CN112965401B - Large-current control device and method for transformer fireproof and explosion-proof physical check test - Google Patents

Large-current control device and method for transformer fireproof and explosion-proof physical check test Download PDF

Info

Publication number
CN112965401B
CN112965401B CN202110169869.9A CN202110169869A CN112965401B CN 112965401 B CN112965401 B CN 112965401B CN 202110169869 A CN202110169869 A CN 202110169869A CN 112965401 B CN112965401 B CN 112965401B
Authority
CN
China
Prior art keywords
current
control device
proof
time
closing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110169869.9A
Other languages
Chinese (zh)
Other versions
CN112965401A (en
Inventor
邓军
潘志城
孙延宏
李世成
邓集瀚
谢志成
梁晨
刘青松
张晋寅
周海滨
楚金伟
彭翔
祁颖矢
章忠国
王铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southern Power Grid Corp Ultra High Voltage Transmission Co Electric Power Research Institute
Shenyang Transformer Research Institute Co ltd
Original Assignee
Shenyang Transformer Research Institute Co ltd
Maintenance and Test Center of Extra High Voltage Power Transmission Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Transformer Research Institute Co ltd, Maintenance and Test Center of Extra High Voltage Power Transmission Co filed Critical Shenyang Transformer Research Institute Co ltd
Priority to CN202110169869.9A priority Critical patent/CN112965401B/en
Publication of CN112965401A publication Critical patent/CN112965401A/en
Application granted granted Critical
Publication of CN112965401B publication Critical patent/CN112965401B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Testing Relating To Insulation (AREA)

Abstract

The invention discloses a large current control device and a method for a fire-proof and explosion-proof physical check test of a transformer, wherein the large current control device comprises a plurality of current controllers and a fracture which is connected in parallel between the current controllers; and an output control port of the synchronous control device is connected with the closing coil and the opening coil of each current controller, and an input port of the synchronous control device is connected with the position switch of each current controller. The invention utilizes the existing current controller, improves the current carrying capacity and the short circuit current breaking capacity of the current controller by times through the parallel connection of the current controller arc extinguish chambers, can realize extremely high synchronization performance by the synchronous control device, ensures the stability and the accuracy of the control by the high precision and the automatic error correction, and has higher reliability and stability compared with mechanical linkage.

Description

变压器防火防爆物理校核试验用大电流控制装置及方法High-current control device and method for physical verification test of transformer fire and explosion protection

技术领域technical field

本发明涉及高压电流控制器技术领域,尤其涉及一种变压器防火防爆物理校核试验用大电流控制装置及方法。The invention relates to the technical field of high-voltage current controllers, in particular to a high-current control device and method for a physical verification test of fire and explosion protection of transformers.

背景技术Background technique

变压器本体内部短路故障过程中,电弧导致气体产生及气泡形态脉动是导致油压升高、腔体破裂的主要原因。为了验证被试变压器的防火防爆能力,需在被试品内部人造大电流电弧故障物理仿真试验。During the internal short-circuit fault of the transformer body, the gas generation and the pulsation of the bubble shape caused by the arc are the main reasons for the increase of oil pressure and the rupture of the cavity. In order to verify the fire-proof and explosion-proof capability of the tested transformer, a physical simulation test of artificial high-current arc fault inside the tested product is required.

现有电网上运行的电流控制器,其灭弧室的开断能力很难超过63kA,但某些大电流试验站存在特殊的需求,要频繁进行大电流开断试验,因此开发开断更大短路电流能力的装置非常迫切。The interrupting capacity of the interrupter of the current controller running on the existing power grid is difficult to exceed 63kA, but some high-current test stations have special requirements, and frequent high-current interrupting tests are required, so the development of larger interrupting capacity The short-circuit current capability of the device is very urgent.

在不改进电流控制器现有技术的前提下,直接并联多个灭弧室是最简易的办法,主要通过一套机械传动装置控制所有触头同时动作,但合分闸时间还是存在不同步,只能通过机械结构微调解决,因受条件限制,机械结构微调触头位置的方式实际效果并不理想,并且运行一定时间以后,其同步性能有所下降,存在一定安全隐患,无法满足大电流试验站对电流控制器频繁操作稳定性的特殊要求。On the premise of not improving the existing technology of the current controller, it is the easiest way to directly connect multiple arc extinguishing chambers in parallel. It mainly controls the simultaneous action of all contacts through a set of mechanical transmission devices, but the closing and opening times are still not synchronized. It can only be solved by fine-tuning the mechanical structure. Due to limited conditions, the actual effect of fine-tuning the contact position of the mechanical structure is not ideal, and after running for a certain period of time, its synchronization performance will decline, there are certain safety hazards, and it cannot meet the high current test. The station has special requirements for the stability of the frequent operation of the current controller.

发明内容SUMMARY OF THE INVENTION

针对上述问题,本发明提出一种变压器防火防爆物理校核试验用大电流控制装置及方法,旨在提高电流控制器的载流能力和短路电流开断能力,以提高变压器的防火防爆能力。In view of the above problems, the present invention proposes a large current control device and method for physical verification test of transformer fire and explosion protection, aiming at improving the current carrying capacity and short circuit current breaking capacity of the current controller, so as to improve the fire protection and explosion protection capability of the transformer.

为解决上述技术问题,本发明一方面提出一种变压器防火防爆物理校核试验用大电流控制装置,包括,In order to solve the above-mentioned technical problems, one aspect of the present invention proposes a high-current control device for a physical verification test of a transformer against fire and explosion, comprising:

若干个电流控制器,并联所述电流控制器之间的断口;a plurality of current controllers, connected in parallel with the fractures between the current controllers;

同步控制装置,所述同步控制装置的输出控制端口与每个所述电流控制器的合闸线圈和分闸线圈连接,所述同步控制装置的输入端口与每个所述电流控制器的位置开关连接。A synchronous control device, the output control port of the synchronous control device is connected with the closing coil and the opening coil of each of the current controllers, and the input port of the synchronous control device is connected with the position switch of each of the current controllers connect.

本发明另一方面提出一种变压器防火防爆物理校核试验用大电流控制方法,用于上述的变压器防火防爆物理校核试验用大电流控制装置,包括以下步骤,Another aspect of the present invention proposes a high-current control method for a fire-proof and explosion-proof physical check test of a transformer, which is used for the above-mentioned high-current control device for a fire-proof and explosion-proof physical check test of a transformer, comprising the following steps:

通过预置动作时序和预设延迟时间,分别控制每个所述电流控制器的合闸/分闸;Through the preset action sequence and preset delay time, respectively control the closing/opening of each of the current controllers;

采集每个所述电流控制器的位置开关信号,所述位置开关信号包含电流控制器从接收到所述预置动作时序和预设延迟时间到本次合闸/分闸完成时间的动作时差;Collecting a position switch signal of each of the current controllers, where the position switch signal includes the action time difference of the current controller from receiving the preset action sequence and preset delay time to the closing/opening completion time of this time;

将所述动作时差进行集中运算,修正所述预设延迟时间。Perform centralized operation on the action time difference to correct the preset delay time.

在一些实施方式中,所述集中运算具体为:求取所述动作时差的平均值。In some embodiments, the centralized operation is specifically: obtaining an average value of the movement time differences.

在一些实施方式中,所述修正具体为:将所述平均值与本次合闸/分闸完成时间作差,计算出修正值,将所述修正值与本次合闸/分闸的预设延迟时间相加,作为下次合闸/分闸的采用的预设延迟时间。In some embodiments, the correction is specifically as follows: making a difference between the average value and the closing/opening completion time of the current time, calculating a correction value, and comparing the correction value with the preset closing/opening time of the current time. Set the delay time to add up as the preset delay time for the next closing/opening.

在一些实施方式中,每个所述电流控制器初次对应的所述预置动作时序和预设延迟时间相同。In some embodiments, the preset action sequence and the preset delay time corresponding to each of the current controllers for the first time are the same.

在一些实施方式中,所述预置动作时序为控制电流控制器合闸/分闸所需的电平输出顺序,所述预设延迟时间为所述电平输出的持续时间。In some embodiments, the preset action sequence is a level output sequence required to control closing/opening of the current controller, and the preset delay time is the duration of the level output.

在一些实施方式中,还包括,循环执行所述步骤。In some embodiments, it also includes performing the steps in a loop.

本发明的有益效果为:利用现有的电流控制器,通过电流控制器灭弧室的并联,以成倍提高电流控制器的载流能力和短路电流开断能力,同步控制装置可实现极高的同步性能,其高精度和误差自动修正保证了其控制的稳定性和精确性,比机械联动有着更高的可靠性和稳定性。The beneficial effects of the present invention are: using the existing current controller, through the parallel connection of the arc extinguishing chambers of the current controller, the current carrying capacity and the short-circuit current breaking capacity of the current controller can be doubled, and the synchronous control device can achieve extremely high Its high-precision and automatic error correction ensure the stability and accuracy of its control, and it has higher reliability and stability than mechanical linkage.

附图说明Description of drawings

图1为本发明实施例一公开的变压器防火防爆物理校核试验用大电流控制装置的连接示意图;Fig. 1 is the connection schematic diagram of the high-current control device for the physical verification test of the transformer fireproof and explosion-proof disclosed in the first embodiment of the present invention;

图2为本发明实施例二公开的变压器防火防爆物理校核试验用大电流控制方法的流程示意图;FIG. 2 is a schematic flowchart of a large current control method for a physical check test for fire and explosion protection of a transformer disclosed in Embodiment 2 of the present invention;

具体实施方式Detailed ways

为使本发明的目的、技术方案及优点更加清楚、明确,下面结合附图和具体实施方式对本发明的内容做进一步详细说明。可以理解的是,此处所描述的具体实施例仅仅用于解释本发明,而非对本发明的限定。另外还需要说明的是,为了便于描述,附图中仅示出了与本发明相关的部分而非全部内容。In order to make the objectives, technical solutions and advantages of the present invention clearer and clearer, the content of the present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention, but not to limit the present invention. In addition, it should be noted that, for the convenience of description, the drawings only show some but not all of the contents related to the present invention.

本实施例提出了一种变压器防火防爆物理校核试验用大电流控制装置,包括,This embodiment proposes a high-current control device for a physical check test of a transformer against fire and explosion, including:

若干个电流控制器,并联电流控制器之间的断口;Several current controllers, the fracture between the parallel current controllers;

同步控制装置,同步控制装置的输出控制端口与每个电流控制器的合闸线圈和分闸线圈连接,同步控制装置的输入端口与每个所述电流控制器的位置开关连接。A synchronous control device, the output control port of the synchronous control device is connected with the closing coil and the opening coil of each current controller, and the input port of the synchronous control device is connected with the position switch of each of the current controllers.

在本实施例中,如图1所示,以电流控制器1的断口和电流控制器2的断口并联后作为一个断口使用,并作为范例。两台电流控制器的合闸线圈、分闸线圈与同步控制装置3的输出控制端口连接,两台电流控制器的位置开关分别与同步控制装置3的输入端口连接。In this embodiment, as shown in FIG. 1 , the fracture of the current controller 1 and the fracture of the current controller 2 are connected in parallel and used as a fracture, and are used as an example. The closing coils and the opening coils of the two current controllers are connected to the output control ports of the synchronous control device 3 , and the position switches of the two current controllers are respectively connected to the input ports of the synchronous control device 3 .

本发明通过把多个电流控制器的灭弧室断口并联起来,用于成倍提高电流控制器的载流能力和短路电流开断能力,且结构简单,功能可靠。The invention is used to multiply the current carrying capacity and short-circuit current breaking capacity of the current controller by connecting the arc-extinguishing chamber fractures of a plurality of current controllers in parallel, and has simple structure and reliable function.

如图2所示,本实施例提出了一种变压器防火防爆物理校核试验用大电流控制方法,用于上述的变压器防火防爆物理校核试验用大电流控制装置,包括以下步骤,As shown in Figure 2, the present embodiment proposes a high-current control method for a transformer fire-proof and explosion-proof physical check test, which is used for the high-current control device for the above-mentioned transformer fire-proof and explosion-proof physical check test, including the following steps:

步骤一,通过预置动作时序和预设延迟时间,分别控制每个电流控制器的合闸/分闸,达到同时导通和开断的目的。In step 1, the closing/opening of each current controller is controlled respectively through the preset action sequence and the preset delay time, so as to achieve the purpose of turning on and off at the same time.

在本实施例中,每个电流控制器初次对应的预置动作时序和预设延迟时间相同。预置动作时序为控制电流控制器合闸/分闸所需的电平输出顺序,预设延迟时间为电平输出的持续时间。在初次合闸/分闸之前,本实施例为每个电流控制器设定了相同的预置动作时序和预设延迟时间,其目的在于假设每个电流控制器之间不存在性能差异,假设每个电流控制器均为理想状态。In this embodiment, the preset action sequence and preset delay time corresponding to each current controller for the first time are the same. The preset action sequence is the level output sequence required to control the closing/opening of the current controller, and the preset delay time is the duration of the level output. Before closing/opening for the first time, this embodiment sets the same preset action sequence and preset delay time for each current controller. The purpose is to assume that there is no performance difference between each current controller. Each current controller is ideal.

步骤二,采集每个电流控制器的位置开关信号,位置开关信号包含电流控制器从接收到预置动作时序和预设延迟时间到本次合闸/分闸完成时间的动作时差。Step 2: Collect the position switch signal of each current controller. The position switch signal includes the action time difference from the current controller receiving the preset action sequence and the preset delay time to the closing/opening completion time.

在本实施例中,上述的集中运算具体为:求取动作时差的平均值。修正具体为:将平均值与本次合闸/分闸完成时间作差,计算出修正值,将修正值与本次合闸/分闸的预设延迟时间相加,作为下次合闸/分闸的采用的预设延迟时间。修正后的延迟时间作为下次合闸/分闸的预设延迟时间,有利于整体调整两个电流控制器之间的动作时差。本实施例中采用了两个电流控制器作为说明,但实际上,电流控制器的数量越多,越有可能获得最佳的预设延迟时间。在理想状态下,即,当开合次数无限制的情况下,最后修正值会趋近于0,电流控制器的开断时间趋于稳定。对于该型号的电流控制器,也可以放弃步骤二和步骤三的修正过程,直接采用修正好的预设延迟时间加上动作时序予以控制。In this embodiment, the above-mentioned centralized operation is specifically: obtaining the average value of the action time difference. The correction is as follows: make the difference between the average value and the completion time of this closing/opening, calculate the correction value, and add the correction value to the preset delay time of this closing/opening, as the next closing/opening time. The preset delay time used for opening. The corrected delay time is used as the preset delay time of the next closing/opening, which is beneficial to the overall adjustment of the action time difference between the two current controllers. In this embodiment, two current controllers are used for illustration, but in fact, the more current controllers there are, the more likely it is to obtain the best preset delay time. In an ideal state, that is, when the number of times of switching is unlimited, the final correction value will be close to 0, and the breaking time of the current controller will be stable. For this type of current controller, the correction process of steps 2 and 3 can also be abandoned, and the corrected preset delay time plus the action sequence can be directly controlled.

步骤三,将动作时差进行集中运算,修正预设延迟时间。Step 3: Perform centralized operation on the movement time difference to correct the preset delay time.

作为本发明的又一种优选实施方案,循环执行上述的步骤一至步骤三。通过电流控制器1和电流控制器2的分合操作,同步装置3会自动采集动作返回信号,根据多次记录结果自动计算出动作时差加以修正,随着各个电流控制器操作次数的增加,其同步效果就会越好。总之,采用本发明提供的方法可以大大降低大电流电流控制器的研发成本。通过利用现有的电流控制器,通过电流控制器灭弧室的并联,以成倍提高电流控制器的载流能力和短路电流开断能力,同步控制装置可实现极高的同步性能,其高精度和误差自动修正保证了其控制的稳定性和精确性,比机械联动有着更高的可靠性和稳定性。因此本发明具有极大的经济价值。As another preferred embodiment of the present invention, the above steps 1 to 3 are performed cyclically. Through the opening and closing operation of the current controller 1 and the current controller 2, the synchronization device 3 will automatically collect the action return signal, and automatically calculate the action time difference according to the multiple recording results to correct it. The synchronization effect will be better. In a word, the research and development cost of the high-current current controller can be greatly reduced by using the method provided by the present invention. By using the existing current controller and paralleling the arc extinguishing chambers of the current controller to double the current carrying capacity and short-circuit current breaking capacity of the current controller, the synchronous control device can achieve extremely high synchronous performance, and its high The automatic correction of precision and error ensures the stability and accuracy of its control, which has higher reliability and stability than mechanical linkage. Therefore, the present invention has great economic value.

再有,本发明具有高度的灵活性,可根据需要随时调整延迟时间,操作方便,还可实现任意角度合闸的特殊要求。Furthermore, the present invention has a high degree of flexibility, the delay time can be adjusted at any time according to the needs, the operation is convenient, and the special requirement of closing the switch at any angle can be realized.

上述实施例只是为了说明本发明的技术构思及特点,其目的是在于让本领域内的普通技术人员能够了解本发明的内容并据以实施,并不能以此限制本发明的保护范围。凡是根据本发明内容的实质所做出的等效的变化或修饰,都应涵盖在本发明的保护范围内。The above-mentioned embodiments are only to illustrate the technical concept and characteristics of the present invention, and the purpose thereof is to enable those of ordinary skill in the art to understand the content of the present invention and implement them accordingly, and not to limit the protection scope of the present invention. All equivalent changes or modifications made according to the essence of the present invention shall be included within the protection scope of the present invention.

Claims (4)

1.一种变压器防火防爆物理校核试验用大电流控制方法,用于变压器防火防爆物理校核试验用大电流控制装置,所述变压器防火防爆物理校核试验用大电流控制装置包括若干个电流控制器,并联所述电流控制器之间的断口;同步控制装置,所述同步控制装置的输出控制端口与每个所述电流控制器的合闸线圈和分闸线圈连接,所述同步控制装置的输入端口与每个所述电流控制器的位置开关连接,其特征在于,包括以下步骤,1. A high-current control method for a fire-proof and explosion-proof physical check test of a transformer, used for a high-current control device for a fire-proof and explosion-proof physical check test of a transformer, and the high-current control device for a fire-proof and explosion-proof physical check test of a transformer includes several currents a controller, connected in parallel with the fracture between the current controllers; a synchronous control device, the output control port of the synchronous control device is connected with the closing coil and the opening coil of each of the current controllers, the synchronous control device The input port is connected with the position switch of each said current controller, and it is characterized in that, comprises the following steps, 通过预置动作时序和预设延迟时间,分别控制每个所述电流控制器的合闸/分闸;Through the preset action sequence and preset delay time, respectively control the closing/opening of each of the current controllers; 采集每个所述电流控制器的位置开关信号,所述位置开关信号包含电流控制器从接收到所述预置动作时序和预设延迟时间到本次合闸/分闸完成时间的动作时差;Collecting a position switch signal of each of the current controllers, where the position switch signal includes the action time difference of the current controller from receiving the preset action sequence and preset delay time to the closing/opening completion time of this time; 将所述动作时差进行集中运算,修正所述预设延迟时间;Perform a centralized operation on the action time difference to correct the preset delay time; 所述集中运算具体为:求取所述动作时差的平均值;The centralized operation is specifically: obtaining the average value of the movement time difference; 所述修正具体为:将所述平均值与本次合闸/分闸完成时间作差,计算出修正值,将所述修正值与本次合闸/分闸的预设延迟时间相加,作为下次合闸/分闸的采用的预设延迟时间。The correction is specifically: making the difference between the average value and the closing/opening completion time of this time, calculating a correction value, and adding the correction value to the preset delay time of the closing/opening this time, The preset delay time used as the next closing/opening. 2.如权利要求1所述的变压器防火防爆物理校核试验用大电流控制方法,其特征在于,每个所述电流控制器初次对应的所述预置动作时序和预设延迟时间相同。2 . The high-current control method for a physical verification test of a transformer against fire and explosion protection according to claim 1 , wherein the preset action sequence and the preset delay time corresponding to each of the current controllers for the first time are the same. 3 . 3.如权利要求1所述的变压器防火防爆物理校核试验用大电流控制方法,其特征在于,所述预置动作时序为控制电流控制器合闸/分闸所需的电平输出顺序,所述预设延迟时间为所述电平输出的持续时间。3. The high-current control method for the physical verification test of fire-proof and explosion-proof transformers as claimed in claim 1, wherein the preset action sequence is the level output sequence required for the closing/opening of the control current controller, The preset delay time is the duration of the level output. 4.如权利要求1所述的变压器防火防爆物理校核试验用大电流控制方法,其特征在于,还包括,循环执行所述步骤。4 . The high-current control method for a physical verification test of fire and explosion protection of a transformer according to claim 1 , further comprising: cyclically executing the steps. 5 .
CN202110169869.9A 2021-02-08 2021-02-08 Large-current control device and method for transformer fireproof and explosion-proof physical check test Active CN112965401B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110169869.9A CN112965401B (en) 2021-02-08 2021-02-08 Large-current control device and method for transformer fireproof and explosion-proof physical check test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110169869.9A CN112965401B (en) 2021-02-08 2021-02-08 Large-current control device and method for transformer fireproof and explosion-proof physical check test

Publications (2)

Publication Number Publication Date
CN112965401A CN112965401A (en) 2021-06-15
CN112965401B true CN112965401B (en) 2022-08-26

Family

ID=76275259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110169869.9A Active CN112965401B (en) 2021-02-08 2021-02-08 Large-current control device and method for transformer fireproof and explosion-proof physical check test

Country Status (1)

Country Link
CN (1) CN112965401B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1234140C (en) * 2001-11-05 2005-12-28 刘卫歧 Cutoff Switch
JP5159075B2 (en) * 2006-09-25 2013-03-06 株式会社東芝 Circuit breaker switching control device
CN103489702B (en) * 2013-09-05 2015-09-09 瑞亿智能控制设备(深圳)有限公司 The circuit breaker open/closure controller detected based on optoelectronic position and control method thereof
CN103545133A (en) * 2013-09-27 2014-01-29 国家电网公司 High-voltage AC phase-controlled circuit breaker and its phase-selection opening/closing control method
CN110556267B (en) * 2019-10-12 2021-08-31 福州大学 Adaptive Synchronization Control Method for Parallel Three-phase AC Contactors
CN110718418B (en) * 2019-10-24 2021-09-28 福州大学 Switch parallel capacity expansion operation control method based on single-pole contactor

Also Published As

Publication number Publication date
CN112965401A (en) 2021-06-15

Similar Documents

Publication Publication Date Title
CN109386731B (en) An SF6 gas automatic filling system and filling method for GIS equipment
CN205139272U (en) Join in marriage power -grid switch analog switch unit for equipment
CN106650062A (en) Construction method of transient simulation model for vacuum circuit breaker switch-off
CN107167726B (en) Modeling method for internal breakdown arc of circuit breaker
CN106529084A (en) Construction method for vacuum circuit breaker switch-on transient state simulation model
CN112965401B (en) Large-current control device and method for transformer fireproof and explosion-proof physical check test
CN104062580B (en) A kind of portable beaker three-phase non-three phase tester movement time
CN106329497A (en) Distribution network fault self-healing dead zone elimination method based on feeder protection simulation principle
CN201819973U (en) Device for making test of high-voltage circuit breaker
CN114047435B (en) Circuit breaker closing time discrete testing method and device
CN202454479U (en) 1100kV extra-high-voltage series-compensation by-pass switch
CN204067884U (en) A distribution line based on double-bus connection
CN110048384A (en) A kind of distribution high reliability self-healing method and system
CN107731616A (en) Parallel series multi-break arc-chutes
CN106253087B (en) Intelligent ring main unit
CN107844638A (en) A kind of breaker emulation mode and system for cut-offfing perceptual low current
CN107565520A (en) A kind of dc circuit breaker principal and subordinate cooperative control method and control system
CN108521117B (en) A commutation branch for DC circuit breaker
CN103257578A (en) Low-voltage current-limiting controlling simulation device
CN115856607A (en) Detection device for mixed current switching of on-load tap-changer vacuum interrupter
CN112927978B (en) A circuit breaker dynamic capacitor voltage equalization device and method
CN110632412B (en) Test method of series compensation protection device
CN206132938U (en) Simple and easy testing tool of voltage type RTU
CN108710291A (en) A kind of anti-jump control circuit of adaptive breaker
CN107783001B (en) Fixed value static check test box of quick cutting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: Building 2, 223 Kexue Avenue, Science City, Huangpu District, Guangzhou City, Guangdong Province

Patentee after: China Southern Power Grid Corporation Ultra High Voltage Transmission Company Electric Power Research Institute

Country or region after: China

Patentee after: SHENYANG TRANSFORMER RESEARCH INSTITUTE Co.,Ltd.

Address before: Building 2, 223 Kexue Avenue, Science City, Huangpu District, Guangzhou City, Guangdong Province

Patentee before: MAINTENANCE & TEST CENTRE, CSG EHV POWER TRANSMISSION Co.

Country or region before: China

Patentee before: SHENYANG TRANSFORMER RESEARCH INSTITUTE Co.,Ltd.

CP03 Change of name, title or address