CN113006456B - Ultrahigh-rise unequal-height ring beam clamp type hanging basket support and construction method thereof - Google Patents

Ultrahigh-rise unequal-height ring beam clamp type hanging basket support and construction method thereof Download PDF

Info

Publication number
CN113006456B
CN113006456B CN202110266110.2A CN202110266110A CN113006456B CN 113006456 B CN113006456 B CN 113006456B CN 202110266110 A CN202110266110 A CN 202110266110A CN 113006456 B CN113006456 B CN 113006456B
Authority
CN
China
Prior art keywords
support
hanging basket
fixed
frame
frame support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110266110.2A
Other languages
Chinese (zh)
Other versions
CN113006456A (en
Inventor
王亚桥
胡飞
史晓亮
温杰
彭云涛
苏致琦
王新双
张�浩
魏恒
刘鸿志
曾庆峰
韩磊
慕志涛
吴慧林
刘恒
祝磊
陈橄
宋家保
明瑞宇
高峰
陈振华
张轻周
郭康康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Bureau Group Co Ltd
China Construction Third Engineering Bureau Science and Innovation Industry Development Co Ltd
Original Assignee
China Construction Third Bureau Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Bureau Construction Engineering Co Ltd filed Critical China Construction Third Bureau Construction Engineering Co Ltd
Priority to CN202110266110.2A priority Critical patent/CN113006456B/en
Publication of CN113006456A publication Critical patent/CN113006456A/en
Application granted granted Critical
Publication of CN113006456B publication Critical patent/CN113006456B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/34Mobile scaffolds; Scaffolds with mobile platforms characterised by supporting structures provided on the roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/045Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on profiles, e.g. I or H profiles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a hoop type hanging basket support for a super high-rise unequal-height ring beam and a construction method thereof, wherein the hoop type hanging basket support comprises two frame supports (1) which are arranged in parallel, two adjusting plates (2) are arranged on each frame support (1), and a support rod (4) and a connecting support are respectively arranged between the two adjusting plates (2) at corresponding positions; a fixed support (5) is arranged at the upper end of the frame support (1), an overhanging support arm (6) is arranged on the fixed support (5), two ends of the overhanging support arm (6) are provided with rolling wheels (7), and a pull rope is wound on each rolling wheel (7); the pull rope is connected with the hanging basket (8). According to the invention, the hanging basket and the frame support are separately arranged, and the frame support is attached to the inclination of the ring beam, so that when the position of the frame support is manually adjusted, the stability of the hanging basket is conveniently ensured, the safety and the accuracy of construction are improved, and the construction quality and the construction efficiency are improved.

Description

Ultrahigh-rise unequal-height ring beam clamp type hanging basket support and construction method thereof
Technical Field
The invention relates to the technical field of curtain wall construction, in particular to a hoop type hanging basket support for a super high-rise unequal-height ring beam and a construction method thereof.
Background
The construction of the curtain wall of the super high-rise generally uses an electric hanging basket as a construction measure, and the problems of overhigh ring beam height, roof waterproof synchronous construction, high-height inclined ring beam of the roof ring beam and the like can be faced in the construction of the curtain wall above a roof layer, so that the hanging basket cannot fall on a roof panel by a conventional suspension mechanism, a balance weight and the like in the erecting mode of the hanging basket, and therefore, the hanging basket support can slide under the action of gravity in the high-height inclined ring beam.
Disclosure of Invention
The invention aims to solve the technical problem of providing a super high-rise unequal-height gird clamp type hanging basket support capable of preventing slippage and a construction method thereof.
The technical scheme of the invention is as follows:
a hoop type hanging basket support of a super high-rise unequal-height ring beam comprises two frame supports which are arranged in parallel, wherein four vertical sections are symmetrically arranged on the left and right of each frame support, two adjusting plates are arranged on each vertical section of each frame support along the vertical direction, a supporting rod is arranged between each two adjusting plates on the same vertical section in a butting mode, and a left connecting support is arranged between each two adjusting plates on the corresponding position on each vertical section at the left end; a right connecting support is arranged between two adjusting plates at corresponding positions on two vertical sections at the right end, and the left connecting support and the right connecting support have the same structure; nine positioning holes are axially formed in each adjusting plate, through holes are formed in the positions, corresponding to the positioning holes, of the vertical sections, threaded holes are formed in two ends of each connecting support, and fixing bolts extend into the through holes, penetrate through the positioning holes in the corresponding positions and are fixedly connected with the threaded holes in a threaded mode so as to fix and limit the connecting supports; a fixed support is fixed at the upper end of the frame support in a threaded manner, an overhanging support arm is fixed on the fixed support in a threaded manner, two ends of the overhanging support arm are respectively provided with a winding wheel connected with a motor, and a pull rope is wound on each winding wheel; two stay cords of same one end on two cantilever support arms are connected with a hanging flower basket.
By adopting the structure, the upper end of the frame support is provided with the fixed support, the lower end of the frame support is in an opening shape, and the frame support is sleeved and clamped on the ring beam from top to bottom, the position of the connecting support at the corresponding position on the adjusting plate is adjusted according to the inclination of the ring beam so that the connecting support is fixed by being attached to the ring beam, the hanging basket is driven by the winding wheel to lift, the belt operator is close to the frame support so as to adjust the position of the connecting support at any time and ensure the safety of curtain wall construction; in this in-process, hanging flower basket and frame support separate operation each other, the inclination of collar tie beam and linking bridge's adjustment can not influence the balanced stability of hanging flower basket operation, ensures the stability that the hanging flower basket removed, can use at least one framework support on the collar tie beam, satisfies the demand of installing the hanging flower basket on slant roofing collar tie beam, simple structure, convenient operation.
In order to improve the installation stability, preferably, two connecting holes are symmetrically formed in the two connecting supports at the upper parts of the left end and the right end, each connecting hole is fixedly connected with the vertical section of the angle steel in a threaded mode, and the horizontal section of the angle steel is fixedly connected with the upper end face of the ring beam in a threaded mode.
In order to ensure the balance of the movement of the hanging basket, preferably, the lower end of each pull rope is provided with two knots, and the two knots are respectively connected and fixed with the inner side and the outer side of the same end of the hanging basket.
The method comprises the following specific steps of,
s1, welding and installing the vertical rectangular steel pipe and the transverse rectangular steel pipe into a frame support;
s2: mounting and fixing an adjusting plate on a vertical section of the frame support;
s3: a stay bar is arranged between an upper adjusting plate and a lower adjusting plate at the same left end and the same right end, and the upper end surface and the lower end surface of the stay bar are respectively abutted against the adjusting plates at the corresponding ends;
s4: along the inclination of the ring beam, the frame support is sleeved on the ring beam;
s5: the cantilever support arm is fixed at the upper end of the frame support by screw joint, and the pull rope on the reel is connected with the hanging basket;
s6: be connected with two hanging flower baskets on the support arm of encorbelmenting altogether, when driving one end hanging flower basket area operator by the winding wheel and go up and down, the hanging flower basket of the other end then is as counter weight portion, keeps encorbelmenting the balance of support arm, is close to behind the frame support to according to the inclination of collar tie beam, adjust left linking bridge and right linking bridge position on the regulating plate, after the inclination location is good, at the connecting hole position, fixed with the angle steel collar tie beam and the linking bridge spiro union connection that corresponds the position.
Has the advantages that: according to the invention, the hanging basket and the frame support are separately arranged, and the frame support is attached to the inclination of the ring beam, so that when the position of the frame support is manually adjusted, the stability of the hanging basket is conveniently ensured, the safety and the accuracy of construction are improved, and the construction quality and the construction efficiency are improved.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a state diagram of the present invention.
Fig. 3 is an enlarged view of a portion a in fig. 2.
Fig. 4 is a schematic structural view of the connecting bracket.
Fig. 5 is a schematic structural view of the adjustment plate.
Detailed Description
The invention will be further explained with reference to the drawings.
As shown in fig. 1, 2, 3, 4 and 5, the present invention includes two frame supports 1 arranged in parallel, four vertical sections are symmetrically arranged on the left and right of each frame support 1, two adjusting plates 2 are arranged on each vertical section along the up-down direction, and a left connecting bracket 31 is arranged between two adjusting plates 2 at the corresponding positions on the two vertical sections at the left end; a right connecting bracket 32 is arranged between the two adjusting plates 2 at corresponding positions on the two vertical sections at the right end, and the left connecting bracket 31 and the right connecting bracket 32 have the same structure; nine positioning holes are axially formed in each adjusting plate 2, through holes are formed in positions, corresponding to the positioning holes, of the vertical section, two threaded holes 33 are formed in two ends of each connecting support, fixing bolts extend into the through holes, penetrate through the positioning holes in the corresponding positions and are fixed with the threaded holes 33 in a threaded mode, and therefore the connecting supports can be fixed and limited; the two adjusting plates 2 on the same vertical section are connected with each other in a butt joint mode and are provided with support rods 4.
Two connecting holes 34 are symmetrically formed in the two connecting supports at the upper parts of the left end and the right end, each connecting hole 34 is fixedly connected with the vertical section of the angle steel in a threaded mode, and the horizontal section of the angle steel is fixedly connected with the upper end face of the ring beam in a threaded mode.
A fixed support 5 is fixed at the upper end of the frame support 1 in a threaded manner, an overhanging support arm 6 is fixed on the fixed support 5 in a threaded manner, two ends of the overhanging support arm 6 are respectively provided with a winding wheel 7 connected with a motor (not marked), and each winding wheel 7 is wound with a pull rope; the lower end of each pull rope is provided with two knots, and the two knots are respectively connected and fixed with the inner side and the outer side of the same end of the hanging basket 8.
The specific steps of the method of use of the invention are as follows,
s1, welding and installing the vertical rectangular steel pipe and the transverse rectangular steel pipe into a frame support 1;
s2: the adjusting plate 2 is installed and fixed on the vertical section of the frame support 1;
s3: a stay bar 4 is arranged between the upper and lower adjusting plates 2 at the same left and right ends, and the upper and lower end surfaces of the stay bar 4 are respectively abutted against the adjusting plates 2 at the corresponding ends;
s4: along the inclination of the ring beam, the frame support 1 is sleeved on the ring beam;
s5: the cantilever support arm 6 is fixed at the upper end of the frame support 1 in a threaded manner, and a pull rope on the winding wheel 7 is connected with a hanging basket 8;
s6: be connected with two hanging flower baskets 8 on the support arm 6 of encorbelmenting altogether, when driving 8 area operators of one end hanging flower baskets and go up and down by winding wheel 7, the hanging flower basket 8 of the other end then is as counter weight portion, keep encorbelmenting the balance of support arm 6, be close to frame support 1 after, and according to the inclination of collar tie-beam, adjust the position on regulating plate 2 of left linking bridge 31 and right linking bridge 32, after the inclination location is good, at the connecting hole 34 position that corresponds the collar tie-beam low side, it is fixed to collar tie-beam and the linking bridge spiro union connection that corresponds the position with the angle steel.
It should be noted that the upper end of the frame support 1 is provided with a fixed support 5, the lower end is open and is sleeved on the ring beam from top to bottom, the position of the connecting support at the corresponding position on the adjusting plate 2 is adjusted according to the inclination of the ring beam so that the connecting support is fixed by being attached to the ring beam, then the hanging basket 8 is driven by the winding wheel 7 to lift, and the belt operator is close to the frame support so as to adjust the position of the connecting support at any time and ensure the safety of curtain wall construction; in the process, the hanging basket 8 and the frame support 1 are operated separately, the inclination of the ring beam and the adjustment of the connecting support do not influence the balance and stability of the operation of the hanging basket 8, the moving stability of the hanging basket 8 is ensured, at least one frame support 1 can be used on the ring beam, and the requirement of installing the hanging basket 8 on the oblique roof ring beam is met; in addition, according to the construction direction of the curtain wall, one of the two hanging baskets 8 can be selected as a riding part, the other end of the hanging basket 8 is a counterweight part, and constructors can stand in the hanging baskets 8 to operate and can move to the ring beam to operate, so that the curtain wall is flexible to use.
The undescribed parts of the present invention are consistent with the prior art, and are not described herein.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all equivalent structures made by using the contents of the present specification and the drawings can be directly or indirectly applied to other related technical fields, and are within the scope of the present invention.

Claims (4)

1. The utility model provides a not high collar tie beam clamp formula hanging flower basket support of superelevation layer which characterized in that: the frame support comprises two frame supports (1) which are arranged in parallel, four vertical sections are symmetrically arranged on the left and right of each frame support (1), two adjusting plates (2) are arranged on each vertical section of each frame support (1) along the vertical direction, a support rod (4) is arranged between the two adjusting plates (2) on the same vertical section in a butt joint mode, and a left connecting support (31) is arranged between the two adjusting plates (2) on the corresponding positions on the two vertical sections at the left end; a right connecting support (32) is arranged between the two adjusting plates (2) at corresponding positions on the two vertical sections at the right end, and the left connecting support (31) and the right connecting support (32) have the same structure; nine positioning holes are axially formed in each adjusting plate (2), through holes are formed in the positions, corresponding to the positioning holes, of the vertical sections, threaded holes (33) are formed in two ends of each connecting support, fixing bolts extend into the through holes, penetrate through the positioning holes in the corresponding positions and are fixedly connected with the threaded holes (33) in a threaded mode, and therefore the connecting supports can be fixed and limited; a fixed support (5) is fixed at the upper end of the frame support (1) in a threaded manner, an overhanging support arm (6) is fixed on the fixed support (5) in a threaded manner, two ends of the overhanging support arm (6) are respectively provided with a winding wheel (7) connected with a motor, and a pull rope is wound on each winding wheel (7); two pull ropes at the same end of the two cantilever support arms (6) are connected with a hanging basket (8).
2. The hoop type hanging basket support for the super high-rise unequal-height ring beams as claimed in claim 1, is characterized in that: two connecting holes (34) are symmetrically formed in the two connecting supports at the upper parts of the left end and the right end, each connecting hole (34) is fixedly connected with the vertical section of the angle steel in a threaded mode, and the horizontal section of the angle steel is fixedly connected with the upper end face of the ring beam in a threaded mode.
3. The hoop type hanging basket support for the super high-rise unequal-height ring beams as claimed in claim 1, is characterized in that: the lower end of each pull rope is provided with two knots, and the two knots are respectively connected and fixed with the inner side and the outer side of the same end of the hanging basket (8).
4. The construction method of the hoop-type hanging basket support for the super high-rise unequal-height gird according to any one of claims 1 to 3, characterized by comprising the following steps of: the specific steps are as follows,
s1, welding and installing the vertical rectangular steel pipe and the transverse rectangular steel pipe into a frame support (1);
s2: the adjusting plate (2) is installed and fixed on the vertical section of the frame support (1);
s3: a support rod (4) is arranged between the upper and lower adjusting plates (2) at the same left and right ends, and the upper and lower end surfaces of the support rod (4) are respectively abutted against the adjusting plates (2) at the corresponding ends;
s4: along the inclination of the ring beam, the frame support (1) is sleeved on the ring beam;
s5: the cantilever support arm (6) is fixed at the upper end of the frame support (1) in a threaded manner, and a pull rope on the winding wheel (7) is connected with a hanging basket (8);
s6: be connected with two hanging flower baskets (8) altogether on the support arm of encorbelmenting (6), when driving one end hanging flower basket (8) by winding wheel (7) and taking the operator to go up and down, the hanging flower basket (8) of the other end then are as counter weight portion, keep the balance of support arm (6) of encorbelmenting, be close to frame support (1) back, and according to the inclination of girth, adjust left linking bridge (31) and right linking bridge (32) position on regulating plate (2), after the inclination location is good, at connecting hole (34) position, it is fixed to girth and the linking bridge spiro union connection of corresponding position with the angle steel.
CN202110266110.2A 2021-03-11 2021-03-11 Ultrahigh-rise unequal-height ring beam clamp type hanging basket support and construction method thereof Active CN113006456B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110266110.2A CN113006456B (en) 2021-03-11 2021-03-11 Ultrahigh-rise unequal-height ring beam clamp type hanging basket support and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110266110.2A CN113006456B (en) 2021-03-11 2021-03-11 Ultrahigh-rise unequal-height ring beam clamp type hanging basket support and construction method thereof

Publications (2)

Publication Number Publication Date
CN113006456A CN113006456A (en) 2021-06-22
CN113006456B true CN113006456B (en) 2022-06-17

Family

ID=76405330

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110266110.2A Active CN113006456B (en) 2021-03-11 2021-03-11 Ultrahigh-rise unequal-height ring beam clamp type hanging basket support and construction method thereof

Country Status (1)

Country Link
CN (1) CN113006456B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114197883B (en) * 2021-08-18 2023-05-26 中铁三局集团有限公司 Integrated assembly type building system
CN113700281B (en) * 2021-09-02 2023-01-10 中国十七冶集团有限公司 Electric hanging basket counterweight-free device for coating outer wall of chimney and mounting method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN211714552U (en) * 2020-01-15 2020-10-20 上海鼎美幕墙工程技术有限公司 Hanging basket for curtain wall installation
CN112049405A (en) * 2020-09-14 2020-12-08 中国十九冶集团有限公司 Hanging basket wall-penetrating type overhanging structure and method for erecting hanging basket on inclined roof
CN112431399A (en) * 2020-11-16 2021-03-02 中山志特铝模科技有限公司 Hanging basket for building outer wall and mounting method thereof

Also Published As

Publication number Publication date
CN113006456A (en) 2021-06-22

Similar Documents

Publication Publication Date Title
CN113006456B (en) Ultrahigh-rise unequal-height ring beam clamp type hanging basket support and construction method thereof
CN101858057B (en) Method for rapidly mounting reinforced concrete crash barrier steel form
JP2587684B2 (en) Construction wall construction equipment
CN107178211B (en) Truss hanging system for installing steel structure
CN110950216A (en) Elevator with telescopic car
CN111021744A (en) Curtain wall installation system and application construction method thereof
CN109231023A (en) The installation method of high pedestal jib crane boom system
CN116986463B (en) Steel box girder lifting device
CN205604084U (en) Hanging flower basket device of prefabricated little case roof beam construction usefulness
CN108035530B (en) Oil tank inner wall construction hanging basket
CN217230001U (en) Combined type supporting and adjusting device for tower installation
JPH0940371A (en) Lifting-in method and device of outer wall members of building
CN112573341B (en) Column top hoisting mechanism and construction method thereof
CN111706060A (en) Steel wire rope inclined-pulling type hanging basket device
CN209082344U (en) A kind of cable-stayed type large-span steel roof beam structure
CN219546446U (en) Slope lifting type hanging basket device
CN214527849U (en) A appurtenance for installation of pile foundation sounding pipe
CN109972845A (en) The installation method of steel roof truss
CN220058774U (en) Split heads hanging basket suspension
CN219491766U (en) Adjustable U-shaped support for overhead installation of suspension type linear steel structure
CN217915405U (en) Full-hanging sky rail of robot
CN219653547U (en) Auxiliary device for bridge anti-collision guardrail construction
JPH10169183A (en) Cage suspension support mechanism of gondola device
CN213174845U (en) Temporary assembling device for roof curved surface # -shaped combined steel truss beam construction
CN211733664U (en) Hoisting support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221130

Address after: 430000 No. 552 Guan Shan Road, Hubei, Wuhan

Patentee after: CHINA CONSTRUCTION THIRD CONSTRUCTION ENGINEERING Co.,Ltd.

Patentee after: China Construction Third Engineering Bureau Science and Innovation Industry Development Co.,Ltd.

Address before: No. 552, Wuluo Road, Wuhan City, Hubei Province, 430074

Patentee before: CHINA CONSTRUCTION THIRD CONSTRUCTION ENGINEERING Co.,Ltd.