature detected through the camera that possesses the function of detecting body temperature, when the intensity of labour who detects first staff is too big or because fever leads to the uncomfortable and can not continue to carry out work, can in time send third prompt information in order to inform this first staff and withdraw from operating condition, inform relevant person in charge simultaneously, so that make it make work instruction to the condition of personnel shortage.
The application also discloses tunnel constructor management system, include:
the information acquisition unit is used for acquiring personal information of workers;
the data processing unit is used for successfully matching the personal information with the pre-input personal information and outputting a control signal to enable the currently detected staff to enter the construction tunnel;
the timing unit is used for timing the working time of the first worker in the working state;
the information output unit is used for outputting first prompt information and second prompt information after the working time of the first worker reaches a preset time period, wherein the first prompt information is used for informing the first worker to move out of the construction tunnel; and the second prompt message is used for informing a second worker of entering the construction tunnel.
Further, the system further comprises:
the environment monitoring unit is used for detecting environment information in the tunnel, and the environment information comprises air environment information and temperature information;
the environment judgment unit is used for judging whether the environment information in the tunnel meets the construction requirement or not, and if so, acquiring personal information of workers; if not, outputting warning information.
Further, the system further comprises:
the quantity counting unit is used for counting quantity information of the first staff;
and the position detection unit is used for detecting and displaying the position information of each first worker.
Further, the system further comprises:
the body detection unit is used for acquiring the body condition information of the first worker in real time;
and the physical condition judging unit is used for judging whether the first worker can continue working according to the physical condition information, and outputting third prompt information to remind the first worker to quit the working state if the first worker cannot continue working.
The present application also discloses an intelligent device comprising a memory and a processor, said memory having stored thereon a computer program that can be loaded by the processor and that performs any of the method steps as described above.
The present application also discloses a computer readable storage medium storing a computer program that can be loaded by a processor and executed to perform any of the method steps as described above.
The computer-readable storage medium includes, for example: various media capable of storing program codes, such as a usb disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk, or an optical disk.
In the above embodiments provided in the present application, it should be understood that the disclosed system, apparatus and method may be implemented in other ways. For example, the above-described apparatus embodiments are merely illustrative, and for example, the division of the modules or units is only one logical division, and there may be other divisions when actually implemented, for example, a plurality of units or components may be combined or may be integrated into another system, or some features may be omitted, or not executed.
The units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the units can be selected according to actual needs to achieve the purpose of the solution of the embodiment.
In addition, functional units in the embodiments of the present application may be integrated into one processing unit, or each unit may exist alone physically, or two or more units are integrated into one unit. The integrated unit can be realized in a form of hardware, and can also be realized in a form of a software functional unit.
The above embodiments are only used to describe the technical solutions of the present application in detail, but the above embodiments are only used to help understanding the method and the core idea of the present invention, and should not be construed as limiting the present invention. Those skilled in the art should also appreciate that they can easily conceive of various changes and substitutions within the technical scope of the present disclosure.

Claims (10)

1. The method for managing tunnel constructors is characterized by comprising the following steps:
collecting personal information of workers;
if the personal information is successfully matched with the pre-input personal information, outputting a control signal to enable the currently detected worker to enter the construction tunnel;
calculating the working time of a first worker, and outputting first prompt information to inform the first worker to move out of the construction tunnel after a preset time period is reached; the first worker is a worker in the construction tunnel;
outputting second prompt information to remind a second worker to enter the construction tunnel; the second worker refers to a worker outside the construction tunnel.
2. The tunnel constructor management method according to claim 1, wherein before the collecting constructor personal information, further comprising:
detecting environmental information in the tunnel, wherein the environmental information comprises air environmental information and temperature information,
judging whether the environmental information in the tunnel meets the construction requirements or not, and if so, acquiring personal information of workers; if not, outputting warning information.
3. The method for managing tunnel construction personnel of claim 1, wherein said outputting a second prompt message to notify a second worker of entering the construction tunnel further comprises:
counting the number information of the first staff;
collecting and recording the position information of each first worker in real time;
and displaying the position information of each first worker on a preset construction tunnel model.
4. The method for managing tunnel construction personnel of claim 3, wherein said outputting a second prompt message to notify a second worker of entering the construction tunnel further comprises:
acquiring physical condition information of a first worker in real time;
and when the physical condition of the first worker cannot meet the working requirement, outputting third prompt information to remind the first worker to exit the working state.
5. A tunnel constructor management system, comprising:
the information acquisition unit is used for acquiring personal information of workers;
the data processing unit is used for successfully matching the personal information with the pre-input personal information and outputting a control signal to enable the currently detected staff to enter the construction tunnel;
the timing unit is used for timing the working time of the first worker in the working state;
the information output unit is used for outputting first prompt information and second prompt information after the working time of the first worker reaches a preset time period, wherein the first prompt information is used for informing the first worker to move out of the construction tunnel; and the second prompt message is used for informing a second worker of entering the construction tunnel.
6. The tunnel constructor management system according to claim 5, further comprising:
the environment monitoring unit is used for detecting environment information in the tunnel, and the environment information comprises air environment information and temperature information;
the environment judgment unit is used for judging whether the environment information in the tunnel meets the construction requirement or not, and if so, acquiring personal information of workers; if not, outputting warning information.
7. The tunnel constructor management system according to claim 5, further comprising:
the quantity counting unit is used for counting quantity information of the first staff;
and the position detection unit is used for detecting and displaying the position information of each first worker.
8. The tunnel constructor management system according to claim 5, further comprising:
the body detection unit is used for acquiring the body condition information of the first worker in real time;
and the physical condition judging unit is used for judging whether the first worker can continue working according to the physical condition information, and outputting third prompt information to remind the first worker to quit the working state if the first worker cannot continue working.
9. An intelligent device comprising a memory and a processor, the memory having stored thereon a computer program that can be loaded by the processor and that executes the method of any one of claims 1 to 4.
10. A computer-readable storage medium, in which a computer program is stored which can be loaded by a processor and which executes the method of any one of claims 1 to 4.
CN202110450506.2A 2021-04-25 2021-04-25 Tunnel constructor management method, system, intelligent equipment and storage medium Pending CN113065800A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110450506.2A CN113065800A (en) 2021-04-25 2021-04-25 Tunnel constructor management method, system, intelligent equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110450506.2A CN113065800A (en) 2021-04-25 2021-04-25 Tunnel constructor management method, system, intelligent equipment and storage medium

Publications (1)

Publication Number Publication Date
CN113065800A true CN113065800A (en) 2021-07-02

Family

ID=76568395

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110450506.2A Pending CN113065800A (en) 2021-04-25 2021-04-25 Tunnel constructor management method, system, intelligent equipment and storage medium

Country Status (1)

Country Link
CN (1) CN113065800A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204069358U (en) * 2014-04-08 2014-12-31 北京市市政工程研究院 Constructing tunnel personnel positioning management system
CN206042382U (en) * 2016-08-26 2017-03-22 招商局重庆交通科研设计院有限公司 Tunnel constructor management system
CN109195105A (en) * 2018-09-04 2019-01-11 成都精位科技有限公司 Tunnel management system and method based on UWB positioning
CN109558802A (en) * 2018-10-31 2019-04-02 云南电网有限责任公司昆明供电局 Personal identification monitoring system and monitoring method in cable tunnel
CN210204689U (en) * 2019-03-14 2020-03-31 陕西铁路工程职业技术学院 Shield constructs tired reminding device of quick-witted storage battery car driver
CN111997690A (en) * 2020-08-19 2020-11-27 上海市安装工程集团有限公司 Intelligent management system and method for tunnel engineering
CN112228156A (en) * 2020-11-17 2021-01-15 西南石油大学 Tunnel constructor safety monitoring method
CN212519051U (en) * 2020-05-25 2021-02-09 中电建十一局工程有限公司 Intelligent management system for traffic tunnel group construction safety in hydropower station field

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204069358U (en) * 2014-04-08 2014-12-31 北京市市政工程研究院 Constructing tunnel personnel positioning management system
CN206042382U (en) * 2016-08-26 2017-03-22 招商局重庆交通科研设计院有限公司 Tunnel constructor management system
CN109195105A (en) * 2018-09-04 2019-01-11 成都精位科技有限公司 Tunnel management system and method based on UWB positioning
CN109558802A (en) * 2018-10-31 2019-04-02 云南电网有限责任公司昆明供电局 Personal identification monitoring system and monitoring method in cable tunnel
CN210204689U (en) * 2019-03-14 2020-03-31 陕西铁路工程职业技术学院 Shield constructs tired reminding device of quick-witted storage battery car driver
CN212519051U (en) * 2020-05-25 2021-02-09 中电建十一局工程有限公司 Intelligent management system for traffic tunnel group construction safety in hydropower station field
CN111997690A (en) * 2020-08-19 2020-11-27 上海市安装工程集团有限公司 Intelligent management system and method for tunnel engineering
CN112228156A (en) * 2020-11-17 2021-01-15 西南石油大学 Tunnel constructor safety monitoring method

Similar Documents

Publication Publication Date Title
CN109151383B (en) BIM-based tunnel safety monitoring information early warning system
CN103854233B (en) A kind of identifying device supervised for electric power safety and recognition methods
CN111899878B (en) Old person health detection system, method, computer device and readable storage medium
CN107041590A (en) A kind of intelligent and safe donning system
US6029889A (en) Firefighter accountability apparatus and method
CN106779447A (en) Builder's intelligent management system and method for a kind of RFID of fusion BIM
CN111128397A (en) Temperature-sensing intelligent wearable monitoring device and monitoring method thereof
CN110206588A (en) Underground mine safety management system for worker
CN109785564A (en) A kind of home intelligent safety defense monitoring system
CN106089305B (en) A kind of underground real time monitoring and personnel location system
CN108765921A (en) View-based access control model lexical analysis is applied to the intelligent patrol method of patrol robot
US20240015480A1 (en) Systems, methods, and program products for digital pet identification
CN215182149U (en) Infrared temperature measurement system of checking card based on face identification
CN109615824A (en) Control method for Bluetooth accompanying alarm of wearable device and wearable device
CN108305448A (en) A kind of method and device of community's correction personnel's early warning
CN110009281A (en) A kind of Warehouse Management System and its management method
CN105094029A (en) Safety management system and method
CN113793072A (en) Comprehensive management system based on mobile terminal epidemic situation prevention and control monitoring information
CN106773628A (en) A kind of protection based reminding method and device for intelligent and portable equipment
CN106974619A (en) A kind of down-hole miner intelligent health management system
CN113065800A (en) Tunnel constructor management method, system, intelligent equipment and storage medium
CN113384252A (en) Epidemic prevention bracelet based on 5G network
RU2734099C1 (en) Apparatus and system for monitoring objects
CN111260003A (en) Full-life intelligent management method and system for fire-fighting equipment
CN210428461U (en) Medical wrist strap and ward inspection system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210702

RJ01 Rejection of invention patent application after publication