CN113034997A - Train traction control simulation system - Google Patents

Train traction control simulation system Download PDF

Info

Publication number
CN113034997A
CN113034997A CN201911360666.7A CN201911360666A CN113034997A CN 113034997 A CN113034997 A CN 113034997A CN 201911360666 A CN201911360666 A CN 201911360666A CN 113034997 A CN113034997 A CN 113034997A
Authority
CN
China
Prior art keywords
unit
competition
simulation
wiring
traction control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201911360666.7A
Other languages
Chinese (zh)
Other versions
CN113034997B (en
Inventor
冯献华
艾彬
尹俊磊
寅宝宝
宋琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Think Freely Hi Tech Co ltd
Original Assignee
Zhengzhou Think Freely Hi Tech Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Think Freely Hi Tech Co ltd filed Critical Zhengzhou Think Freely Hi Tech Co ltd
Priority to CN201911360666.7A priority Critical patent/CN113034997B/en
Publication of CN113034997A publication Critical patent/CN113034997A/en
Application granted granted Critical
Publication of CN113034997B publication Critical patent/CN113034997B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B9/00Simulators for teaching or training purposes

Abstract

The invention relates to a train traction control simulation system, which comprises a host, a training unit, a competition operating machine, a braking equipment simulation unit, an actual operation simulation control unit and a first execution unit, wherein the training unit is connected with the first execution unit; the main machine is connected with the training unit and the competition operating machine, and the training unit and the competition operating machine are connected through a connecting line by a competition personnel; the host determines corresponding operation logic according to the competition questions and sends the operation logic to the training unit; the practical training unit comprises a practical training controller and a wiring terminal, and generates a corresponding switching value signal on the wiring terminal according to the operation logic control; the competition operating machine collects the switching value signals on the wiring terminal and sends the switching value signals to the host machine; the actual operation simulation control unit is connected with the braking equipment simulation unit, the host and the first execution unit and is used for realizing the locomotive traction control simulation operation. The invention can automatically judge whether the wiring of the competition personnel is correct, avoids the condition of high difficulty through manual confirmation, can skip the wiring part to directly carry out simulation operation test under the condition of wrong wiring, and has strong practicability.

Description

Train traction control simulation system
Technical Field
The invention relates to a train traction control simulation system, and belongs to the technical field of teaching equipment.
Background
The train traction control system is a related control circuit system designed for realizing train traction related functions, controls the start of a train and is a key component in each system of the train. At present, a course of urban rail transit is developed in many vocational schools, and a train traction control system is one of important teaching contents of the course.
In order to examine the mastering condition of the trainee on the train traction control system, the trainee can examine the abilities of the trainee in multiple aspects of equipment installation, wiring, debugging operation and the like through a competition mode. However, because the whole train traction control system has more switches, plugs, electromagnetic valves and other devices and a complex wiring process, for the existing train traction control simulation system, in the competition, the competitors are difficult to finish all wiring parts within a limited time, and because the wiring is more and complex, under the condition of finishing the wiring, the competitors are difficult to manually determine whether the wiring is correct. In addition, when the wiring of the participants is incorrect, the testing in the aspects of next simulation operation and the like cannot be carried out, so that the testing cannot be continued.
Disclosure of Invention
The invention aims to provide a train traction control simulation system, which is used for solving the problem that the existing train traction control simulation system cannot be tested next time under the condition of wrong wiring.
In order to solve the above technical problem, the present invention provides a train traction control simulation system, including: the system comprises a host, a training unit and a competition operating machine; the main machine is in communication connection with the training unit and the competition operating machine, and the training unit and the competition operating machine are connected through wires by competition personnel; the host is used for determining corresponding operation logic according to the competition questions and sending the operation logic to the practical training unit;
the training unit comprises a training controller and a wiring terminal; the practical training controller is used for receiving the operation logic and controlling the terminal to generate a corresponding switching value signal according to the operation logic;
the competition operating machine is used for acquiring switching value signals on the wiring end and sending the switching value signals to the host;
the locomotive traction control simulation system further comprises a brake equipment simulation unit, an actual operation simulation control unit and a first execution unit, wherein the actual operation simulation control unit is connected with the brake equipment simulation unit, the host and the first execution unit and is used for realizing locomotive traction control simulation operation.
The invention has the beneficial effects that: during competition, the host machine determines corresponding operation logic according to the competition question and sends the operation logic to the practical training control panel, and the practical training control panel simulates a corresponding switching value signal according to the operation logic; the competition personnel carry out the wiring between wiring end and competition operation machine, and when the wiring is correct, the competition operation machine just can gather these switching value signals, otherwise just can not gather these switching value signals, and the host computer just can know whether the personnel of participating in the competition are worked a telephone switchboard correctly through the switching value signal that gathers to the competition operation machine. In addition, under the condition that the wiring of the competitor is wrong, the wiring part and the actual operation control test are separately arranged, so that the wiring part of the competitor can be skipped, and the simulation operation of the locomotive traction control is realized by directly adopting the brake equipment simulation unit, the actual operation simulation control unit, the host and the first execution unit. The invention can automatically judge whether the wiring of the competition personnel is correct, thereby avoiding the situation of high difficulty through manual confirmation, improving the efficiency and facilitating the popularization and application; and under the condition that the contestant connects wrong line, can skip the contestant part of working a telephone switchboard and directly carry out the simulation operation test, the practicality is stronger.
Furthermore, in order to further feed back whether the wiring of the competition personnel is correct, the competition operating machine is connected with a second execution unit.
Furthermore, in order to further feed back whether the competitor is correctly wired, the wiring terminal is connected with a second execution unit.
Furthermore, in order to facilitate visual judgment, the first execution unit and the second execution unit respectively comprise a relay, a diode and a status indicator lamp.
Further, in order to facilitate arrangement, the practical training controller is arranged on the control board, and the wiring terminal is arranged on the wiring board.
Further, the host computer is a PC, and the competition operating machine is a PLC module.
Further, the brake equipment simulation unit comprises a brake cabinet and a low-voltage electrical appliance cabinet.
Drawings
Fig. 1 is a configuration diagram of a train traction control simulation system of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
As shown in fig. 1, the present embodiment provides a train traction control simulation system, which includes a console, a computer host (PC), a PLC module, a practical training unit and an execution unit, where the practical training unit includes a practical training control board and a terminal board. The control console is connected with a computer host through a network, the computer host is connected with the practical training control panel and the PLC module through a COM interface, and the PLC module is connected with the execution unit. The train traction control simulation system also comprises a brake equipment simulation unit and an actual operation simulation control unit, wherein the actual operation simulation control unit is connected with the brake equipment simulation unit, the computer host and the execution unit.
The practical training control board is used for realizing main functions (described in detail below) of the practical training unit, various external signals (for externally connecting the PLC module) of the practical training control board are connected to the wiring board, and the wiring board is used for realizing signal conversion (for example, impedance matching, level conversion and the like) between the practical training control board and the PLC module. In this embodiment, the practical training control board and the terminal board are separated, mainly because: the personnel of competing in need carry out the line between PLC module and real standard control panel, and the personnel of competing only fiddles the wiring board of irrelevant key function when the wiring, avoids the operation in-process mistake to touch the key component on the real standard control panel. Of course, as other embodiments, the terminal board may be integrated with the practical training control board.
The brake equipment simulation unit comprises a brake cabinet and a low-voltage electrical appliance cabinet, and analog quantity signals and switching quantity signals in the brake cabinet and the low-voltage electrical appliance cabinet are sent to the actual operation simulation control unit. The real operation simulation control unit comprises a simulation control panel, a switch panel and a real operation controller, wherein the real operation controller is in communication connection with the computer host, is connected with the braking equipment simulation unit through the simulation control panel or the switch panel, and is connected with the execution unit through the simulation control panel or the switch panel. The brake equipment simulation unit, the actual operation simulation control unit, the console, the computer host and the execution unit are mutually matched, so that the locomotive traction control simulation operation can be realized.
The execution unit comprises a relay, a diode and a status indicator lamp and is used for simulating whether the locomotive actually executes equipment to act or not. In this embodiment, the real operation simulation control unit and the PLC module are connected to the same set of execution unit, as another embodiment, the real operation simulation control unit and the PLC module may also be connected to their respective execution units, and at this time, the specific structures of the two sets of execution units may be the same or may not be the same.
The working principle of the train traction control simulation system is as follows:
1. wiring test
Firstly, inputting a competition question on an operation console, and issuing the competition question to a computer host by the operation console; and the host computer receives the competition questions issued by the console, determines corresponding operation logic according to the stored mapping relation, and sends the operation logic to the practical training control panel according to the information which should be acquired by the PLC module corresponding to the operation logic. The practical training control panel is provided with a processor, and after receiving the operation logic, the practical training control panel can generate corresponding switching value signals which are reflected on the wiring board.
Then, the competitor connects the PLC module and the wiring board; if the personnel of participating in the contest wiring is correct, then the PLC module just can gather these switching value signals correctly.
Then, the PLC module transmits the collected switching value signal (whether the switching value signal is correct or not) to the computer host through the COM port. The host computer not only stores the mapping relation between the competition questions and the operation logic, but also stores the correct switching value signals (namely correct acquisition information) under the corresponding operation logic. Therefore, the computer host can judge whether the wiring of the competitor is correct.
And finally, the computer sends the judgment result of whether the wiring of the competition personnel is correct to the console, and the console displays the judgment result.
That is, in a competition test, a competitor can operate on the PLC module, for example, design a schematic diagram according to a competition question, determine a corresponding operation logic according to the schematic diagram, and perform wiring between the PLC module and a wiring board according to the operation logic. For a certain competition subject, when the operation logic designed by the competition personnel is correct, namely the designed operation logic is the same as the operation logic stored in the computer host, and the wiring between the PLC module and the wiring board is also correct, at the moment, the PLC module can acquire the switching value signal which is generated by the simulation of the practical training control board and corresponds to the operation logic. When the wiring of the competitor is correct, the corresponding devices in the execution unit work, for example, a relay is closed, and a status indicator lamp is lighted.
The PLC module sends the collected switching value signals to the host computer, and the host computer compares the received switching value signals with the information which is stored by the host computer and is required to be collected by the PLC module, so that whether the operation logic design and the wiring of the competitor are correct or not can be known, and the result is sent to the console. And the console displays the corresponding connection result.
It should be noted that, in this embodiment, the competitor only needs to perform wiring between the PLC module and the wiring board, and all other lines are connected in advance. As another embodiment, in order to further investigate the wiring capability of the contestants, the contestants may connect the lines between the practical training control board and the connection board and between the PLC module and the execution unit.
In addition, as other embodiments, the execution unit can be connected to a wiring board or a practical training control board; adopt the mode of fixed connection, perhaps let the personnel of participating in the contest connect to examine the personnel's of participating in the contest ability.
The following describes the process of the wiring test with reference to specific examples:
and selecting a competition item on the console to control the pantograph to lift, and sending the competition item to the host computer. And the host computer determines the corresponding operation logics of closing the relays K1 and K2 and opening the relay K3 according to the competition questions. The personnel of participating in the race are through working a telephone switchboard between wiring board and PLC module, make the PLC module can gather above-mentioned operating logic, and can gather this operating logic, and the key lies in that the personnel of participating in the race can correctly design the schematic diagram and correctly work a telephone switchboard.
After the operation logic information is generated, the computer host sends the operation logic to the practical training control panel. In order to close the relays K1 and K2 and open the relay K3, the PLC module acquires the operation logic, and the practical training control board needs to be simulated. The simulation mode is to generate a switching value signal, and the PLC module collects the switching value signal. For the operating logic that relays K1 and K2 are closed and relay K3 is open, it is necessary to generate switching quantities a-1, B-1 and C-0. Corresponding to the wiring board, 1 is obtained on the a terminal, 1 is obtained on the B terminal, and 0 is obtained on the C terminal.
If the wiring of the competitor is correct, an x terminal of the x, y and z terminals on the PLC module is connected with an A terminal, a y terminal of the x terminal is connected with a B terminal, a z terminal of the z terminal is connected with a C terminal, at the moment, x is 1, y is 1, z is 0, and a status indicator lamp for displaying the pantograph lifting in the execution unit is turned on. The PLC module sends the collected information of x 1, y 1 and z 0 to the host computer, and the host computer compares the received information with the information stored by the host computer, so that the wiring of the participators can be judged to be correct. The information stored in the PLC module is the operation logic of closing the corresponding relays K1 and K2 and opening the corresponding relay K3, and the PLC module is required to acquire the information. The computer host sends the correct wiring information to the console, and an icon indicating that the pantograph successfully rises is displayed on the console.
If the personnel of participating in the race wiring is wrong, the PLC module just can't gather x 1, y 1, z 0 this information, is used for showing the pantograph in the execution unit and rises the status indicator lamp of bow and not light. The computer host can know that the match personnel are in wrong wiring through comparison, and sends the wrong wiring information to the console, and an icon indicating that the pantograph fails to rise is displayed on the console.
2. Actual operation test
On the basis of wiring test, when the wiring of the participants is correct, the locomotive traction control simulation operation can be realized by adopting the wiring scheme of the participants and utilizing the mutual cooperation of the console, the computer host, the training unit, the PLC module and the execution unit. When the wiring of the competition personnel is incorrect, the wiring part of the competition personnel can be skipped, and the locomotive traction control simulation operation can be realized by directly utilizing the brake equipment simulation unit, the real operation simulation control unit, the control console, the computer host and the execution unit.
When the competitor adopts the wiring scheme, the corresponding traction operation item is selected through the console and is sent to the computer host. The computer host sends the traction operation items to the PLC module, and the PLC module collects signals corresponding to the practical training unit (the signals are simulated in advance by the practical training unit according to operation logics issued by the computer host), performs corresponding logical operation, and controls the execution unit to act so as to complete the locomotive traction control simulation operation.
When the competitor does not adopt the wiring scheme, the corresponding traction operation item is selected through the console and is sent to the computer host. The computer host sends the traction operation item to the real operation simulation control unit, and the real operation simulation control unit acquires a corresponding signal of the brake equipment simulation unit, performs corresponding logical operation, and controls the execution unit to act so as to complete the locomotive traction control simulation operation.

Claims (7)

1. A train traction control simulation system, comprising: the system comprises a host, a training unit and a competition operating machine; the main machine is in communication connection with the training unit and the competition operating machine, and the training unit and the competition operating machine are connected through wires by competition personnel; the host is used for determining corresponding operation logic according to the competition questions and sending the operation logic to the practical training unit;
the training unit comprises a training controller and a wiring terminal; the practical training controller is used for receiving the operation logic and controlling the terminal to generate a corresponding switching value signal according to the operation logic;
the competition operating machine is used for acquiring switching value signals on the wiring end and sending the switching value signals to the host;
the locomotive traction control simulation system further comprises a brake equipment simulation unit, an actual operation simulation control unit and a first execution unit, wherein the actual operation simulation control unit is connected with the brake equipment simulation unit, the host and the first execution unit and is used for realizing locomotive traction control simulation operation.
2. The train traction control simulation system of claim 1, wherein a second execution unit is connected to the racing operator.
3. The train traction control simulation system according to claim 1, wherein a second execution unit is connected to the terminal.
4. The train traction control simulation system according to claim 2 or 3, wherein the first and second execution units each comprise a relay, a diode, and a status indicator light.
5. The train traction control simulation system according to any one of claims 1 to 3, wherein the training controller is provided on a control board, and the terminal is provided on a terminal block.
6. The train traction control simulation system according to any one of claims 1 to 3, wherein the host is a PC and the race operator is a PLC module.
7. The train traction control simulation system according to any one of claims 1 to 3, wherein the brake equipment simulation unit includes a brake cabinet and a low-voltage electrical cabinet.
CN201911360666.7A 2019-12-25 2019-12-25 Train traction control simulation system Active CN113034997B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911360666.7A CN113034997B (en) 2019-12-25 2019-12-25 Train traction control simulation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911360666.7A CN113034997B (en) 2019-12-25 2019-12-25 Train traction control simulation system

Publications (2)

Publication Number Publication Date
CN113034997A true CN113034997A (en) 2021-06-25
CN113034997B CN113034997B (en) 2023-09-22

Family

ID=76458436

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911360666.7A Active CN113034997B (en) 2019-12-25 2019-12-25 Train traction control simulation system

Country Status (1)

Country Link
CN (1) CN113034997B (en)

Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU918962A1 (en) * 1980-08-04 1982-04-07 Рижское Высшее Военно-Политическое Краснознаменное Училище Им.Маршала Советского Союза Бирюзова С.С. Control system operator simulator
US6674259B1 (en) * 2000-10-06 2004-01-06 Innovation First, Inc. System and method for managing and controlling a robot competition
KR20090005371U (en) * 2007-11-30 2009-06-03 (주) 이더 The training apparatus for controlling electrical assembly
CN102054377A (en) * 2010-11-24 2011-05-11 江苏省电力试验研究院有限公司 Remote simulation training system for electrical tests of transformer
JP2013034765A (en) * 2011-08-10 2013-02-21 Sanica:Kk Training system having competition function
CN104809946A (en) * 2015-04-26 2015-07-29 李力 Intelligent teaching and checking system for electrical control experimental training
CN204791764U (en) * 2015-07-20 2015-11-18 江苏汇博机器人技术有限公司 Professional contest system of intelligence vision industrial robot letter sorting vanning
CN106373448A (en) * 2016-10-08 2017-02-01 深圳国泰安教育技术股份有限公司 Automotive electronic wiring experimental device and method
CN205985491U (en) * 2016-06-30 2017-02-22 西安蓝钻电子科技有限公司 Binding post convenient to discernment wiring is accurate
WO2017055982A1 (en) * 2015-09-30 2017-04-06 Tyco Electronics (Shanghai) Co. Ltd. Intelligent connector module and bus control system
CN206179358U (en) * 2016-09-23 2017-05-17 浙江德龙科教设备有限公司 Automatic change wiring examination appraisal system
CN206460714U (en) * 2016-12-03 2017-09-01 河南工程学院 One kind teaching, contest PLC industry control training platforms
CN108122446A (en) * 2016-11-29 2018-06-05 中车大同电力机车有限公司 A kind of motorcycle pantograph control function experimental rig and method
CN108806410A (en) * 2018-08-27 2018-11-13 四川胜驾科技有限公司 A kind of student's Behavior adjustment method applied to two right-angled bend of subject
CN109697910A (en) * 2019-02-21 2019-04-30 江苏工程职业技术学院 A kind of electric automatization teaching experiment real training integration unit
CN109801531A (en) * 2019-03-01 2019-05-24 杭州电子科技大学 A kind of training of chemical industry emergency drilling and wire examination method based on virtual reality
CN110176170A (en) * 2019-05-31 2019-08-27 广州市轻工高级技工学校 A kind of train traction control circuit wiring actual training device
US10490103B1 (en) * 2016-11-14 2019-11-26 Realityworks, Inc. Electrical wiring training kit and method of training
CN110517549A (en) * 2019-08-29 2019-11-29 宁波工程学院 Electronic Design Competition training platform and its training application method
KR20190139468A (en) * 2018-06-08 2019-12-18 (주)앤츠 Plc switch board and method for controlling plc switch board

Patent Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU918962A1 (en) * 1980-08-04 1982-04-07 Рижское Высшее Военно-Политическое Краснознаменное Училище Им.Маршала Советского Союза Бирюзова С.С. Control system operator simulator
US6674259B1 (en) * 2000-10-06 2004-01-06 Innovation First, Inc. System and method for managing and controlling a robot competition
KR20090005371U (en) * 2007-11-30 2009-06-03 (주) 이더 The training apparatus for controlling electrical assembly
CN102054377A (en) * 2010-11-24 2011-05-11 江苏省电力试验研究院有限公司 Remote simulation training system for electrical tests of transformer
JP2013034765A (en) * 2011-08-10 2013-02-21 Sanica:Kk Training system having competition function
CN104809946A (en) * 2015-04-26 2015-07-29 李力 Intelligent teaching and checking system for electrical control experimental training
CN204791764U (en) * 2015-07-20 2015-11-18 江苏汇博机器人技术有限公司 Professional contest system of intelligence vision industrial robot letter sorting vanning
WO2017055982A1 (en) * 2015-09-30 2017-04-06 Tyco Electronics (Shanghai) Co. Ltd. Intelligent connector module and bus control system
CN205985491U (en) * 2016-06-30 2017-02-22 西安蓝钻电子科技有限公司 Binding post convenient to discernment wiring is accurate
CN206179358U (en) * 2016-09-23 2017-05-17 浙江德龙科教设备有限公司 Automatic change wiring examination appraisal system
CN106373448A (en) * 2016-10-08 2017-02-01 深圳国泰安教育技术股份有限公司 Automotive electronic wiring experimental device and method
US10490103B1 (en) * 2016-11-14 2019-11-26 Realityworks, Inc. Electrical wiring training kit and method of training
CN108122446A (en) * 2016-11-29 2018-06-05 中车大同电力机车有限公司 A kind of motorcycle pantograph control function experimental rig and method
CN206460714U (en) * 2016-12-03 2017-09-01 河南工程学院 One kind teaching, contest PLC industry control training platforms
KR20190139468A (en) * 2018-06-08 2019-12-18 (주)앤츠 Plc switch board and method for controlling plc switch board
CN108806410A (en) * 2018-08-27 2018-11-13 四川胜驾科技有限公司 A kind of student's Behavior adjustment method applied to two right-angled bend of subject
CN109697910A (en) * 2019-02-21 2019-04-30 江苏工程职业技术学院 A kind of electric automatization teaching experiment real training integration unit
CN109801531A (en) * 2019-03-01 2019-05-24 杭州电子科技大学 A kind of training of chemical industry emergency drilling and wire examination method based on virtual reality
CN110176170A (en) * 2019-05-31 2019-08-27 广州市轻工高级技工学校 A kind of train traction control circuit wiring actual training device
CN110517549A (en) * 2019-08-29 2019-11-29 宁波工程学院 Electronic Design Competition training platform and its training application method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李哲英: "模拟电子分析与设计技术的进展", no. 01, pages 36 - 38 *

Also Published As

Publication number Publication date
CN113034997B (en) 2023-09-22

Similar Documents

Publication Publication Date Title
RU2617972C1 (en) Simulator for operational and maintenance staff on the basis of virtual reality models of transformer substation
CN111459138B (en) Turnout fault testing system
CN204965090U (en) Integrated multiple fault type's intelligent fault injection system
CN103258452A (en) Virtuality and reality combination urban railway transit analog simulation practical training device and method
CN106297504A (en) Engineer equipment automatically controlled simulated teaching examination training system
CN109830138B (en) Radar equipment simulation training system
CN103745630A (en) Trackside simulation method and system
CN103913728B (en) A kind of method of testing based on portable radar comprehensive tester
CN212410719U (en) Outdoor signal equipment simulation testing device
CN106781928B (en) Virtual-real combined crane electric control simulation system
CN113034997B (en) Train traction control simulation system
CN106652646B (en) Ship power system embedded simulation training system based on actual monitoring system
CN108445286A (en) A kind of three-phase four-wire system electrical energy meter fault simulator
CN113031504A (en) Train traction control simulation system
CN201359510Y (en) Railway signal interlocking testing and detecting system
CN214585770U (en) Semaphore analogue test device for railway signal system analogue test
CN201465353U (en) Demonstration device for terminating fault of twisted pair
CN212847225U (en) Rail transit signal relay simulation device
CN109584663B (en) Training examination system for simulating fault elimination of train
CN209446703U (en) A kind of student's wiring check device
CN202758045U (en) Apparatus used for detecting drive circuit of electromagnetic induction
CN201060590Y (en) Liquid crystal television fault setting and training examiner
CN215493868U (en) Cab electric appliance detection equipment
CN113487932A (en) Bus engine teaching and training system
CN105336232A (en) Intelligent multimedia interactive teaching and assessment system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant