CN113052482A - Construction site energy consumption monitoring method, device, equipment and storage medium thereof - Google Patents

Construction site energy consumption monitoring method, device, equipment and storage medium thereof Download PDF

Info

Publication number
CN113052482A
CN113052482A CN202110376721.2A CN202110376721A CN113052482A CN 113052482 A CN113052482 A CN 113052482A CN 202110376721 A CN202110376721 A CN 202110376721A CN 113052482 A CN113052482 A CN 113052482A
Authority
CN
China
Prior art keywords
energy consumption
node
equipment
data
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110376721.2A
Other languages
Chinese (zh)
Inventor
庞旭
陈志恒
丁勇俊
徐健
刘巨龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Zhongling Intelligent Technology Co ltd
Original Assignee
Shenzhen Zhongling Intelligent Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Zhongling Intelligent Technology Co ltd filed Critical Shenzhen Zhongling Intelligent Technology Co ltd
Priority to CN202110376721.2A priority Critical patent/CN113052482A/en
Publication of CN113052482A publication Critical patent/CN113052482A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/26Visual data mining; Browsing structured data
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/82Energy audits or management systems therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Databases & Information Systems (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Development Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Data Mining & Analysis (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Computational Linguistics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a construction site energy consumption monitoring method, a construction site energy consumption monitoring device, construction site energy consumption monitoring equipment and a storage medium thereof, wherein the method comprises the following steps: acquiring energy consumption data of each node, wherein the energy consumption data comprises the power consumption of each node acquired by an intelligent electric meter and the water consumption of each node acquired by an intelligent water meter; generating an energy consumption statistical graph according to the energy consumption data, and judging whether the energy consumption of each node is in a preset range according to the energy consumption statistical graph; and when the energy consumption of the node exceeds a preset range, outputting an alarm prompt, and searching the node according to the number of the intelligent electric meter and/or the intelligent water meter. According to the construction site energy consumption monitoring method provided by the embodiment of the invention, the energy consumption of each node can be monitored, and when the energy consumption exceeds a preset range, the corresponding node can be prompted and searched, so that the problem can be found in time and can be treated in time conveniently.

Description

Construction site energy consumption monitoring method, device, equipment and storage medium thereof
Technical Field
The invention relates to the technical field of building construction management, in particular to a construction site energy consumption monitoring method, a construction site energy consumption monitoring device, construction site energy consumption monitoring equipment and a storage medium of the construction site energy consumption monitoring device.
Background
The construction management of the construction site is a guarantee foundation for the safety and stability of a construction project and a foundation for ensuring that the construction project can be successfully completed according to expected requirements such as expected construction cost, project period and the like.
The intelligent construction site is a brand-new integrated management mode of an engineering site and is a deep integration of the Internet + and the traditional construction industry. The method fully utilizes new generation information technologies such as mobile interconnection, Internet of things, cloud computing, big data and the like, and completely changes the interaction mode, working mode and management mode of site management of all parties participating in the traditional building construction site around key factors of people, machines, materials, methods, rings and the like, thereby providing a site management informatization solution for building groups, construction enterprises, government supervision departments and the like.
However, although the intelligent site management mode can effectively improve the engineering guarantee of the construction engineering, for each construction engineering at present, the problems of large energy consumption, unclear consumption process, inaccurate consumption point, difficult control, energy waste, project cost increase and the like are not effectively solved.
Disclosure of Invention
The present invention is directed to solving, at least to some extent, one of the technical problems in the related art. Therefore, the invention aims to provide a construction site energy consumption monitoring method, a construction site energy consumption monitoring device, construction site energy consumption monitoring equipment and a storage medium thereof.
To achieve the above object, in a first aspect, a worksite energy consumption monitoring method according to an embodiment of the present invention includes:
acquiring energy consumption data of each node, wherein the energy consumption data comprises the power consumption of each node acquired by an intelligent electric meter and the water consumption of each node acquired by an intelligent water meter;
generating an energy consumption statistical graph according to the energy consumption data, and judging whether the energy consumption of each node is in a preset range according to the energy consumption statistical graph;
and when the energy consumption of the node exceeds a preset range, outputting an alarm prompt, and searching the node according to the number of the intelligent electric meter and/or the intelligent water meter.
According to an embodiment of the present invention, before determining whether the energy consumption is within the predetermined range according to the energy consumption statistical map, the method further includes:
acquiring energy consumption equipment parameters input by a manager, wherein the energy consumption equipment parameters comprise electric equipment parameters, water utilization equipment parameters and use time periods of all nodes;
generating a preset energy consumption curve of each node according to the energy consumption equipment parameters, wherein the preset energy consumption curve represents the relation between the energy consumption of the energy consumption equipment of the node and the time in a preset time period;
the generating an energy consumption statistical graph according to the energy consumption data, and judging whether the energy consumption is in a preset range according to the energy consumption statistical graph comprises the following steps:
and generating an actual energy consumption curve according to the energy consumption data, and comparing the actual energy consumption curve with the preset energy consumption curve to judge whether the energy consumption of each node is in a preset range.
According to an embodiment of the present invention, further comprising:
acquiring state data of electric equipment and water-using equipment on each node;
and when the energy consumption of the node exceeds a preset range and the node is searched according to the number of the intelligent electric meter and/or the intelligent water meter, analyzing the state data of the node to determine whether the electric equipment and/or the water equipment of the node work normally.
According to one embodiment of the invention, the status data comprises time, switch status, voltage current data;
the analyzing the state data of the node to determine whether the electric equipment and/or the water equipment of the node work normally comprises:
judging whether the electric equipment and/or the water equipment of the node are in an open state outside the use time period or not according to the time and the switch state in the state data of the node;
if the electric equipment and/or the water equipment of the node are/is in an open state outside the use time period, outputting prompt information;
and if the electric equipment and/or the water using equipment of the node are in the closed state within the using time period, judging whether the electric equipment and/or the water using equipment of the node have faults or not according to the voltage and current data.
According to an embodiment of the present invention, before determining whether the energy consumption of each node is within a predetermined range according to the energy consumption statistical graph, the method further includes:
acquiring environmental data, wherein the environmental data comprises an environmental temperature and an environmental illumination;
and correcting the preset energy consumption curve according to the environment data so as to enable the preset energy consumption curve to be matched with the current construction environment.
According to an embodiment of the invention, said correcting said predetermined energy consumption profile according to said environmental data comprises:
determining a deviation value between the environment data and the customized environment data of the preset energy consumption curve;
calculating an energy consumption compensation value according to the deviation value and the energy consumption equipment parameters of each node;
and regenerating a preset energy consumption curve according to the energy consumption compensation value.
In a second aspect, a worksite energy consumption monitoring apparatus according to an embodiment of the present invention includes:
the system comprises a first acquisition unit, a second acquisition unit and a control unit, wherein the first acquisition unit is used for acquiring energy consumption data of each node, and the energy consumption data comprises power consumption of each node acquired by an intelligent electric meter and water consumption of each node acquired by an intelligent water meter;
the first generation unit is used for generating an energy consumption statistical graph according to the energy consumption data and judging whether the energy consumption of each node is in a preset range or not according to the energy consumption statistical graph;
and the prompting unit is used for outputting an alarm prompt when the energy consumption of the node exceeds a preset range, and searching the node according to the number of the intelligent electric meter and/or the intelligent water meter.
According to an embodiment of the present invention, further comprising:
the second acquisition unit is used for acquiring energy consumption equipment parameters input by a manager, wherein the energy consumption equipment parameters comprise electric equipment parameters, water utilization equipment parameters and use time periods of all nodes;
the second generation unit is used for generating a preset energy consumption curve of each node according to the energy consumption equipment parameters, and the preset energy consumption curve represents the relation between the energy consumption equipment energy consumption of the node and the time in a preset time period;
the first generating unit is specifically configured to generate an actual energy consumption curve according to the energy consumption data, and compare the actual energy consumption curve with the predetermined energy consumption curve to determine whether the energy consumption of each node is within a predetermined range.
In a third aspect, a monitoring device according to an embodiment of the present invention includes a memory, a processor, and a computer program stored on the memory and executable on the processor, the processor implementing the worksite energy consumption monitoring method as described above when executing the computer program.
In a fourth aspect, a computer storage medium according to an embodiment of the invention has stored thereon a computer program which, when executed by a processor, implements a worksite energy consumption monitoring method as described above.
According to the construction site energy consumption monitoring method, the construction site energy consumption monitoring device, the construction site energy consumption monitoring equipment and the storage medium thereof, energy consumption data of each node are obtained, an energy consumption statistical graph is generated according to the energy consumption data, and whether the energy consumption of each node is in a preset range or not is judged according to the energy consumption statistical graph; when the energy consumption of the nodes exceeds the preset range, an alarm prompt is output, and the nodes are searched according to the numbers of the intelligent water meters and/or the intelligent water meters.
Additional aspects and advantages of the invention will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the invention.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the structures shown in the drawings without creative efforts.
FIG. 1 is a schematic diagram of a worksite energy consumption monitoring system of the present invention;
FIG. 2 is a flow chart of one embodiment of a worksite energy consumption monitoring method of the present invention;
FIG. 3 is a flow chart of another embodiment of a worksite energy consumption monitoring method of the present invention;
FIG. 4 is a flow chart of yet another embodiment of a worksite energy consumption monitoring method of the present invention;
FIG. 5 is a flowchart of step S302 of an embodiment of the worksite energy consumption monitoring method of the present invention;
FIG. 6 is a flow chart of yet another embodiment of a worksite energy consumption monitoring method of the present invention;
FIG. 7 is a flowchart of step S502 in an embodiment of the worksite energy consumption monitoring method of the present invention;
FIG. 8 is a schematic diagram of the construction of one embodiment of the worksite energy consumption monitoring apparatus of the present invention;
FIG. 9 is a schematic illustration of another embodiment of a worksite energy consumption monitoring apparatus of the present invention;
FIG. 10 is a schematic illustration of a further embodiment of a worksite energy consumption monitoring apparatus of the present invention;
FIG. 11 is a schematic diagram of an analysis unit in an embodiment of the worksite energy consumption monitoring apparatus of the present invention;
FIG. 12 is a schematic illustration of a further embodiment of a worksite energy consumption monitoring apparatus of the present invention;
FIG. 13 is a schematic diagram of a calibration unit in an embodiment of the worksite energy consumption monitoring apparatus of the present invention;
fig. 14 is a schematic structural diagram of the monitoring device of the present invention.
The implementation, functional features and advantages of the objects of the present invention will be further explained with reference to the accompanying drawings.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the accompanying drawings are illustrative only for the purpose of explaining the present invention, and are not to be construed as limiting the present invention.
Referring to fig. 2, fig. 2 is a flow chart of an embodiment of the monitoring method for energy consumption of a construction site according to the embodiment of the present invention, and for convenience of description, only the parts related to the embodiment of the present invention are shown. Specifically, the method for monitoring energy consumption of the construction site can be executed by a monitoring device, and specifically includes:
s101, energy consumption data of each node 100 are obtained, wherein the energy consumption data comprise power consumption of each node 100 collected by the intelligent electric meter 103 and water consumption of each node 100 collected by the intelligent water meter 104.
Specifically, as shown in fig. 1, a collection device is installed at each node 100 on the construction site, for example, a smart meter 103 is installed on each lighting device and construction device, and a smart meter 104 is installed on a pipeline of a construction process water, a construction machine water, a domestic water, a fire water, and the like. The power consumption and the water consumption of each node 100 can be collected through the intelligent electric meter 103 and the intelligent water meter 104 on each node 100.
And S102, generating an energy consumption statistical graph according to the energy consumption data, and judging whether the energy consumption of each node 100 is in a preset range according to the energy consumption statistical graph.
Since the water consumption and the power consumption of each node 100 can be estimated in advance according to specific use conditions, for example, lighting devices, and the time for providing lighting each day is approximately the same, the power consumption range of the lighting devices can be calculated, and the power consumption range of construction devices can be calculated by the construction devices according to the time required by the construction progress. Correspondingly, the construction production water and the mechanical water can also calculate the water consumption of the production water and the mechanical water according to the construction area, the water consumption proportion and the like, the daily life water is relatively constant, and the daily average water consumption can be calculated. In other words, the power consumption and the range (predetermined range) of the water consumption of each node 100 may be calculated in advance according to the conditions of the nodes 100 to which the power consumption equipment 101 and the water consumption equipment 102 of the construction site are applied.
In the construction process, the collected energy consumption data is compared with the pre-calculated preset range according to the actual energy consumption data such as the power consumption and the water consumption of each node 100, and then whether the power consumption and the water consumption of each node 100 are within the preset range is judged, if the power consumption and the water consumption exceed the preset range, the corresponding node 100 is indicated, and the problem of overlarge energy consumption possibly exists.
S103, when the energy consumption of the node 100 exceeds a preset range, outputting an alarm prompt, and searching the node 100 according to the number of the intelligent electric meter 103 and/or the intelligent water meter 104.
That is, as described above, when it is determined that the capacity of a certain node 100 exceeds the predetermined range, which indicates that the energy consumption of the node 100 is excessive, an alarm prompt is output, and the alarm prompt may be displayed on the monitoring terminal. In addition, since the smart meter 103 and the smart water meter 104 of each node 100 have unique numbers and the nodes 100 have one-to-one correspondence, the corresponding node 100 information can be found according to the numbers of the smart meter 103 or the smart water meter 104, and the node 100 information can be displayed on the monitoring terminal, so that a manager can quickly know the corresponding node 100 according to the alarm prompt and the node 100 information on the monitoring terminal, so as to conveniently troubleshoot the node 100 and find the reason of high energy consumption.
According to the construction site energy consumption monitoring method provided by the embodiment of the invention, the energy consumption data of each node 100 is obtained, an energy consumption statistical graph is generated according to the energy consumption data, and whether the energy consumption of each node 100 is in a preset range or not is judged according to the energy consumption statistical graph; when the energy consumption of the node 100 exceeds the preset range, an alarm prompt is output, and the node 100 is searched according to the number of the intelligent electric meter 103 and/or the intelligent water meter 104, so that the energy consumption of each node 100 can be monitored, and when the energy consumption exceeds the preset range, the node 100 can be prompted and searched correspondingly, so that problems can be found in time and can be processed in time.
Referring to fig. 3, in an embodiment of the present invention, step S103 further includes:
s201, acquiring energy consumption equipment parameters input by a manager, wherein the energy consumption equipment parameters comprise the parameters of the electric equipment 101, the parameters of the water equipment 102 and the use time period of each node 100.
Specifically, the manager may pre-enter energy consumption device parameters, such as power and on-time of lighting devices, usage time of construction devices in one day, power and the like, according to the application conditions of the electric devices 101 and the water using devices 102 of different nodes 100, and the construction water may be used according to the current construction technology, such as concrete construction, a required water ratio and the like. It is understood that the energy consumption equipment parameters of each node 100 may be input on a daily basis according to different schedules and process schedules of construction on a daily basis.
And S202, generating a preset energy consumption curve of each node 100 according to the energy consumption device parameters, wherein the preset energy consumption curve represents the relation between the energy consumption device energy consumption of the node 100 and the time in a preset time period.
That is, after acquiring the energy consumption device parameters of each node 100, a predetermined energy consumption curve of each node 100 may be calculated according to the energy consumption device parameters, where the ordinate of the predetermined energy consumption curve is energy consumption and the abscissa is time (e.g., daily).
Correspondingly, step S103 includes:
and generating an actual energy consumption curve according to the energy consumption data, and comparing the actual energy consumption curve with the preset energy consumption curve to judge whether the energy consumption of each node 100 is in a preset range.
Because the energy consumption data of each node 100 can be obtained every day along with the progress of the construction process, the connection of the energy consumption data can form an actual energy consumption curve, the actual energy consumption curve and the preset energy consumption curve are in a coordinate system, the energy consumption value of the same day on the actual energy consumption curve and the preset energy consumption curve is compared, if the energy consumption value of a certain day on the actual energy consumption curve is higher than the energy consumption value of the preset energy consumption curve, and the difference value between the energy consumption value of the certain day on the actual energy consumption curve and the energy consumption value of the preset energy consumption curve is larger than a set value, the energy consumption of the corresponding node 100 is judged to exceed a.
In this embodiment, through the above steps, a predetermined energy consumption curve of each node 100 changing with time is calculated in advance according to energy consumption device parameters, and then an actual energy consumption curve is obtained according to energy consumption data acquired in a construction process, so that whether the energy consumption of the node 100 exceeds a predetermined range can be accurately judged by comparing the actual energy consumption curve with the predetermined energy consumption curve, accurate and reliable monitoring of daily energy consumption can be realized, and each node 100 can be specified.
Referring to fig. 4, in an embodiment of the present invention, the method further includes:
s301, acquiring state data of the electric equipment 101 and the water equipment 102 on each node 100;
s302, when the energy consumption of the node 100 exceeds a preset range and the node 100 is searched according to the number of the intelligent electric meter 103 and/or the intelligent water meter 104, analyzing the state data of the node 100 to determine whether the electric equipment 101 and/or the water using equipment 102 of the node 100 work normally.
Specifically, the electric devices 101 and the water consuming devices 102 of the nodes 100 may be connected to the monitoring device on the site by the nodes 100, and the electric devices 101 and the water consuming devices 102 may upload their own status data to the monitoring device. After the monitoring device acquires the state data of the electric equipment 101 and the water using equipment 102 on each node 100, if the energy consumption of the node 100 exceeds a preset range, the node 100 is searched according to the number of the intelligent electric meter 103 and/or the intelligent water meter 104, the state data corresponding to the electric equipment 101 and/or the water using equipment 102 on the node 100 is searched, and after the state data is analyzed, whether the electric equipment 101 and/or the water using equipment 102 work normally is judged, so that the electric equipment 101 or the water using equipment 102 with problems on the node 100 can be automatically and quickly positioned, and the problems can be quickly checked and repaired.
Referring to fig. 5, in one embodiment of the present invention, the state data includes time, switch state, voltage current data; the step S302 includes:
s401, judging whether the electric equipment 101 and/or the water equipment 102 of the node 100 are in an open state outside the use time period according to the time and the switch state in the state data of the node 100.
S402, if the electric equipment 101 and/or the water equipment 102 of the node 100 are in an open state outside the use time period, outputting prompt information.
And S403, if the electric equipment 101 and/or the water using equipment 102 of the node 100 are in a closed state within the use time period, judging whether the electric equipment 101 and/or the water using equipment 102 of the node 100 have faults or not according to the voltage and current data.
That is to say, after the status data of the node 100 is obtained, whether the electric equipment 101 and/or the water using equipment 102 operate normally may be determined according to whether the electric equipment 101 and/or the water using equipment 102 on the node 100 are in an open state outside the usage time period, and if the electric equipment 101 and/or the water using equipment 102 of the node 100 are in an open state outside the usage time period, it is obvious that the energy consumption of the node 100 increases, and at this time, the electric equipment 101 and/or the water using equipment 102 of the node 100 should be closed, so that by outputting a prompt message, a manager may be prompted to perform field verification, so as to close the electric equipment 101 and/or the water using equipment 102 in time when it is determined that the electric equipment 101 and/or the water using equipment 102 should not be opened. Furthermore, if the electrical equipment 101 and/or the water consuming equipment 102 of the node 100 is in the off state within the usage period, the electrical equipment 101 and/or the water consuming equipment 102 is not turned on if it should be turned on, and at this time, the electrical equipment 101 and/or the water consuming equipment 102 of the node 100 may have a fault, and the fault needs to be timely cleared.
In this embodiment, according to the status data of the electric equipment 101 and/or the water using equipment 102, it can be determined whether the electric equipment 101 and/or the water using equipment 102 should be turned off or have a fault, so that on the premise of ensuring normal completion of construction, the energy loss point is monitored, and the purpose of timely finding and timely processing is achieved.
Referring to fig. 6, in an embodiment of the present invention, step S103 further includes:
s501, obtaining environment data, wherein the environment data comprise environment temperature and environment illumination.
S502, correcting the preset energy consumption curve according to the environment data so as to enable the preset energy consumption curve to be matched with the current construction environment.
For the powered device 101, for example, a lighting device, the lighting device is turned on for different time periods according to the ambient illumination, for example, in a cloudy day or other weather with weak light, the ambient illumination sensor of the lighting device may cause the lighting device to be turned on earlier, and thus the power consumption of the lighting device increases. For example, in a cooling device such as an air conditioner, the power consumption of the cooling device is also increased in hot weather.
Under the above circumstances, through obtaining environmental data, rectify predetermined energy consumption curve according to environmental data, so, can be so that whether predetermined energy consumption curve can with the environment looks adaptation on the same day, and then in the control of realization energy consumption, more accurate reliable can not lead to the false triggering to report to the police and indicate scheduling problem because of environmental factor's change.
Referring to fig. 7, in an embodiment of the present invention, step S502 includes:
s601, determining a deviation value between the environment data and the customized environment data where the preset energy consumption curve is located. It will be appreciated that the predetermined energy consumption profile is referenced to the general environment during the specification, for example, the average ambient air temperature and the average ambient light level over a future period of time (one month).
And S602, calculating an energy consumption compensation value according to the deviation value and the energy consumption equipment parameters of each node 100.
And S603, regenerating a preset energy consumption curve according to the energy consumption compensation value.
That is, the deviation value between the collected environmental data and the customized environmental data is calculated, and then the energy consumption compensation value is calculated according to the deviation value and the energy consumption equipment parameters, so that the preset energy consumption curve can be accurately corrected.
Referring to fig. 8, fig. 8 is a schematic structural diagram of an embodiment of the monitoring apparatus for energy consumption at a construction site according to the embodiment of the present invention, and for convenience of description, only the parts related to the embodiment of the present invention are shown. Specifically, this building site energy consumption monitoring device includes:
the first obtaining unit 201 is configured to obtain energy consumption data of each node 100, where the energy consumption data includes power consumption of each node 100 collected by the smart meter 103 and water consumption of each node 100 collected by the smart water meter 104.
The first generating unit 202 generates an energy consumption statistical graph according to the energy consumption data, and determines whether the energy consumption of each node 100 is within a predetermined range according to the energy consumption statistical graph.
And the prompting unit 203 is configured to output an alarm prompt when the energy consumption of the node 100 exceeds a predetermined range, and search the node 100 according to the number of the smart electric meter 103 and/or the smart water meter 104.
Referring to FIG. 9, in one embodiment of the present invention, the worksite energy consumption monitoring apparatus further comprises:
the second obtaining unit 301 is configured to obtain energy consumption device parameters input by a manager, where the energy consumption device parameters include parameters of the electric devices 101, parameters of the water using devices 102, and a usage time period of each node 100.
A second generating unit 302, configured to generate a predetermined energy consumption curve for each node 100 according to the energy consumption device parameter, where the predetermined energy consumption curve represents a relationship between energy consumption of the energy consumption device of the node 100 and time in a predetermined time period.
The first generating unit 202 is specifically configured to generate an actual energy consumption curve according to the energy consumption data, and compare the actual energy consumption curve with the predetermined energy consumption curve to determine whether the energy consumption of each node 100 is within a predetermined range.
Referring to FIG. 10, in one embodiment of the present invention, the worksite energy consumption monitoring apparatus further comprises:
a third obtaining unit 401, configured to obtain status data of the consumers 101 and 102 on the respective nodes 100.
An analyzing unit 402, configured to analyze the state data of the node 100 when the energy consumption of the node 100 exceeds a predetermined range and the node 100 is located according to the number of the smart meter 103 and/or the smart water meter 104, so as to determine whether the electric equipment 101 and/or the water using equipment 102 of the node 100 work normally.
Referring to fig. 11, in one embodiment of the present invention, the state data includes time, switch state, voltage current data; the analysis unit 402 includes:
a first determining module 501, configured to determine, according to the time and the switch state in the state data of the node 100, whether the electric device 101 and/or the water device 102 of the node 100 are in an on state outside the usage time period.
An output module 502, configured to output a prompt message when the electric device 101 and/or the water consuming device 102 of the node 100 are in an on state outside the usage time period.
The second determining module 503 is configured to determine whether the electrical equipment 101 and/or the water consuming equipment 102 of the node 100 have a fault according to the voltage and current data when the electrical equipment 101 and/or the water consuming equipment 102 of the node 100 are in an off state within the usage time period.
Referring to FIG. 12, in one embodiment of the present invention, the worksite energy consumption monitoring apparatus further comprises:
a fourth obtaining unit 601, configured to obtain environment data, where the environment data includes an environment temperature and an environment illumination.
A correcting unit 602, configured to correct the predetermined energy consumption curve according to the environment data, so that the predetermined energy consumption curve is adapted to the current construction environment.
Referring to fig. 13, in an embodiment of the present invention, the correction unit 602 includes:
a determining module 701, configured to determine a deviation value between the environmental data and the customized environmental data of the predetermined energy consumption curve.
A calculating module 702, configured to calculate an energy consumption compensation value according to the deviation value and the energy consumption device parameter of each node 100.
A regeneration module 703, configured to regenerate the predetermined energy consumption curve according to the energy consumption compensation value.
It should be noted that, in the present specification, the embodiments are all described in a progressive manner, each embodiment focuses on differences from other embodiments, and the same and similar parts among the embodiments may be referred to each other. For the device or system type embodiment, since it is basically similar to the method embodiment, the description is simple, and for the relevant points, refer to the partial description of the method embodiment.
According to the construction site energy consumption monitoring device provided by the embodiment of the invention, the first acquisition unit acquires energy consumption data of each node 100, the first generation unit generates an energy consumption statistical graph according to the energy consumption data, and judges whether the energy consumption of each node 100 is in a preset range or not according to the energy consumption statistical graph; the prompting unit outputs an alarm prompt when the energy consumption of the node 100 exceeds a preset range, and searches the node 100 according to the number of the intelligent electric meter 103 and/or the intelligent water meter 104, so that the energy consumption of each node 100 can be monitored, and when the energy consumption exceeds the preset range, the prompting unit can prompt and search the corresponding node 100, thereby being convenient for finding problems in time and processing in time.
Referring to fig. 14, fig. 14 shows a monitoring device 200 provided by an embodiment of the present invention, which includes a memory, a processor, and a computer program stored in the memory and running on the processor, and when the processor executes the computer program, the monitoring device implements the worksite energy consumption monitoring method as described above.
Illustratively, the computer program 2051 may be divided into one or more modules/units, which are stored in the memory 205 and executed by the processor 204 to carry out the invention. The one or more modules/units may be a series of computer program instruction segments capable of performing specific functions, which are used to describe the execution of the computer program 2051 in the monitoring device 200.
The monitoring device 200 may include, but is not limited to, a processor 204, a memory 205. It will be appreciated by those skilled in the art that the figures are merely examples of the monitoring device 200 and do not constitute a limitation of the monitoring device 200 and may include more or less components than those shown, or some components may be combined, or different components, for example, the monitoring device 200 may also include input output devices, network access devices, buses, etc.
The Processor 204 may be a Central Processing Unit (CPU), other general purpose Processor, a Digital Signal Processor (DSP), an Application Specific Integrated Circuit (ASIC), a Field Programmable Gate Array (FPGA) or other programmable logic device, discrete Gate or transistor logic, discrete default hardware components, and so on. A general purpose processor may be a microprocessor or the processor may be any conventional processor or the like.
The storage 205 may be an internal storage unit of the monitoring device 200, such as a hard disk or a memory of the monitoring device 200. The memory 205 may also be an external storage device of the monitoring device 200, such as a plug-in hard disk, a Smart Media Card (SMC), a Secure Digital (SD) Card, a Flash memory Card (Flash Card), and the like, which are provided on the monitoring device 200. Further, the memory 205 may also include both an internal storage unit and an external storage device of the monitoring device 200. The memory 205 is used for storing the computer program 2051 and other programs and data required by the monitoring device 200. The memory 205 may also be used to temporarily store data that has been output or is to be output.
Embodiments of the present invention also provide a computer storage medium, on which a computer program 2051 is stored, which when executed by the processor 204 implements the worksite energy consumption monitoring method as described above.
The computer program 2051 may be stored in a computer-readable storage medium, and when executed by the processor 204, the computer program 2051 may implement the steps of the above-described method embodiments. Wherein the computer program 2051 comprises computer program code, which may be in source code form, object code form, an executable file or some intermediate form, etc. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, usb disk, removable hard disk, magnetic disk, optical disk, computer Memory, Read-Only Memory (ROM), Random Access Memory (RAM), electrical carrier wave signals, telecommunications signals, software distribution medium, and the like.
It should be noted that the computer readable medium may contain other components which may be suitably increased or decreased as required by legislation and patent practice in jurisdictions, for example, in some jurisdictions, computer readable media which may not include electrical carrier signals and telecommunications signals in accordance with legislation and patent practice.
In the above embodiments, the descriptions of the respective embodiments have respective emphasis, and reference may be made to the related descriptions of other embodiments for parts that are not described or illustrated in a certain embodiment.
The steps in the method of the embodiment of the invention can be sequentially adjusted, combined and deleted according to actual needs.
The modules or units in the system of the embodiment of the invention can be combined, divided and deleted according to actual needs.
Those of ordinary skill in the art would appreciate that the various illustrative elements and algorithm steps described in connection with the embodiments disclosed herein may be implemented as electronic pre-set hardware or in a combination of computer software and electronic pre-set hardware. Whether these functions are performed by pre-determined hardware or software depends on the particular application and design constraints imposed on the solution. Skilled artisans may implement the described functionality in varying ways for each particular application, but such implementation decisions should not be interpreted as causing a departure from the scope of the present invention.
In the embodiments provided by the present invention, it should be understood that the disclosed apparatus/monitoring device 200 and method may be implemented in other ways. For example, the above-described embodiment of the apparatus/monitoring device 200 is merely illustrative, and for example, the division of the modules or units is only one logical division, and there may be other divisions when the actual implementation is performed, for example, a plurality of units or components may be combined or integrated into another system, or some features may be omitted, or not executed. In addition, the shown or discussed mutual coupling or direct coupling or communication connection may be an indirect coupling or communication connection through some interfaces, devices or units, and may be in an electrical, mechanical or other form.
The above-mentioned embodiments are only used for illustrating the technical solutions of the present invention, and not for limiting the same; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not substantially depart from the spirit and scope of the embodiments of the present invention, and are intended to be included within the scope of the present invention.

Claims (10)

1. A method of monitoring energy consumption at a worksite, comprising:
acquiring energy consumption data of each node, wherein the energy consumption data comprises the power consumption of each node acquired by an intelligent electric meter and the water consumption of each node acquired by an intelligent water meter;
generating an energy consumption statistical graph according to the energy consumption data, and judging whether the energy consumption of each node is in a preset range according to the energy consumption statistical graph;
and when the energy consumption of the node exceeds a preset range, outputting an alarm prompt, and searching the node according to the number of the intelligent electric meter and/or the intelligent water meter.
2. The worksite energy consumption monitoring method of claim 1, wherein determining whether energy consumption is within a predetermined range based on the energy consumption histogram further comprises:
acquiring energy consumption equipment parameters input by a manager, wherein the energy consumption equipment parameters comprise electric equipment parameters, water utilization equipment parameters and use time periods of all nodes;
generating a preset energy consumption curve of each node according to the energy consumption equipment parameters, wherein the preset energy consumption curve represents the relation between the energy consumption of the energy consumption equipment of the node and the time in a preset time period;
the generating an energy consumption statistical graph according to the energy consumption data, and judging whether the energy consumption is in a preset range according to the energy consumption statistical graph comprises the following steps:
and generating an actual energy consumption curve according to the energy consumption data, and comparing the actual energy consumption curve with the preset energy consumption curve to judge whether the energy consumption of each node is in a preset range.
3. The worksite energy consumption monitoring method of claim 2, further comprising:
acquiring state data of electric equipment and water-using equipment on each node;
and when the energy consumption of the node exceeds a preset range and the node is searched according to the number of the intelligent electric meter and/or the intelligent water meter, analyzing the state data of the node to determine whether the electric equipment and/or the water equipment of the node work normally.
4. The worksite energy consumption monitoring method of claim 3, wherein the status data comprises time, switch status, voltage current data;
the analyzing the state data of the node to determine whether the electric equipment and/or the water equipment of the node work normally comprises:
judging whether the electric equipment and/or the water equipment of the node are in an open state outside the use time period or not according to the time and the switch state in the state data of the node;
if the electric equipment and/or the water equipment of the node are/is in an open state outside the use time period, outputting prompt information;
and if the electric equipment and/or the water using equipment of the node are in the closed state within the using time period, judging whether the electric equipment and/or the water using equipment of the node have faults or not according to the voltage and current data.
5. The worksite energy consumption monitoring method according to claim 2, wherein before determining whether the energy consumption of each node is within a predetermined range according to the energy consumption statistical map, further comprising:
acquiring environmental data, wherein the environmental data comprises an environmental temperature and an environmental illumination;
and correcting the preset energy consumption curve according to the environment data so as to enable the preset energy consumption curve to be matched with the current construction environment.
6. The worksite energy consumption monitoring method of claim 5, wherein the correcting the predetermined energy consumption profile based on the environmental data comprises:
determining a deviation value between the environment data and the customized environment data of the preset energy consumption curve;
calculating an energy consumption compensation value according to the deviation value and the energy consumption equipment parameters of each node;
and regenerating a preset energy consumption curve according to the energy consumption compensation value.
7. A worksite energy consumption monitoring apparatus, comprising:
the system comprises a first acquisition unit, a second acquisition unit and a control unit, wherein the first acquisition unit is used for acquiring energy consumption data of each node, and the energy consumption data comprises power consumption of each node acquired by an intelligent electric meter and water consumption of each node acquired by an intelligent water meter;
the first generation unit is used for generating an energy consumption statistical graph according to the energy consumption data and judging whether the energy consumption of each node is in a preset range or not according to the energy consumption statistical graph;
and the prompting unit is used for outputting an alarm prompt when the energy consumption of the node exceeds a preset range, and searching the node according to the number of the intelligent electric meter and/or the intelligent water meter.
8. The worksite energy consumption monitoring apparatus of claim 7, further comprising:
the second acquisition unit is used for acquiring energy consumption equipment parameters input by a manager, wherein the energy consumption equipment parameters comprise electric equipment parameters, water utilization equipment parameters and use time periods of all nodes;
the second generation unit is used for generating a preset energy consumption curve of each node according to the energy consumption equipment parameters, and the preset energy consumption curve represents the relation between the energy consumption equipment energy consumption of the node and the time in a preset time period;
the first generating unit is specifically configured to generate an actual energy consumption curve according to the energy consumption data, and compare the actual energy consumption curve with the predetermined energy consumption curve to determine whether the energy consumption of each node is within a predetermined range.
9. A monitoring device comprising a memory, a processor and a computer program stored on the memory and executable on the processor, characterized in that the processor implements the worksite energy consumption monitoring method according to any one of claims 1 to 6 when executing the computer program.
10. A computer storage medium having a computer program stored thereon, wherein the program, when executed by a processor, implements a worksite energy consumption monitoring method according to any one of claims 1 to 6.
CN202110376721.2A 2021-04-08 2021-04-08 Construction site energy consumption monitoring method, device, equipment and storage medium thereof Pending CN113052482A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110376721.2A CN113052482A (en) 2021-04-08 2021-04-08 Construction site energy consumption monitoring method, device, equipment and storage medium thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110376721.2A CN113052482A (en) 2021-04-08 2021-04-08 Construction site energy consumption monitoring method, device, equipment and storage medium thereof

Publications (1)

Publication Number Publication Date
CN113052482A true CN113052482A (en) 2021-06-29

Family

ID=76519039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110376721.2A Pending CN113052482A (en) 2021-04-08 2021-04-08 Construction site energy consumption monitoring method, device, equipment and storage medium thereof

Country Status (1)

Country Link
CN (1) CN113052482A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120066574A (en) * 2010-12-14 2012-06-22 그린베일 주식회사 System for controlling devices according to target charge and method thereof
CN108614507A (en) * 2018-04-25 2018-10-02 华翔翔能电气股份有限公司 Intelligent energy management method and intelligent terminal
CN110069017A (en) * 2019-04-01 2019-07-30 深圳市豪斯特力节能环保科技有限公司 A kind of equipment energy consumption control method, storage medium and its controlling terminal
CN110334953A (en) * 2019-07-08 2019-10-15 武汉诚信卓远科技发展有限公司 Electricity statistical method, equipment and computer readable storage medium
CN110658791A (en) * 2019-09-28 2020-01-07 深圳中物智建科技有限公司 Intelligent building construction management method and system based on Internet of things
CN111160598A (en) * 2019-11-13 2020-05-15 浙江中控技术股份有限公司 Energy prediction and energy consumption control method and system based on dynamic energy consumption benchmark
CN112365030A (en) * 2020-10-21 2021-02-12 深圳市紫衡技术有限公司 Building energy consumption management method and system, electronic equipment and computer storage medium

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120066574A (en) * 2010-12-14 2012-06-22 그린베일 주식회사 System for controlling devices according to target charge and method thereof
CN108614507A (en) * 2018-04-25 2018-10-02 华翔翔能电气股份有限公司 Intelligent energy management method and intelligent terminal
CN110069017A (en) * 2019-04-01 2019-07-30 深圳市豪斯特力节能环保科技有限公司 A kind of equipment energy consumption control method, storage medium and its controlling terminal
CN110334953A (en) * 2019-07-08 2019-10-15 武汉诚信卓远科技发展有限公司 Electricity statistical method, equipment and computer readable storage medium
CN110658791A (en) * 2019-09-28 2020-01-07 深圳中物智建科技有限公司 Intelligent building construction management method and system based on Internet of things
CN111160598A (en) * 2019-11-13 2020-05-15 浙江中控技术股份有限公司 Energy prediction and energy consumption control method and system based on dynamic energy consumption benchmark
CN112365030A (en) * 2020-10-21 2021-02-12 深圳市紫衡技术有限公司 Building energy consumption management method and system, electronic equipment and computer storage medium

Similar Documents

Publication Publication Date Title
CN110212645B (en) Power consumption information acquisition terminal power failure event reporting method and device
US20150142347A1 (en) Solar Energy Disaggregation Techniques for Whole-House Energy Consumption Data
WO2020191663A1 (en) Method and apparatus for detecting electricity consumption behavior, electronic device and storage medium
CN108197774B (en) Distributed photovoltaic power generation capacity abnormity diagnosis method and device
CN112131441A (en) Method and system for rapidly identifying abnormal behavior of power utilization
CN112886922B (en) Calculation method, device and storage medium for loss electric quantity of photovoltaic power station
CN116187552A (en) Abnormality detection method, computing device, and computer storage medium
CN116151776B (en) Power distribution line power protection management method and system and electronic equipment
CN115034519A (en) Method and device for predicting power load, electronic equipment and storage medium
US20150120270A1 (en) Apparatus and method for automating smart grid common information model interoperability test
Manoharan et al. An Intellectual Energy Device for Household Appliances Using Artificial Neural Network
CN114511147A (en) Line loss monitoring and early warning method, device, equipment and storage medium
CN108846505A (en) The grid-connected consumption information various dimensions check method of renewable energy and equipment
CN116826696A (en) Method and device for reducing industrial energy consumption by fusing new energy into direct-current micro-grid
CN113052482A (en) Construction site energy consumption monitoring method, device, equipment and storage medium thereof
CN109466370B (en) Charging station cluster system based on distributed energy supply and management method
CN109103904B (en) Frequency stability determination method and device and electronic equipment
CN116073340A (en) Relay protection constant value list generation method and device under source-load interaction scene
WO2019128373A1 (en) Detection method, device, computer device and storage medium for faulty device
CN115130572A (en) Method, device, equipment and medium for determining abnormal energy consumption of public building
CN114696328A (en) Power line loss analysis method, system and storage medium
CN116862036A (en) Load prediction method and device
CN113283076A (en) Method and device for researching electricity utilization abnormity and computer readable storage medium
CN115425734B (en) Operation and maintenance box with automatic energy-saving operation program
CN114414938B (en) Dynamic response method and system for power distribution network faults

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination