CN108614507A CN201810381237.7A CN201810381237A CN108614507A CN 108614507 A CN108614507 A CN 108614507A CN 201810381237 A CN201810381237 A CN 201810381237A CN 108614507 A CN108614507 A CN 108614507A
Authority
CN
China
Prior art keywords
energy
energy consumption
output value
equipment
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810381237.7A
Other languages
Chinese (zh)
Other versions
CN108614507B (en
Inventor
贺更新
贾创强
方八零
黄召戎
游玫瑰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaxiang Xiangneng Electric Co Ltd
Original Assignee
Huaxiang Xiangneng Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaxiang Xiangneng Electric Co Ltd filed Critical Huaxiang Xiangneng Electric Co Ltd
Priority to CN201810381237.7A priority Critical patent/CN108614507B/en
Publication of CN108614507A publication Critical patent/CN108614507A/en
Application granted granted Critical
Publication of CN108614507B publication Critical patent/CN108614507B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/048Monitoring; Safety

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of intelligent energy management method and intelligent terminal, this method includes the consumption information obtained in each the first preset time of monitoring point, wherein consumption information is acquired by intelligent acquisition equipment;When temporal information is working time section, and consumption information is more than the first preset value, first energy consumption per unit of output value is obtained, when first energy consumption per unit of output value is more than the default energy consumption per unit of output value, provides the feedback result of "abnormal";When temporal information is non-working time section, and consumption information is more than the second preset value, the feedback result of "abnormal" is provided;When feedback result is "abnormal", the location information of the corresponding monitoring point of abnormal consumption information is obtained, warning message is generated according to feedback result and location information, and warning message is sent to terminal.Technical solution proposed by the present invention to working time section and non-working time section with can the use of equipment can be monitored early warning, achieve the effect that elimination energy hidden trouble of equipment and energy saving.

Description

Intelligent energy management method and intelligent terminal
Technical field
The present invention relates to energy management method technical fields, and in particular to a kind of intelligent energy management method and intelligent end End.
Background technology
The energy plays the role of vital in modern society, but the thing followed is the energy shortage etc. that can not be ignored Problem.With development in science and technology, raising energy utilization rate is taken effective measures, has been increasingly becoming the top priority of people.The energy Management is a systematicness, comprehensive very strong work, and directly take on person and main energy-consuming of the enterprise as production Person has huge energy-saving potential.It is abnormal to the energy consumption of various equipment without early warning behave in existing energy management method, cause It is wasted during the use of the energy serious.
Invention content
The main object of the present invention is to provide a kind of intelligent energy management method and intelligent terminal, it is intended to solve the existing energy It is abnormal to the energy consumption of various equipment without early warning behave in management method, cause to waste serious ask during the use of the energy Topic.
To achieve the above object, the present invention provides a kind of intelligent energy management method, the intelligent energy management method packet It includes:
Obtain the consumption information in the first preset time of each monitoring point, wherein the consumption information is by intelligent acquisition equipment Acquisition;
When temporal information is working time section, and the consumption information is more than the first preset value, the production of the first unit is obtained It is worth energy consumption, when first energy consumption per unit of output value is more than the default energy consumption per unit of output value, provides the feedback result of "abnormal";
When temporal information is non-working time section, and the consumption information is more than the second preset value, "abnormal" is provided Feedback result;
When the feedback result is "abnormal", the position letter of the abnormal corresponding monitoring point of the consumption information is obtained Breath generates warning message according to the feedback result and the location information, and the warning message is sent to terminal.
Preferably, described when the feedback result is "abnormal", obtain the abnormal corresponding monitoring of the consumption information The location information of point generates warning message according to the feedback result and the location information, and by the warning message send to Further include after the step of terminal:
Summarize the warning message that the second preset time internal feedback result is abnormal;
It is the monitoring point correspondence that abnormal number is more than third preset value to obtain the second preset time internal feedback result With can equipment;
Replacement is repaired with energy equipment more than third preset value to frequency of abnormity or emphasis monitors.
Preferably, according to the different humitures in four seasons spring, summer, autumn and winter, the working time section, the non-working time are adjusted Section, first preset value and second preset value.
Preferably, described when the feedback result is "abnormal", obtain the abnormal corresponding monitoring of the consumption information The location information of point generates warning message according to the feedback result and the location information, and by the warning message send to Further include after the step of terminal:
The warning message is sent to the mobile phone of the staff of monitoring point in the form of short message.
Preferably, the consumption information obtained in each the first preset time of monitoring point, wherein the consumption information is by intelligence Can include before the step of collecting device acquisition:
Using for each monitoring point monitoring of typing can equipment and location information.
Preferably, the consumption information obtained in each the first preset time of monitoring point, wherein the consumption information is by intelligence Can further include later the step of collecting device acquisition:
The consumption information is uploaded, and is stored as the historical energy consumption data of Time Continuous;
Obtain the historical energy consumption data in each monitoring point third preset time;
Second energy consumption per unit of output value is calculated according to the historical energy consumption data;
It is carried out according to the sequence of second energy consumption per unit of output value, or with second energy consumption per unit of output value of the history same period Analysis on year-on-year basis, provides analysis report.
Preferably, the Ordination according to second energy consumption per unit of output value, the step of providing analysis report include:
It is arranged in order second energy consumption per unit of output value is descending, checks that second energy consumption per unit of output value is more than the The corresponding with monitoring point of four preset values uses energy equipment, and it is to carrying out repair and maintenance with energy equipment and will use to provide conclusion The analysis report that energy equipment uses when exchanging to energy prices low ebb.
Preferably, second energy consumption per unit of output value according to second energy consumption per unit of output value and the history same period into Analysis, the step of providing analysis report, include row on year-on-year basis:
Second energy consumption per unit of output value is analyzed on year-on-year basis with the history same period, when second energy consumption per unit of output value height When the history same period, it is the analysis report to carrying out repair and maintenance with energy equipment to provide conclusion.
Preferably, it is also wrapped after the step of historical energy consumption data obtained in each monitoring point third preset time It includes:
Energy consumption cost is calculated, and the energy consumption cost is uploaded to according to the point of energy prices, peak, gentle paddy four-stage Terminal;
According to the historical energy consumption data and the energy consumption cost, prediction energy trend, and used described in energy trend Reach terminal.
To achieve the above object, a kind of intelligent terminal provided by the invention, including memory, processor and it is stored in storage On device and the computer program that can run on a processor, which is characterized in that when the processor executes the computer program The step of realizing above-mentioned intelligent energy management method.
In technical scheme of the present invention, working hour use will be divided into energy equipment to work with inoperative period energy When the consumption information of period is more than the first preset value, if this uses first energy consumption per unit of output value of energy equipment to be higher than default unit at this time Output value energy consumption, shows that use energy equipment is in improper energy, generates warning message, and Maintenance and Repair are carried out with energy equipment to this, With reduce the use can equipment energy consumption, achieve the purpose that remove a hidden danger and energy saving.In the consumption information of inoperative period When more than the second preset value, shows that this is likely to be at energy equipment and forget closed state, generating warning message simultaneously can set the use It is standby to carry out checking inspection, to achieve the purpose that remove a hidden danger and energy saving.
Description of the drawings
Fig. 1 is the flow diagram of intelligent energy management method first embodiment of the present invention;
Fig. 2 is the flow diagram of intelligent energy management method second embodiment of the present invention;
Fig. 3 is the modular structure schematic diagram of one embodiment of intelligent terminal of the present invention.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific implementation mode
It should be appreciated that described herein, specific examples are only used to explain the present invention, is not intended to limit the present invention.
Fig. 1 is please referred to, Fig. 1 is the intelligent energy management method that first embodiment of the invention proposes, in this embodiment, intelligence Can energy management method include:
Step S100 obtains the consumption information in the first preset time of each monitoring point, wherein consumption information is by intelligent acquisition Equipment acquires.
Intelligent acquisition equipment includes intelligent electric energy meter, the control of reactive power compensating instrument etc..Electric energy instrument and the control of reactive power compensating instrument By Shielded Twisted Pair (485 line), access data collector, warp are connected with RS485 buses using MODBUS-RTU communications protocol Data collector and interchanger reach network, and fieldbus uses the Shielded Twisted Pair of RVVSP 2*1.Intelligent acquisition equipment passes through Twisted-pair feeder carries out communication connection in a manner of handing in hand, and the intelligent acquisition equipment of every bus is at 10 or so, access data acquisition Device and converter, the consumption information in the first preset time of acquisition are uploaded to terminal by interchanger.The consumption information of acquisition Including electric current, voltage, electricity consumption and reactive power etc..
It is single to obtain first when temporal information is working time section, and consumption information is more than the first preset value by step S200 Position output value energy consumption provides the feedback result of "abnormal" when first energy consumption per unit of output value is more than the default energy consumption per unit of output value.
Between at work when section, each energy consumption with energy equipment is higher, according to each power, production capacity and performance with energy equipment Etc. the factor setting of various aspects correspond the first preset value of matched consumption information with energy equipment with each.When intelligent acquisition is set When the consumption information of standby acquisition is more than the first preset value, it is default more than first to obtain first energy consumption per unit of output value and consumption information The corresponding location information with energy equipment when value.
Consumption information is the total amount in the first preset time, and when the live load with energy equipment is big, consumption information may More than the first preset value, thus obtains the further analysis of first energy consumption per unit of output value and consumption information is caused to be more than the first preset value Reason.
When first energy consumption per unit of output value is more than the default energy consumption per unit of output value, show that the use can equipment energy under the same output value The reason of consuming and increase, energy consumption is caused to increase may be to be caused with aging, failure or the abnormal use of energy equipment.If with can set Standby aging causes energy consumption to increase, then needs, to carrying out maintaining with energy equipment, to reduce energy consumption to reach energy saving mesh 's.Cause energy consumption to increase if with the failure or abnormal use of energy equipment, then needs to carrying out repair and maintenance or tune with energy equipment Whole application method come eliminate with can equipment hidden danger and achieve the purpose that energy saving.
Step S300 is provided " different when temporal information is non-working time section, and consumption information is more than the second preset value Feedback result often ".
Within the inoperative period, with can equipment energy consumption significantly lower than the energy consumption in working hour, according to can equipment The factors such as suspend mode power set the second preset value, when the collected consumption information of intelligent acquisition equipment is more than the second preset value, Show that use energy equipment also has improper energy phenomenon, the phenomenon that may be forgotten to close use energy equipment or use by staff Energy equipment fault causes.It needs to carry out examination exclusion with energy equipment to this at this time, with the hidden danger of elimination energy equipment and reaches section The about purpose of the energy.
Step S400 obtains the position letter of the corresponding monitoring point of abnormal consumption information when feedback result is "abnormal" Breath generates warning message according to feedback result and location information, and warning message is sent to terminal.
When feedback result is abnormal, produce warning message, warning message include consumption information it is corresponding with can equipment with And the information such as power consumption values, the time with energy equipment.
In technical scheme of the present invention, working hour use will be divided into energy equipment to work with inoperative period energy When the consumption information of period is more than the first preset value, if this uses first energy consumption per unit of output value of energy equipment to be higher than default unit at this time Output value energy consumption, shows that use energy equipment is in improper energy, generates warning message, and Maintenance and Repair are carried out with energy equipment to this, With reduce the use can equipment energy consumption, achieve the purpose that remove a hidden danger and energy saving.In the consumption information of inoperative period When more than the second preset value, shows that this is likely to be at energy equipment and forget closed state, generating warning message simultaneously can set the use It is standby to carry out checking inspection, to achieve the purpose that remove a hidden danger and energy saving.
Preferably, according to the different humitures in four seasons spring, summer, autumn and winter, adjustment working time section, non-working time section, first Preset value and the second preset value.The humiture situation difference in four seasons autumn and winter early summer is apparent, and the length of daylight time is also inconsistent, because And working time section, non-working time section, the first preset value and the second preset value are adjusted, it avoids because of Various Seasonal Humiture or daylight time length it is inconsistent caused by energy consumption increase, and make consumption information be more than the first preset value or second Preset value causes the generation of false alarm.
Fig. 2 is please referred to, Fig. 2 is the second embodiment of intelligent energy management method proposed by the present invention, is carried based on the present invention The first embodiment of the intelligent energy management method gone out obtains abnormal consumption information and corresponds to when feedback result is "abnormal" Monitoring point location information, warning message is generated according to feedback result and location information, and warning message is sent to terminal Further include after step:
Step S500 summarizes the warning message that the second preset time internal feedback result is abnormal;
Step S600, it is the monitoring point that abnormal number is more than third preset value to obtain the second preset time internal feedback result Corresponding energy equipment;
Step S700 repairs replacement with energy equipment more than third preset value to frequency of abnormity or emphasis monitors.
After warning message is uploaded to terminal, each history warning message tables of data with energy equipment is established, statistical analysis is each There is the frequency of alarm condition with energy equipment, when the frequency for occurring alarm condition in the second preset time is higher than third preset value When, emphasis supervision is carried out with energy equipment to this and safeguards or replace use energy equipment.If there is frequent alarm condition with energy equipment, Emphasis supervision is carried out to it and safeguards the security risk that can effectively eliminate with energy equipment, while also can be energy saving.However frequently Supervision maintenance work waste a large amount of human cost and time cost, if when human cost and excessively high time cost, can This is replaced with energy equipment, achievees the purpose that maximization of economic benefit.
Further, in the 3rd embodiment of intelligent energy management method proposed by the present invention, when feedback result is " different When often ", the location information of the corresponding monitoring point of abnormal consumption information is obtained, is generated and is alarmed according to feedback result and location information Information, and warning message is given and further includes to after the step of terminal:
Warning message is sent to the mobile phone of the staff of monitoring point in the form of short message.
Terminal includes the personal information of staff in advance, and forms address list.Personal information includes identity information, mobile phone Number and professional skill etc..After receiving warning message, staff is preferentially chosen from frequent contact, by warning message It is sent on the mobile phone of the staff to match with alarm content, staff is made to be on the scene in time process problem.If often When can not be shown up for some reason with the staff in contact person, then other staff is selected in address list to show up dimension Shield maintenance.
Further, in the fourth embodiment of intelligent energy management method proposed by the present invention, each monitoring point is obtained Consumption information in one preset time, wherein include before the step of consumption information is acquired by intelligent acquisition equipment:
Using for each monitoring point monitoring of typing can equipment and location information.
Advance typing respectively with the active power of energy equipment, reactive power, rated voltage, rated current, production capacity and uses energy The relevant informations such as the location information of equipment, convenient for checking the feelings of use energy equipment in time after staff receives warning message Condition, while the rapid specific location got with energy equipment, Maintenance and Repair are carried out to be on the scene in time.
Further, in the 5th embodiment of intelligent energy management method proposed by the present invention, each monitoring point is obtained Consumption information in one preset time, wherein further include after the step of consumption information is acquired by intelligent acquisition equipment:
Consumption information is uploaded, and is stored as the historical energy consumption data of Time Continuous;
Specifically, consumption information is fabricated to the historical energy consumption data of Time Continuous, and with number, the shape of icon, figure Formula is intuitively shown to staff's access, and can be by historical energy consumption data with Segment Report, daily sheet, weekly return, monthly magazine The form of table or year report carries out printing or dish preserves.
Obtain the historical energy consumption data in each monitoring point third preset time;
Second energy consumption per unit of output value is calculated according to historical energy consumption data;
Same score is carried out according to the sequence of second energy consumption per unit of output value, or with second energy consumption per unit of output value of the history same period Analysis, provides analysis report.
Preferably, it is carried out according to the sequence of second energy consumption per unit of output value or with second energy consumption per unit of output value of the history same period same Include than the step of analyzing, providing analysis report:
It is arranged in order second energy consumption per unit of output value is descending, checks that second energy consumption per unit of output value is more than the 4th preset value It is corresponding with monitoring point with can equipment, and provide conclusion be to can equipment carries out repair and maintenance and will use energy equipment tune Shift to the analysis report used when energy prices low ebb;
Preferably, it is analyzed on year-on-year basis according to second energy consumption per unit of output value and second energy consumption per unit of output value of the history same period, The step of providing analysis report include:
Second energy consumption per unit of output value and the history same period are analyzed on year-on-year basis, when second energy consumption per unit of output value is same higher than history When the phase, it is the analysis report to carrying out repair and maintenance with energy equipment to provide conclusion.
Each second energy consumption per unit of output value with energy equipment in third preset time is subjected to sequence from large to small, is obtained Each inside energy consumption ranking with energy equipment, in the top to internal energy consumption carries out repair and maintenance with energy equipment, checks high energy consumption Caused by the reason of causing is equipment fault or incorrect use, and reform advice is provided according to the reason after checking.To reach Energy equipment safety hidden danger and energy saving effect are used to eliminating.
Second energy consumption per unit of output value and second energy consumption per unit of output value of the history same period are analyzed on year-on-year basis, obtain same use Energy equipment currently difference with second energy consumption per unit of output value when history same period in third preset time, if the second current unit Output value energy consumption is higher than the history same period, then need to investigate thoroughly cause this with can the high reason of second energy consumption per unit of output value of equipment be with energy equipment Aging, failure or incorrect use cause.
In the sixth embodiment of intelligent energy management method proposed by the present invention, each monitoring point third preset time is obtained Further include after the step of interior historical energy consumption data:
Energy consumption cost is calculated, and will expend and be uploaded to end according to the point of energy prices, peak, gentle paddy four-stage End;
According to historical energy consumption data and energy consumption cost, prediction energy trend, and terminal will be uploaded to energy trend.
Determine point, peak, the corresponding energy consumption of four different phases of gentle paddy, and according to the energy consumption calculation of price energy of four-stage Consuming is used, realization remote meter reading, and according to the working condition with energy equipment, is specified and is reasonably used strategy with energy equipment.Such as With can bigger drying equipment, which can be placed on work night energy consumption price it is relatively low when use, to reach maximum Limit reduces the purpose of energy consumption cost.If also thering is worker to use the drying equipment in electricity consumption on the daytime spike period in actual production, Early warning then is carried out to the behavior, adjusts strategy in time.
It was predicted according to the energy consumption cost and the energy consumption cost of the history same period of a upper period with energy trend.According to going through History energy consumption data and energy consumption cost, prediction with can trend, sale of electricity company according to can trend determine electricity sales amount, user according to Energy trend determines budgetary resources, achievees the purpose that rationally to utilize resource.
The present invention also provides a kind of intelligent terminals, please refer to Fig. 3, and in one embodiment, which includes memory 100, processor 200 and it is stored in the computer program that can be run on memory 100 and on processor 200, processor executes The step of intelligent energy management method in any of the above-described embodiment is realized when computer program.
Specifically, for realizing following steps when processor 200 executes computer program:
Step S100 obtains the consumption information in the first preset time of each monitoring point, wherein consumption information is by intelligent acquisition Equipment acquires.
It is single to obtain first when temporal information is working time section, and consumption information is more than the first preset value by step S200 Position output value energy consumption provides the feedback result of "abnormal" when first energy consumption per unit of output value is more than the default energy consumption per unit of output value.
Step S300 is provided " different when temporal information is non-working time section, and consumption information is more than the second preset value Feedback result often ".
Step S400 obtains the position letter of the corresponding monitoring point of abnormal consumption information when feedback result is "abnormal" Breath generates warning message according to feedback result and location information, and warning message is sent to terminal.
In technical scheme of the present invention, working hour use will be divided into energy equipment to work with inoperative period energy When the consumption information of period is more than the first preset value, if this uses first energy consumption per unit of output value of energy equipment to be higher than default unit at this time Output value energy consumption, shows that use energy equipment is in improper energy, generates warning message, and Maintenance and Repair are carried out with energy equipment to this, With reduce the use can equipment energy consumption, achieve the purpose that remove a hidden danger and energy saving.In the consumption information of inoperative period When more than the second preset value, shows that this is likely to be at energy equipment and forget closed state, generating warning message simultaneously can set the use It is standby to carry out checking inspection, to achieve the purpose that remove a hidden danger and energy saving.
Preferably, according to the different humitures in four seasons spring, summer, autumn and winter, adjustment working time section, non-working time section, first Preset value and the second preset value.The humiture situation difference in four seasons autumn and winter early summer is apparent, and the length of daylight time is also inconsistent, because And working time section, non-working time section, the first preset value and the second preset value are adjusted, it avoids because of Various Seasonal Humiture or daylight time length it is inconsistent caused by energy consumption increase, and make consumption information be more than the first preset value or second Preset value causes the generation of false alarm.
Further, processor 200, when feedback result is "abnormal", obtains abnormal when executing computer program The location information of the corresponding monitoring point of consumption information generates warning message according to feedback result and location information, and by alarm signal Breath is sent further includes to after the step of terminal:
Step S500 summarizes the warning message that the second preset time internal feedback result is abnormal;
Step S600, it is the monitoring point that abnormal number is more than third preset value to obtain the second preset time internal feedback result Corresponding energy equipment;
Step S700 repairs replacement with energy equipment more than third preset value to frequency of abnormity or emphasis monitors.
After warning message is uploaded to terminal, each history warning message tables of data with energy equipment is established, statistical analysis is each There is the frequency of alarm condition with energy equipment, when the frequency for occurring alarm condition in the second preset time is higher than third preset value When, emphasis supervision is carried out with energy equipment to this and safeguards or replace use energy equipment.If there is frequent alarm condition with energy equipment, Emphasis supervision is carried out to it and safeguards the security risk that can effectively eliminate with energy equipment, while also can be energy saving.However frequently Supervision maintenance work waste a large amount of human cost and time cost, if when human cost and excessively high time cost, can This is replaced with energy equipment, achievees the purpose that maximization of economic benefit.
Further, when feedback result is "abnormal", the position letter of the corresponding monitoring point of abnormal consumption information is obtained Breath generates warning message according to feedback result and location information, and warning message is sent to terminal:
Warning message is sent to the mobile phone of the staff of monitoring point in the form of short message.
Terminal includes the personal information of staff in advance, and forms address list.Personal information includes identity information, mobile phone Number and professional skill etc..After receiving warning message, staff is preferentially chosen from frequent contact, by warning message It is sent on the mobile phone of the staff to match with alarm content, staff is made to be on the scene in time process problem.If often When can not be shown up for some reason with the staff in contact person, then other staff is selected in address list to show up dimension Shield maintenance.
Further, the consumption information in the first preset time of each monitoring point is obtained, wherein consumption information is by intelligent acquisition Include before the step of equipment acquires:
Using for each monitoring point monitoring of typing can equipment and location information.
Advance typing respectively with the active power of energy equipment, reactive power, rated voltage, rated current, production capacity and uses energy The relevant informations such as the location information of equipment, convenient for checking the feelings of use energy equipment in time after staff receives warning message Condition, while the rapid specific location got with energy equipment, Maintenance and Repair are carried out to be on the scene in time.
Further, the consumption information in the first preset time of each monitoring point is obtained, wherein consumption information is by intelligent acquisition Further include after the step of equipment acquires:
Consumption information is uploaded, and is stored as the historical energy consumption data of Time Continuous;
Specifically, consumption information is fabricated to the historical energy consumption data of Time Continuous, and with number, the shape of icon, figure Formula is intuitively shown to staff's access, and can be by historical energy consumption data with Segment Report, daily sheet, weekly return, monthly magazine The form of table or year report carries out printing or dish preserves.
Obtain the historical energy consumption data in each monitoring point third preset time;
Second energy consumption per unit of output value is calculated according to historical energy consumption data;
Same score is carried out according to the sequence of second energy consumption per unit of output value, or with second energy consumption per unit of output value of the history same period Analysis, provides analysis report.
Preferably, it is carried out according to the sequence of second energy consumption per unit of output value or with second energy consumption per unit of output value of the history same period same Include than the step of analyzing, providing analysis report:
It is arranged in order second energy consumption per unit of output value is descending, checks that second energy consumption per unit of output value is more than the 4th preset value It is corresponding with monitoring point with can equipment, and provide conclusion be to can equipment carries out repair and maintenance and will use energy equipment tune Shift to the analysis report used when energy prices low ebb;
Preferably, it is analyzed on year-on-year basis according to second energy consumption per unit of output value and second energy consumption per unit of output value of the history same period, The step of providing analysis report include:
Second energy consumption per unit of output value and the history same period are analyzed on year-on-year basis, when second energy consumption per unit of output value is same higher than history When the phase, it is the analysis report to carrying out repair and maintenance with energy equipment to provide conclusion.
Each second energy consumption per unit of output value with energy equipment in third preset time is subjected to sequence from large to small, is obtained Each inside energy consumption ranking with energy equipment, in the top to internal energy consumption carries out repair and maintenance with energy equipment, checks high energy consumption Caused by the reason of causing is equipment fault or incorrect use, and reform advice is provided according to the reason after checking.To reach Energy equipment safety hidden danger and energy saving effect are used to eliminating.
Second energy consumption per unit of output value and second energy consumption per unit of output value of the history same period are analyzed on year-on-year basis, obtain same use Energy equipment currently difference with second energy consumption per unit of output value when history same period in third preset time, if the second current unit Output value energy consumption is higher than the history same period, then need to investigate thoroughly cause this with can the high reason of second energy consumption per unit of output value of equipment be with energy equipment Aging, failure or incorrect use cause.
Further, further include after the step of obtaining the historical energy consumption data in each monitoring point third preset time:
Energy consumption cost is calculated, and will expend and be uploaded to end according to the point of energy prices, peak, gentle paddy four-stage End;
According to historical energy consumption data and energy consumption cost, prediction energy trend, and terminal will be uploaded to energy trend.
Determine point, peak, the corresponding energy consumption of four different phases of gentle paddy, and according to the energy consumption calculation of price energy of four-stage Consuming is used, realization remote meter reading, and according to the working condition with energy equipment, is specified and is reasonably used strategy with energy equipment.Such as With can bigger drying equipment, which can be placed on work night energy consumption price it is relatively low when use, to reach maximum Limit reduces the purpose of energy consumption cost.If also thering is worker to use the drying equipment in electricity consumption on the daytime spike period in actual production, Early warning then is carried out to the behavior, adjusts strategy in time.
It was predicted according to the energy consumption cost and the energy consumption cost of the history same period of a upper period with energy trend.According to going through History energy consumption data and energy consumption cost, prediction with can trend, sale of electricity company according to can trend determine electricity sales amount, user according to Energy trend determines budgetary resources, achievees the purpose that rationally to utilize resource.
In the description of this specification, reference term " embodiment ", " another embodiment ", " other embodiment " or " The description of one embodiment~X embodiment " etc. mean specific features described in conjunction with this embodiment or example, structure, material or Person's feature is included at least one embodiment or example of the invention.In the present specification, to the schematic table of above-mentioned term It states and may not refer to the same embodiment or example.Moreover, specific features, structure, material, method and step or the spy of description Point can be combined in any suitable manner in any one or more of the embodiments or examples.
It should be noted that herein, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that process, method, article or device including a series of elements include not only those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or device institute it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including this There is also other identical elements in the process of element, method, article or device.
The embodiments of the present invention are for illustration only, can not represent the quality of embodiment.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side Method can add the mode of required general hardware platform to realize by software, naturally it is also possible to by hardware, but in many cases The former is more preferably embodiment.Based on this understanding, technical scheme of the present invention substantially in other words does the prior art Going out the part of contribution can be expressed in the form of software products, which is stored in a storage medium In (such as ROM/RAM, magnetic disc, CD), including some instructions are used so that a station terminal (can be mobile phone, computer, service Device, air conditioner or network equipment etc.) execute method described in each embodiment of the present invention.
The embodiment of the present invention is described with above attached drawing, but the invention is not limited in above-mentioned specific Embodiment, the above mentioned embodiment is only schematical, rather than restrictive, those skilled in the art Under the inspiration of the present invention, without breaking away from the scope protected by the purposes and claims of the present invention, it can also make very much Form, all of these belong to the protection of the present invention.

Claims (10)

1. a kind of intelligent energy management method, which is characterized in that the intelligent energy management method includes:
Obtain the consumption information in the first preset time of each monitoring point, wherein the consumption information is acquired by intelligent acquisition equipment;
When temporal information is working time section, and the consumption information is more than the first preset value, the first unit output value energy is obtained Consumption provides the feedback result of "abnormal" when first energy consumption per unit of output value is more than the default energy consumption per unit of output value;
When temporal information is non-working time section, and the consumption information is more than the second preset value, the feedback of "abnormal" is provided As a result;
When the feedback result is "abnormal", the location information of the abnormal corresponding monitoring point of the consumption information, root are obtained Warning message is generated according to the feedback result and the location information, and the warning message is sent to terminal.
2. intelligent energy management method as described in claim 1, which is characterized in that described when the feedback result is "abnormal" When, the location information of the abnormal corresponding monitoring point of the consumption information is obtained, is believed according to the feedback result and the position Breath generates warning message, and the warning message is sent and further includes to after the step of terminal:
Summarize the warning message that the second preset time internal feedback result is abnormal;
It is the corresponding use in monitoring point that abnormal number is more than third preset value to obtain the second preset time internal feedback result It can equipment;
Replacement is repaired with energy equipment more than third preset value to frequency of abnormity or emphasis monitors.
3. intelligent energy management method as described in claim 1, which is characterized in that warm and humid according to the difference in four seasons spring, summer, autumn and winter Degree adjusts the working time section, non-working time section, first preset value and second preset value.
4. intelligent energy management method as described in claim 1, which is characterized in that described when the feedback result is "abnormal" When, the location information of the abnormal corresponding monitoring point of the consumption information is obtained, is believed according to the feedback result and the position Breath generates warning message, and the warning message is sent and further includes to after the step of terminal:
By the mobile phone of the staff of the warning message to monitoring point in the form of short message.
5. intelligent energy management method according to any one of claims 1-4, which is characterized in that described to obtain each monitoring point the Consumption information in one preset time, wherein include before the step of consumption information is acquired by intelligent acquisition equipment:
Using for each monitoring point monitoring of typing can equipment and location information.
6. intelligent energy management method according to any one of claims 1-4, which is characterized in that described to obtain each monitoring point the Consumption information in one preset time, wherein further include after the step of consumption information is acquired by intelligent acquisition equipment:
The consumption information is uploaded, and is stored as the historical energy consumption data of Time Continuous;
Obtain the historical energy consumption data in each monitoring point third preset time;
Second energy consumption per unit of output value is calculated according to the historical energy consumption data;
It is carried out on year-on-year basis according to the sequence of second energy consumption per unit of output value, or with second energy consumption per unit of output value of the history same period Analysis, provides analysis report.
7. intelligent energy management method as claimed in claim 6, which is characterized in that described according to the second unit output value energy The Ordination of consumption, the step of providing analysis report include:
It is arranged in order second energy consumption per unit of output value is descending, it is pre- to check that second energy consumption per unit of output value is more than the 4th If value it is corresponding with monitoring point with can equipment, and provide conclusion be to can equipment carry out repair and maintenance and will be with can set The analysis report used when standby exchange is to energy prices low ebb.
8. intelligent energy management method as claimed in claim 6, which is characterized in that described according to the second unit output value energy Consuming the step of second energy consumption per unit of output value with the history same period is analyzed on year-on-year basis, provides analysis report includes:
Second energy consumption per unit of output value is analyzed on year-on-year basis with the history same period, is gone through when second energy consumption per unit of output value is higher than When the history same period, it is the analysis report to carrying out repair and maintenance with energy equipment to provide conclusion.
9. intelligent energy management method as claimed in claim 6, which is characterized in that when each monitoring point third of acquisition is preset In the historical energy consumption data the step of after further include:
Energy consumption cost is calculated, and the energy consumption cost is uploaded to end according to the point of energy prices, peak, gentle paddy four-stage End;
According to the historical energy consumption data and the energy consumption cost, prediction energy trend, and it is uploaded to described with energy trend Terminal.
10. a kind of intelligent terminal, including memory, processor and storage are on a memory and the calculating that can run on a processor Machine program, which is characterized in that the processor is realized when executing the computer program such as any one of claim 1 to 9 institute The step of intelligent energy management method stated.
CN201810381237.7A 2018-04-25 2018-04-25 Intelligent energy management method and intelligent terminal Active CN108614507B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810381237.7A CN108614507B (en) 2018-04-25 2018-04-25 Intelligent energy management method and intelligent terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810381237.7A CN108614507B (en) 2018-04-25 2018-04-25 Intelligent energy management method and intelligent terminal

Publications (2)

Publication Number Publication Date
CN108614507A true CN108614507A (en) 2018-10-02
CN108614507B CN108614507B (en) 2020-09-25

Family

ID=63661115

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810381237.7A Active CN108614507B (en) 2018-04-25 2018-04-25 Intelligent energy management method and intelligent terminal

Country Status (1)

Country Link
CN (1) CN108614507B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109709912A (en) * 2018-12-20 2019-05-03 广西程天电子科技有限公司 Energy management control method and system based on Internet of Things
CN110069017A (en) * 2019-04-01 2019-07-30 深圳市豪斯特力节能环保科技有限公司 A kind of equipment energy consumption control method, storage medium and its controlling terminal
CN112486307A (en) * 2020-11-27 2021-03-12 宁波阶梯教育科技有限公司 Classroom energy consumption monitoring method, device, system and computer storage medium
CN112561591A (en) * 2020-12-21 2021-03-26 国网电子商务有限公司 Intelligent settlement method and device for energy electronic bill
CN113052482A (en) * 2021-04-08 2021-06-29 深圳市中瓴智慧科技有限公司 Construction site energy consumption monitoring method, device, equipment and storage medium thereof
CN113177669A (en) * 2021-05-26 2021-07-27 天纳能源科技(上海)有限公司 Comprehensive energy intelligent management method based on Internet of things
CN113379202A (en) * 2021-05-26 2021-09-10 天纳能源科技(上海)有限公司 Comprehensive energy intelligent management platform based on Internet of things
CN114495446A (en) * 2022-01-04 2022-05-13 珠海格力电器股份有限公司 Energy consumption monitoring alarm method and device, computing equipment and storage medium
TWI773120B (en) * 2021-02-04 2022-08-01 竹陞科技股份有限公司 Equipment performance monitoring device and equipment performance monitoring method
CN115455064A (en) * 2022-09-20 2022-12-09 国网浙江义乌市供电有限公司 Comprehensive energy metering data acquisition and transmission method and system
CN115630790A (en) * 2022-09-05 2023-01-20 天纳能源科技(上海)有限公司 Metering network management method
CN118428905A (en) * 2024-07-02 2024-08-02 无锡锐泰节能系统科学有限公司 Building energy management method and system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060206240A1 (en) * 2002-05-20 2006-09-14 Tsui Jonah C System and method for managing and optimizing power use
CN202735441U (en) * 2012-08-03 2013-02-13 深圳市海亿达能源科技股份有限公司 Energy equipment on-line energy consumption management device
CN104570973A (en) * 2013-10-18 2015-04-29 广州邦讯信息系统有限公司 Method and device for enterprise energy management
CN104599198A (en) * 2015-01-27 2015-05-06 华南理工大学 Indicator type multi-stage analysis method and system for campus building energy efficiency management
CN105241018A (en) * 2015-10-28 2016-01-13 青岛海尔空调器有限总公司 Heat exchange fault detection method and device for dehumidification device
CN105259847A (en) * 2015-10-15 2016-01-20 深圳市万嘉明科技发展有限公司 Energy management control method and system based on energy consumption historical data analysis
CN105357828A (en) * 2015-11-30 2016-02-24 广州长丰电子科技有限公司 City illumination intelligence control system and method
CN107153410A (en) * 2017-07-12 2017-09-12 上海云统创申智能科技有限公司 A kind of intelligent sandstone aggregate production line

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060206240A1 (en) * 2002-05-20 2006-09-14 Tsui Jonah C System and method for managing and optimizing power use
CN202735441U (en) * 2012-08-03 2013-02-13 深圳市海亿达能源科技股份有限公司 Energy equipment on-line energy consumption management device
CN104570973A (en) * 2013-10-18 2015-04-29 广州邦讯信息系统有限公司 Method and device for enterprise energy management
CN104599198A (en) * 2015-01-27 2015-05-06 华南理工大学 Indicator type multi-stage analysis method and system for campus building energy efficiency management
CN105259847A (en) * 2015-10-15 2016-01-20 深圳市万嘉明科技发展有限公司 Energy management control method and system based on energy consumption historical data analysis
CN105241018A (en) * 2015-10-28 2016-01-13 青岛海尔空调器有限总公司 Heat exchange fault detection method and device for dehumidification device
CN105357828A (en) * 2015-11-30 2016-02-24 广州长丰电子科技有限公司 City illumination intelligence control system and method
CN107153410A (en) * 2017-07-12 2017-09-12 上海云统创申智能科技有限公司 A kind of intelligent sandstone aggregate production line

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109709912A (en) * 2018-12-20 2019-05-03 广西程天电子科技有限公司 Energy management control method and system based on Internet of Things
CN109709912B (en) * 2018-12-20 2021-04-20 广西程天电子科技有限公司 Energy management control method and system based on Internet of things
CN110069017A (en) * 2019-04-01 2019-07-30 深圳市豪斯特力节能环保科技有限公司 A kind of equipment energy consumption control method, storage medium and its controlling terminal
CN112486307A (en) * 2020-11-27 2021-03-12 宁波阶梯教育科技有限公司 Classroom energy consumption monitoring method, device, system and computer storage medium
CN112561591A (en) * 2020-12-21 2021-03-26 国网电子商务有限公司 Intelligent settlement method and device for energy electronic bill
TWI773120B (en) * 2021-02-04 2022-08-01 竹陞科技股份有限公司 Equipment performance monitoring device and equipment performance monitoring method
CN113052482A (en) * 2021-04-08 2021-06-29 深圳市中瓴智慧科技有限公司 Construction site energy consumption monitoring method, device, equipment and storage medium thereof
CN113177669A (en) * 2021-05-26 2021-07-27 天纳能源科技(上海)有限公司 Comprehensive energy intelligent management method based on Internet of things
CN113379202A (en) * 2021-05-26 2021-09-10 天纳能源科技(上海)有限公司 Comprehensive energy intelligent management platform based on Internet of things
CN114495446A (en) * 2022-01-04 2022-05-13 珠海格力电器股份有限公司 Energy consumption monitoring alarm method and device, computing equipment and storage medium
CN115630790A (en) * 2022-09-05 2023-01-20 天纳能源科技(上海)有限公司 Metering network management method
CN115630790B (en) * 2022-09-05 2024-02-09 天纳能源科技(上海)有限公司 Metering network management method
CN115455064A (en) * 2022-09-20 2022-12-09 国网浙江义乌市供电有限公司 Comprehensive energy metering data acquisition and transmission method and system
CN118428905A (en) * 2024-07-02 2024-08-02 无锡锐泰节能系统科学有限公司 Building energy management method and system

Also Published As

Publication number Publication date
CN108614507B (en) 2020-09-25

Similar Documents

Publication Publication Date Title
CN108614507A (en) Intelligent energy management method and intelligent terminal
CN104283308B (en) Smart central strategy control system for micro-grid
CN110137958B (en) User voltage sag analysis method and system
CN117474319A (en) Risk assessment method and system for electric power system
CN111260188A (en) Voltage sag treatment device configuration method
CN103837777A (en) Method and system for power quality assessment of power supply system
CN103944263A (en) Power grid control method and system with various load devices
CN116885763A (en) Energy management device and method suitable for distributed energy storage system
CN106124835B (en) A kind of method that power distribution voltage compares with predetermined voltage
Chua et al. Peak reduction for commercial buildings using energy storage
CN111553720A (en) User electricity utilization behavior analysis method based on improved k-means algorithm
CN116882595B (en) Comprehensive performance prediction method and system for transformer substation
CN109347132A (en) A kind of power peak regulation industrial energy-storage system and its charge and discharge strategy
CN117691640A (en) Evaluation method and device for power grid side energy storage emergency peak regulation standby capability
CN108573352A (en) Intelligent energy efficiency analysis method for air and intelligent terminal
CN116345687A (en) User behavior safety early warning system of power monitoring system
CN103473655A (en) Country area company production and operation integrated platform
CN112636564B (en) Converter control method and device, converter, electronic device and storage medium
CN110807602B (en) Power dispatching system fault detection method based on big data
CN112821551A (en) Power grid regulation and control operation self-adaptive programming method and system
CN110110961A (en) Power quality data monitoring method, device and terminal device
CN112612225A (en) Control system for data acquisition of electrical control cabinet
CN112614008A (en) Load transfer processing method and device
CN116014898B (en) Power distribution network protection system based on electricity consumption demand
CN116577583B (en) Electrical parameter evaluation method and device for desulfurization system and electronic equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 413002 Yiyang City, Hunan province Heshan District Long Ridge Industrial Park, West Road, No. 1

Applicant after: Huaxiang XiangNeng Technology Co.,Ltd.

Address before: 413002 Yiyang City, Hunan province Heshan District Long Ridge Industrial Park, West Road, No. 1

Applicant before: HXXN ELECTRICITY Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Intelligent energy management methods and intelligent terminals

Effective date of registration: 20231106

Granted publication date: 20200925

Pledgee: China Co. truction Bank Corp Yiyang branch

Pledgor: Huaxiang XiangNeng Technology Co.,Ltd.

Registration number: Y2023980063452

PE01 Entry into force of the registration of the contract for pledge of patent right