Invention content
The main object of the present invention is to provide a kind of intelligent energy management method and intelligent terminal, it is intended to solve the existing energy
It is abnormal to the energy consumption of various equipment without early warning behave in management method, cause to waste serious ask during the use of the energy
Topic.
To achieve the above object, the present invention provides a kind of intelligent energy management method, the intelligent energy management method packet
It includes:
Obtain the consumption information in the first preset time of each monitoring point, wherein the consumption information is by intelligent acquisition equipment
Acquisition;
When temporal information is working time section, and the consumption information is more than the first preset value, the production of the first unit is obtained
It is worth energy consumption, when first energy consumption per unit of output value is more than the default energy consumption per unit of output value, provides the feedback result of "abnormal";
When temporal information is non-working time section, and the consumption information is more than the second preset value, "abnormal" is provided
Feedback result;
When the feedback result is "abnormal", the position letter of the abnormal corresponding monitoring point of the consumption information is obtained
Breath generates warning message according to the feedback result and the location information, and the warning message is sent to terminal.
Preferably, described when the feedback result is "abnormal", obtain the abnormal corresponding monitoring of the consumption information
The location information of point generates warning message according to the feedback result and the location information, and by the warning message send to
Further include after the step of terminal:
Summarize the warning message that the second preset time internal feedback result is abnormal;
It is the monitoring point correspondence that abnormal number is more than third preset value to obtain the second preset time internal feedback result
With can equipment;
Replacement is repaired with energy equipment more than third preset value to frequency of abnormity or emphasis monitors.
Preferably, according to the different humitures in four seasons spring, summer, autumn and winter, the working time section, the non-working time are adjusted
Section, first preset value and second preset value.
Preferably, described when the feedback result is "abnormal", obtain the abnormal corresponding monitoring of the consumption information
The location information of point generates warning message according to the feedback result and the location information, and by the warning message send to
Further include after the step of terminal:
The warning message is sent to the mobile phone of the staff of monitoring point in the form of short message.
Preferably, the consumption information obtained in each the first preset time of monitoring point, wherein the consumption information is by intelligence
Can include before the step of collecting device acquisition:
Using for each monitoring point monitoring of typing can equipment and location information.
Preferably, the consumption information obtained in each the first preset time of monitoring point, wherein the consumption information is by intelligence
Can further include later the step of collecting device acquisition:
The consumption information is uploaded, and is stored as the historical energy consumption data of Time Continuous;
Obtain the historical energy consumption data in each monitoring point third preset time;
Second energy consumption per unit of output value is calculated according to the historical energy consumption data;
It is carried out according to the sequence of second energy consumption per unit of output value, or with second energy consumption per unit of output value of the history same period
Analysis on year-on-year basis, provides analysis report.
Preferably, the Ordination according to second energy consumption per unit of output value, the step of providing analysis report include:
It is arranged in order second energy consumption per unit of output value is descending, checks that second energy consumption per unit of output value is more than the
The corresponding with monitoring point of four preset values uses energy equipment, and it is to carrying out repair and maintenance with energy equipment and will use to provide conclusion
The analysis report that energy equipment uses when exchanging to energy prices low ebb.
Preferably, second energy consumption per unit of output value according to second energy consumption per unit of output value and the history same period into
Analysis, the step of providing analysis report, include row on year-on-year basis:
Second energy consumption per unit of output value is analyzed on year-on-year basis with the history same period, when second energy consumption per unit of output value height
When the history same period, it is the analysis report to carrying out repair and maintenance with energy equipment to provide conclusion.
Preferably, it is also wrapped after the step of historical energy consumption data obtained in each monitoring point third preset time
It includes:
Energy consumption cost is calculated, and the energy consumption cost is uploaded to according to the point of energy prices, peak, gentle paddy four-stage
Terminal;
According to the historical energy consumption data and the energy consumption cost, prediction energy trend, and used described in energy trend
Reach terminal.
To achieve the above object, a kind of intelligent terminal provided by the invention, including memory, processor and it is stored in storage
On device and the computer program that can run on a processor, which is characterized in that when the processor executes the computer program
The step of realizing above-mentioned intelligent energy management method.
In technical scheme of the present invention, working hour use will be divided into energy equipment to work with inoperative period energy
When the consumption information of period is more than the first preset value, if this uses first energy consumption per unit of output value of energy equipment to be higher than default unit at this time
Output value energy consumption, shows that use energy equipment is in improper energy, generates warning message, and Maintenance and Repair are carried out with energy equipment to this,
With reduce the use can equipment energy consumption, achieve the purpose that remove a hidden danger and energy saving.In the consumption information of inoperative period
When more than the second preset value, shows that this is likely to be at energy equipment and forget closed state, generating warning message simultaneously can set the use
It is standby to carry out checking inspection, to achieve the purpose that remove a hidden danger and energy saving.
Specific implementation mode
It should be appreciated that described herein, specific examples are only used to explain the present invention, is not intended to limit the present invention.
Fig. 1 is please referred to, Fig. 1 is the intelligent energy management method that first embodiment of the invention proposes, in this embodiment, intelligence
Can energy management method include:
Step S100 obtains the consumption information in the first preset time of each monitoring point, wherein consumption information is by intelligent acquisition
Equipment acquires.
Intelligent acquisition equipment includes intelligent electric energy meter, the control of reactive power compensating instrument etc..Electric energy instrument and the control of reactive power compensating instrument
By Shielded Twisted Pair (485 line), access data collector, warp are connected with RS485 buses using MODBUS-RTU communications protocol
Data collector and interchanger reach network, and fieldbus uses the Shielded Twisted Pair of RVVSP 2*1.Intelligent acquisition equipment passes through
Twisted-pair feeder carries out communication connection in a manner of handing in hand, and the intelligent acquisition equipment of every bus is at 10 or so, access data acquisition
Device and converter, the consumption information in the first preset time of acquisition are uploaded to terminal by interchanger.The consumption information of acquisition
Including electric current, voltage, electricity consumption and reactive power etc..
It is single to obtain first when temporal information is working time section, and consumption information is more than the first preset value by step S200
Position output value energy consumption provides the feedback result of "abnormal" when first energy consumption per unit of output value is more than the default energy consumption per unit of output value.
Between at work when section, each energy consumption with energy equipment is higher, according to each power, production capacity and performance with energy equipment
Etc. the factor setting of various aspects correspond the first preset value of matched consumption information with energy equipment with each.When intelligent acquisition is set
When the consumption information of standby acquisition is more than the first preset value, it is default more than first to obtain first energy consumption per unit of output value and consumption information
The corresponding location information with energy equipment when value.
Consumption information is the total amount in the first preset time, and when the live load with energy equipment is big, consumption information may
More than the first preset value, thus obtains the further analysis of first energy consumption per unit of output value and consumption information is caused to be more than the first preset value
Reason.
When first energy consumption per unit of output value is more than the default energy consumption per unit of output value, show that the use can equipment energy under the same output value
The reason of consuming and increase, energy consumption is caused to increase may be to be caused with aging, failure or the abnormal use of energy equipment.If with can set
Standby aging causes energy consumption to increase, then needs, to carrying out maintaining with energy equipment, to reduce energy consumption to reach energy saving mesh
's.Cause energy consumption to increase if with the failure or abnormal use of energy equipment, then needs to carrying out repair and maintenance or tune with energy equipment
Whole application method come eliminate with can equipment hidden danger and achieve the purpose that energy saving.
Step S300 is provided " different when temporal information is non-working time section, and consumption information is more than the second preset value
Feedback result often ".
Within the inoperative period, with can equipment energy consumption significantly lower than the energy consumption in working hour, according to can equipment
The factors such as suspend mode power set the second preset value, when the collected consumption information of intelligent acquisition equipment is more than the second preset value,
Show that use energy equipment also has improper energy phenomenon, the phenomenon that may be forgotten to close use energy equipment or use by staff
Energy equipment fault causes.It needs to carry out examination exclusion with energy equipment to this at this time, with the hidden danger of elimination energy equipment and reaches section
The about purpose of the energy.
Step S400 obtains the position letter of the corresponding monitoring point of abnormal consumption information when feedback result is "abnormal"
Breath generates warning message according to feedback result and location information, and warning message is sent to terminal.
When feedback result is abnormal, produce warning message, warning message include consumption information it is corresponding with can equipment with
And the information such as power consumption values, the time with energy equipment.
In technical scheme of the present invention, working hour use will be divided into energy equipment to work with inoperative period energy
When the consumption information of period is more than the first preset value, if this uses first energy consumption per unit of output value of energy equipment to be higher than default unit at this time
Output value energy consumption, shows that use energy equipment is in improper energy, generates warning message, and Maintenance and Repair are carried out with energy equipment to this,
With reduce the use can equipment energy consumption, achieve the purpose that remove a hidden danger and energy saving.In the consumption information of inoperative period
When more than the second preset value, shows that this is likely to be at energy equipment and forget closed state, generating warning message simultaneously can set the use
It is standby to carry out checking inspection, to achieve the purpose that remove a hidden danger and energy saving.
Preferably, according to the different humitures in four seasons spring, summer, autumn and winter, adjustment working time section, non-working time section, first
Preset value and the second preset value.The humiture situation difference in four seasons autumn and winter early summer is apparent, and the length of daylight time is also inconsistent, because
And working time section, non-working time section, the first preset value and the second preset value are adjusted, it avoids because of Various Seasonal
Humiture or daylight time length it is inconsistent caused by energy consumption increase, and make consumption information be more than the first preset value or second
Preset value causes the generation of false alarm.
Fig. 2 is please referred to, Fig. 2 is the second embodiment of intelligent energy management method proposed by the present invention, is carried based on the present invention
The first embodiment of the intelligent energy management method gone out obtains abnormal consumption information and corresponds to when feedback result is "abnormal"
Monitoring point location information, warning message is generated according to feedback result and location information, and warning message is sent to terminal
Further include after step:
Step S500 summarizes the warning message that the second preset time internal feedback result is abnormal;
Step S600, it is the monitoring point that abnormal number is more than third preset value to obtain the second preset time internal feedback result
Corresponding energy equipment;
Step S700 repairs replacement with energy equipment more than third preset value to frequency of abnormity or emphasis monitors.
After warning message is uploaded to terminal, each history warning message tables of data with energy equipment is established, statistical analysis is each
There is the frequency of alarm condition with energy equipment, when the frequency for occurring alarm condition in the second preset time is higher than third preset value
When, emphasis supervision is carried out with energy equipment to this and safeguards or replace use energy equipment.If there is frequent alarm condition with energy equipment,
Emphasis supervision is carried out to it and safeguards the security risk that can effectively eliminate with energy equipment, while also can be energy saving.However frequently
Supervision maintenance work waste a large amount of human cost and time cost, if when human cost and excessively high time cost, can
This is replaced with energy equipment, achievees the purpose that maximization of economic benefit.
Further, in the 3rd embodiment of intelligent energy management method proposed by the present invention, when feedback result is " different
When often ", the location information of the corresponding monitoring point of abnormal consumption information is obtained, is generated and is alarmed according to feedback result and location information
Information, and warning message is given and further includes to after the step of terminal:
Warning message is sent to the mobile phone of the staff of monitoring point in the form of short message.
Terminal includes the personal information of staff in advance, and forms address list.Personal information includes identity information, mobile phone
Number and professional skill etc..After receiving warning message, staff is preferentially chosen from frequent contact, by warning message
It is sent on the mobile phone of the staff to match with alarm content, staff is made to be on the scene in time process problem.If often
When can not be shown up for some reason with the staff in contact person, then other staff is selected in address list to show up dimension
Shield maintenance.
Further, in the fourth embodiment of intelligent energy management method proposed by the present invention, each monitoring point is obtained
Consumption information in one preset time, wherein include before the step of consumption information is acquired by intelligent acquisition equipment:
Using for each monitoring point monitoring of typing can equipment and location information.
Advance typing respectively with the active power of energy equipment, reactive power, rated voltage, rated current, production capacity and uses energy
The relevant informations such as the location information of equipment, convenient for checking the feelings of use energy equipment in time after staff receives warning message
Condition, while the rapid specific location got with energy equipment, Maintenance and Repair are carried out to be on the scene in time.
Further, in the 5th embodiment of intelligent energy management method proposed by the present invention, each monitoring point is obtained
Consumption information in one preset time, wherein further include after the step of consumption information is acquired by intelligent acquisition equipment:
Consumption information is uploaded, and is stored as the historical energy consumption data of Time Continuous;
Specifically, consumption information is fabricated to the historical energy consumption data of Time Continuous, and with number, the shape of icon, figure
Formula is intuitively shown to staff's access, and can be by historical energy consumption data with Segment Report, daily sheet, weekly return, monthly magazine
The form of table or year report carries out printing or dish preserves.
Obtain the historical energy consumption data in each monitoring point third preset time;
Second energy consumption per unit of output value is calculated according to historical energy consumption data;
Same score is carried out according to the sequence of second energy consumption per unit of output value, or with second energy consumption per unit of output value of the history same period
Analysis, provides analysis report.
Preferably, it is carried out according to the sequence of second energy consumption per unit of output value or with second energy consumption per unit of output value of the history same period same
Include than the step of analyzing, providing analysis report:
It is arranged in order second energy consumption per unit of output value is descending, checks that second energy consumption per unit of output value is more than the 4th preset value
It is corresponding with monitoring point with can equipment, and provide conclusion be to can equipment carries out repair and maintenance and will use energy equipment tune
Shift to the analysis report used when energy prices low ebb;
Preferably, it is analyzed on year-on-year basis according to second energy consumption per unit of output value and second energy consumption per unit of output value of the history same period,
The step of providing analysis report include:
Second energy consumption per unit of output value and the history same period are analyzed on year-on-year basis, when second energy consumption per unit of output value is same higher than history
When the phase, it is the analysis report to carrying out repair and maintenance with energy equipment to provide conclusion.
Each second energy consumption per unit of output value with energy equipment in third preset time is subjected to sequence from large to small, is obtained
Each inside energy consumption ranking with energy equipment, in the top to internal energy consumption carries out repair and maintenance with energy equipment, checks high energy consumption
Caused by the reason of causing is equipment fault or incorrect use, and reform advice is provided according to the reason after checking.To reach
Energy equipment safety hidden danger and energy saving effect are used to eliminating.
Second energy consumption per unit of output value and second energy consumption per unit of output value of the history same period are analyzed on year-on-year basis, obtain same use
Energy equipment currently difference with second energy consumption per unit of output value when history same period in third preset time, if the second current unit
Output value energy consumption is higher than the history same period, then need to investigate thoroughly cause this with can the high reason of second energy consumption per unit of output value of equipment be with energy equipment
Aging, failure or incorrect use cause.
In the sixth embodiment of intelligent energy management method proposed by the present invention, each monitoring point third preset time is obtained
Further include after the step of interior historical energy consumption data:
Energy consumption cost is calculated, and will expend and be uploaded to end according to the point of energy prices, peak, gentle paddy four-stage
End;
According to historical energy consumption data and energy consumption cost, prediction energy trend, and terminal will be uploaded to energy trend.
Determine point, peak, the corresponding energy consumption of four different phases of gentle paddy, and according to the energy consumption calculation of price energy of four-stage
Consuming is used, realization remote meter reading, and according to the working condition with energy equipment, is specified and is reasonably used strategy with energy equipment.Such as
With can bigger drying equipment, which can be placed on work night energy consumption price it is relatively low when use, to reach maximum
Limit reduces the purpose of energy consumption cost.If also thering is worker to use the drying equipment in electricity consumption on the daytime spike period in actual production,
Early warning then is carried out to the behavior, adjusts strategy in time.
It was predicted according to the energy consumption cost and the energy consumption cost of the history same period of a upper period with energy trend.According to going through
History energy consumption data and energy consumption cost, prediction with can trend, sale of electricity company according to can trend determine electricity sales amount, user according to
Energy trend determines budgetary resources, achievees the purpose that rationally to utilize resource.
The present invention also provides a kind of intelligent terminals, please refer to Fig. 3, and in one embodiment, which includes memory
100, processor 200 and it is stored in the computer program that can be run on memory 100 and on processor 200, processor executes
The step of intelligent energy management method in any of the above-described embodiment is realized when computer program.
Specifically, for realizing following steps when processor 200 executes computer program:
Step S100 obtains the consumption information in the first preset time of each monitoring point, wherein consumption information is by intelligent acquisition
Equipment acquires.
It is single to obtain first when temporal information is working time section, and consumption information is more than the first preset value by step S200
Position output value energy consumption provides the feedback result of "abnormal" when first energy consumption per unit of output value is more than the default energy consumption per unit of output value.
Step S300 is provided " different when temporal information is non-working time section, and consumption information is more than the second preset value
Feedback result often ".
Step S400 obtains the position letter of the corresponding monitoring point of abnormal consumption information when feedback result is "abnormal"
Breath generates warning message according to feedback result and location information, and warning message is sent to terminal.
In technical scheme of the present invention, working hour use will be divided into energy equipment to work with inoperative period energy
When the consumption information of period is more than the first preset value, if this uses first energy consumption per unit of output value of energy equipment to be higher than default unit at this time
Output value energy consumption, shows that use energy equipment is in improper energy, generates warning message, and Maintenance and Repair are carried out with energy equipment to this,
With reduce the use can equipment energy consumption, achieve the purpose that remove a hidden danger and energy saving.In the consumption information of inoperative period
When more than the second preset value, shows that this is likely to be at energy equipment and forget closed state, generating warning message simultaneously can set the use
It is standby to carry out checking inspection, to achieve the purpose that remove a hidden danger and energy saving.
Preferably, according to the different humitures in four seasons spring, summer, autumn and winter, adjustment working time section, non-working time section, first
Preset value and the second preset value.The humiture situation difference in four seasons autumn and winter early summer is apparent, and the length of daylight time is also inconsistent, because
And working time section, non-working time section, the first preset value and the second preset value are adjusted, it avoids because of Various Seasonal
Humiture or daylight time length it is inconsistent caused by energy consumption increase, and make consumption information be more than the first preset value or second
Preset value causes the generation of false alarm.
Further, processor 200, when feedback result is "abnormal", obtains abnormal when executing computer program
The location information of the corresponding monitoring point of consumption information generates warning message according to feedback result and location information, and by alarm signal
Breath is sent further includes to after the step of terminal:
Step S500 summarizes the warning message that the second preset time internal feedback result is abnormal;
Step S600, it is the monitoring point that abnormal number is more than third preset value to obtain the second preset time internal feedback result
Corresponding energy equipment;
Step S700 repairs replacement with energy equipment more than third preset value to frequency of abnormity or emphasis monitors.
After warning message is uploaded to terminal, each history warning message tables of data with energy equipment is established, statistical analysis is each
There is the frequency of alarm condition with energy equipment, when the frequency for occurring alarm condition in the second preset time is higher than third preset value
When, emphasis supervision is carried out with energy equipment to this and safeguards or replace use energy equipment.If there is frequent alarm condition with energy equipment,
Emphasis supervision is carried out to it and safeguards the security risk that can effectively eliminate with energy equipment, while also can be energy saving.However frequently
Supervision maintenance work waste a large amount of human cost and time cost, if when human cost and excessively high time cost, can
This is replaced with energy equipment, achievees the purpose that maximization of economic benefit.
Further, when feedback result is "abnormal", the position letter of the corresponding monitoring point of abnormal consumption information is obtained
Breath generates warning message according to feedback result and location information, and warning message is sent to terminal:
Warning message is sent to the mobile phone of the staff of monitoring point in the form of short message.
Terminal includes the personal information of staff in advance, and forms address list.Personal information includes identity information, mobile phone
Number and professional skill etc..After receiving warning message, staff is preferentially chosen from frequent contact, by warning message
It is sent on the mobile phone of the staff to match with alarm content, staff is made to be on the scene in time process problem.If often
When can not be shown up for some reason with the staff in contact person, then other staff is selected in address list to show up dimension
Shield maintenance.
Further, the consumption information in the first preset time of each monitoring point is obtained, wherein consumption information is by intelligent acquisition
Include before the step of equipment acquires:
Using for each monitoring point monitoring of typing can equipment and location information.
Advance typing respectively with the active power of energy equipment, reactive power, rated voltage, rated current, production capacity and uses energy
The relevant informations such as the location information of equipment, convenient for checking the feelings of use energy equipment in time after staff receives warning message
Condition, while the rapid specific location got with energy equipment, Maintenance and Repair are carried out to be on the scene in time.
Further, the consumption information in the first preset time of each monitoring point is obtained, wherein consumption information is by intelligent acquisition
Further include after the step of equipment acquires:
Consumption information is uploaded, and is stored as the historical energy consumption data of Time Continuous;
Specifically, consumption information is fabricated to the historical energy consumption data of Time Continuous, and with number, the shape of icon, figure
Formula is intuitively shown to staff's access, and can be by historical energy consumption data with Segment Report, daily sheet, weekly return, monthly magazine
The form of table or year report carries out printing or dish preserves.
Obtain the historical energy consumption data in each monitoring point third preset time;
Second energy consumption per unit of output value is calculated according to historical energy consumption data;
Same score is carried out according to the sequence of second energy consumption per unit of output value, or with second energy consumption per unit of output value of the history same period
Analysis, provides analysis report.
Preferably, it is carried out according to the sequence of second energy consumption per unit of output value or with second energy consumption per unit of output value of the history same period same
Include than the step of analyzing, providing analysis report:
It is arranged in order second energy consumption per unit of output value is descending, checks that second energy consumption per unit of output value is more than the 4th preset value
It is corresponding with monitoring point with can equipment, and provide conclusion be to can equipment carries out repair and maintenance and will use energy equipment tune
Shift to the analysis report used when energy prices low ebb;
Preferably, it is analyzed on year-on-year basis according to second energy consumption per unit of output value and second energy consumption per unit of output value of the history same period,
The step of providing analysis report include:
Second energy consumption per unit of output value and the history same period are analyzed on year-on-year basis, when second energy consumption per unit of output value is same higher than history
When the phase, it is the analysis report to carrying out repair and maintenance with energy equipment to provide conclusion.
Each second energy consumption per unit of output value with energy equipment in third preset time is subjected to sequence from large to small, is obtained
Each inside energy consumption ranking with energy equipment, in the top to internal energy consumption carries out repair and maintenance with energy equipment, checks high energy consumption
Caused by the reason of causing is equipment fault or incorrect use, and reform advice is provided according to the reason after checking.To reach
Energy equipment safety hidden danger and energy saving effect are used to eliminating.
Second energy consumption per unit of output value and second energy consumption per unit of output value of the history same period are analyzed on year-on-year basis, obtain same use
Energy equipment currently difference with second energy consumption per unit of output value when history same period in third preset time, if the second current unit
Output value energy consumption is higher than the history same period, then need to investigate thoroughly cause this with can the high reason of second energy consumption per unit of output value of equipment be with energy equipment
Aging, failure or incorrect use cause.
Further, further include after the step of obtaining the historical energy consumption data in each monitoring point third preset time:
Energy consumption cost is calculated, and will expend and be uploaded to end according to the point of energy prices, peak, gentle paddy four-stage
End;
According to historical energy consumption data and energy consumption cost, prediction energy trend, and terminal will be uploaded to energy trend.
Determine point, peak, the corresponding energy consumption of four different phases of gentle paddy, and according to the energy consumption calculation of price energy of four-stage
Consuming is used, realization remote meter reading, and according to the working condition with energy equipment, is specified and is reasonably used strategy with energy equipment.Such as
With can bigger drying equipment, which can be placed on work night energy consumption price it is relatively low when use, to reach maximum
Limit reduces the purpose of energy consumption cost.If also thering is worker to use the drying equipment in electricity consumption on the daytime spike period in actual production,
Early warning then is carried out to the behavior, adjusts strategy in time.
It was predicted according to the energy consumption cost and the energy consumption cost of the history same period of a upper period with energy trend.According to going through
History energy consumption data and energy consumption cost, prediction with can trend, sale of electricity company according to can trend determine electricity sales amount, user according to
Energy trend determines budgetary resources, achievees the purpose that rationally to utilize resource.
In the description of this specification, reference term " embodiment ", " another embodiment ", " other embodiment " or "
The description of one embodiment~X embodiment " etc. mean specific features described in conjunction with this embodiment or example, structure, material or
Person's feature is included at least one embodiment or example of the invention.In the present specification, to the schematic table of above-mentioned term
It states and may not refer to the same embodiment or example.Moreover, specific features, structure, material, method and step or the spy of description
Point can be combined in any suitable manner in any one or more of the embodiments or examples.
It should be noted that herein, the terms "include", "comprise" or its any other variant are intended to non-row
His property includes, so that process, method, article or device including a series of elements include not only those elements, and
And further include other elements that are not explicitly listed, or further include for this process, method, article or device institute it is intrinsic
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including this
There is also other identical elements in the process of element, method, article or device.
The embodiments of the present invention are for illustration only, can not represent the quality of embodiment.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side
Method can add the mode of required general hardware platform to realize by software, naturally it is also possible to by hardware, but in many cases
The former is more preferably embodiment.Based on this understanding, technical scheme of the present invention substantially in other words does the prior art
Going out the part of contribution can be expressed in the form of software products, which is stored in a storage medium
In (such as ROM/RAM, magnetic disc, CD), including some instructions are used so that a station terminal (can be mobile phone, computer, service
Device, air conditioner or network equipment etc.) execute method described in each embodiment of the present invention.
The embodiment of the present invention is described with above attached drawing, but the invention is not limited in above-mentioned specific
Embodiment, the above mentioned embodiment is only schematical, rather than restrictive, those skilled in the art
Under the inspiration of the present invention, without breaking away from the scope protected by the purposes and claims of the present invention, it can also make very much
Form, all of these belong to the protection of the present invention.