CN112925228A - Intelligent control water supply system for regulating south to north and dispatching method - Google Patents
Intelligent control water supply system for regulating south to north and dispatching method Download PDFInfo
- Publication number
- CN112925228A CN112925228A CN202110154626.8A CN202110154626A CN112925228A CN 112925228 A CN112925228 A CN 112925228A CN 202110154626 A CN202110154626 A CN 202110154626A CN 112925228 A CN112925228 A CN 112925228A
- Authority
- CN
- China
- Prior art keywords
- scheduling
- nodes
- water resource
- amount
- instruction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The application relates to a south-to-north water diversion intelligent control water supply system and a scheduling method, wherein the method comprises the steps of responding to an obtained request instruction, and analyzing the request instruction; inquiring a corresponding scheduling range in a first database according to the level; acquiring all scheduling nodes in a scheduling range, and recording as a first scheduling node; screening the first scheduling node according to the sending position; acquiring the available water resource scheduling amount of a second scheduling node; calculating the scheduling cost of each second scheduling node for transmitting the available water resource scheduling amount to the sending position; and screening the second scheduling nodes according to the available water resource scheduling amount and the scheduling cost corresponding to the available water resource scheduling amount, marking the screened second scheduling nodes as third scheduling nodes and sending a control scheduling instruction to the third scheduling nodes, wherein the control scheduling instruction comprises the water resource scheduling amount and the sending position of the request instruction. The method and the device are used for regional temporary scheduling of water resources, and scheduling cost during temporary scheduling can be reduced.
Description
Technical Field
The application relates to the technical field of resource allocation, in particular to a south-to-north water allocation intelligent control water supply system and a scheduling method.
Background
The project for matching the south water and the north water is to supply the Yangtze river water to various water using targets through a city-crossing main canal or a common water conveying pipeline, and is used for meeting the requirements of industrial and domestic water of various counties and cities and direct water supply of enterprises. In the scheduling process, besides the overall scheduling plan, a temporary scheduling situation may also occur, the temporary scheduling needs to involve multiple scheduling nodes, and how to control the scheduling cost becomes an urgent problem to be solved.
Disclosure of Invention
The application provides a south-to-north water transfer intelligent control water supply system and a scheduling method, which can reduce scheduling cost during temporary scheduling.
The above object of the present application is achieved by the following technical solutions:
in a first aspect, the present application provides a scheduling method, including:
responding to the acquired request instruction, analyzing the request instruction, and acquiring the level, the sending position and the modulation amount contained in the request instruction;
inquiring a corresponding scheduling range in a first database according to the level;
acquiring all scheduling nodes in a scheduling range, and recording as a first scheduling node;
screening the first scheduling nodes according to the sending positions, marking the screened first scheduling nodes as second scheduling nodes, and enabling the second scheduling nodes to have a physical connection relation with the sending positions;
acquiring the available water resource scheduling amount of a second scheduling node;
calculating the scheduling cost of each second scheduling node for transmitting the available water resource scheduling amount to the sending position;
screening the second scheduling nodes according to the available water resource scheduling amount and the scheduling cost corresponding to the available water resource scheduling amount, and marking the screened second scheduling nodes as third scheduling nodes; and
and sending a control scheduling instruction to the third scheduling node, wherein the control scheduling instruction comprises the water resource scheduling amount and the sending position of the request instruction.
By adopting the technical scheme, the water resource can be automatically scheduled in the corresponding range according to the request instruction, and meanwhile, the selection can be carried out according to the scheduling cost in the scheduling process, so that the scheduling cost in the scheduling process can be effectively reduced.
In a possible implementation manner of the first aspect, if there is a time requirement in the request instruction, the method further includes:
acquiring a time requirement in a request instruction;
acquiring the time length of the transmission of the available water resource scheduling amount to the sending position by the second scheduling node;
screening the second scheduling nodes according to the available water resource scheduling amount, the scheduling cost and the time length corresponding to the available water resource scheduling amount, and marking the screened second scheduling nodes as third scheduling nodes; and
and sending a control scheduling instruction to the third scheduling node, wherein the control scheduling instruction comprises the water resource scheduling amount and the sending position of the request instruction.
By adopting the technical scheme, the scheduling of water resources can be carried out under the condition of meeting the time requirement, so that the scheduling cost is controlled within an allowable range.
In a possible implementation manner of the first aspect, when the screened third scheduling node cannot satisfy the request instruction, the method further includes:
sending an intervention request to a cloud, wherein the request comprises a part which cannot be met in a request instruction;
responding to a feedback instruction sent by the cloud, analyzing the feedback instruction, and acquiring a designated scheduling node contained in the feedback instruction and a water resource scheduling amount corresponding to the designated scheduling node; and
and sending a control scheduling instruction to the corresponding appointed scheduling node according to the water resource scheduling amount, wherein the control scheduling instruction comprises the water resource scheduling amount and the sending position of the request instruction.
By adopting the technical scheme, when the scheduling request cannot be met, the scheduling of water resources can be carried out in an external intervention mode, and the scheduling requirement of the water resources is met.
In a possible implementation manner of the first aspect, in the process of screening the second scheduling node, the method further includes:
selecting a plurality of groups of second scheduling nodes;
calculating the scheduling cost of each group of second scheduling nodes for transmitting the available water resource scheduling amount to the sending position;
selecting a plurality of groups of second scheduling nodes within a fluctuation allowable range by taking the lowest scheduling cost as a reference; and
recording the second scheduling node in a group with the least number of second scheduling nodes as a third scheduling node;
and during selection, if only one group of second scheduling nodes remains, marking the second scheduling nodes in the group as third scheduling nodes.
By adopting the technical scheme, on the premise of meeting the scheduling cost, the participation quantity of the scheduling nodes can be reduced, the participation quantity of the scheduling nodes can be further controlled, and the scheduling cost is controlled in a proper range.
In a possible implementation manner of the first aspect, when the screened third scheduling node cannot satisfy the request instruction, the method further includes:
sending an intervention request to a cloud, wherein the request comprises a part which cannot be met in a request instruction;
responding to a feedback instruction sent by the cloud, analyzing the feedback instruction, and acquiring a designated scheduling node contained in the feedback instruction and a water resource scheduling amount corresponding to the designated scheduling node; and
and sending a control scheduling instruction to the corresponding appointed scheduling node according to the water resource scheduling amount, wherein the control scheduling instruction comprises the water resource scheduling amount and the sending position of the request instruction.
By adopting the technical scheme, when the scheduling request cannot be met, the scheduling of water resources can be carried out in an external intervention mode, and the scheduling requirement of the water resources is met.
In a second aspect, the present application provides a water resource scheduling device, including:
the first processing unit is used for responding to the acquired request instruction, analyzing the request instruction and acquiring the level, the sending position and the adjustment amount contained in the request instruction;
the first query unit is used for querying a scheduling range corresponding to the first database according to the level;
the second processing unit is used for acquiring all scheduling nodes in the scheduling range and recording the scheduling nodes as first scheduling nodes;
the first screening unit is used for screening the first scheduling nodes according to the sending positions, the screened first scheduling nodes are marked as second scheduling nodes, and the second scheduling nodes and the sending positions have physical connection relations;
the first acquisition unit is used for acquiring the available water resource scheduling amount of the second scheduling node;
the first calculating unit is used for calculating the scheduling cost of conveying the available water resource scheduling amount to the sending position by each second scheduling node;
the second screening unit is used for screening the second scheduling nodes according to the available water resource scheduling amount and the scheduling cost corresponding to the available water resource scheduling amount, and the screened second scheduling nodes are marked as third scheduling nodes; and
and the third processing unit is used for sending a control scheduling instruction to the third scheduling node, wherein the control scheduling instruction comprises the water resource scheduling amount and the sending position of the request instruction.
In a third aspect, the present application provides a north-south water diversion intelligent control water supply system, the system comprising:
one or more memories for storing instructions; and
one or more processors configured to call and execute the instructions from the memory, and execute the scheduling method according to the first aspect and any possible implementation manner of the first aspect.
In a fourth aspect, the present application provides a computer-readable storage medium comprising:
a program that, when executed by a processor, performs the scheduling method as described in the first aspect and any possible implementation manner of the first aspect.
In a fifth aspect, the present application provides a computer program product comprising program instructions that, when executed by a computing device, perform the scheduling method as described in the first aspect and any possible implementation manner of the first aspect.
In a sixth aspect, the present application provides a system on a chip comprising a processor configured to perform the functions recited in the above aspects, such as generating, receiving, sending, or processing data and/or information recited in the above methods.
The chip system may be formed by a chip, or may include a chip and other discrete devices.
In one possible design, the system-on-chip further includes a memory for storing necessary program instructions and data. The processor and the memory may be decoupled, disposed on different devices, connected in a wired or wireless manner, or coupled on the same device.
Drawings
Fig. 1 is a schematic diagram illustrating a method for screening scheduling nodes according to a scheduling scope according to an embodiment of the present application.
Fig. 2 is a schematic diagram of screening scheduling nodes according to physical connection relationships based on the method shown in fig. 1.
Fig. 3 is a schematic diagram of screening scheduling nodes according to scheduling cost based on fig. 2.
Fig. 4 is a schematic diagram illustrating a method for screening scheduling nodes according to a fluctuation range according to an embodiment of the present application.
Fig. 5 is a schematic process diagram of cloud intervention scheduling according to an embodiment of the present application.
Detailed Description
The technical solution of the present application will be described in further detail below with reference to the accompanying drawings.
The scheduling method disclosed by the embodiment of the application comprises the following steps:
s101, responding to the acquired request instruction, analyzing the request instruction, and acquiring the level, the sending position and the adjustment amount contained in the request instruction;
s102, inquiring a corresponding scheduling range in a first database according to the level;
s103, acquiring all scheduling nodes in a scheduling range, and recording as a first scheduling node;
s104, screening the first scheduling nodes according to the sending positions, marking the screened first scheduling nodes as second scheduling nodes, wherein the second scheduling nodes have physical connection relations with the sending positions;
s105, acquiring the available water resource dispatching amount of the second dispatching node;
s106, calculating the scheduling cost of transmitting the available water resource scheduling amount to the sending position by each second scheduling node;
s107, screening the second scheduling nodes according to the available water resource scheduling amount and the scheduling cost corresponding to the available water resource scheduling amount, and marking the screened second scheduling nodes as third scheduling nodes; and
and S108, sending a control scheduling instruction to the third scheduling node, wherein the control scheduling instruction comprises the water resource scheduling amount and the sending position of the request instruction.
Specifically, in step S101, a scheduling node that needs water resource issues a request command, and after receiving the request command, the server analyzes the request command to obtain the level, the issue position, and the scheduling amount included in the request command.
The level represents the level of the scheduling node and represents the distribution range of other scheduling nodes which can schedule the scheduling node, the higher the level is, the higher the importance of the scheduling node is, the larger the distribution range of the scheduling node which can schedule water resources for the scheduling node is, the sending position represents the position of the scheduling node, and the scheduling amount represents the amount of the water resources required by the scheduling node.
After obtaining the data, the process starts to enter the subsequent scheduling node screening process, in step S102, please refer to fig. 1, the server queries the scheduling range corresponding to the level in the first database according to the level, for example, the level is totally seven, then the corresponding scheduling range is seven, the information is stored in the first database, and the scheduling node screening process is invoked from the first database if necessary.
In step S103, the server may obtain all scheduling nodes within the scheduling range and mark these scheduling nodes as first scheduling nodes, and it should be understood that the number of the scheduling nodes is multiple and may increase or decrease with time, so that it is more appropriate to select using the scheduling range, and the positions of the scheduling nodes are fixed, so that the query work of the scheduling nodes may be performed with the sending position as a center of a circle and the scheduling range as a radius according to the scheduling range.
After the query is completed, the obtained first scheduling nodes are screened, that is, the content in step S104, please refer to fig. 2, in this step, the first scheduling nodes are screened according to the physical connection relationship, the step is used to remove the first scheduling nodes that cannot participate in the scheduling process, and the first scheduling nodes that are screened and left are marked as second scheduling nodes.
It should be understood that the first scheduling node in the scheduling range is not all capable of participating in the scheduling process, for example, there is no canal or river between two scheduling nodes, and thus the water resource cannot be transported, so that this part of scheduling nodes needs to be removed, and the scheduling nodes that can participate in the water resource scheduling process are left.
In step S105, an available water resource scheduling amount of the second scheduling node is obtained, the available water resource scheduling amount indicates an amount of water resource that the second scheduling node can participate in the resource process, and the data is obtained for calculating the overall scheduling cost.
It should be understood that, for all the second scheduling nodes, the scheduling costs of the second scheduling nodes to the scheduling node that sends the request instruction are different, the scheduling costs of some second scheduling nodes are high, and the scheduling costs of some second scheduling nodes are low, because the scheduling distance, the number of devices participating in scheduling, the power consumption and the like are involved, the scheduling costs of each second scheduling node are different, and the scheduling nodes need to be screened according to the scheduling costs, and some second scheduling nodes with too high scheduling costs are removed.
For the calculation of the scheduling cost, there are two forms,
firstly, the data of each scheduling node is stored in a database, for example, the unit cost of delivering water resources from one scheduling node to another scheduling node is fixed, and the data can be directly retrieved;
second, for water resource scheduling, there is a fixed distance cost per unit weight, and the scheduling cost is the distance cost per scheduling amount.
It should also be understood that although some of the second scheduling nodes are closer to the scheduling node that issued the request instruction, there are also situations where the scheduling cost is higher, and therefore, considering the scheduling cost, these some second scheduling nodes also need to be eliminated.
In step S106, the server calculates a scheduling cost for each second scheduling node to deliver the available water resource scheduling amount to the sending location, where the scheduling cost is the cost for sending the part of the water resource from the second scheduling node to the sending location, and includes electricity charges, equipment charges, human charges, and other charges.
Next, in step S107, referring to fig. 3, the server screens the second scheduling node according to the available water resource scheduling amount and the scheduling cost corresponding thereto, the screened second scheduling node is marked as a third scheduling node, the screening process is performed on the premise of the minimum scheduling cost, in the following manner,
and calculating the scheduling cost of the unit water resource of each second scheduling node, then sequencing the scheduling cost from low to high, accumulating the scheduling cost according to the available water resource scheduling amount of each second scheduling node to obtain second scheduling nodes which finally participate in water resource scheduling, and marking the screened second scheduling nodes as third scheduling nodes.
And executing a final step S108, wherein the server sends a control scheduling instruction to the third scheduling node, the control scheduling instruction comprises a water resource scheduling amount and a sending position of the request instruction, so that the scheduling process is completed, and for the third scheduling node, after receiving the control scheduling instruction, the third scheduling node schedules the water resource according to the available water resource scheduling amount and the sending position of the request instruction.
Taking a specific scenario as an example, after a certain scheduling node sends a request instruction, the server will automatically schedule the water resource according to the request instruction, the process is automatically performed, human intervention is not needed, the automation degree of water resource scheduling can be effectively improved, and meanwhile, the scheduling cost can be considered in the scheduling process, and the scheduling cost is reduced to the minimum.
Overall, the scheduling method disclosed in the embodiment of the present application can automatically perform reasonable scheduling on water resources according to the scheduling cost, and the process is automatically operated without human intervention, so that the degree of automation of scheduling can be effectively improved.
In addition, when there is a time requirement in the request command, the time requirement needs to be considered first, so in one specific embodiment of the scheduling method provided by the application, the following steps are used for processing the request command with the time requirement:
s201, acquiring a time requirement in a request instruction;
s202, acquiring the time length of the second scheduling node for transmitting the available water resource scheduling amount to the sending position;
s203, screening the second scheduling nodes according to the available water resource scheduling amount, the scheduling cost and the time length corresponding to the available water resource scheduling amount, and marking the screened second scheduling nodes as third scheduling nodes; and
and S204, sending a control scheduling instruction to the third scheduling node, wherein the control scheduling instruction comprises the water resource scheduling amount and the sending position of the request instruction.
Specifically, in step S201, the server obtains the time requirement in the request command, that is, there are two cases of time requirement and no time requirement in the process of parsing the request command, and when there is a time requirement, the server obtains the time requirement in the request command.
Then, step S202 is executed, in which the time length of the available water resource dispatching amount transmitted to the sending location by the second dispatching node, that is, the time taken for dispatching the water resource, is obtained. The calculation time length is used for screening the second scheduling node, and if the scheduling time is too long, the part of the second scheduling node needs to be discarded.
In step S203, the server will screen the second scheduling node according to the available water resource scheduling amount, the scheduling cost and the time length corresponding to the available water resource scheduling amount, and the screened second scheduling node is marked as a third scheduling node, in this step, the time length is added as a reference.
In the last step S204, the server sends a control scheduling command to the third scheduling node, where the control scheduling command includes the water resource scheduling amount and the sending position of the request command.
Overall, in steps S201 to S204, time is added as a reference for scheduling water resources, and on the premise that the time requirement is met, the scheduling cost is reduced as much as possible.
Although the time dimension is considered, from another aspect, if the number of scheduling nodes participating in the scheduling process can be reduced, the scheduling cost can also be controlled within a suitable range, for example, the base cost in the scheduling process is unchanged, and the base cost is amortized as the scheduling amount increases, so in one embodiment of the scheduling method provided by the application, the following steps are added to the process of screening the second scheduling node:
s301, selecting a plurality of groups of second scheduling nodes;
s302, calculating the scheduling cost of transmitting the available water resource scheduling amount to the sending position by each group of second scheduling nodes;
s303, selecting a plurality of groups of second scheduling nodes within a fluctuation allowable range by taking the lowest scheduling cost as a reference; and
s304, marking the second scheduling node in a group with the least number of the second scheduling nodes as a third scheduling node;
and during selection, if only one group of second scheduling nodes remains, marking the second scheduling nodes in the group as third scheduling nodes.
Referring to fig. 4, specifically, a fluctuation range is set based on the lowest scheduling cost, for example, the fluctuation range may be 5% or 10%, then in this range, multiple groups of second scheduling nodes are present, because the scheduling costs of these groups are all within an allowable range within the fluctuation range, at this time, the second scheduling node in one group is selected from these groups with the least number, and then this group of second scheduling nodes is marked as a third scheduling node to participate in the following water resource scheduling process.
In addition, when considering that some situations do occur and need intervention, that is, when the screened third scheduling node cannot meet the request instruction, in a specific embodiment of the scheduling method provided by the application, the following steps are added:
s401, sending an intervention request to a cloud end, wherein the request comprises a part which cannot be met in a request instruction;
s402, responding to a feedback instruction sent by the cloud, analyzing the feedback instruction, and acquiring a designated scheduling node contained in the feedback instruction and a water resource scheduling amount corresponding to the designated scheduling node; and
and S403, sending a control scheduling instruction to the corresponding designated scheduling node according to the water resource scheduling amount, wherein the control scheduling instruction comprises the water resource scheduling amount and the sending position of the request instruction.
There are several situations when the scheduling requirements cannot be met,
1. the available water resource scheduling amount provided by the scheduling node in the scheduling range is insufficient;
2. after screening, the available water resource scheduling amount provided by the rest scheduling nodes is insufficient;
3. the available water resource scheduling amount provided by the scheduling node meeting the time requirement is insufficient;
when these conditions occur, in step S401, the server sends an intervention request to the cloud, where the request includes a portion that cannot be satisfied in the request instruction, and the cloud receives the intervention request and processes the intervention request, where the processing is generally performed by a human, because internal resource coordination needs to be performed, and after the processing is completed, the cloud sends a feedback instruction to the server.
After receiving the feedback instruction, the server executes step S402, in which the server parses the feedback instruction, obtains the designated scheduling node included in the feedback instruction and the water resource scheduling amount corresponding to the designated scheduling node, and then sends a control scheduling instruction to the designated scheduling node corresponding to the feedback instruction according to the water resource scheduling amount, where the control scheduling instruction includes the water resource scheduling amount and the sending position of the request instruction, that is, the content in step S403.
After the request cloud is intervened, the situation that the scheduling requirement cannot be met can be solved, and the scheduling process can be smoothly carried out.
The embodiment of the present application further provides a water resource scheduling device, include:
the first processing unit is used for responding to the acquired request instruction, analyzing the request instruction and acquiring the level, the sending position and the adjustment amount contained in the request instruction;
the first query unit is used for querying a scheduling range corresponding to the first database according to the level;
the second processing unit is used for acquiring all scheduling nodes in the scheduling range and recording the scheduling nodes as first scheduling nodes;
the first screening unit is used for screening the first scheduling nodes according to the sending positions, the screened first scheduling nodes are marked as second scheduling nodes, and the second scheduling nodes and the sending positions have physical connection relations;
the first acquisition unit is used for acquiring the available water resource scheduling amount of the second scheduling node;
the first calculating unit is used for calculating the scheduling cost of conveying the available water resource scheduling amount to the sending position by each second scheduling node;
the second screening unit is used for screening the second scheduling nodes according to the available water resource scheduling amount and the scheduling cost corresponding to the available water resource scheduling amount, and the screened second scheduling nodes are marked as third scheduling nodes; and
and the third processing unit is used for sending a control scheduling instruction to the third scheduling node, wherein the control scheduling instruction comprises the water resource scheduling amount and the sending position of the request instruction.
In one example, the units in any of the above apparatuses may be one or more integrated circuits configured to implement the above methods, such as: one or more Application Specific Integrated Circuits (ASICs), or one or more Digital Signal Processors (DSPs), or one or more Field Programmable Gate Arrays (FPGAs), or a combination of at least two of these integrated circuit forms.
As another example, when a unit in a device may be implemented in the form of a processing element scheduler, the processing element may be a general-purpose processor, such as a Central Processing Unit (CPU) or other processor capable of invoking programs. As another example, these units may be integrated together and implemented in the form of a system-on-a-chip (SOC).
Various objects such as various messages/information/devices/network elements/systems/devices/actions/operations/procedures/concepts may be named in the present application, it is to be understood that these specific names do not constitute limitations on related objects, and the named names may vary according to circumstances, contexts, or usage habits, and the understanding of the technical meaning of the technical terms in the present application should be mainly determined by the functions and technical effects embodied/performed in the technical solutions.
It is clear to those skilled in the art that, for convenience and brevity of description, the specific working processes of the above-described systems, apparatuses and units may refer to the corresponding processes in the foregoing method embodiments, and are not described herein again.
In the several embodiments provided in the present application, it should be understood that the disclosed system, apparatus and method may be implemented in other ways. For example, the above-described apparatus embodiments are merely illustrative, and for example, the division of the units is only one logical division, and other divisions may be realized in practice, for example, a plurality of units or components may be combined or integrated into another system, or some features may be omitted, or not executed. In addition, the shown or discussed mutual coupling or direct coupling or communication connection may be an indirect coupling or communication connection through some interfaces, devices or units, and may be in an electrical, mechanical or other form.
The units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the units can be selected according to actual needs to achieve the purpose of the solution of the embodiment.
Those of ordinary skill in the art will appreciate that the various illustrative elements and algorithm steps described in connection with the embodiments disclosed herein may be implemented as electronic hardware or combinations of computer software and electronic hardware. Whether such functionality is implemented as hardware or software depends upon the particular application and design constraints imposed on the implementation. Skilled artisans may implement the described functionality in varying ways for each particular application, but such implementation decisions should not be interpreted as causing a departure from the scope of the present application.
It should also be understood that, in various embodiments of the present application, first, second, etc. are used merely to indicate that a plurality of objects are different. For example, the first time window and the second time window are merely to show different time windows. And should not have any influence on the time window itself, and the above-mentioned first, second, etc. should not impose any limitation on the embodiments of the present application.
It is also to be understood that the terminology and/or the description of the various embodiments herein is consistent and mutually inconsistent if no specific statement or logic conflicts exists, and that the technical features of the various embodiments may be combined to form new embodiments based on their inherent logical relationships.
The functions, if implemented in the form of software functional units and sold or used as a stand-alone product, may be stored in a computer readable storage medium. Based on such understanding, the technical solution of the present application or portions thereof that substantially contribute to the prior art may be embodied in the form of a software product stored in a computer-readable storage medium, which includes instructions for causing a computer device (which may be a personal computer, a server, or a network device) to perform all or part of the steps of the method according to the embodiments of the present application. And the aforementioned computer-readable storage media comprise: various media capable of storing program codes, such as a usb disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk, or an optical disk.
The embodiment of the application also provides a south-to-north water transfer intelligent control water supply system, the system includes:
one or more memories for storing instructions; and
one or more processors configured to call and execute the instructions from the memory to perform the scheduling method as described above.
The present application also provides a computer program product, which includes instructions that, when executed, cause the virtual reality technology-based movement trajectory generation system to perform the operations of the virtual reality technology-based movement trajectory generation system corresponding to the above-mentioned method.
Embodiments of the present application further provide a chip system, which includes a processor, and is configured to implement the functions referred to in the foregoing, for example, to generate, receive, transmit, or process data and/or information referred to in the foregoing methods.
The chip system may be formed by a chip, or may include a chip and other discrete devices.
The processor mentioned in any of the above may be a CPU, a microprocessor, an ASIC, or one or more integrated circuits for controlling the execution of the program of the method for transmitting feedback information.
In one possible design, the system-on-chip further includes a memory for storing necessary program instructions and data. The processor and the memory may be decoupled, respectively disposed on different devices, and connected in a wired or wireless manner to support the chip system to implement various functions in the above embodiments. Alternatively, the processor and the memory may be coupled to the same device.
Optionally, the computer instructions are stored in a memory.
Alternatively, the memory is a storage unit in the chip, such as a register, a cache, and the like, and the memory may also be a storage unit outside the chip in the terminal, such as a ROM or other types of static storage devices that can store static information and instructions, a RAM, and the like.
It will be appreciated that the memory in the embodiments of the subject application can be either volatile memory or nonvolatile memory, or can include both volatile and nonvolatile memory.
The non-volatile memory may be ROM, Programmable Read Only Memory (PROM), Erasable PROM (EPROM), Electrically Erasable PROM (EEPROM), or flash memory.
Volatile memory can be RAM, which acts as external cache memory. There are many different types of RAM, such as Static Random Access Memory (SRAM), Dynamic RAM (DRAM), Synchronous DRAM (SDRAM), double data rate SDRAM (DDR SDRAM), Enhanced SDRAM (ESDRAM), synclink DRAM (SLDRAM), and direct memory bus RAM.
The embodiments of the present invention are preferred embodiments of the present application, and the scope of protection of the present application is not limited by the embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.
Claims (8)
1. A method of scheduling, comprising:
responding to the acquired request instruction, analyzing the request instruction, and acquiring the level, the sending position and the modulation amount contained in the request instruction;
inquiring a corresponding scheduling range in a first database according to the level;
acquiring all scheduling nodes in a scheduling range, and recording as a first scheduling node;
screening the first scheduling nodes according to the sending positions, marking the screened first scheduling nodes as second scheduling nodes, and enabling the second scheduling nodes to have a physical connection relation with the sending positions;
acquiring the available water resource scheduling amount of a second scheduling node;
calculating the scheduling cost of each second scheduling node for transmitting the available water resource scheduling amount to the sending position;
screening the second scheduling nodes according to the available water resource scheduling amount and the scheduling cost corresponding to the available water resource scheduling amount, and marking the screened second scheduling nodes as third scheduling nodes; and
and sending a control scheduling instruction to the third scheduling node, wherein the control scheduling instruction comprises the water resource scheduling amount and the sending position of the request instruction.
2. The method of claim 1, wherein if there is a time requirement in the request instruction, further comprising:
acquiring a time requirement in a request instruction;
acquiring the time length of the transmission of the available water resource scheduling amount to the sending position by the second scheduling node;
screening the second scheduling nodes according to the available water resource scheduling amount, the scheduling cost and the time length corresponding to the available water resource scheduling amount, and marking the screened second scheduling nodes as third scheduling nodes; and
and sending a control scheduling instruction to the third scheduling node, wherein the control scheduling instruction comprises the water resource scheduling amount and the sending position of the request instruction.
3. The scheduling method according to claim 1 or 2, wherein when the screened third scheduling node fails to satisfy the request instruction, further comprising:
sending an intervention request to a cloud, wherein the request comprises a part which cannot be met in a request instruction;
responding to a feedback instruction sent by the cloud, analyzing the feedback instruction, and acquiring a designated scheduling node contained in the feedback instruction and a water resource scheduling amount corresponding to the designated scheduling node; and
and sending a control scheduling instruction to the corresponding appointed scheduling node according to the water resource scheduling amount, wherein the control scheduling instruction comprises the water resource scheduling amount and the sending position of the request instruction.
4. The scheduling method of claim 1, wherein the step of screening the second scheduling node further comprises:
selecting a plurality of groups of second scheduling nodes;
calculating the scheduling cost of each group of second scheduling nodes for transmitting the available water resource scheduling amount to the sending position;
selecting a plurality of groups of second scheduling nodes within a fluctuation allowable range by taking the lowest scheduling cost as a reference; and
recording the second scheduling node in a group with the least number of second scheduling nodes as a third scheduling node;
and during selection, if only one group of second scheduling nodes remains, marking the second scheduling nodes in the group as third scheduling nodes.
5. The scheduling method according to claim 4, wherein when the screened third scheduling node fails to satisfy the request instruction, further comprising:
sending an intervention request to a cloud, wherein the request comprises a part which cannot be met in a request instruction;
responding to a feedback instruction sent by the cloud, analyzing the feedback instruction, and acquiring a designated scheduling node contained in the feedback instruction and a water resource scheduling amount corresponding to the designated scheduling node; and
and sending a control scheduling instruction to the corresponding appointed scheduling node according to the water resource scheduling amount, wherein the control scheduling instruction comprises the water resource scheduling amount and the sending position of the request instruction.
6. A water resource scheduling device, comprising:
the first processing unit is used for responding to the acquired request instruction, analyzing the request instruction and acquiring the level, the sending position and the adjustment amount contained in the request instruction;
the first query unit is used for querying a scheduling range corresponding to the first database according to the level;
the second processing unit is used for acquiring all scheduling nodes in the scheduling range and recording the scheduling nodes as first scheduling nodes;
the first screening unit is used for screening the first scheduling nodes according to the sending positions, the screened first scheduling nodes are marked as second scheduling nodes, and the second scheduling nodes and the sending positions have physical connection relations;
the first acquisition unit is used for acquiring the available water resource scheduling amount of the second scheduling node;
the first calculating unit is used for calculating the scheduling cost of conveying the available water resource scheduling amount to the sending position by each second scheduling node;
the second screening unit is used for screening the second scheduling nodes according to the available water resource scheduling amount and the scheduling cost corresponding to the available water resource scheduling amount, and the screened second scheduling nodes are marked as third scheduling nodes; and
and the third processing unit is used for sending a control scheduling instruction to the third scheduling node, wherein the control scheduling instruction comprises the water resource scheduling amount and the sending position of the request instruction.
7. A south-to-north water intelligent control water supply system, the system comprising:
one or more memories for storing instructions; and
one or more processors configured to call and execute the instructions from the memory to perform the scheduling method of any one of claims 1 to 5.
8. A computer-readable storage medium, the computer-readable storage medium comprising:
program for performing the scheduling method according to any one of claims 1 to 5 when said program is run by a processor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110154626.8A CN112925228A (en) | 2021-02-04 | 2021-02-04 | Intelligent control water supply system for regulating south to north and dispatching method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110154626.8A CN112925228A (en) | 2021-02-04 | 2021-02-04 | Intelligent control water supply system for regulating south to north and dispatching method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112925228A true CN112925228A (en) | 2021-06-08 |
Family
ID=76170298
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110154626.8A Pending CN112925228A (en) | 2021-02-04 | 2021-02-04 | Intelligent control water supply system for regulating south to north and dispatching method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112925228A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN118071105A (en) * | 2024-03-18 | 2024-05-24 | 广州高得环保科技股份有限公司 | Intelligent control method and system for rural drinking water treatment |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107679717A (en) * | 2017-09-15 | 2018-02-09 | 西安博兴自动化科技有限公司 | A kind of management system based on water amount information collection and Group of Pumping Station Optimized Operation |
CN108005016A (en) * | 2017-10-31 | 2018-05-08 | 江苏省水利勘测设计研究院有限公司 | A kind of south water to north water transfer system Water Resources Allocation device and collocation method |
CN109066691A (en) * | 2018-09-13 | 2018-12-21 | 珠海格力电器股份有限公司 | Energy scheduling method, energy control device and energy system |
CN109214110A (en) * | 2018-09-27 | 2019-01-15 | 中国水利水电科学研究院 | A kind of long range water lift engineering optimization dispatching method |
CN109377408A (en) * | 2018-09-29 | 2019-02-22 | 青海大学 | A kind of resource regulating method and system improving renewable energy utilization rate |
CN109544024A (en) * | 2018-11-30 | 2019-03-29 | 北京科技大学 | A kind of method of suitable small watershed river multi-water resources water quality and quantity scheduling |
CN109685685A (en) * | 2018-12-28 | 2019-04-26 | 中国水利水电科学研究院 | A kind of Programming for Multiobjective Water Resources equalization scheduling method based on macroscopic allocation scheme |
-
2021
- 2021-02-04 CN CN202110154626.8A patent/CN112925228A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107679717A (en) * | 2017-09-15 | 2018-02-09 | 西安博兴自动化科技有限公司 | A kind of management system based on water amount information collection and Group of Pumping Station Optimized Operation |
CN108005016A (en) * | 2017-10-31 | 2018-05-08 | 江苏省水利勘测设计研究院有限公司 | A kind of south water to north water transfer system Water Resources Allocation device and collocation method |
CN109066691A (en) * | 2018-09-13 | 2018-12-21 | 珠海格力电器股份有限公司 | Energy scheduling method, energy control device and energy system |
CN109214110A (en) * | 2018-09-27 | 2019-01-15 | 中国水利水电科学研究院 | A kind of long range water lift engineering optimization dispatching method |
CN109377408A (en) * | 2018-09-29 | 2019-02-22 | 青海大学 | A kind of resource regulating method and system improving renewable energy utilization rate |
CN109544024A (en) * | 2018-11-30 | 2019-03-29 | 北京科技大学 | A kind of method of suitable small watershed river multi-water resources water quality and quantity scheduling |
CN109685685A (en) * | 2018-12-28 | 2019-04-26 | 中国水利水电科学研究院 | A kind of Programming for Multiobjective Water Resources equalization scheduling method based on macroscopic allocation scheme |
Non-Patent Citations (1)
Title |
---|
游进军等: "跨流域调水工程水量配置与调度耦合方法研究", 《水利水电技术》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN118071105A (en) * | 2024-03-18 | 2024-05-24 | 广州高得环保科技股份有限公司 | Intelligent control method and system for rural drinking water treatment |
CN118071105B (en) * | 2024-03-18 | 2024-08-20 | 广州高得环保科技股份有限公司 | Intelligent control method and system for rural drinking water treatment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3648253A (en) | Program scheduler for processing systems | |
CN110677462B (en) | Access processing method, system, device and storage medium for multi-block chain network | |
CN110599148B (en) | Cluster data processing method and device, computer cluster and readable storage medium | |
CN110168529A (en) | Date storage method, device and storage medium | |
CN102541661B (en) | Realize the method and apparatus of wait on address synchronization interface | |
CN111767144B (en) | Transaction route determination method, device, equipment and system for transaction data | |
CN106649638B (en) | Big data acquisition method | |
CN109597687B (en) | Resource allocation method and device for data synchronization, storage medium and electronic equipment | |
CN103810045A (en) | Resource allocation method, resource manager, resource server and system | |
US20200074516A1 (en) | Providing device, processing system, and communication method | |
CN112925228A (en) | Intelligent control water supply system for regulating south to north and dispatching method | |
CN110298549B (en) | Project task processing method, device, equipment and medium for airport construction engineering | |
CN108632452A (en) | Schedule arrangement updating method, device and system | |
CN110569129A (en) | Resource allocation method and device, storage medium and electronic device | |
CN110672918A (en) | Method and device for measuring electric quantity of shared base station | |
CN115373828A (en) | Resource scheduling method, device, equipment and computer storage medium | |
CN115202890B (en) | Data element production resource space distribution method, system and equipment | |
CN116611662A (en) | Multi-job-place scheduling processing method, device, system and medium | |
CN116611987A (en) | Data processing method, device, graphics processor and storage medium | |
CN103516618A (en) | Information providing method, system and related device | |
Yang et al. | Study on static task scheduling based on heterogeneous multi-core processor | |
CN115514818A (en) | Resource configuration method and resource scheduling method for edge cloud | |
CN112381590A (en) | Cost accounting method, device, server and storage medium | |
CN114675954A (en) | Task scheduling method and device | |
CN116661982A (en) | Computing resource processing method, device, equipment, storage medium and program product |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210608 |