CN112883592B - 一种电网全电磁暂态建模方法 - Google Patents
一种电网全电磁暂态建模方法 Download PDFInfo
- Publication number
- CN112883592B CN112883592B CN202110325215.0A CN202110325215A CN112883592B CN 112883592 B CN112883592 B CN 112883592B CN 202110325215 A CN202110325215 A CN 202110325215A CN 112883592 B CN112883592 B CN 112883592B
- Authority
- CN
- China
- Prior art keywords
- model
- power grid
- electromechanical
- electromagnetic
- parameters
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000001052 transient effect Effects 0.000 title claims abstract description 40
- 238000000034 method Methods 0.000 title claims abstract description 21
- 238000004088 simulation Methods 0.000 claims abstract description 23
- 238000006243 chemical reaction Methods 0.000 claims description 11
- 238000013507 mapping Methods 0.000 claims description 5
- 238000004804 winding Methods 0.000 claims description 4
- 230000005540 biological transmission Effects 0.000 claims description 2
- 230000006698 induction Effects 0.000 claims description 2
- 230000006641 stabilisation Effects 0.000 claims description 2
- 238000011105 stabilization Methods 0.000 claims description 2
- 230000001360 synchronised effect Effects 0.000 claims description 2
- 238000004364 calculation method Methods 0.000 abstract description 9
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 abstract description 2
- 238000004458 analytical method Methods 0.000 description 4
- 238000011160 research Methods 0.000 description 4
- 238000012360 testing method Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 1
- 230000005284 excitation Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
一种电网全电磁暂态建模方法,涉及一种电网全电磁暂态建模技术,为了解决现有的电网机电暂态模型对交直流互联电网进行无故障电磁暂态计算时,存在计算精度差的问题。本发明采用电力系统全数字实时仿真系统,对PSASP平台中的机电模型参数按照机电数据校核修正方法进行校核;利用校核后的机电模型参数建立电网交流机电模型;将建立的电网交流机电模型转换为骨干网架电磁模型;利用校核后的机电模型参数建立电网直流机电模型;对电网直流机电模型进行初始化;将初始化的电网直流机电模型加入到骨干网架电磁模型中,生成电网全电磁暂态模型。有益效果为计算精度较高。
Description
技术领域
本发明涉及一种电网全电磁暂态建模技术。
背景技术
目前针对交直流相互影响仿真分析大多采用机电暂态仿真,虽然交流电网基本已采用实测数据建模,但是特高压直流的建模仍较为简化;有部分研究采用了机电-电磁暂态混合仿真,但大多只是将直流以电磁暂态建模,电网其余部分均以机电暂态建模;由于机电暂态模型采用基波相量描述,电磁侧非线性元件引起的波形畸变等谐波特性无法全部通过混合仿真接口传递至机电侧,因此在一定程度上影响了计算的精度。
发明内容
本发明的目的是为了解决现有的电网机电暂态模型对交直流互联电网进行无故障电磁暂态计算时,存在计算精度差的问题,提出了一种电网全电磁暂态建模方法。
本发明所述的一种电网全电磁暂态建模方法包括以下步骤:
步骤一、采用电力系统全数字实时仿真系统,对PSASP平台中的机电模型参数按照机电数据校核修正方法进行校核;
步骤二、利用步骤一校核后的机电模型参数建立电网交流机电模型;
步骤三、将步骤二建立的电网交流机电模型转换为骨干网架电磁模型;
步骤四、建立电网直流机电模型;
步骤五、对步骤四建立的电网直流机电模型进行初始化;
步骤六、将步骤五初始化的电网直流机电模型加入到步骤三转换后的骨干网架电磁模型中,生成电网全电磁暂态模型。
本发明的有益效果是:利用本发明所述的电网全电磁暂态建模方法建立的电网全电磁暂态模型对交直流互联电网进行无故障电磁暂态计算时,在发电机有功功率、无功功率结果方面,绝对误差小于10MW;线电压结果对比,母线电压误差小于1%;关键断面有功偏差小于50MW,计算精度较高。
附图说明
图1为具体实施方式一所述的一种电网全电磁暂态建模方法流程图。
具体实施方式
具体实施方式一:结合图1说明本实施方式,本实施方式所述的一种电网全电磁暂态建模方法包括以下步骤:
步骤一、采用电力系统全数字实时仿真系统(ADPSS),对PSASP平台中的机电模型参数按照机电数据校核修正方法进行校核;
步骤二、利用步骤一校核后的机电模型参数建立电网交流机电模型;
步骤三、将步骤二建立的电网交流机电模型转换为骨干网架电磁模型;
步骤四、建立电网直流机电模型;
步骤五、对步骤四建立的电网直流机电模型进行初始化;
步骤六、将步骤五初始化的电网直流机电模型加入到步骤三转换后的骨干网架电磁模型中,生成电网全电磁暂态模型。
在本实施方式中,步骤一中的电力系统全数字实时仿真系统包括机电暂态计算程序(PSASP7.51)和电磁暂态计算程序(ETSDAC2.6);电力系统全数字实时仿真系统涵盖了适用于大电网运行仿真分析的关键设备电磁暂态模型,包括发电机及其调节器、交流线路、变压器、直流输电系统、电力电子设备、负荷等各种元件。电网直流机电模型为现有模型
机电暂态仿真的主要功能包括:
(1)复杂故障的模拟;
(2)仿真中可考虑各种用户自定义模型;
(3)仿真中可接入Matlab数字模型;
(4)自动判稳和终止仿真;
(5)仿真结果的Prony分析;
(6)大规模电网实时计算;
(7)具备物理接口功能;
电磁暂态仿真,主要用于分析和计算故障或操作后可能出现的暂态过电压和过电流,以便根据所得到的暂态过电压和过电流对相关电力设备进行合理设计,确定已有设备能否安全运行,并研究相应的限制和保护措施。
电磁暂态仿真的主要功能包括:
(1)包含丰富的电力系统元件模型,如发电机、变压器、线路、PT/CT、非线性元件、电力电子元件、直流元件或负荷元件。
(2)可模拟电力系统的各种暂态过程,包括操作暂态、谐振暂态和故障暂态。
(3)具有分网并行计算功能,实现了一定规模电磁暂态网络的实时或超实时仿真。
(4)可通过A/D和D/A转换接口接入物理模型或实际控制装置,进行电力系统的仿真研究或装置试验;在仿真过程中可接入继电保护设备、安全自动装置、PSS装置、发电机励磁装置、SVC控制装置或HVDC控制装置,进行装置的检验和试验研究。
在本实施方式中,步骤一中对机电模型参数进行校核的种类包括以下四类:
第一类为:发动机的同步机模型号、发电机阻抗和机组额定参数;
第二类为:变压器的绕组接线方式、激磁电阻电抗和绕组电抗参数;
第三类为:线路的正序和零序参数;
第四类为:负荷的模型类型和感应电动机的比例参数。
在本实施方式中,步骤三中将电网交流机电模型转换为骨干网架电磁模型的具体方法为:
步骤三一、对机电侧网络进行划分,定义电磁子网;
步骤三二、对机电侧的暂稳作业进行操作,提取电磁子网关键参数;
步骤三三、根据步骤提取的电磁子网关键参数,生成数据转换映射表;
步骤三四、根据步骤三三生成的数据转换映射表完成转换。
在本实施方式中,步骤三三中生成的数据转换映射表如下:
在本实施方式中,通过中国电科院开发IFETSDAC机电转电磁转换程序完成将电网交流机电模型转换为骨干网架电磁模型。
在本实施方式中,通过对电力系统电网交流机电模型与骨干网架电磁模型的分析对比,顺利完成了电网交流机电模型到骨干网架电磁模型的转化,并成功将电网直流机电模型加入到骨干网架电磁模型中,最终实现网交直流互联电网的全电磁暂态建模的建立。
Claims (3)
1.一种电网全电磁暂态建模方法,其特征在于,该暂态建模分析方法包括以下步骤:
步骤一、采用电力系统全数字实时仿真系统,对PSASP平台中的机电模型参数按照机电数据校核修正方法进行校核;
电力系统全数字实时仿真系统包括发电机及其调节器、交流线路、变压器、直流输电系统、电力电子设备和负荷;
步骤二、利用步骤一校核后的机电模型参数建立电网交流机电模型;
步骤三、将步骤二建立的电网交流机电模型转换为骨干网架电磁模型;
将电网交流机电模型转换为骨干网架电磁模型的具体方法为:
步骤三一、对机电侧网络进行划分,定义电磁子网;
步骤三二、对机电侧的暂稳作业进行操作,提取电磁子网关键参数;
步骤三三、根据步骤提取的电磁子网关键参数,生成数据转换映射表;
步骤三四、根据步骤三三生成的数据转换映射表完成转换;
步骤三三中生成的数据转换映射表如下:
步骤四、建立电网直流机电模型;
步骤五、对步骤四建立的电网直流机电模型进行初始化;
步骤六、将步骤五初始化的电网直流机电模型加入到步骤三转换后的骨干网架电磁模型中,生成电网全电磁暂态模型。
2.根据权利要求1所述的一种电网全电磁暂态建模方法,其特征在于,步骤一中的电力系统全数字实时仿真系统包括机电暂态计算程序和电磁暂态计算程序。
3.根据权利要求1所述的一种电网全电磁暂态建模方法,其特征在于,步骤一中对机电模型参数进行校核的种类包括以下四类:
第一类为:发动机的同步机模型号、发电机阻抗和机组额定参数;
第二类为:变压器的绕组接线方式、激磁电阻电抗和绕组电抗参数;
第三类为:线路的正序和零序参数;
第四类为:负荷的模型类型和感应电动机的比例参数。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110325215.0A CN112883592B (zh) | 2021-03-26 | 2021-03-26 | 一种电网全电磁暂态建模方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110325215.0A CN112883592B (zh) | 2021-03-26 | 2021-03-26 | 一种电网全电磁暂态建模方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112883592A CN112883592A (zh) | 2021-06-01 |
CN112883592B true CN112883592B (zh) | 2023-11-14 |
Family
ID=76042430
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110325215.0A Active CN112883592B (zh) | 2021-03-26 | 2021-03-26 | 一种电网全电磁暂态建模方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112883592B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113447760B (zh) * | 2021-06-24 | 2022-11-29 | 积成电子股份有限公司 | 一种全电磁暂态故障扫描中复合故障元件建模方法与系统 |
CN113884748B (zh) * | 2021-09-24 | 2023-07-25 | 广东电网有限责任公司 | 基于可控移相器的交流输电线路过电压测量方法及装置 |
CN115021256B (zh) * | 2022-08-08 | 2022-10-21 | 四川大学 | 一种大规模交直流输电系统电磁暂态模型自动生成方法 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101533428A (zh) * | 2009-04-30 | 2009-09-16 | 华北电力大学 | 一种电磁暂态离线非实时并行仿真系统及仿真方法 |
CN102999668A (zh) * | 2012-11-27 | 2013-03-27 | 中国电力科学研究院 | 一种机电暂态数据至电磁暂态数据的自动转换方法 |
CN105022903A (zh) * | 2015-08-21 | 2015-11-04 | 南方电网科学研究院有限责任公司 | 电力系统的混合仿真方法和系统 |
CN107664954A (zh) * | 2017-10-16 | 2018-02-06 | 国网四川省电力公司电力科学研究院 | 一种电力系统电磁暂态可视化仿真模型自动生成方法 |
CN108427821A (zh) * | 2017-11-24 | 2018-08-21 | 中国电力科学研究院有限公司 | 一种交直流混联电网运行特性的数模混合仿真方法及系统 |
CN109766586A (zh) * | 2018-12-14 | 2019-05-17 | 中国电力科学研究院有限公司 | 一种自动生成大规模电网电磁暂态仿真模型的方法及系统 |
CN109918762A (zh) * | 2019-03-01 | 2019-06-21 | 国家电网有限公司 | 一种交直流电网混合仿真对比模型构建方法 |
CN112100860A (zh) * | 2020-09-18 | 2020-12-18 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | 多端直流输电系统的mmc模型建立方法和电磁暂态仿真方法 |
CN112434409A (zh) * | 2020-11-13 | 2021-03-02 | 国家电网有限公司 | 基于恒定阻抗接口的同步发电机全电磁暂态仿真方法 |
-
2021
- 2021-03-26 CN CN202110325215.0A patent/CN112883592B/zh active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101533428A (zh) * | 2009-04-30 | 2009-09-16 | 华北电力大学 | 一种电磁暂态离线非实时并行仿真系统及仿真方法 |
CN102999668A (zh) * | 2012-11-27 | 2013-03-27 | 中国电力科学研究院 | 一种机电暂态数据至电磁暂态数据的自动转换方法 |
CN105022903A (zh) * | 2015-08-21 | 2015-11-04 | 南方电网科学研究院有限责任公司 | 电力系统的混合仿真方法和系统 |
CN107664954A (zh) * | 2017-10-16 | 2018-02-06 | 国网四川省电力公司电力科学研究院 | 一种电力系统电磁暂态可视化仿真模型自动生成方法 |
CN108427821A (zh) * | 2017-11-24 | 2018-08-21 | 中国电力科学研究院有限公司 | 一种交直流混联电网运行特性的数模混合仿真方法及系统 |
CN109766586A (zh) * | 2018-12-14 | 2019-05-17 | 中国电力科学研究院有限公司 | 一种自动生成大规模电网电磁暂态仿真模型的方法及系统 |
CN109918762A (zh) * | 2019-03-01 | 2019-06-21 | 国家电网有限公司 | 一种交直流电网混合仿真对比模型构建方法 |
CN112100860A (zh) * | 2020-09-18 | 2020-12-18 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | 多端直流输电系统的mmc模型建立方法和电磁暂态仿真方法 |
CN112434409A (zh) * | 2020-11-13 | 2021-03-02 | 国家电网有限公司 | 基于恒定阻抗接口的同步发电机全电磁暂态仿真方法 |
Non-Patent Citations (1)
Title |
---|
多馈入直流大规模电网机电―电磁混合仿真的程序实现与结果分析;童伟林;王建全;肖谭南;李静波;朱翎;;能源工程(第06期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN112883592A (zh) | 2021-06-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112883592B (zh) | 一种电网全电磁暂态建模方法 | |
Lin et al. | A wide-band multi-port system equivalent for real-time digital power system simulators | |
Ma et al. | Reducing identified parameters of measurement-based composite load model | |
Liang et al. | Improved coherency-based wide-band equivalents for real-time digital simulators | |
Chandrasekar et al. | Dynamic phasor modeling of type 3 DFIG wind generators (including SSCI phenomenon) for short-circuit calculations | |
Gagnon et al. | Hydro-Québec strategy to evaluate electrical transients following wind power plant integration in the Gaspésie transmission system | |
CN102969692A (zh) | 一种基于电网实时数据的分支系数计算方法 | |
CN105116360A (zh) | 基于adpss的小电流接地选线装置的测试系统及该系统的测试方法 | |
CN115358079A (zh) | 风电场场站实时仿真模型的构建方法和阻抗特性评估方法 | |
Li et al. | An integrated online dynamic security assessment system for improved situational awareness and economic operation | |
Suvorov et al. | Comprehensive validation of transient stability calculations in electric power systems and hardware-software tool for its implementation | |
CN105608252B (zh) | 一种电网故障模拟测试的仿真方法及装置 | |
Li et al. | Research on HIL-based HVRT and LVRT automated test system for photovoltaic inverters | |
CN105095590A (zh) | 一种基于三序等值阻抗的机电暂态仿真系统的建模方法 | |
Tan et al. | Automatic generation and parameter verification of large-scale EMT simulation models based on TSP projects | |
CN109033660A (zh) | 不对称故障分析方法及装置 | |
Su et al. | A new approach for integration of two distinct types of numerical simulator | |
Le-Huy et al. | Real-time simulation of large-scale AC system with offshore DC grid | |
Helać et al. | Power Transformer Neutral Point Grounding Methods: Analysis of Fault Characteristics | |
CN113378360A (zh) | 新能源机组接入双高电力系统的适应性测试方法及系统 | |
Liu | Fault detection model based on FFT-HHT analysis method | |
Liu et al. | Automatic generation and initialization of EMT simulation models for large-scale AC-DC hybrid power system | |
Shetye et al. | Assessment of discrepancies in load models across transient stability software packages | |
CN113569515B (zh) | 一种风电场电磁暂态分析方法及系统 | |
Su et al. | Hybrid simulation of large electrical networks with assymmetrical fault modelling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |