CN112900903A - High-stability protection device for high-rise building construction and protection method thereof - Google Patents
High-stability protection device for high-rise building construction and protection method thereof Download PDFInfo
- Publication number
- CN112900903A CN112900903A CN202110109602.0A CN202110109602A CN112900903A CN 112900903 A CN112900903 A CN 112900903A CN 202110109602 A CN202110109602 A CN 202110109602A CN 112900903 A CN112900903 A CN 112900903A
- Authority
- CN
- China
- Prior art keywords
- top end
- ring
- building
- steel cable
- stability
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/32—Safety or protective measures for persons during the construction of buildings
- E04G21/3204—Safety or protective measures for persons during the construction of buildings against falling down
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/24—Safety or protective measures preventing damage to building parts or finishing work during construction
- E04G21/30—Safety or protective measures preventing damage to building parts or finishing work during construction against mechanical damage or dirt, e.g. guard covers of stairs
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The invention relates to the technical field of buildings, in particular to a high-stability protection device for high-rise building construction and a protection method thereof, wherein the protection device comprises a building body and a fence body, a plurality of floor slabs are connected between the left side wall and the right side wall of the building body, telescopic rods are connected between the floor slabs, a winch is arranged at the top end of the building body, a connecting plate is arranged at the top end of a first slideway in a sliding manner, pulleys are arranged at the right end of the connecting plate, a support is arranged at the top end of the fence body, a protection plate is arranged at the lower area of the fence body, a plurality of guardrails are connected at the top end of the protection plate and the bottom end of a second connecting rod, an upper supporting plate is arranged at the top end of each telescopic rod, a second lantern ring and a first lantern ring are respectively sleeved at the upper area and the lower area of each telescopic rod, a group of, and the influence of wind force is small, and the protection effect is high.
Description
Technical Field
The invention relates to the technical field of buildings, in particular to a high-stability protection device for high-rise building construction and a protection method thereof.
Background
As is known, a building with elevators, i.e. a high-rise building, is generally called a high-rise building with 9 floors or more according to the traditional theory, but in modern society, because the number of the high-rise buildings is more and the height is higher and higher, new definitions are added to the high-rise building, generally more than 18 floors are called the high-rise building, more than 100 meters or 30 floors can be called a super high-rise building or a skyscraper, and the building is a general term of buildings and structures and is a general term of people for meeting the needs of social life.
Because the construction height is higher to personnel are under construction at high-rise, the danger probability is higher, and in the work progress, because weather reason, high altitude construction wind-force is great, and personnel's protection and the protection level of building materials are relatively poor, lead to protector's protecting effect lower, and the practicality is less.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides the protection device and the protection method for the high-stability high-rise building construction, which have the advantages of higher stability, smaller wind influence and higher protection effect.
(II) technical scheme
In order to achieve the purpose, the invention provides the following technical scheme: a protection device for high-stability high-rise building construction comprises a building body and a fence body, wherein a plurality of floor slabs are connected between the left side wall and the right side wall of the building body, telescopic rods are connected between the floor slabs, a winch is arranged at the top end of the building body, a main steel cable is arranged inside the winch, a first slide way is arranged on the right side of the top end of the building body, a connecting plate is arranged at the top end of the first slide way in a sliding mode, a pulley is arranged at the right end of the connecting plate, one end of the main steel cable penetrates through the pulley and is connected with a hanging ring, a support is arranged at the top end of the fence body, the top end of the support is fixedly connected with the bottom end of the hanging ring, a second connecting rod is connected to the upper area of the fence body, a protection plate is arranged on the lower area of the fence body, a plurality of guardrails, the bottom end of each telescopic rod is provided with a lower supporting plate, the top end of each telescopic rod is provided with an upper supporting plate, the upper area and the lower area of each telescopic rod are respectively sleeved with a second sleeve ring and a first sleeve ring, a lower steel cable is connected between the first sleeve rings, an upper steel cable is connected between the second sleeve rings, the circumferential outer wall of the upper steel cable and the circumferential outer wall of the lower steel cable are respectively sleeved with a second group of sliding rings, vertical steel cables are connected between the second sliding rings, the circumferential outer wall of each vertical steel cable is sleeved with a first sliding ring, each first sliding ring is connected with a first connecting rod through a rotating ring, the top end of the second connecting rod is provided with a control box, the right end of the control box is provided with a plurality of control keys, the left side wall and the right side wall of the second connecting rod are respectively provided with a second sliding way, the circumferential outer wall of the connecting rope is connected with a safety belt through a sliding ring III.
Preferably, each of the top ends of the upper support plates and the bottom ends of the lower support plates is provided with a slip prevention claw, and each slip prevention claw is in contact with the top end and the bottom end of the floor.
Preferably, the front end of each first lantern ring and the front end of each second lantern ring are provided with a fixing screw, and the rear end of each fixing screw penetrates through the first lantern ring and the second lantern ring respectively and contacts with the front end of the telescopic rod.
Preferably, the four corners of the bottom end of the fence body are provided with support legs.
Preferably, the safety belt is provided with a lock catch.
Preferably, the left end and the right end of capstan winch all are provided with the fixed plate to the top of each fixed plate all is provided with the pilot pin, and the bottom of each pilot pin all passes the fixed plate and to being connected with the building body.
Preferably, the front end and the rear end of the first slideway are both provided with a limiting plate.
A protection method of the high-stability protection device for building construction according to any one of claims 1 to 7, comprising the steps of:
fixing a winch at the top end of a building body, fixing a first slideway at the edge of the top end of the building body, and connecting a connecting plate with the first slideway;
step two, connecting the winch with the fence body through a steel cable, supporting and fixing the telescopic rod and the floor slab, tensioning an upper steel cable and a lower steel cable between the first lantern ring and the second lantern ring, and connecting the vertical steel cables;
thirdly, connecting the slip ring I with the connecting rod, putting the building materials into the fence body, and binding the safety belt on the body of a constructor;
and step four, controlling the fence body to ascend through the control key, connecting and fixing the fence body through the rotating ring and the connecting rod when the fence body ascends to a working point, controlling the fence body to move up and down, left and right on the layer through sliding between the sliding ring I and the sliding ring II, enlarging the construction range of constructors and improving the stability of the fence body.
(III) advantageous effects
Compared with the prior art, the invention provides a high-stability protection device for high-rise building construction, which has the following beneficial effects:
this high building protection device for construction of high stability, intercept the human body through connecting rod two and the guardrail on the fence body, prevent that personnel from weighing down and falling at the external portion of fence, increase constructor's security, and protect building material through the guard plate, prevent the building materials in the work progress, the outside of the fence body that falls, cooperation through between safety belt and the slider increases constructor's safety protection performance, and increase constructor's flexibility at the internal fence, through last cable wire, down cable wire and perpendicular cable wire are connected the fence body, increase the stability of the fence body, simultaneously through sliding ring one, sliding ring two, cooperation between sliding ring three and the connecting plate increases the construction range of the fence body between this floor.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic diagram of the right side of the present invention;
FIG. 3 is a schematic view of the structure of the fence of the present invention;
FIG. 4 is an enlarged schematic view of FIG. 1 at A;
FIG. 5 is an enlarged view of the structure of FIG. 1 at B;
FIG. 6 is an enlarged view of the structure of FIG. 2 at C;
FIG. 7 is an enlarged view of FIG. 2 at D according to the present invention;
fig. 8 is an enlarged schematic view of the structure at E in fig. 2 according to the present invention.
In the figure: 1. a building body; 2. a floor slab; 3. a main wire rope; 4. a first slideway; 5. a connecting plate; 6. a pulley; 7. a telescopic rod; 8. a fixing plate; 9. positioning bolts; 10. a winch; 11. a first connecting rod; 12. rotating the ring; 13. a protection plate; 14. a support leg; 15. a hurdle body; 16. a guardrail; 17. a support; 18. a second connecting rod; 19. an anti-slip claw; 20. a lower support plate; 21. a lantern ring I; 22. fixing screws; 23. an upper support plate; 24. a second lantern ring; 25. a slip ring I; 26. a control key; 27. a control box; 28. a hoisting ring; 29. steel cable feeding; 30. a vertical steel cable; 31. a second slip ring; 32. a steel cable is arranged; 33. a slip ring III; 34. connecting ropes; 35. a second slideway; 36. a slider; 37. locking; 38. a seat belt; 39. and a limiting plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Examples
Referring to fig. 1-8, a protection device for high-stability high-rise building construction comprises a building body 1 and a fence body 15, wherein a plurality of floor slabs 2 are connected between the left side wall and the right side wall of the building body 1, telescopic rods 7 are connected between the floor slabs 2, a winch 10 is arranged at the top end of the building body 1, a main steel cable 3 is arranged inside the winch 10, a first slideway 4 is arranged at the right side of the top end of the building body 1, a connecting plate 5 is slidably arranged at the top end of the first slideway 4, a pulley 6 is arranged at the right end of the connecting plate 5, one end of the main steel cable 3 passes through the pulley 6 and is connected with a hanging ring 28, a support 17 is arranged at the top end of the fence body 15, the top end of the support 17 is fixedly connected with the bottom end of the hanging ring 28, a connecting rod 18 is connected to the upper region of the fence body 15, a protection plate 13 is arranged at the lower region of the fence body 15, the left end of the hurdle body 15 is connected with a first connecting rod 11 through a rotating ring 12, the bottom end of each telescopic rod 7 is provided with a lower supporting plate 20, the top end of each telescopic rod 7 is provided with an upper supporting plate 23, the upper area and the lower area of each telescopic rod 7 are respectively sleeved with a second sleeve ring 24 and a first sleeve ring 21, a lower steel cable 32 is connected between the first sleeve rings 21, an upper steel cable 29 is connected between the second sleeve rings 24, the circumferential outer wall of the upper steel cable 29 and the circumferential outer wall of the lower steel cable 32 are respectively sleeved with a group of second sliding rings 31, a vertical steel cable 30 is connected between the second sliding rings 31, the circumferential outer wall of each vertical steel cable 30 is sleeved with a first sliding ring 25, each sliding ring 25 is connected with the first connecting rod 11 through the rotating ring 12, the top end of the second connecting rod 18 is provided with a control box 27, and the right end, the left side wall and the right side wall of the second connecting rod 18 are both provided with a second slide way 35, each second slide way 35 is provided with a slide block 36, a connecting rope 34 is connected between the slide blocks 36, the circumferential outer wall of the connecting rope 34 is connected with a safety belt 38 through a third slide ring 33, the high-stability protection device for high-rise building construction intercepts a human body through the second connecting rod 18 and the guardrail 16 on the fence body 15, prevents personnel from falling outside the fence body 15, increases the safety of the constructors, protects building materials through the protective plate 13, prevents building materials from falling outside the fence body 15 in the construction process, increases the safety protection performance of the constructors through the matching between the safety belt 38 and the slide blocks 36, increases the flexibility of the constructors in the fence body 15, connects the fence body 15 through the upper steel cable 29, the lower steel cable 32 and the vertical steel cable 30, and increases the stability of the fence body 15, meanwhile, the construction range of the fence body 15 between floors is increased through the matching of the first sliding ring 25, the second sliding ring 31, the third sliding ring 33 and the connecting plate 5.
Specifically, the top end of each upper support plate 23 and the bottom end of the lower support plate 20 are provided with anti-slip claws 19, and each anti-slip claw 19 is in contact with the top end and the bottom end of the floor slab 2, so that the friction force between the telescopic rod 7 and the floor slab 2 is increased.
Specifically, the front end of each of the first lantern ring 21 and the front end of each of the second lantern ring 24 are provided with a fixing screw 22, and the rear end of each fixing screw 22 passes through the first lantern ring 21 and the second lantern ring 24 respectively and contacts with the front end of the telescopic rod 7, so that the stability of the first lantern ring 21 and the second lantern ring 24 with the telescopic rod 7 is improved.
Specifically, the four corners of the bottom end of the fence body 15 are provided with the supporting legs 14, so that the stability of the fence body 15 is improved when the fence body 15 lands on the ground.
In particular, the safety belt 38 is provided with a lock catch 37, which is convenient for people of different body types to wear.
Specifically, the left end and the right end of the winch 10 are both provided with a fixing plate 8, the top end of each fixing plate 8 is provided with a positioning bolt 9, the bottom end of each positioning bolt 9 penetrates through the fixing plate 8 and is connected with the building body 1, and the fixing effect between the winch 10 and the building body 1 is improved.
Specifically, the front end and the rear end of the first slideway 4 are both provided with a limiting plate 39, so that the connecting plate 5 is prevented from slipping off the first rail.
A protection method of the high-stability protection device for building construction according to any one of claims 1 to 7, comprising the steps of:
step one, fixing a winch 10 at the top end of a building body 1, fixing a first slideway 4 at the edge of the top end of the building body 1, and connecting a connecting plate 5 with the first slideway 4;
step two, connecting the winch 10 with the fence body 15 through a steel cable, supporting and fixing the telescopic rod 7 with the floor slab 2, tensioning an upper steel cable 29 and a lower steel cable 32 between the first lantern ring 21 and the second lantern ring 24, and connecting the vertical steel cable 30;
thirdly, connecting the sliding ring I25 with the connecting rod, putting the building materials into the fence body 15, and binding the safety belt 38 on the body of a constructor;
and step four, the control key 26 is used for controlling the lifting of the fence body 15, when the fence body rises to a working point, the fence body 15 is fixedly connected through the rotating ring 12 and the connecting rod, the fence body 15 is controlled to move up and down, left and right on the layer through sliding between the sliding ring I25 and the sliding ring II 31, the construction range of constructors is enlarged, and the stability of the fence body 15 is improved.
In summary, when the high-stability protection device for high-rise building construction is used, firstly, the winch 10 is fixed at the top end of the building body 1, the slideway first 4 is fixed at the edge of the top end of the building body 1, the connecting plate 5 is connected with the slideway first 4, the winch 10 is connected with the fence 15 through the steel cable, the telescopic rod 7 is supported and fixed with the floor 2, the upper steel cable 29 and the lower steel cable 32 between the lantern ring first 21 and the lantern ring second 24 are tensioned, the vertical steel cable 30 is connected, the connecting rod is connected through the sliding ring first 25, the building material is put into the fence 15, the safety belt 38 is bound on the body of a constructor, the fence 15 is controlled to ascend through the control key 26, when the building protection device ascends to a working point, the building protection device is connected and fixed through the rotating ring 12 and the connecting rod, the fence 15 is controlled to move up and down and left and right through the sliding between the sliding ring first 25 and the sliding ring second, the construction range of constructors is enlarged, and the stability of the fence body 15 is improved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (8)
1. A high-stability protection device for high-rise building construction comprises a building body (1) and a fence body (15), and is characterized in that a plurality of floor slabs (2) are connected between the left side wall and the right side wall of the building body (1), telescopic rods (7) are connected between the floor slabs (2), a winch (10) is arranged at the top end of the building body (1), a main steel cable (3) is arranged inside the winch (10), a first slideway (4) is arranged on the right side of the top end of the building body (1), a connecting plate (5) is slidably arranged at the top end of the first slideway (4), a pulley (6) is arranged at the right end of the connecting plate (5), one end of the main steel cable (3) penetrates through the pulley (6) and is connected with a hanging ring (28), a support (17) is arranged at the top end of the fence body (15), and the top end of the support (17) is fixedly connected with the, the upper area of the hurdle body (15) is connected with a second connecting rod (18), the lower area of the hurdle body (15) is provided with a first protecting plate (13), the top end of the protecting plate (13) and the bottom end of the second connecting rod (18) are connected with a plurality of guardrails (16), the left end of the hurdle body (15) is connected with a first connecting rod (11) through a rotating ring (12), the bottom end of each telescopic rod (7) is provided with a lower supporting plate (20), the top end of each telescopic rod (7) is provided with an upper supporting plate (23), the upper area and the lower area of each telescopic rod (7) are respectively sleeved with a second lantern ring (24) and a first lantern ring (21), a lower steel cable (32) is connected between the first lantern rings (21), an upper steel cable (29) is connected between the second lantern rings (24), and a group of sliding rings (31) are sleeved on the circumferential outer wall of the upper steel cable (29, and all be connected with between each sliding ring two (31) and erect cable wire (30), each the circumference outer wall of erecting cable wire (30) all overlaps and is equipped with sliding ring one (25), and each sliding ring one (25) all is connected with connecting rod one (11) through swivel (12), the top of connecting rod two (18) is provided with control box (27), and the right-hand member of control box (27) is provided with a plurality of control key (26), the left side wall and the right side wall of connecting rod two (18) all are provided with slide two (35), and all are provided with slider (36) on each slide two (35), are connected with between each slider (36) and connect rope (34), the circumference outer wall of connecting rope (34) is connected with safety belt (38) through sliding ring three (33).
2. A high-stability building construction protector according to claim 1 wherein the top end of each upper support plate (23) and the bottom end of the lower support plate (20) are provided with anti-slip claws (19), and each anti-slip claw (19) is in contact with the top and bottom ends of the floor (2).
3. The high-stability building construction protection device as claimed in claim 2, wherein the front end of each first lantern ring (21) and the front end of each second lantern ring (24) are provided with fixing screws (22), and the rear end of each fixing screw (22) passes through the first lantern ring (21) and the second lantern ring (24) respectively and contacts with the front end of the telescopic rod (7).
4. A high-stability high-rise building construction protection device according to claim 3, wherein the bottom four corners of the fence body (15) are provided with support legs (14).
5. A high-stability protection device for high-rise building construction according to claim 4, wherein the safety belt (38) is provided with a lock catch (37).
6. The high-stability protective device for building construction of high-rise building according to claim 5, wherein the winch (10) is provided with fixing plates (8) at the left end and the right end, and each fixing plate (8) is provided with a positioning bolt (9) at the top end, and the bottom end of each positioning bolt (9) passes through the fixing plate (8) and is connected with the building body (1).
7. The high-stability protection device for high-rise building construction according to claim 6, wherein the first slideway (4) is provided with a limiting plate (39) at the front end and the rear end.
8. A protection method of a high-stability protection device for building construction according to any one of claims 1 to 7, comprising the steps of:
step one, fixing a winch (10) at the top end of a building body (1), fixing a first slideway (4) at the edge of the top end of the building body (1), and connecting a connecting plate (5) with the first slideway (4);
secondly, connecting a winch (10) with a fence body (15) through a steel cable, supporting and fixing a telescopic rod (7) and a floor slab (2), tensioning an upper steel cable (29) and a lower steel cable (32) between a first lantern ring (21) and a second lantern ring (24), and connecting a vertical steel cable (30);
thirdly, connecting the sliding ring I (25) with the connecting rod, putting the building materials into the fence body (15), and binding the safety belt (38) on the body of a constructor;
and fourthly, controlling the lifting of the fence body (15) through the control key (26), connecting and fixing through the rotating ring (12) and the connecting rod when the fence body rises to a working point, controlling the fence body (15) to move up and down, left and right on the layer through sliding between the sliding ring I (25) and the sliding ring II (31), enlarging the construction range of constructors and improving the stability of the fence body (15).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110109602.0A CN112900903B (en) | 2021-01-26 | 2021-01-26 | Protection device for high-stability high-rise building construction and protection method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110109602.0A CN112900903B (en) | 2021-01-26 | 2021-01-26 | Protection device for high-stability high-rise building construction and protection method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112900903A true CN112900903A (en) | 2021-06-04 |
CN112900903B CN112900903B (en) | 2023-06-09 |
Family
ID=76120556
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110109602.0A Active CN112900903B (en) | 2021-01-26 | 2021-01-26 | Protection device for high-stability high-rise building construction and protection method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112900903B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203976331U (en) * | 2014-06-16 | 2014-12-03 | 朱震原 | Can cross travel building external application hanging basket |
JP2015045148A (en) * | 2013-08-27 | 2015-03-12 | 株式会社カシワバラ・コーポレーション | Construction work device and construction work method of vertical plane |
CN205976513U (en) * | 2016-08-18 | 2017-02-22 | 浙江嘉兴福达建设股份有限公司 | Building construction protection platform |
CN107700807A (en) * | 2017-10-11 | 2018-02-16 | 温州瓯建建筑工程有限公司 | The intelligent spraying equipment and its spraying method of a kind of external wall wall |
CN210127623U (en) * | 2019-03-21 | 2020-03-06 | 中建二局第二建筑工程有限公司 | Pulling-up hanging basket for construction of constructional engineering |
CN211946094U (en) * | 2020-04-07 | 2020-11-17 | 江苏省苏中建设集团股份有限公司 | But construction layering security elevating gear |
-
2021
- 2021-01-26 CN CN202110109602.0A patent/CN112900903B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2015045148A (en) * | 2013-08-27 | 2015-03-12 | 株式会社カシワバラ・コーポレーション | Construction work device and construction work method of vertical plane |
CN203976331U (en) * | 2014-06-16 | 2014-12-03 | 朱震原 | Can cross travel building external application hanging basket |
CN205976513U (en) * | 2016-08-18 | 2017-02-22 | 浙江嘉兴福达建设股份有限公司 | Building construction protection platform |
CN107700807A (en) * | 2017-10-11 | 2018-02-16 | 温州瓯建建筑工程有限公司 | The intelligent spraying equipment and its spraying method of a kind of external wall wall |
CN210127623U (en) * | 2019-03-21 | 2020-03-06 | 中建二局第二建筑工程有限公司 | Pulling-up hanging basket for construction of constructional engineering |
CN211946094U (en) * | 2020-04-07 | 2020-11-17 | 江苏省苏中建设集团股份有限公司 | But construction layering security elevating gear |
Also Published As
Publication number | Publication date |
---|---|
CN112900903B (en) | 2023-06-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2058928C1 (en) | Working platform for lift of shaft in building under construction | |
CN102381611B (en) | Vertically-lifting hanging basket | |
CN209226360U (en) | A kind of multiscrew multi-storey building elevator | |
CN107700719A (en) | A kind of hanging method of high-rise building glass curtain wall | |
CN102502378A (en) | Climbing elevator for building construction | |
CN202369227U (en) | Vertical-lift hanging basket | |
CN112900903A (en) | High-stability protection device for high-rise building construction and protection method thereof | |
CN108590170A (en) | A kind of rectangle chimney twin-well frame displacement type template integral lifting apparatus and its construction method | |
CN108675116B (en) | Construction method of PC (polycarbonate) component | |
CN106193621A (en) | Fabricated construction superimposed sheet string hangs construction method | |
KR101923925B1 (en) | Rope type elevator apparatus of high speed and heavy road and mast structure equipped with crane for constructing high-rise building | |
CN216583666U (en) | Construction elevator of downward installation | |
CN215101404U (en) | Construction elevator mounting structure in well | |
CN215803088U (en) | Attached scaffold lifting height control device | |
CN105155427A (en) | Construction method for laying suspension bridge catwalk | |
CN107989448A (en) | A kind of grain depot with side ladder | |
WO2009062243A1 (en) | Perimeter screening system | |
CN209179426U (en) | A kind of elevator shaft steel construction section construction device | |
CN210655915U (en) | Connecting device for climbing frame and tower crane | |
CN113175203A (en) | Method for setting lifting power equipment in attached lifting scaffold | |
CN207032835U (en) | A kind of construction lifting platform | |
CN207632282U (en) | Shallow pit type helistop elevator | |
CN216276806U (en) | Novel integral lifting type operation platform for elevator shaft construction | |
CN111305539A (en) | Integrated system for hard protection and crane in core barrel of super high-rise building | |
CN206000194U (en) | A kind of elevator hoistways soft or hard safeguard structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20230511 Address after: 530000 Workshop 3, No. 28 Gaoke Road, Nanning City, Guangxi Zhuang Autonomous Region Applicant after: Guangxi Zesheng Construction Engineering Co.,Ltd. Address before: No. 404, middle Industrial Avenue, Haizhu District, Guangzhou, Guangdong 510000 Applicant before: Zhang Weibing |
|
GR01 | Patent grant | ||
GR01 | Patent grant |